RFI_Responses_FA930217PK029_12_May_2017.pdf

PDF 9 MB Posted

Attached to
Avionics Cooling Unit Federal contract opportunity
Solicitation number
FA9302-17-P-K029
Issued by
Department of the Air Force Materiel Command Test Center

View the file

Other files for this federal contract opportunity

Other files attached to Avionics Cooling Unit, newest first.
File Type Posted
ACU__Provisions_and_Clauses_Am.pdf PDF
ACU_Mechanical_Reference_Drawings.pdf PDF
ACU_Proposal_Technical_Capability_Criteria_FedBizOps.pdf PDF
ACU_-_Provisions_and_Clauses.pdf PDF
SOW_Avionics_Cooling_Unit_FINAL.pdf PDF
ACU_Specifications_Package.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Government Responses to below RFI 12 May 2017

Requests for Information (RFI’s) for the Avionics Cooling Unit

FA9302-17-P-K029

1. During the job walk, we did not have access to see the POC’s for the CHW in corridor 030 on Sheet M-3. Please provide pictures of the POC’s along showing the height and the direction/path of access to the point of connections

Attached is a picture of where the current ACU chilled water lines are tied into.

2. Please provide pictures of the area showing location of new concrete pad for new equipment.

Attached is a picture of the proposed installation area for the new ACU.

3. Pictures of existing electrical panel that we need to tap into.

Attached are pictures of the existing ACU circuit breaker nomenclature tag and front of circuit breaker.

4. Specs for new Concrete Pad

The minimum requirement of the concrete pad is 5000 psi.