-3715 Entr Drum Cvr Source Pre-Qual.pdf
PDF 797 KB Posted
- Solicitation number
- FD2060-23-00074
- Issued by
-
Defense Logistics Agency Aviation
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Qualification for Requirements FAR 9.202(a) as amended by DFARS 209.270-4(a)(2)
AMSC C: These parts require engineering source approval by the control activity to assure the integrity of the part. An alternative source must qualify according to the design control activity’s procedures as approved by the applicable government engineering activity, WR-ALC, 409
SCMS/GUEA
Section A: Item Identification
1. Stock Number (NSN): __1005-00-570-3715 ___
2. Part Number (P/N): ___198F288______________________________
3. Noun: ________Cover, Drum, Entrance ________
4. Application: ___30 mm (GAU-8/A) Gun Handling System___________________
Section B: Justification for Establishing a Qualification Requirement and Reason Why Qualification Requirement Must Be Demonstrated Prior to Any Contract Award.
1. The inability to utilize investment for forging/casting, welding assembly and special machine processes of this assembly can result in deleterious product performance and structural or durability degradation. Close tolerance machining of the component is required and specialized heat treatment process (es) is/are required. Special care in machining and heat treatment is required to assure compliance of the end item with specified acceptance test requirements and ultrasonic inspection requirements. This assembly contains the cover, inserts, and pins that interface with the ammunition entrance unit that feeds live rounds into the scoop disc assembly.
Any failure of this item will result in a gun jam. This cover attaches directly to the aircraft and proper alignment of the ammunition storage container is critical to gun operation.
2. The qualification requirements specified herein are necessary to verify the structural, functional integrity.
3. Failure to procure these items from a fully qualified source can result in structural or functional deficiencies that will compromise the mission capability of the respective weapon system.
Section C: Qualification Requirements That Must be Satisfied to Become a Qualified Source and Qualification Waiver Requirements.
1. Prequalification Notice. The contractor shall notify the points of contact identified in the notice that the pre-qualification requirement is being established or notify the point of contact identified in the notice of solicitation issuance that is subject to a pre-qualification requirement of their intent to qualify as a source.
2. Facilities. The contractor must certify to the government that they have (or have access to) the required facilities, tools and specialized equipment to manufacture, inspect, test, and package the item. The contractor shall provide a summary of the company’s capabilities, including a detailed factory layout, a list of the machinery, fixtures, tooling, and test and inspection equipment, any specialized equipment and the personnel skill level that will be performing the effort. The contractor shall make their facilities, equipment, tooling, and personnel available for evaluation and inspection by the government.
3. Manufacture. The contractor must manufacture this item to conform to all the requirements of the latest revision of Drawings 198F288 rev BB. The contractor must provide, at their own expense, data showing the results of quality, performance, and environmental evaluations conducted by the contractor to show compliance with the requirements (tolerance, tooling, finishing, forging, casting and etc.) of the drawings and specifications for the same item or a similar item(s). Contractors are cautioned that if any qualified tooling was used to produce all previously produced 198F288 item, that the tooling is the property of the OEM and cannot be made available for the contractor’s use by the government. Potential bidder shall provide a detailed quality plan implementing ISO 9001 (or equivalent); this requirement may be satisfied by evidence of an independent ISO 9001 certification or current/previous DCMA-administered contract that required ISO 9001 (or equivalent) compliance. At any time, the government retains the right to inspect the contractor’s facilities; and manufacturing, quality, test and environmental processes and documentation.
4. First Article Test (FAT) Requirements. If the contractor is awarded a contract, the contractor will be required to provide two post-contract award first article exhibits to evaluate the manufacturing capability of the contractor. The articles must comply with all of the requirements of the end item drawing (198F288 rev BB). Complete FAT at government’s expense may include form, fit, function and test firing. The First Article may be required even if a Source Qualification Wavier is granted IAW Section C5 below.
5. Waiver. Sources who meet any of the following Source Qualification Waiver Criteria (QWC) may apply for a waiver of all or part of the qualification requirements:
QWC1: The potential source submits written certification that the articles have been supplied to the government or original equipment manufacturer and shall provide the following:
1. Contract Number
2. Procuring Agency
3. Contract Value
4. Number of assets shipped
5. Copies of DD Form 250, Material Inspection and Receiving Report, Purchase Order, or Invoice
QWC2: The potential source is qualified on the right-hand article and requests to be qualified on the left-hand article. If the right-and left-hand articles are mirror images of each other, then approval can generally be given.
QWC3: A source qualified to provide an assembly is usually qualified to provide subassemblies, major components, and items of that assembly.
QWC4: A source qualified to provide earlier dash numbers of a basic P/N may be qualified to provide other dash numbers of that same basic P/N, provided there is no increase in complexity, criticality, or other relevant requirements.
QWC5: A source qualified to provide a similar or like item can be qualified to provide the required item, if the source can produce proof that they have (or have access to) the tooling available to produce a qualified casting and the source can prove that they have the ability to carry out the machining and specialized heat treatment processes. However, for approval, the engineering authority must verify that there is no increase in complexity, criticality, or other requirements over that of the similar item. As a minimum, the source shall provide a complete set of drawings for the similar item and written proof, such as purchase orders, shipping documents, etc., to show that the similar item was provided to the original equipment manufacturer or DoD.
QWC6: A source previously qualified to provide an item, but which has been purchased, sold, merged, absorbed, reformed, split, etc., may qualify if it can be established that the qualification is currently with the requester and that the requester has the same or equivalent facilities, tooling, equipment, personnel, and utilizes the original forging, castings, etc., in the manufacturing process.
Section D: Signatures
AFLCMC/EBW
Lead Engineer, Armament Section
Signature Date
AFLCMC/EBW
Armament Section Chief
AFLCMC/EBW
Director of Engineering, Armament Division
409 SCMS/GUEA
Chief, F-15 and Armament Engineering
409 SCMS/GUEA
Chief, Engineering Flight
Signature
Signature
Date
Date
DLA/AWB
Contracting Officer
DLA/AW
Competition Advocate
Chief, Contracting Office DLA Aviation
The qualification requirement shall not exceed seven (7) years past the last signed date (FAR 9.202(f)).
| 3715 Source Pre-Qualification for Requirements |
| 3715 Source Pre-Qualification for Requirements page 4 |
| 2022-06-13T12:13:48-0400 | |
| HOOPER.WILLIAM.L.1386289804 |
| 2022-06-17T12:53:30-0400 | |
| BEEBE.LAURIE.A.1255231770 |
| 2022-06-17T13:37:11-0400 | |
| HERNANDEZ.HECTOR.R.1231165661 |
| 2022-06-21T07:50:01-0400 | |
| GROVES.SCOTT.B.1279744817 |
| 2022-06-21T07:50:15-0400 | |
| GROVES.SCOTT.B.1279744817 |
| 2022-06-22T14:01:57-0400 | |
| MCGAHA.RUSSELL.C.1387944334 |
| 2022-06-27T08:51:49-0400 | |
| HOLLAND.FRANKLIN.N.1229984353 |
| 2022-06-27T08:25:12-0500 | |
| CULP.SHARITA.J.1289108145 |
File details come from the government source that posted it. Updated .