This is an Invitation to Bid (ITB #26-037-ITB) issued by the City of West Sacramento for Fire Station 45 Kitchen and Appliance Improvements. The project scope includes removal and replacement of one standard-size dishwasher, furnishing and installation of one additional standard-size dishwasher, furnishing and installation of one residential washer/dryer unit, removal and replacement of approximately 107 square feet of kitchen countertops with stainless steel, and removal and replacement of existing kitchen lighting fixtures with new LED fixtures. The pre-proposal meeting is mandatory and scheduled for July 7, 2026 at 1:00 pm at 2040 Lake Washington Blvd, West Sacramento, CA 95691, with a Microsoft Teams option available. The deadline for submitting questions is July 14, 2026 at 5:00 pm, with responses due July 21, 2026 at 5:00 pm. Sealed bid responses must be submitted electronically through the City's OpenGov procurement portal no later than July 28, 2026 at 2:00 pm. The contractor selection date is September 16, 2026. The work must be completed within 30 working days from the Notice to Proceed. All proposals must remain valid for at least 90 business days after the proposal due date.
The cost proposal must be submitted using the electronic pricing table provided in the City's e-Procurement Portal, with line items including mobilization, permit documentation, removal and disposal, furnishing and installation of appliances, electrical and plumbing modifications, lighting improvements, rigging and placement, and demobilization. Contractors must be registered with the California Department of Industrial Relations and comply with prevailing wage requirements. The City reserves the right to reject any and all bids and to waive variances in proposals. Award will be made to the lowest responsive, responsible bidder whose bid complies with all requirements. Contractors must possess all necessary business and professional licenses and certifications, provide a one-year labor warranty and five-year parts warranty, maintain comprehensive insurance coverage as outlined in the Insurance Checklist, and utilize the Virtual Project Manager (VPM) cloud-based project management system for all documentation and administration. A bid bond is required with proposal submission.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
INVITATION TO BID
26-037-ITB
FIRE STATION 45 KITCHEN AND APPLIANCE IMPROVEMENTS
City of West Sacramento
1110 W Capitol Ave
West Sacramento, CA 95691
RELEASE DATE: June 26, 2026
DEADLINE FOR QUESTIONS: July 14, 2026
RESPONSE DEADLINE: July 28, 2026, 2:00 pm
RESPONSES MUST BE SUBMITTED ELECTRONICALLY TO:
https://procurement.opengov.com/portal/cityofwestsacramento https://procurement.opengov.com/portal/%7bproject.government.code%7d
City of West Sacramento
INVITATION TO BID
Fire Station 45 Kitchen and Appliance Improvements
I. Introduction II. Project Details
III. Terms and Conditions IV. Bid Submittal V. Cost Table
VI. Contract Award
Attachments:
A - Construction Bid Packet _Fire Station 45 Kitchen and Appliance Improvements
B - FS 45 As-Built Plans_2nd Floor
C - Insurance Checklist
D - FS 45 Kitchen and Appliance Improvement Project Reference Photos
Invitation to Bid #26-037-ITB Title: Fire Station 45 Kitchen and Appliance Improvements
1. Introduction
1.1. Summary
The City of West Sacramento is accepting sealed responses for Fire Station 45 Kitchen and Appliance
Improvements to be received no later than Tuesday, July 28, 2026 at 2:00 pm.
The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full
1.2. Background
West Sacramento is a vibrant riverfront community centrally located in Northern California. West
Sacramento shares the Sacramento River with neighboring Sacramento, with the deep water ship canal serving the Port of Sacramento. Incorporated in 1987, West Sacramento encompasses approximately 22 square miles, with a population just over 55,000. West Sacramento has a Council/Manager form of government. Citizens elect four City Council Members by district (as of the November, 2022 election) who serve four year terms and directly elect the mayor who serves a four-year term. The City is full-service with nine (9) departments and nearly 500 full-time employees. The City provides the full range of municipal services including police and fire protection, park, street, fleet, and facility maintenance, economic development and housing, community development, capital projects, and parks and recreation. The City also provides water, wastewater, and solid waste services. In addition, the City maintains port, water, wastewater, and solid waste enterprise funds. Other activities and related entities include the West Sacramento Redevelopment Successor Agency, Reclamation District 900 and the West Sacramento Area Flood Control Agency.
1.3. Contact Information
Cody Ochoa
Project Manager II
1110 W Capitol Ave.
West Sacramento, CA 95691
Email: codyo@cityofwestsacramento.org
Phone: (916) 617-4920
Department:
Capital Projects - Construction
1.4. Timeline
Release Project Date June 26, 2026 https://secure.procurenow.com/portal/cityofwestsacramento/projects/250258/document?section=undefined mailto:codyo@cityofwestsacramento.org tel:(916)617-4920
Pre-Proposal Meeting (Mandatory) July 7, 2026, 1:00pm
2040 Lake Washington Blvd, West Sacramento, CA
95691
Question Submission Deadline July 14, 2026, 5:00pm
Question Response Deadline July 21, 2026, 5:00pm
Proposal Submission Deadline July 28, 2026, 2:00pm
Microsoft Teams meeting
Join:
https://teams.microsoft.com/meet/288036703085
90?p=tnosjcYLJzpKss75wq
Meeting ID:
288 036 703 085 90
Passcode:
Qy3pj652
Contractor Selection Date September 16, 2026 https://teams.microsoft.com/meet/28803670308590?p=tnosjcYLJzpKss75wq https://teams.microsoft.com/meet/28803670308590?p=tnosjcYLJzpKss75wq
2. Project Details
2.1. Important Instructions for Electronic Submittal
The City of West Sacramento is only accepting electronic bid submissions and only through its online bidding platform, OpenGov. Bidders shall create a FREE account by signing up at OpenGov.com. Once you have completed account registration, browse back to this page, click on "Submit Response", and follow the instructions to submit the electronic bid.
The bid specifications, including instructions on how to bid, standards for a responsive bid, and project specifications, are attached hereto in Attachments and incorporated herein by reference as if set forth in full
2.2. Project Scope
The City of West Sacramento (“City”) is soliciting bids from qualified contractors to provide appliance and kitchen improvements at Fire Station 45. The second-floor kitchen and laundry facilities are outdated and no longer meet the needs of a growing, 24/7 dual-company crew. The existing equipment and infrastructure are inadequate to support the increased staffing levels and operational demands.
Work includes removal, lawful disposal, furnishing, delivery, installation, manufacturer-authorized start-up, testing and commissioning.
The Contractor shall provide all labor, materials, equipment, rework, and services necessary to
• Remove and replace one (1) existing standard-size dishwasher
• Furnish and install one (1) additional standard-size dishwasher
• Furnish and install (1) new residential washer/dryer unit
• Remove and replace an estimated 107 square feet of kitchen countertops with stainless steel
• Remove and replace existing insufficient lighting fixtures in the kitchen with new fixtures to provide improved illumination levels suitable for food preparation, cleaning, and general kitchen operations.
This shall also include any necessary modifications to existing cabinetry, countertops, walls, floors, utility connections, and surrounding finishes required to properly accommodate the new equipment. Proposed equipment shall be submitted to the City for review and approval prior to purchase and installation.
The contractor shall provide all necessary labor, materials, and coordination to properly connect and commission the appliances.
All work areas are identified on the attached floor plans; however, any dimensions are approximate.
Contractors must verify exact measurements during the mandatory Pre-Bid Meeting.
The Contractor shall perform all work in a manner that minimizes disruption to Fire Station operations.
https://secure.procurenow.com/portal/cityofwestsacramento/projects/250258/document?section=undefined
A. Contractor Responsibilities
The Contractor shall furnish all labor, supervision, materials, equipment, tools, transportation, permits, fees, and incidentals necessary to complete the Work, including but not limited to:
• Field verification of existing conditions o Please note there is no elevator on site, the second floor is accessible by stairwell only
• Remove and lawfully dispose of existing equipment and furnishings
• Remove and lawfully dispose of approximately one hundred seven (107) square feet of existing countertops. Furnish and install new Type 304 Stainless Steel 14-gauge countertops in the same locations, complete with all necessary fabrication, supports, fasteners, and finish work for a fully functional installation.
• Remove and dispose of the existing dishwasher. Furnish and install two (2) new stainless steel high-quality, heavy-duty, standard-size undercounter dishwashers designed and rated for high-volume residential use. Including one (1) replacement unit in the existing location and one (1) additional under-counter unit installed adjacent.
• Ensure all required plumbing, electrical connections, and finishes are complete for full operation.
• Remove and replace existing insufficient lighting fixtures in the kitchen with new LED fixtures to provide improved illumination levels suitable for food preparation, cleaning, and general kitchen operations.
• Furnish and install one (1) residential-grade stacked washer and dryer unit in the second-floor janitorial closet, including all required plumbing, electrical connections, venting, and finish work for a complete and operational installation.
• Manufacturer-authorized start-up and commissioning of all appliances
• Documentation and project closeout
B. Project Management and Coordination
The Contractor shall:
• Assign dedicated project manager
• Provide baseline schedule and updates
• Coordinate with City representatives
• Provide advance notice of service interruptions
• Participate in meetings as requested
C. Safety and Quality Control
Contractor shall:
• Maintain site-specific safety plan
• Provide PPE
• Conduct internal quality inspections
• Correct deficiencies promptly
D. Codes and Standards
All Work shall comply with the latest adopted editions of applicable laws and standards, including but not limited to:
• California Mechanical Code
• California Electrical Code
• California Building Code (including seismic anchorage requirements)
• California Energy Code (Title 24)
• ASHRAE Standards
• Cal/OSHA Safety Requirements
• Manufacturer installation requirements
• All applicable federal, state, and local regulations
E. Schedule and Delivery
• Complete work within 30 working days from Notice to Proceed
• Coordinate site access and deliveries
• Use designated staging areas
• Maintain clean site conditions throughout construction
F. Permits and Inspections
• Obtain permit documents and application
• Schedule inspections
• Correct deficiencies
• Obtain final approval
G. Warranty
The Contractor shall provide:
• Minimum one (1) year labor warranty
• Minimum five (5) year parts warranty
Warranty period shall begin upon final acceptance by the City.
H. Acceptance
Final acceptance shall occur after:
• Final walkthrough
• Completion of punch list items
• Submission of required documentation
• Written acceptance by the City
3. Terms and Conditions
3.1. Prevailing Wages
A. Contractor Registration. Pursuant to Labor Code section 1725.5, no contractor or subcontractor may be listed on a bid proposal for a public works project unless registered with the Department of Industrial Relations (DIR) pursuant to Labor Code section 1725.5. No contractor or subcontractor may be awarded a contract for public work on a public works project unless registered with the DIR pursuant to Labor Code section 1725.5. The work contemplated by this
ITB is subject to compliance monitoring and enforcement by the DIR.
B. Prevailing Wages. Proposers are hereby notified that the DIR has determined the general prevailing rate of wages for each craft, classification, or type of worker needed to execute the work. Copies of the current schedules for California prevailing wages are located in the City’s office, and the contents of those schedules are included herein as if set forth in full. Licensure and Special Certification.
3.2. Statement of Offer
Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost
Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.
3.3. Project Management Documentation & Administration
Virtual Project Manager (VPM)
The City anticipates using an online cloud-based project management system to manage, assign, and coordinate specific tasks with the City's selected Contractor within the Scope of Work. By way of this section, the City reserves the right to utilize an online cloud-based project management system. By submitting a bid, bidder acknowledges and agrees that they are prepared to use the system, as may be required by the City. The City's specific system is Virtual Project Manager (VPM). VPM allows for paperless documentation and project administration. For more information on VPM, go to www.virtual-pm.com
A. Submittal Procedures and Construction Progress Documentation for requirements for administering and using VPM.
1. The Contractor shall submit the items associated with this section via Virtual Project
Manager (VPM), an online cloud-based project management system, as specified below.
2. Virtual Project Manager (VPM) allows for paperless documentation and project administration. All posted information is available to all personnel involved with the project at any time using the internet.
3. The use of VPM by the Contractor is mandatory. Access to VPM will be provided at no cost to the contractor.
4. In order to utilize VPM, the contractor needs a computer, internet access, a digital camera, and a scanner. For more information, go to www.virtual-pm.com. To Login, from the homepage, select LOGIN and enter the Username and Password that will be provided to you by the agency.
B. The contractor shall use the following features:
1. Daily Logs: Contractor’s daily reports shall be entered electronically via VPM.
2. Change Order Manager: Contractor requests for change order shall be submitted electronically via VPM.
3. Transmittals: Schedules, Pay applications, etc. shall be submitted electronically via VPM.
4. Submittals: Submittals requiring approval shall be submitted electronically via VPM.
5. RFIs: Requests for information (RFIs) shall be submitted electronically via VPM.
C. Technical Submittals
1. Submittal Procedure
a. The Contractor shall utilize the agency’s online cloud-based project management system
(Virtual Project Manager) for submittals.
3.4. Questions and/or Objections
It is to the City and Proposer's benefit that questions and objections are brought to the City's attention so it may issue necessary amendments to the ITB and help prevent the opening of defective proposals upon which the City could not award a Contract. Proposer should carefully review this ITB and all attachments for comments, questions, defects, objections, or any other matter requiring clarification or correction (collectively, “Questions”).
A Proposer may submit Questions related to this RFP to the City through the City’s e-Procurement Portal at or before:
Tuesday, July 14, 2026 at 5:00 pm.
Questions shall be considered waived and invalid if not brought to the attention of the City in conformity with this subsection. Questions not submitted through the City's e-Procurement Portal will not be accepted or responded to. Questions submitted after the deadline will not be accepted or responded to. Questions and answers will be posted on the City's e-Procurement Portal and visible to all.
3.5. Amendment and Cancellation
The City reserves the right to amend, cancel, or reissue this bid at any time and at its sole discretion. Any amendment shall be in writing and posted to the City's e-Procurement portal. A potential Proposer is solely responsible for clicking "Follow" on the main page to receive notifications and shall be solely responsible for complying with such notifications.
https://secure.procurenow.com/portal/CityofWestSacramento
3.6. Right of Rejection
A. The City reserves the right, at its sole discretion, to reject any and all Proposals, no matter their level of responsiveness, or to cancel this ITB in its entirety.
B. A Proposer must comply with all of the terms and instruction of this ITB, and all applicable state and local laws and regulations. Any Proposal that does not meet the requirements of this ITB may be considered to be nonresponsive and rejected.
C. A Proposer may not restrict the rights of the City or otherwise qualify a Proposal. If a Proposer does so, the City may determine the Proposal is a nonresponsive counteroffer, and the Proposal may be rejected.
D. The City reserves the right, at its sole discretion, to waive variances in a Proposal, provided such action is in the best interest of the City. Where the City waives variances in a Proposal, such waiver does not modify the ITB requirements or excuse the Proposer from full compliance with the ITB. Notwithstanding any variance, the City may hold any Proposer to strict compliance with the ITB.
3.7. Prohibition of Respondent Terms and Conditions
A Proposer shall not submit their own contract terms and conditions in a Proposal. If a Proposal contains such terms and conditions, the City, at its sole discretion, may reject the Proposal. A Proposer may either submit Questions to gain clarification on a term of the City's standard contract or submit proposed revisions to the City's standard contract in redline as part of the Proposal Transmission Letter, both pursuant to the terms of this ITB.
3.8. Joint Ventures and Partnering
A Proposal from joint ventures or entities partnering for a specific service must be designed to minimize any administrative burden on the City as a result of the participation of multiple entities. Joint proposals must adhere to the following:
A. The Proposal shall respond to each section and subsection of this ITB.
B. The Proposal shall clearly set forth the respective responsibilities and functions that each
Principal of the joint venture or partnering entities would perform if awarded a Contract pursuant to this ITB.
C. The Proposal must include a copy of the joint venture or partnering agreement(s) that identify the Principals involved, as well as their rights and responsibilities regarding the Contract pursuant to this ITB.
D. The Proposal Transmittal Letter must be signed by each Principal of the joint venture and include all required information.
3.9. Proposal of Alternate Services
A Proposal for alternate services (i.e., proposals that offer something different from that requested by the ITB) will be considered nonresponsive and rejected.
3.10. Proposal of Additional Services
A Proposal may indicate and offer services in addition to those required by this ITB. These additional services may be added to the Contract, at the sole discretion of the City. The cost for any such additional services shall be mutually agreed upon by the Contractor and the City, and incorporated into the
Contract before execution.
3.11. Severability
If any provision of this ITB is declared by a court to be illegal or in conflict with any law, the validity of the remaining terms and provisions shall not be affected, and the rights and obligations of the City and
Proposers shall be construed and enforced as if the ITB did not contain the particular provision held to be invalid.
3.12. Licensure and Special Certification
Before executing the Contract pursuant to this ITB, the Contractor must hold all necessary business and professional licenses and certifications to complete the Scope of Work. The City may require any or all
Proposers to submit evidence of proper licensure and certifications.
3.13. Disclosure of Proposal Contents
All Proposals and other materials submitted to the City related to this ITB shall become the property of the City. Selection or rejection of a Proposal does not affect this right. All proposal information, including detailed price and cost information, shall be held in confidence during the evaluation and selection process. Upon the completion of the evaluation and selection process, or by rejection of all Proposals, the Proposals and shall be open for review by the public to the extent required by the California Public
Records Act, Government Code section 7920.000 et seq.. By submitting a Proposal, a Proposer acknowledges and accepts that the contents of the Proposal and associated documents shall become open to public inspection.
Portions of a Proposal exempt from public disclosure by law may be protected from public disclosure by the City. A Proposer is required to clearly label such portion of a Proposal "CONFIDENTIAL" and list the grounds for non-disclosure. In doing so, the Proposer thereby agrees to indemnify and defend the City from any action arising from the non-disclosure of the information. The failure to so label any information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.
3.14. Conflict of Interest and Restrictions
By submitting a Proposal, the Proposer certifies that no amount shall be paid directly or indirectly to an employee or official of the City as wages, compensation, or gifts in exchange for acting as an officer, agent, employee, subcontractor, or consultant to the Proposer in connection with the procurement under this ITB.
3.15. Proprietary Information
A copy of each Proposal shall be retained for official files and will become public record after the award of a contract unless the Proposal, or specific parts of the Proposal, can be shown to be exempt by law.
Each Proposer may clearly label any part of a Proposal as "CONFIDENTIAL." In doing so, the Proposer thereby agrees to indemnify and defend the City for withholding the information from public inspection.
Failure to label information shall constitute a complete waiver of all claims for damages caused by or related to any release of the information.
If a public records request for appropriately-labeled information is received by the City, the City will endeavor to notify the Proposer of the request and delay access to the material until seven (7) working days after the City’s notice. Within that time delay, it will be the duty of the Proposer to act in protection of its labeled information. Failure to so act shall constitute a complete waiver.
4. Bid Submittal
4.1. Please upload a current 2024 W-9*
Please download the attached 2024 W9 form and upload a completed form.
• W-9_Form_ver._2024_-_BLANK.pdf
*Response required
4.2. Please enter Legal Company Name and related DBA*
Please state your company name and any related DBA's based on your California Secretary of State
Filing.
*Response required
4.3. Cost Proposal using Electronic Pricing Table*
The bidder acknowledges that a Cost Proposal must be completed using the electronic pricing table provided in the City’s e-Procurement Portal and that this information will be kept separate from the rest of the bid response. The bidder further acknowledges that all pricing and related costs will be based solely on the information entered in the electronic pricing table. The City will not be responsible for any errors, omissions, or discrepancies contained in any additional or supplemental pricing documents submitted by the bidder.
☐ Please confirm
*Response required
4.4. Response (without Cost Proposal)*
Please Upload Your Response Here, excluding your Cost Proposal.
*Response required
4.5. Statement of Offer*
Submission of a proposal is an offer to complete the Scope of Work. The offer, including the Cost
Proposal rates and budget, must remain valid for at least ninety (90) business days after the Proposal due date.
☐ Please confirm
*Response required
4.6. Bid Bond*
Bid contents, including requisite declarations and forms to be signed and included in the Bid, are included in the Attachments - Bid Docs
*Response required
4.7. California Contractors State License Board
Please enter your contractor license number for verification.
https://government-project.s3.us-west-2.amazonaws.com/4013/4713e161-0e9b-428f-be7a-2b0ae306a414_W-9_Form_ver._2024_-_BLANK.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MFKEO5LV%2F20260626%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260626T150019Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJ7%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCvyYtu4L52JrY37Pelz3SiFWLh9SebHTcST90SEvfFrgIgFd4Z%2FG6XO%2Bw%2Fr6s%2FJh6%2BYxiKLIfcLiWKW%2Bku2f0veS4qjAUIZxACGgw4OTIzNjQ2ODc2NzIiDPivO1XzbAZ9UCQ2cyrpBNYFEnMuKYCJLT4wB3ASkMO4qh44yCiPyS3j7ahge%2BaKADGRJaYZk%2F0IEH1LCzsou0xxF8QZLJLIlflNsiI0OiDdIfJ7j5FlYHETBOhrEsg37Dk%2FbFiQlz8NRr0MtJmyNdsWX7K55oCBFGRJIU3%2FJXU5YdpiWlcrBrv1QCMQ6VC2OL9s3C4VhT6Dq%2FPwXLghi7QVoImM9UMv%2BxhlnQKUSaJb6OgHxgSA9HPhSAt4u9p8y8ygh6YGWAE3bYpp8lyMavybgoE0XQ7SeWn4iSMl9I1uGIgAO%2B%2B4YLuXNn4bjPfucWbUXGiHmdYWvpX1QB12n9Pq9YF7DsVoN0VJg1tq5bpJWgZzdRXk%2BbBqKoYJy9ULVu1d2zmcnv9jsvrqDPcThfIYeLrl1uFuhUBk2faWfDpqnAGR6hyNNTPmK5qiowlYJlyU7rYzfFCR%2F%2B6T5nB2nuWfTi4aarKV9Pf2eAwI1RzYR581SNqC4ag%2FEJ2Jpy00i%2BS9Jahh0XXTdRPB%2Bs0HEseWXGSFZaoSd6J0rafRCRI1seL98WWhyefIyl%2FGj9i3XTLaqXwlnmxg3OISwPZNS3E1zoQNcUOkrPd1GriQeqS9zS24YQfD9oham0xn%2BrnEeqS%2Fy3OsXzO3OroyuB%2BCXBRWzfvfRrVe9e7PqgoUqRoebQoRt85UxKnp2OkzkuyOCMooQwVePz4QbDqukLeRQ%2BNEgddaC8Mm1vgwANpP6y96D6EEYBg3RIhTLoTX563Y%2BO7SqM6zzEkbR6tfgF2rQIL7b3enDxLO0djQtfnYrEAhpI1lx7Iti1MVPNS8%2FiLmltTmqUcUAUlAMOiM%2BtEGOpkB63u2FpyP%2FA9turNlLcGw3cS2bUwvZU7en%2B2SRw49qc6jtobiusKixrzFl%2Bvjix3lv6rYJgc9wYIWiUfRFfdRbfEzSwbCu66HIXg3zmKkAjcu4su5IIb%2FBwuLV1zw5vn7xKv3%2BhSIH0ZBGRrjNPDD4gUPmw26%2BdjgjFRL8DE9gaqwR4ADOu1VJSQpWdrLqks6hDmhXIG%2B5w6n&X-Amz-Signature=f45c766e4c90ada8593877fcc17031978b35bbf4f0bcf01b99c2d7030bee205e&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22W-9_Form_ver._2024_-_BLANK.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/250258/document?section=2393324
4.8. Certification regarding Debarment
The City performs a SAM.GOV verification check to confirm debarment status. Please download the attached document, complete the form, and upload.
A unique entity identifier is requested for contracts greater than $25,000 or funded with Federal dollars.
Your entity may register for a unique entity identifier on SAM.GOV at the following link https://sam.gov/content/entity-registration.
For all other proposers, the completed form is sufficient.
• Certification_Regarding_Deb...
4.9. City Contract *
The Proposer acknowledges and is presumed to have accepted the Contract and be capable of completing the Scope of Work, as well as all reasonably associated managerial tasks, without reservation or qualification pursuant to the Contract.
☐ Yes
☐ No
*Response required
4.10. Insurance Requirements*
The Proposer acknowledges the City's insurance requirements and endorsements as outlined in the
Insurance Checklist in Attachments. Any Proposal unable to meet the Insurance Checklist requirements shall be considered nonresponsive and ineligible for Contract award.
☐ Yes
☐ No
*Response required
4.11. Authorized Contract Signer *
Please provide the name, title and email address of the authorized contract signer.
*Response required https://government-project.s3.us-west-2.amazonaws.com/4013/7fbcd8f3-7d1e-4b79-a50c-03f71fe54e62_Certification_Regarding_Debarment_Form_COWS.pdf?X-Amz-Algorithm=AWS4-HMAC-SHA256&X-Amz-Content-Sha256=UNSIGNED-PAYLOAD&X-Amz-Credential=ASIA47RIURE4MFKEO5LV%2F20260626%2Fus-west-2%2Fs3%2Faws4_request&X-Amz-Date=20260626T150019Z&X-Amz-Expires=72000&X-Amz-Security-Token=IQoJb3JpZ2luX2VjEJ7%2F%2F%2F%2F%2F%2F%2F%2F%2F%2FwEaCXVzLXdlc3QtMiJHMEUCIQCvyYtu4L52JrY37Pelz3SiFWLh9SebHTcST90SEvfFrgIgFd4Z%2FG6XO%2Bw%2Fr6s%2FJh6%2BYxiKLIfcLiWKW%2Bku2f0veS4qjAUIZxACGgw4OTIzNjQ2ODc2NzIiDPivO1XzbAZ9UCQ2cyrpBNYFEnMuKYCJLT4wB3ASkMO4qh44yCiPyS3j7ahge%2BaKADGRJaYZk%2F0IEH1LCzsou0xxF8QZLJLIlflNsiI0OiDdIfJ7j5FlYHETBOhrEsg37Dk%2FbFiQlz8NRr0MtJmyNdsWX7K55oCBFGRJIU3%2FJXU5YdpiWlcrBrv1QCMQ6VC2OL9s3C4VhT6Dq%2FPwXLghi7QVoImM9UMv%2BxhlnQKUSaJb6OgHxgSA9HPhSAt4u9p8y8ygh6YGWAE3bYpp8lyMavybgoE0XQ7SeWn4iSMl9I1uGIgAO%2B%2B4YLuXNn4bjPfucWbUXGiHmdYWvpX1QB12n9Pq9YF7DsVoN0VJg1tq5bpJWgZzdRXk%2BbBqKoYJy9ULVu1d2zmcnv9jsvrqDPcThfIYeLrl1uFuhUBk2faWfDpqnAGR6hyNNTPmK5qiowlYJlyU7rYzfFCR%2F%2B6T5nB2nuWfTi4aarKV9Pf2eAwI1RzYR581SNqC4ag%2FEJ2Jpy00i%2BS9Jahh0XXTdRPB%2Bs0HEseWXGSFZaoSd6J0rafRCRI1seL98WWhyefIyl%2FGj9i3XTLaqXwlnmxg3OISwPZNS3E1zoQNcUOkrPd1GriQeqS9zS24YQfD9oham0xn%2BrnEeqS%2Fy3OsXzO3OroyuB%2BCXBRWzfvfRrVe9e7PqgoUqRoebQoRt85UxKnp2OkzkuyOCMooQwVePz4QbDqukLeRQ%2BNEgddaC8Mm1vgwANpP6y96D6EEYBg3RIhTLoTX563Y%2BO7SqM6zzEkbR6tfgF2rQIL7b3enDxLO0djQtfnYrEAhpI1lx7Iti1MVPNS8%2FiLmltTmqUcUAUlAMOiM%2BtEGOpkB63u2FpyP%2FA9turNlLcGw3cS2bUwvZU7en%2B2SRw49qc6jtobiusKixrzFl%2Bvjix3lv6rYJgc9wYIWiUfRFfdRbfEzSwbCu66HIXg3zmKkAjcu4su5IIb%2FBwuLV1zw5vn7xKv3%2BhSIH0ZBGRrjNPDD4gUPmw26%2BdjgjFRL8DE9gaqwR4ADOu1VJSQpWdrLqks6hDmhXIG%2B5w6n&X-Amz-Signature=781d57e0232b6963171623c2e1b55029625a37efaa5934d87f65b1e589e43dd2&X-Amz-SignedHeaders=host&response-content-disposition=attachment%3B%20filename%3D%22Certification_Regarding_Debarment_Form_COWS.pdf%22&x-id=GetObject https://secure.procurenow.com/portal/cityofwestsacramento/projects/250258/document?section=undefined
5. Cost Table
Line Item Description Quantity Unit of
Measure Unit Cost Total
1 Mobilization, Staging, and Site Access 1 LS
2 Permit Documentation, Application, Plan Review, Inspections
1 LS
3 Removal & Disposal — Existing
Countertops
1 LS
4 Removal & Disposal —Existing
Dishwasher
1 LS
5 Furnish and Install Replacement
Dishwasher
1 EA
6 Furnish and Install Additional
Dishwasher
1 EA
7 Electrical and Plumbing Modifications
& Connections
1 LS
8 Kitchen Lighting Improvements 1 LS
9 Furnish and Install Washer and Dryer
Unit
1 EA
10 Rigging / Hoisting / Placement 1 LS
11 Demobilization & Site Cleanup 1 LS
TOTAL
6. Contract Award
6.1. Opening & Award of Contract
Bids will be opened publicly and read aloud at the time and date established in the invitation to Bidders.
Bid Summaries may be made available to Bidders after the Bid Date.
The City reserves the right to accept or reject any and all Bids for a period of sixty (60) days after the date of opening, and to waive any informality or irregularity in any Bid. No Bid can be withdrawn during that period, except pursuant to Public Contract Code section 5102, et seq. 1751480.1 7203-001
The City reserves the right to reject any or all Bids, including, without limitation, the right to reject any non-conforming, non-responsive, or conditional bids.
Before a Bid is considered for award, the City may, in addition to the Experience & Qualifications form included in the Bid documents, require a Bidder to submit a statement of facts and detail as to its business, technical organization and financial resources and equipment available and to be used in performing the work. Additionally, the City may require evidence that the Bidder has performed other work of comparable magnitude and type. The City expressly reserves the right to reject any Bid if it determines that the business and technical organization, equipment, financial and other resources or other experience of the Bidder (including the bidder’s Subcontractors) is not sufficiently qualified for the work Bid upon and, therefore, justifies such rejection.
The award of the Contract, if it is awarded, will be to the lowest responsive, responsible Bidder whose
Bid complies with the requirements set forth herein.
The issuance by the City of a notice to the successful Bidder of the award of the Contract (“Notice of
Award”) shall be deemed the Award of Contract.
6.2. Bid Protests
The lack of a prompt procedure to resolve disputes regarding the bidding process would impair the
City’s ability to carry out its purpose of constructing this project in a timely manner. Therefore, to the maximum extent authorized by law and notwithstanding any other procedures specified in documents referenced herein, all disputes and/or protests regarding the bidding process shall be subject to the following procedure. In submitting a Bid to the City for this project, the Bidder agrees to comply with and to be bound by this procedure.
Any Bid protest must be submitted in writing to the Director of Capital Projects & Transportation of the
City of West Sacramento before 5:00 p.m. on the fifth (5th) working day following Bid opening.
(a) The initial protest document must contain a complete statement of the basis for the protest, and all supporting documentation.
(b) The party filing the protest must have actually submitted a Bid for the Work. A Subcontractor of a party submitting a Bid for the Work may not submit a Bid protest. A party may not rely on the Bid protest submitted by another Bidder, but must timely pursue its own protest.
(c) The protest must refer to the specific portion of the Contract Documents which forms the basis for the protest.
(d) The protest must include the name, address and telephone number of the person representing the protesting party.
(e) The party filing the protest must concurrently transmit a copy of the initial protest document and any attached documentation to all other parties with a direct financial interest which may be adversely affected by the outcome of the protest. Such parties shall include all other Bidders who appear to have a reasonable prospect of receiving an award depending upon the outcome of the protest.
(f) The City will give the protested Bidder five (5) working days after the receipt of the protest to submit a written response. The responding Bidder shall transmit the response to the protesting Bidder concurrent with delivery to the City.
(g) The procedure and time limits set forth in this paragraph are mandatory and are the Bidder’s sole and exclusive remedy in the event of Bid protest. The Bidder’s failure to comply with these procedures shall constitute a waiver of any right to further pursue the Bid protest, including filing a Government
Code Claim or legal proceedings.
(h) If the City determines that a protest is frivolous, the protesting Bidder may be determined to be non-responsible and that Bidder may be determined to be ineligible for future contract awards.
| 1. Introduction |
| 1.1. Summary |
| 1.2. Background |
| 1.3. Contact Information |
| 1.4. Timeline |
| 2. Project Details |
| 2.1. Important Instructions for Electronic Submittal |
| 2.2. Project Scope |
| 3. Terms and Conditions |
| 3.1. Prevailing Wages |
| 3.2. Statement of Offer |
| 3.3. Project Management Documentation & Administration |
| 3.4. Questions and/or Objections |
| 3.5. Amendment and Cancellation |
| 3.6. Right of Rejection |
| 3.7. Prohibition of Respondent Terms and Conditions |
| 3.8. Joint Ventures and Partnering |
| 3.9. Proposal of Alternate Services |
| 3.10. Proposal of Additional Services |
| 3.11. Severability |
| 3.12. Licensure and Special Certification |
| 3.13. Disclosure of Proposal Contents |
| 3.14. Conflict of Interest and Restrictions |
| 3.15. Proprietary Information |
| 4. Bid Submittal |
| 4.1. Please upload a current 2024 W-9* |
| 4.2. Please enter Legal Company Name and related DBA* |
| 4.3. Cost Proposal using Electronic Pricing Table* |
| 4.4. Response (without Cost Proposal)* |
| 4.5. Statement of Offer* |
| 4.6. Bid Bond* |
| 4.7. California Contractors State License Board |
| 4.8. Certification regarding Debarment |
| 4.9. City Contract * |
| 4.10. Insurance Requirements* |
| 4.11. Authorized Contract Signer * |
| 5. Cost Table |
| 6. Contract Award |
| 6.1. Opening & Award of Contract |
| 6.2. Bid Protests |
File details come from the government source that posted it. Updated .