STATEMENT OF WORK

351 BA TS, Truck Modification Kirtland AFB, NM 87117

1. SCOPE OF WORK. Contractor will purchase and install the truck modifications identified on the attached estimate (par number specific). The contractor shall furnish all personnel to accomplish work required by this contract and ensure that the modifications/additions meet DOT, local, state, and federal regulations.

2. PERSONNEL. The contractor must provide a Point of Contact (POC) who will have oversight for the performance of the work. The Point of Contact will also have the authority to act for the contractor on all contact matters related to the contract.

3. INVENTORY. The contractor shall install the modifications on the following government owned vehicles:

· 2011 Ford F-350s

· Reg # 10B0927

· Reg# 10B0928

· Reg# 10B0931

· 2012 Chevrolet 3500HD

· Reg# 11B2744

· Reg# 11B2745

· Reg# 11B2746

4. The contractor should be located within 10 miles of Kirtland AFB, so that is has the least impact on the mission as possible.

5. The Vehicles will be dropped off and picked up by members of 351 BA TS

6. The contractor shall ensure government owned vehicle modifications are installed safely in accordance with the manufactures recommendations.

7. The contractor shall perform all phase of the work from start to completion and coordinate with the 351 BA TS Vehicle NCO (VNCO), SSgt Andres Tenorio (505) 846-3965 or 941-448-1152or TSgt Sarah Riley (505)846-7066 prior to beginning work. This is to ensure the 351 BA TS Vehicle NCO (VNCO) is aware of and approves all work being performed on these government owned vehicles.

8. Contractor will notify the 351 BA TS VNCO upon arrival of parts. Upon notification, the VNCO will coordinate vehicle drop off.

9. Only 2 vehicles will be worked on simultaneously, upon completion of the first 2 vehicle, two more will be dropped off.

10. Once the contractor has taken possession of the first 2 government vehicles, the contractor has fifteen (15) working days to complete required work on all vehicles(unless some foreseen circumstance arises and is coordinated with 351 BA TS).

11. The point of contact for the inspection will be 351 BA TS VNCO. If the VNCO is unable to perform the inspection, a representative will be appointed by 351 BA TS. A final inspection of the completed work will be conducted between the contractor and the inspector prior to invoice.

12. All factory parts are to be placed in the bed of the truck from which they were removed, and are to be store by the 351 BA TS Logistics Flight.

13. All vehicle mods will be in working order and all paperwork on warranties will be provided to the VNCO by the scheduled pick up time.