fillable_price_schedule_-_140P8322Q0002.docx

DOCX document 22 KB Posted

Attached to
Barge services between Stehekin and Chelan WA Federal contract opportunity
Solicitation number
140P8322Q0002
Issued by
Department of the Interior National Park Service Pacific West Region

View the file

Other files for this federal contract opportunity

Other files attached to Barge services between Stehekin and Chelan WA, newest first.
File Type Posted
Sol_140P8322Q0002.pdf PDF
Attachment_1_Statement_of_Work_for_barge_services.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION B: Contract Price Schedule, 140P8322Q0002

INSTRUCTIONS: Enter price for all line items; failure to do so may render the offer non-responsive. On lump-sum-priced line items, provide the total price only. If no specific line item exists for a portion of the work, include the costs in a related item. In case of errors in summations, the total of the corrected amounts govern. Round totals to whole dollars. Complete this page and return with other documents described in solicitation.

Provide barge transportation of materials, supplies, bulk fuel, vehicles, and equipment between Stehekin and Chelan WA for North Cascades National Park Service Complex. Includes storage in Chelan and use of boom truck and ancillary equipment as needed. Services shall be performed as described in Attachment 1, Statement of Work (SOW).

PRICE SCHEDULE: Base Year and Option Years 1 and 2 (if exercised)

Class of goods
Un it or percent of barge deck space
Price
Heavy equipment/Boat/Trailer
sq ft
Vehicles
sq ft
Boxed, palleted, or crated supplies
ea
Fuel tanks (round trip)
ea
Fuel, delivery and transfer from Landing to fixed tanks
hr
Loose materials (e.g. soil, gravel), 10-30 cy
cu yd
Loose materials that can be handled with a forklift
(small) Pallet 4x4

(medium) Small unit 4x8

(large) Large unit 4x10

55-gal drums
ea
Boom truck use (smaller truck), within Stehekin valley
hr
Boom truck use (larger truck), within Stehekin valley
hr
Equipment trailer, hauling NPS items
hr

day

Forklift (10,000-lb capacity)
hr
Regular charter (general freight)
≤100% one way
Round-trip charter (general freight)
≤100% both directions (exclusive)
Rock/Gravel barge (using excavator to handle)
≤100% one way
Miscellaneous use of tug and barge
hr
Short-term storage, Days 10 to 21
Per item per day

Long-term storage, starting on Day 22

List other equipment and services with unit and price below or on separate sheet.

Business name: _____________________________________

DUNS number: _____________________________________CAGE code: _____________________
Point of contact name: ______________________________E-mail: _________________________

Phone number: ____________________ Except for specific representations and certifications returned with the quote, the representations and certifications in SAM apply to this quote (see FAR provision 52.204-8(b)(2)): __yes __no.

File details come from the government source that posted it. Updated .