RFI_Responses_FA930217PK029_12_May_2017.pdf
PDF 9 MB Posted
- Attached to
- Avionics Cooling Unit Federal contract opportunity
- Solicitation number
- FA9302-17-P-K029
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| ACU__Provisions_and_Clauses_Am.pdf | ||
| ACU_Mechanical_Reference_Drawings.pdf | ||
| ACU_Proposal_Technical_Capability_Criteria_FedBizOps.pdf | ||
| ACU_-_Provisions_and_Clauses.pdf | ||
| SOW_Avionics_Cooling_Unit_FINAL.pdf | ||
| ACU_Specifications_Package.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Government Responses to below RFI 12 May 2017
Requests for Information (RFI’s) for the Avionics Cooling Unit
FA9302-17-P-K029
1. During the job walk, we did not have access to see the POC’s for the CHW in corridor 030 on Sheet M-3. Please provide pictures of the POC’s along showing the height and the direction/path of access to the point of connections
Attached is a picture of where the current ACU chilled water lines are tied into.
2. Please provide pictures of the area showing location of new concrete pad for new equipment.
Attached is a picture of the proposed installation area for the new ACU.
3. Pictures of existing electrical panel that we need to tap into.
Attached are pictures of the existing ACU circuit breaker nomenclature tag and front of circuit breaker.
4. Specs for new Concrete Pad
The minimum requirement of the concrete pad is 5000 psi.