FireSuppressionBldgADAL-Drawings 6-15-20.pdf
PDF 6 MB Posted
- Attached to
- AASF Fire Suppression Building Federal contract opportunity
- Solicitation number
- W91ZRS-21-B-0001
About this file
This document package includes construction drawings and specifications for a federal construction contract opportunity. The project involves alterations and additions to the Fire Suppression Building at the Army Aviation Support Facility in Windsor Locks, Connecticut. Work will be performed in accordance with the contract documents, drawings, and technical specifications. This is a total small business set-aside with a NAICS code of 236220 and size standard of $39.5 million average annual revenue. The project magnitude is estimated between $1 million and $5 million. A single award contract will be awarded to the responsible bidder offering the lowest price. A pre-bid conference and site visit will be held on May 17, 2021. Interested parties must register in advance with contact information. The bid opening date is listed in the solicitation. Offerors must be registered in the System for Award Management.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| W91ZRS-21-B-0001-AASF-BidAbstract_20210622.pdf | ||
| SK-M2.pdf | ||
| W91ZRS-21-B-0001-Solicitation Amend 05.pdf | ||
| SK-M1.pdf | ||
| W91ZRS-21-B-0001-Solicitation Amend 04.pdf | ||
| W91ZRS-21-B-0001-RFI_Responses-6-22.pdf | ||
| W91ZRS-21-B-0001-Addendum-1_ PumpHouseDrawings.pdf | ||
| W91ZRS-21-B-0001-Solicitation Amend 03.pdf | ||
| Request for Information.pdf | ||
| W91ZRS-21-B-0001-Solicitation Amend 02.pdf | ||
| Pre-Bid Conference Attendance Roster.pdf | ||
| W91ZRS-21-B-0001 Amendment 1.pdf | ||
| FireSuppressionBldgADAL-Specifications 6-15-20.pdf | ||
| W50S8A-20-B-5200_ AASF Fire Suppression Bldg-Solicitation 20210505.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
If> G G
-11 G
G llJ (i
PROJECT:
FIRE SUPPRESSION BUILDING
201 ADDITION - AL TERA TIONS
AASF, WINDSOR LOCKS, CONNECTICUT
PROJECT NUMBER: 0011492466
MILITARY DEPARTMENT
MAJOR GENERAL FRANCIS J. EVON, Jr.
ADJUTANT GENERAL
U.S. PROPERTY AND FISCAL
OFFICE for CONNECTICUT
SHEET INDEX
G:-<ZlOI TITLE E>1=155T
G-"02 COOE &UMMARY
CDIOI EXIE>TING CONDITION$/REMOVA1=$ $!TE PL.AN
C&l01 $!TE PI..AN
CUIIZII UTII..ITY PI..AN
CG:101 G:RADING: F'I..AN
C-&01 &ITE DETAIi..& $.a,01 $TRUCTURAI.. NOTE$
&6101 FOUNDATION PI..AN
&6&0 I F=OUNDA i I ON D5i A I 1..&
&FIIZII ROOF FRAMING; PL.AN
&F&OI $TRlCTURA1= DETAIL.$ ADIOI REMOVAi..$ FI..OOR PI..AN 4 EXTERIOR EI..EVATION& AEIIZII i=I..OOR PI..AN AND ROOI= PI..AN A520I 5Xf5RIOR 51..5V.AilON& AE220 6UII..DINC= &ECTION AND DETAIi..&
AE�OI WA1=1= $ECTION$
AE&IZII WAI-I.. DETAIi..&
AE&02 ROOF DET A I 1..&
M -"01 M5Cl=I NOT5&, 1..EG END&, &YM601..&, AND
&CI-IEDUI..E&
M -IOI MEC!-1.ANICAI.. F'ARi F'I..ANo AND DEiAll..o E-001 51..5CiRICAI.. $YM601..$, A66R5VI.AilON$
AND GENER.Al.. NOTE&
EPIOI POWER PI..AN
EP&OI ONE-1..INE DIAGRAM&
EP60I PANEl..60ARD &Cl=IEDUI..E& El..101 1..IGI-ITING PI..AN& F-001 FIRE PROTECTION GENERAi.. NOTE& i=-IIZII !=IRE PROTECTION REMOVAi..& PI..AN i=-102 P.IRE PUMP EGlUIPMENi PI..AN F�O� I-I.AZ.ARO CI..A&&li=ICATION PI..AN
!=-104 FIRE $PRINK1=5R PL.AN
i=-10& FIRE Al-ARM &Y&iEM PI..AN
!=-JOI !=IRE PROTECTION &ECTION&
i=-&01 !=IRE PROTECTION DETAIi.. ArchltseVEn9ln""'
F-&02 Fa I RE Al-ARM D5i A I 1..& [ 11:]i=-601 P.IRE AI..ARM Rl&ER TETRA TECH
Mead &1 lunt Fa-61Zi2 FIRE Al-ARM MATRIX
Joint Venture with l,.) Mason&Hanger
,__ ________________________________ ,I ____________________________________________ __,..._ ____________ ...... ■ ■ � OAK POI NT occhh,nu,e
■ ii1 eng1ne-er1ng
PROJECT SITE KEY PLAN
PROJECT AREA
B201 PUMP HOUSE ----¥
WATER TANK�
B200
ACCESS ROUTE TO
PROJECT AREA
MAIN GATE
LOCATION PLAN
WINDSOR LOCKS, CONNECTICUT
PROJECT LOCATION
WINDSOR LOCK&, CT
n ■ ■ A S S O C I A T E S ploan;ng
231 Main Street, Biddeford, Maine 04005 (T) 207.283.0193 (F) 207.283.4283 www.oekpoint.com
REVISION
Mark Date Deecrlpt.lon
I 11/21/19 30% SUBMISSION
2 03/06/20 60% SUBMISSION
3 05/19/20 90% SUBMISSION
4 06/15/20 100% FINAL DOCUMENTS
Drawn bij, DELU
Seals, AS NOTED
Rle ae, (D 5TATE OF CONNECTICUT
MILITARY DEPARTMENT
Facllltleo Mana9emenl orrlce
36f'> l!roold &tr..t. W.rtFord, CT £1611e No�A'l3.2125 F.,x No�.&2-4.4'»1
'rr�E &UF'F'�E&&ION 6UIL.DINGi 2�1
AODITION - A� TERATION&
LUIN0eOR I.OCJ<:e, CT
Draw1ne Title
TITI..E &1-15ET
o_ ----------------------------------------- -------------------------------------------------------------
C:\DFILE\21912.04-G001.dwg, G-001, 6114/2020 10:25:49 AM
FCVA
F
SP
FS
D
DRAIN
ZCVA
F-101
6 6
7a 7a
13 13 13 13
13 13 13 13
7b 7b
9 9
7 7
7a
7b
1 1
2 3 2 3
24 25
F-301
F-301
8F-301
F-301
6 6
2 2
9 9
20 20
6 621
FRONT VIEW
9"
15"
CHECK VALVE
EXTERIOR WALLAUTO BALL DRIP
SIDE SECTION VIEW
ALL THREAD
ROD
PIPE RING
3"&SMALLER PIPE
RING W/ ALL THREAD
ROD
4"&LARGER CLEVIS
HANGER W/ ALL THREAD
ROD
ALL THREAD
ROD
PIPE RING
1" SPRINKLER PIPE
END OF BRANCH LINE
HANGER & ROD
CONCRETE ANCHOR
ALL THREAD
ROD
PIPE RING
DRILLED CONC.
ANCHOR
RETAINER STRAP
STEEL CLAMP
C-CLAMP HANGER
PIPE HANGER DETAILS
NOT TO SCALE
1. HANGERS SHALL BE PER NFPA #13 -NFPA #14 -NFPA#24 (LATEST EDITIONS).
2. HANGERS DISTANCES/THREADED ROD SIZES/ FASTENER SIZES (SEE CHART BELOW).
3. ALL MATERIALS TO BE ZINC/GALVANIZED
MAXIMUM DISTANCE BETWEEN HANGERS PER NFPA #13
NORMAL PIPE SIZE (in)
STEEL PIPE SCH.10/SCH.40
THREADED ROD DIAMETER
CONC. ANCHOR DIAMETER
1" 12-0 3/8" 3/8" 3/8"
3/8" 12-0 1-¼" 1-½"
15-0 3/8" 3/8" 3/8"
3/8" 15-0
2" 2½" 15-0 3/8" 3/8" 3/8"
3/8" 15-0
3" 4" 15-0
3/8" 3/8" 1/2"
1/2"
15-0 6"
18" MIN ABOVE
FINISHED GRADE
(36" MAX.)
COORDINATE
LOCATION
W/ARCHITECTURAL
DRAWINGS
NOTE:
(6) 2 ½" HV FOR TEST TO BE
GIVEN TO THE OWNER AFTER
ACCEPTANCE OF FIRE PUMP
EXTERIOR WALL
SIDE SECTION VIEW
FRONT VIEW
44"
FIRE PUMP TEST
9"
AUTO BALL DRIP
FINISHED FLOOR
ALERT
MIN. 80"MAX. 96"
NOTES:
1. THE ENTIRE LENS OF THE STROBE MUST BE LOCATED NOT LESS
THAN 80" AND NOT GREATER THAN 96" AFF.
2. CONTRACTOR SHALL COORDINATE THE LOCATION OF THE
JUNCTION BOX USED FOR MOUNTING WITH THE ACTUAL STROBE
DEVICE TO BE INSTALLED TO ENSURE THAT THE LENS WILL BE
LOCATED WITHIN THIS RANGE.
SPEAKER/STROBE OR
STROBE ONLY DEVICE
ALERT
SYNCHRONIZE STROBES WHERE MORE
THAN ONE DEVICE IS IN FIELD OF VIEW
NOTE:
FOR CLARIFICATION OR ADDITIONAL
INFORMATION REFER TO NFPA 72.
CEILI NG MOUNTED SMOKE
DETECTOR
WALL
TOP OF WALL MOUNTED SMOKE
DETECTOR ACCEPTABLE HERE
5' (MIN)
' 0
1/
MA
X.
HVAC SUPPLY
DIFFUSER
CEILING
File details come from the government source that posted it. Updated .