Final ALT Industry Day Jan 2025.pdf
PDF 952 KB Posted
- Attached to
- PEO IEWS ALT INDUSTRY SESSION JAN 2025
- Solicitation number
- W56KGY25F0002
- Issued by
-
Department of the Army
About this file
This is a presentation deck from PEO IEW&S's 16th Acquisition Lead Time (ALT) Industry Forum scheduled for January 29, 2025. The deck outlines upcoming contract opportunities across multiple project management offices including Intelligence Systems & Analytics, Cyber & Space, Electronic Warfare & Cyber, Positioning Navigation & Timing (PNT), Sensors-Aerial Intelligence, and Terrestrial Sensors.
Key opportunities include: the Artificial Intelligence and Software At Pace (AIS@P) effort with final RFP in March 2025 and awards in Q4 FY25; Federated Hyperconverged Infrastructure (FHCI) with award planned for May 2025; NorthStar PNT system valued at $86-106M; Block 2 CMFF PNT redesign valued at $15-25M; NAVWAR SA system valued at $160-200M; PD Aerostat SETA ($65-85M); PD Aerostats MATOC IDIQ ($4.06-4.14B); and IBD-SS support services ($460-540M). Notable recent awards include DevSecOps to Lufburrow and Company (December 2024) and PMOSE to Creedance Dynamo Solutions (December 2024). The presentation includes multiple RFIs in progress, including for SIGINT capabilities for the MQ-1C Gray Eagle platform and Launched Effects Payloads requirements.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 1
JANUARY 29, 2025
PEO IEW&S
Acquisition Lead Time (ALT) Industry Forum #16
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 2DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
PM INTELLIGENCE SYSTEMS & ANALYTICS
(IS&A)
JANUARY 2025
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 3
PM IS&A Changes from September 2024
• Geospatial Intelligence (App 5) and Signals Intelligence (App 6) no longer planned at this time
• Data Collection, Reduction and Analysis action restructured. Requested White Papers in December.
Planned award 31 March 2025
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 4DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
PEO Headquarters
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 5
Headquarters Changes from September 2024
• PEO IEW&S held an industry day on 07 JAN 25 for the Artificial Intelligence and Software At Pace (AIS@P) effort
• Currently PEO IEW&S is working with ACC-APG to conduct additional market research. Market research will be used to help shape updated draft RFP and evaluation criteria.
• AIS@P is still on track for a MAR 2025 final RFP and 4QFY25 base contract awards
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 6
Headquarters
Initiation of Action ACC ARP Acceptance RFP Release Contract Award Awarded Contracts
Planned Award
**The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired products and services. All information provided is subject to change, including specifications, requirements, acquisition strategy, and funding, and nothing provided during this briefing is to be considered a government commitment or obligation.
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 7DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
PM CYBER & SPACE
(C&S)
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 8
PM C&S Changes from September 2024
• Federated Hyperconverged Infrastructure (FHCI)
- Vendor Technology Presentations ongoing; to be completed by 31 January 2025
- Award on track for May 2025
• Systems Engineering & Technical Assistance (SETA)
- Draft documents to be released to industry by 31 Jan
- Virtual Industry Day planned for early February 2025
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 9
PM C&S
Initiation of Action ACC ARP Acceptance RFP Release Contract Award Awarded Contracts
Planned Award
**The forecast data is for planning purposes, does not represent a pre-solicitation synopsis, does not constitute an invitation for bid or request for proposal, and is not a commitment by the government to purchase the desired products and services. All information provided is subject to change, including specifications, requirements, acquisition strategy, and funding, and nothing provided during this briefing is to be considered a government commitment or obligation.
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 10DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
PM Electronic Warfare & Cyber
(EW&C)
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 11
PM EW&C Changes from September 2024
• PdL Strategic Spectrum Warfare: DevSecOps Follow-On – Awarded on 6 Dec 2024 to Lufburrow and Company.
• PdL Strategic Spectrum Warfare: TLS EAB Division SIGINT and EW Integration – New OTA added, currently defining requirements. Estimated award(s) date 2QFY26.
• PdL Electronic Attack: Radio Frequency Fidelity Metrics and Testing SBIR – New SBIR effort added, currently working to define requirements. Estimated award date 1QFY26.
• PM EW&C: Systems Engineering and Technical Assistance (SETA) – Follow on Task Order, currently working to define requirements. Estimated award date 2QFY27.
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 12
PM EW&C
Initiation of Action ACC ARP Acceptance RFP Release Contract Award Awarded Contracts
Planned Award
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 13
PM EW&C
Initiation of Action ACC ARP Acceptance RFP Release Contract Award Awarded Contracts
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 14DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
Project Manager Positioning, Navigation & Timing
(PNT)
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 15
PM PNT Changes from September 2024
• The SETA support follow-on effort has been added. Award is forecasted for 3QFY26. An RFI was released to all RS3 Vendors by ACC-APG Div C on 5 December 2024, with responses due on 20 December 2024. Government is preparing market research report. Likely set aside for RS3 SB suite.
• NorthStar will likely utilize the C5 OTA.
• Statement of Need (SON)/Request for White Paper (RWP) release projected for 2QFY25
• Selected vendor basis of prototype demonstrations 3QFY25
• Request for Prototype Proposal (RPP) projected for 1QFY26
• Developing contract strategy for the Block 2 Mounted Form Factor (CMFF) effort following RFI. Considering leveraging the C5 OTA, pending PEO strategy approval.
• SON/RWP release projected for 3QFY25
• Prototype Demonstrations 4QFY25
• RPP release 1QFY26
• NAVWAR SA considering leveraging the PEO IEW&S AIS@P Multiple Award IDIQ, pending PEO strategy approval.
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 16
NorthStar FAQs NorthStar’s priorities remain affordability and MOSA-centered design
• pntOS
- Government owns full/unlimited rights to pntOS
- Any support for pntOS will be provided through a Government Agency
- pntOS 1.0 expected, must have path to 2.0 defined (schedule)
- pntOS furnished to vendors for implementation (DoD SAFE)
- Alternatives to pntOS may be considered- special consideration given to favorable IP data rights
• A-Kits
- Defined as the mounting hardware, wiring, and vehicle modification required for vehicle integration
- To avoid additional costs, PM PNT seeks compatibility with an existing A-kit design
- Preferred A-Kit- recapitalize existing DAGR cables and mounting space to the fullest extent possible in
Tier 1 & 2 platforms.
For more complicated platforms, how would you reduce the cost of an A-kit or leverage existing A-
Kit?
• System Design Agent (SDA)
- As a result of market research, PM PNT will not pursue an SDA approach
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 17
PM PNT
FY 2025
Q1 Q2 Q3 Q4
Estimated Value
$86,000,000 - $106,000,000
$15,000,000 - $25,000,000
$160,000,000 - $200,000,000
$44,000,000 - $64,000,000
$42,000,000 - $52,000,000
PNT
PNT
PM
PNT
NorthStar is a low cost modular Mounted APNT capability for fielding Army 2030/2040. Focus is on affordability through reduced integration costs, government architectures and standards that facilitate modularity while providing tiered capability solutions.
PM POC: Joseph Stevanak, joseph.t.stevanak.civ@army.mil KO: Charles Compton, charles.t.compton5.civ@army.mil
Block 2 CMFF - Redesign of APNT card for cost reduction, mitigate supply chain risk management issues, and to incorporate bug fixes. Factoring integration support to PM Mission Command (MC).
PM POC: Amy Short, amy.l.short.civ@army.mil KO: Charles Compton, charles.d.compton5.civ@army.mil
Contract Description/POC Info
PNT
PNT
NAVWAR SA is a system of systems solution that ties together applications, systems, and Soldiers necessary to sense areas of PNT denial, analyze mission impact, and communicate those impacts for mission planning and execution.
Fusion of sensors provide a comprehensive and in-depth common operating picture of electromagnetic spectrum access to PNT information across all and warfighting domains.
PM POC: Kristin Riesett, kristin.m.riesett.civ@army.mil
KO: TBD
Systems Engineering and Technical Assistance (SETA) Support
Product Support Services (PSS) and field support services for PM PNT new or existing hardware and software products. Utilizing RS3 small business suite.
PM PNT: Paul Davis, paul.m.davis14.civ@army.mil KO: Aaron Kazi, (443) 861-4765, aaron.h.kazi.civ@army.mil
FY 2028
Q1 Q2 Q3 Q4
FY 2027
Q1 Q2 Q3 Q4
FY 2026
Q1 Q2 Q3 Q4
RFP/RWP Release Contract Award Awarded Contracts
Initiation of Action
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 18DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
PD Sensors-Aerial Intelligence
(SAI)
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 19
PD SAI Changes from September 2024
• PD SAI awarded the Project Director Sensors-Aerial Intelligence (PD SAI) Systems Engineering and Technical Assistance (SETA) Support Task Order on 27 November 2024.
• Product Manager Aerial Enhanced Radars, Sensors, and Optics (PdM AEROS) posted an RFI 28 October with a close date of 25 November to explore available operational state-of-the-art Signals Intelligence (SIGINT) sensor capabilities for the MQ-1C Gray Eagle platform for a Multi-Domain Operation (MDO) environment. PdM AEROS is interested in seeking industry information on available extended range Electronic Intelligence (ELINT) and Communications Intelligence (COMINT) sensor solutions with a high Technology Readiness Level (TRL) that will require minimal development.
(https://sam.gov/opp/677c9db33960460ebe4fe202cd9295d5/vie w) https://sam.gov/opp/677c9db33960460ebe4fe202cd9295d5/view https://sam.gov/opp/677c9db33960460ebe4fe202cd9295d5/view
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 20
PD SAI Changes from August 2024
• Launched Effects (LE) Payloads Follow-Up RFI: LE Payloads will be issuing a follow up RFI from our FY23 RFI to determine how Industry's proposed solutions (both previously submitted and ones we didn't receive under the previous RFI) meet the Threshold and Objective of the LE A-CDD requirements that were AROC approved on 28 June 2024 by the Chief of Staff of the Army. Planned Release: EOM January 2025.
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 21
PD SAI
Initiation of Action ACC ARP Acceptance RFP Release Contract Award Awarded Contracts
Planned Award
FY 2028
Q1
FY 2026
Q1 Q2 Q3 Q4
FY 2027
Q1 Q2 Q3 Q4
Q2 Q3 Q4
PM
SAI
Contract Description/POC Info
New task order for cell phone services to support the PD SAI office, with a one-year base period and four option years, utilizing the existing Spiral 4 contract vehicle.
POC: Alexa Hobbs, alexa.r.hobbs.civ@army.mil, and 520-945-8284
0 - $1,000,000
FY 2025
Estimated Value
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 22DISTRIBUTION STATEMENT A. Approved for public release: distribution unlimited
Project Manager Terrestrial Sensors
(PM TS)
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 23
PM TS Changes from September 2024
• Aerostats SETA & Integrated Base Defense-Sustainment Support (IBD-SS) are still in Source Selection.
• Future Advanced Long-range Common Optical / Netted-fires Sensor (FALCONS) OTA RFP closes 31 Jan 25.
• Project Management, Operations and Systems Engineering Support (PMOSE) was awarded to Creedance Dynamo Solutions (CDS) on 10 Dec 24.
• PM TS SETA RFI (W909MY-25-SETA) closed 06 Jan 25.
PEO IEW&S | JANUARY 2025 | DISTRIBUTION STATEMENT A. Approved for public release; distribution unlimited 24
Project Manager Terrestrial Sensors RFP Release Contract Aw ard
Aw arded Contracts Planned Aw ard
FY 2025
Q1 Q2 Q3 Q4
Estimated Value
$65,000,000 - $85,000,000 PD Aerostat SETA HQ Support provides for the following services: Engineering & Technical support, Product Support Management, Business & Financial Management, Operations & Program Management in support of PD Aerostats and Aerostat Programs PM COR- Neal Dedicatoria, neal.h.dedicatoria2.civ@army.mil ACC APG POC- Jennifer Mattessino, jennifer.l.mattessino.civ@army.mil
$91,000,000 - $131,000,000
Contract Description/POC Info
PM FPS IBD-SS
Product Manager Force Protection Systems (PM FPS) and Product Manager Ground Sensors (PM GS) have requirements for comprehensive training, contractor logistics, operator, and sustainment support services, to include material procurement, for equipment and capabilities in the contiguous United States and outside the contiguous United States.
PM FPS POC: Mr. Summerlin Walker, summerlin.s.walker.civ@army.mil, [T]
(520) 673-5258 ACC-APG Belvoir POC: Ms. Rosetta Wisdom-Russell, rosetta.wisdom-russell.civ@army.mil [P] (703) 704-0826
PM GS FALCONS
Develop Future Advanced Long-range Common Optical / Netted-fires Sensor (FALCONS) prototype system
$4,060,000,000 - $4,140,000,000
$460,000,000 - $540,000,000
Q2 Q3 Q4
TS
TS
TS
PM
TS
PD Aerostats MATOC IDIQ Aerostat production and contractor support services of aerostats for PSS-T and future FMS cases.
PD Aerostats POC: Mr. Eric Brixen - eric.c.brixen.civ@army.mil ACC-APG POC - Ms. Jennifer Mattessino, FY 2028
Q1
FY 2026
Q1 Q2 Q3 Q4
FY 2027
Industry Day
RFP Release Contract Award Awarded Contracts
Planned Award
PM Contract Description/POC Info Estimated Value FY 2025 FY 2026 FY 2027 FY 2028
Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4 Q1 Q2 Q3 Q4
TS PD Aerostat SETA HQ Support provides for the following services: Engineering & Technical support, Product Support Management, Business & Financial Management, Operations & Program Management in support of PD Aerostats and Aerostat Programs PM COR- Neal Dedicatoria, neal.h.dedicatoria2.civ@army.mil ACC APG POC- Jennifer Mattessino, jennifer.l.mattessino.civ@army.mil $65,000,000 - $85,000,000 |
TS PD Aerostats MATOC IDIQ Aerostat production and contractor support services of aerostats for PSS-T and future FMS cases.
PD Aerostats POC: Mr. Eric Brixen - eric.c.brixen.civ@army.mil ACC-APG POC - Ms. Jennifer Mattessino, jennifer.l.mattessino.civ@army.mil $4,060,000,000 - $4,140,000,000 |
TS PM FPS IBD-SS Product Manager Force Protection Systems (PM FPS) and Product Manager Ground Sensors (PM GS) have requirements for comprehensive training, contractor logistics, operator, and sustainment support services, to include material procurement, for equipment and capabilities in the contiguous United States and outside the contiguous United States.
PM FPS POC: Mr. Summerlin Walker, summerlin.s.walker.civ@army.mil, [T] (520) 673-5258 ACC-APG Belvoir POC: Ms. Rosetta Wisdom-Russell, rosetta.wisdom-russell.civ@army.mil [P] (703) 704-0826 $460,000,000 - $540,000,000 |
TS PM GS FALCONS Develop Future Advanced Long-range Common Optical / Netted-fires Sensor (FALCONS) prototype system $91,000,000 - $131,000,000 | image1.jpeg
| PEO IEW&S�Acquisition Lead Time (ALT) Industry Forum #16 |
| PM INTELLIGENCE SYSTEMS & ANALYTICS (IS&A) |
| PM IS&A Changes from September 2024 |
| PEO Headquarters |
| Headquarters Changes from September 2024 |
| Headquarters |
| PM CYBER & SPACE�(C&S) |
| PM C&S Changes from September 2024 |
| PM C&S |
| PM Electronic Warfare & Cyber (EW&C) |
| PM EW&C Changes from September 2024 |
| PM EW&C |
| PM EW&C |
| Project Manager Positioning, Navigation & Timing (PNT) |
| PM PNT Changes from September 2024 |
| NorthStar FAQs |
| PM PNT |
| PD Sensors-Aerial Intelligence� (SAI) |
| PD SAI Changes from September 2024 |
| PD SAI Changes from August 2024 |
| PD SAI |
| Project Manager Terrestrial Sensors (PM TS) |
| PM TS Changes from September 2024 |
| Project Manager Terrestrial Sensors |
File details come from the government source that posted it. Updated .