FLOOR PLAN PHASE 2.pdf
PDF 94 KB Posted
- Attached to
- Camp Verde HS Library Renovations Project
- Solicitation number
- IFB #2026-01
- Issued by
- Yavapai County, Arizona
About this file
This is a preliminary floor plan document for the Camp Verde Unified School District's library renovations project at its high school facility located in Camp Verde, Arizona. The Phase 2 renovation design includes the creation of multiple instructional and collaborative spaces within the existing library structure. The floor plan designates 14 distinct classroom and office areas ranging from 76 to 587 square feet, including three standard classrooms, a large classroom, a flexible classroom, and an IT room designed for daily classes accommodating 30 students on laptops with provisions for up to 45 occupants during higher-attendance meetings. Additional spaces include administrative offices (Director's Office 1 and 2, Office 1, and Open Office 2), a work room, specialized areas such as book stacks (932 SF), a study lounge (497 SF), individual research areas, a lobby lounge (126 SF), group study rooms with seating capacities ranging from 4 to 30 seats, multimedia rooms (one required, two optional), and a multipurpose hall (1,335 SF). The design specifies the removal of existing doors, windows, carpeting, and ceiling tiles, with new wall construction to specified heights using standard 12-foot walls with sound batt insulation and feature walls.
The preliminary plan document is not approved for construction and contains architect-prepared specifications by Robert Polcar Architects, Inc., dated November 19, 2025, with a drawing date of March 13, 2026. The design indicates maintenance of existing Fire Alarm Control Panel access points across multiple building areas and includes keynoted specifications for door removals, new wall installations, window modifications, and concrete block infill work to match existing scored block patterns. The document references three additional sheets (Floor Plan Phase 2, Exit Plan Phase 2, and Notes & Dimensions Plan) which contain detailed construction specifications and dimensional information necessary for project bidding and execution.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| IFB #2026-01 Camp Verde HS Library Renovations Project.pdf | ||
| NOTES_DIMENSIONS PLAN.pdf | ||
| EXIT PLAN PHASE 2.pdf | ||
| ARCHITECUTURAL DEMO.pdf | ||
| Attachment 3, Bid Cost Form (BT-46IV).xlsx | XLSX spreadsheet | |
| Attachment 2, Questionnaire (Q-27CT).xlsx | XLSX spreadsheet |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CHANGING
AREA
EQUIP
PARKING
EXISTING
LIBRARY
OFFICE 3
ADA STALL
EXISTING
CHECKOUT
354 SF
Classrm 1
320 SF
Classrm 2
89 SF
Off 4
326 SF
Classrm3
587 SF
Large Classrm
306 SF
Flex Classrm
284 SF
IT 2
1. Daily class for 30 students on laptops
2. Store Board Member dias during day-to-day class
3. Remove all class tables & add chairs for higher attendance mtgs (up to ~45 occupants)
SPED Entry
1335 SF
Book Stacks
932 SF
Study Lounge
Individual Research
497 SF
Lobby Lounge
126 SF
Dir Ofc 1
114 SF
Dir Ofc 2
76 SF
Ofc 1
124 SF
Open Ofc 2
85 SF
Workrm
B o a rd
M e m b e rs
141 SF
HALL B
695 SF
Multipurpose
120 SF
Furn Storage maintain FACP access (multi bldg panel)
Lounge 1
Lounge 2
Group Study 1
M u lt im e d ia re q 'd
Multimedia 2 (opt)
M u lt im e d ia o p t) p ro j s c re e n re q 'd
24 seats 30 seats
16 seats
6 seats
72lf 72lf
96lf
96lf
24lf
24lf lf lf lf lf
Group Study 3
4 seats
0' 5' 10' 20'
N
PROJECT
NORTH
96lf lf
72lf
Group Study 2
Group Study 4 maintain FACP access (Building panel)
TYP.
258 SF
HALL C
132 SF
HALL A
A
WALL TYPE A: (TYP 12' HIGH WALL. 3-5/8" 20ga STL STUDS @ 16"oc WITH ONE LAYER 5/8" GYP BOARD EA SIDE.
PROVIDE HORIZONTAL 1-1/2" CRC AT MID-HEIGHT +/-
DOUBLE STUDS AT JAMBS AND HEADER. INSTALL FULL
HEIGHT SOUND BATT INSULATION)
WALL TYPE B: FEATURE WALL (WALL
DETAIL/DESCRIPTION...) TO UNDERSIDE OF EXISTING
SOFFIT @ 10'-8" SEE DETAILS
WALL TYPE B: FEATURE WALL (WALL
DETAIL/DESCRIPTION...) TO UNDERSIDE OF EXISTING
SOFFIT @ 10'-8" SEE DETAILS
EXISTING WALL REMAINS
LEGEND
B
C
D
Project number
Date
Drawn by
F il e
N a m e
Checked by
Revision Revision Date
ROBERT POLCAR ARCHITECTS, INC
(602) 363-4096 (480) 675-9760
SEDONA, ARIZONA
ARCH D Sheet Size
P R
E L
IM
IN
A R
Y
N O
T F
R
C
N S
T R
U C
T
IO
N
C
U s e rs \b o b
\D ro p b o x \A
Z S
C H
O O
L S
\C a m p V e rd e \L ib ra ry \r e v it \L ib -C a m p V e rd e
P c .r v t
/1
/2
:0
:5
A
M
A1.1
Project Number
C A
M P
V E
R D
E H
IG
H
S C
H O
O L
L
IB
R A
R Y
R E
N O
V A
T
IO
N S
P
H A
S E
C
A M
P V
E R
D E
A
Z
11/19/25
CW
BP
3/16" = 1'-0"
FLOOR PLAN PHASE 2
KEYNOTES
D1 REMOVE EXISTING DOOR AND FRAME.
D2
D2 REMOVE EXISTING WINDOW AND CMU
BELOW FOR INSTALLATION OF NEW
DOOR.
D3 REMOVE EXISTING CARPETING AND PREP
FOR NEW.
D4 REMOVE EXISTING LAY-IN CEILING TILE
AND GRID.
D5 CUT AND REMOVE EXISTING CONCRETE
BLOCK FOR INSTALLATION OF NEW
DOOR.
N1 NEW WALL. TO UNDERSIDE OF EXISTING
SOFFIT (10'- 8"+/-).
N2 NEW WALL. (12'- 0")
N3 NEW WALL. TO UNDERSIDE OF EXISTING
CEILING (8'- 8"+/-).
N4 INFILL WITH BLOCK TO MATCH EXISTING
16" SCORED.
N5 NEW 6" STL STUD W/5'8" GWB EACH SIDE.
WALL INFILL DOOR OPENING. LEAVE
FRAME IF POSSIBLE.
N6 NEW DOOR AND FRAME.
| Sheets |
| A1.1 - FLOOR PLAN PHASE 2 |
| A1.2 - EXIT PLAN PHASE 2 |
| A1.3 - NOTES & DIMENSIONS PLAN |
File details come from the government source that posted it. Updated .