RFP.pdf
PDF 313 KB Posted
- Attached to
- VKF Revitalization Federal contract opportunity
- Solicitation number
- FA9101-14-R-0019
About this file
RFP
View the file
Other files for this federal contract opportunity
Show all 50
VKF Revitalization has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NO.
FA9101-14-R-0019
2. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
3. DATE ISSUED
01 Aug 14
PAGE OF PAGES
IMPORTANT - The “offer” section on the reverse must be fully completed by offeror.
4. CONTRACT NO.
5. REQUESTION/PURCHASE REQUEST NO.
SEE SCHEDULE
6. PROJECT NO.
7. ISSUED BY AFTC PZI ARNOLD CODE FA9101 8. ADDRESS OFFER TO
AFTC/PZI (ARNOLD)
100 KINDEL DRIVE, SUITE A-332
ARNOLD AFB, TN 37389-1332
christopher.fanning.1@us.af.mil
SEE BLOCK 7
DO: DO-C2 NAIC: 236220
9. FOR INFORMATION
CALL:
A. NAME
CHRISTOPHER M.
FANNING
B. TELEPHONE NO. (Include area code) (NO COLLECT CALLS)
931-454-4675 X
SOLICITATION
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying no, date):
A. Construction Specification for VKF Revitalization (HVAC-MT&L) Spec No. 13019-11-001A
B. All offers are subject to (1) work requirements (2) other provisions and clauses incorporated in full text or reference.
C. In accordance with FAR 36.204: Magnitude of Construction is $1,000,000-$5,000,000
11. The Contractor shall begin performance within _30__ calendar days and complete it within __280__ calendar days after receiving award, notice to proceed. This performance period is mandatory, negotiable. (See _ _.)
12A. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If “YES”, indicate within how many calendar days after award in Item 12B.)
YES NO
12B. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
A. This is a Past Performance—Price Tradeoff with Technical source selection. See attachments for details.
B. Proposals and Past Performance Questionnaires are due no later than 2 September 2014 at 2:00 PM CST
C. Faxed proposals will not be accepted. See Attachment 3, Instructions to Offerors for details on submission of proposals and questionnaires.
D. An organized site visit will be held 12 August 2014 beginning at 9:00 SM CST. See 52.236-27 for details
E. Offers are to be valid for 60 days from the solicitation due date.
NSN 7540-01-155-3212
ConWrite Version 6.14.1 Created 01 Aug 2014 10:56 AM
1442-101 STANDARD FORM 1442 (REV. 4-85)
Prescribed by GSA
FAR (48 CFR) 53.236-1(e)
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NO. (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14)
CODE FACILITY CODE
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within __ __ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13D. Failure to insert any number means the offeror accepts the minimum in Item 13D.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation – give number and date of each)
AMENDMENT NO.
DATE
20A. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER
(Type or print)
20B. SIGNATURE 20C. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
See Section G
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO
10 U.S.C. 2304(c) ( ) 41 U.S.C. 253(c) ( )
26. ADMINISTERED BY
CODE
27. PAYMENT WILL BE MADE BY
EFT:T
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return _______ copies to issuing office.)
Contractor agrees to furnish and deliver all items or perform all work, requisitions identified on this form and any continuation sheets for the consideration slated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award,
(b) the solicitation, and (c) the clauses, representations, certifications, and specifications or incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation, is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30A. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN
(Type or print)
31A. NAME OF CONTRACTING OFFICER (Type or print)
30B. SIGNATURE 30C. DATE 31B. UNITED STATES OF AMERICA
BY
31C. AWARD DATE
STANDARD FORM 1442 PAGE 2 (REV. 4-85)
PART I - THE SCHEDULE
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION B FA9101-14-R-0019
Qty Unit Price ITEM SUPPLIES OR SERVICES Purch Unit Total Item Amount
VKF Revitalization
0001 1 __________ Lot __________ Noun: VKF REVITALIZATION
ACRN: AA
NSN: N - Not Applicable Contract type: J - FIRM FIXED PRICE Inspection: DESTINATION Acceptance: DESTINATION
FOB: DESTINATION
Descriptive Data:
The work consists of all materials, equipment, and labor to demolish and replace the HVAC system and associated piping, ceiling, interior finishes, and provide a fire suppression system for a portion of MT&L Building 676.
Work will also include interior furnishes and installation of a mass notification system for the building. All work is to be done at Arnold Engineering Development Center, Arnold Air Force Base, Tennessee.
SECTION B - SUPPLIES OR SERVICES AND PRICES/COSTS
SECTION B FA9101-14-R-0019
NO CLAUSES OR PROVISIONS IN THIS SECTION
SECTION C - DESCRIPTION/SPECS./WORK STATEMENT
SECTION C FA9101-14-R-0019
SECTION D - PACKAGING AND MARKING
SECTION D FA9101-14-R-0019
SECTION E - INSPECTION AND ACCEPTANCE
SECTION E FA9101-14-R-0019
NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:
FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES
52.246-12 INSPECTION OF CONSTRUCTION (AUG 1996)
SECTION F - DELIVERIES OR PERFORMANCE
SECTION F FA9101-14-R-0019
SHIP MARK TRANS
ITEM SUPPLIES SCHEDULE DATA QTY TO FOR PRI DATE
0001 1 F1EESF FA9101 ASREQ
Noun: VKF REVITALIZATION
ACRN: AA
Descriptive Data:
All work shall be performed:
Building 636 Arnold Engineering Development Center Arnold AFB, TN 37389
Period of Performance for this project is 280 calendar days after notice to proceed.
Mark For: FA9101-14-C-00XX
REQ: 474438
This contract is subject to invoices being submitted into Wide Area Work Flow. Please use the following codes for entering a CONSTRUCTION INVOICE:
Invoices shall be submitted as a CONSTRUCTION electronically using Wide Area Work Flow (WAWF) in accordance with DFARS Clause 252.232-7003.
Issue DoDAAC: FA9101 Admin DoDAAC: FA9101 Inspected By DoDAAC: F1EESF Service Acceptor (Ship To Code): FA9101 Pay DoDAAC: F03000 Inspection/Acceptance: Destination
Construction payment requests must be supported by a Progress Report. No invoice will be paid without approval of the Progress Report.
CONSTRUCTION INVOICES received with improper coding are subject to rejection, which could cause payment delay.
I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:
FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES
52.211-12 LIQUIDATED DAMAGES -- CONSTRUCTION (SEP 2000)
Para (a), Amount of liquidated damages. '$200.00'
II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:
SECTION F - DELIVERIES OR PERFORMANCE
SECTION F FA9101-14-R-0019
OTHER CONTRACT CLAUSES IN FULL TEXT
F002 PERIOD OF PERFORMANCE (FEB 1997) (TAILORED)
Period of performance under this contract shall be 280 calendars days after issuance of notice to proceed. All work must be complete within 280 days of the notice to proceed.
The Government reserves the right to issue Notice to Proceed at any time through 31 December 2014.
SECTION G - CONTRACT ADMINISTRATION DATA
SECTION G FA9101-14-R-0019
Obligation ACRN Appropriation/Lmt Subhead/Supplemental Accounting Data Amount
AA
57 43600 294 4711 6606MC 7A4435 52200 65976F 503000 F03000
JON: 00014164
NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:
AEDC-G001 SUBMISSION OF INVOICES (JUN 2014)
1. Invoices shall be submitted as CONSTRUCTION electronically using Wide Area Work Flow (WAWF) in accordance with DFARS Clause 252.232-7003.
2. Construction invoice payment requests must be supported by a Progress Report. Progress Reports are to be submitted no more frequently than once a month unless authorized by the Contracting Officer.
No invoice will be paid without approval of the Progress Report.
3. The following codes shall be used for inputting a CONSTRUCTION via WAWF:
Issue DoDAAC: FA9101 Admin DoDAAC: FA9101 Inspected By DoDAAC: F1EESF Service Acceptor (Ship To Code): FA9101 Pay DoDAAC: F03000 Inspection/Acceptance: Destination
CONSTRUCTION INVOICES received with improper coding are subject to rejection, which could cause payment delay.
AEDC-G002 PAYMENT INSTRUCTIONS (JUL 2012)
This order will be funded by a single source of funding for the contract line item. Payment shall be made using the ACRN funding of the line item being billed.
SECTION H - SPECIAL CONTRACT REQUIREMENTS
SECTION H FA9101-14-R-0019
NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:
AEDC-H001 DISPOSAL AREAS (JUL 2012)
An approved disposal area is located about 2 miles from the construction site. This area is approved for surplus earth, stone, broken concrete, and building materials waste. Building materials waste also includes containers, dunnage, and other related items.
AEDC-H002 EXISTING UNDERGROUND UTILITIES (JUL 2012)
The location of existing underground utilities as shown on the contract drawings has been taken from as built drawings. There may be underground utilities which are not shown on the contract drawings and these utilities may be dangerous if ruptured. If the Contractor unearths or strikes any underground utility not shown, the excavation work shall cease and the Contracting Officer shall be notified immediately.
The Contractor shall determine with caution the exact location of such utilities and will not proceed with further excavation unless otherwise advised by the Contracting Officer.
AEDC-H003 INSURANCE CLAUSE IMPLEMENTATION (JUL 2012)
The Contractor shall obtain and maintain the minimum kinds and amounts of insurance during performance of this contract as specified by FAR 28.307-2 Liability, and contemplated by FAR 52.228-5, Insurance--Work on a Government Installation, and/or 52.228-7, Insurance--Liability to Third Persons.
AEDC-H004 PRECONSTRUCTION CONFERENCE (JUL 2012)
A preconstruction conference will be held within 14 calendar days after contract award date. The Contractor shall provide the following at the preconstruction meeting:
(1) A detailed total job schedule on AF Form 3064, Contract Progress Schedule.
(2) Submittal items as noted in the specification package.
AEDC-H005 PROGRESS SCHEDULE (JUL 2012)
(a) In accordance with FAR Clause 52.236-15, which is incorporated by reference in the Contract Clauses section of this solicitation, the Contractor shall submit three copies of a progress schedule (Air Force Form 3064) for review and approval by the Contracting Officer no later than 30 days before planned start of on-site work. The Contractor shall comply with the procedures for completing the form on the reverse of the Air Force Form 3064.
(b) The progress schedule shall outline in detail the phasing of the project. Include the major elements of work, including material submittals and approval, materials procurement, mobilization, and execution of all on-site work, including detailed construction progress milestones.
(c) When requesting payment for materials stored on site, the Contractor shall include stored materials as a separate work element on the progress schedule and submit paid invoices to support the request for payment.
AEDC-H006 REQUIRED INSURANCE (JUL 2012)
Pursuant to FAR clause 52.228-5, Insurance - Work on a Government Installation (JAN 1997) (Deviation) the contractor shall maintain the following minimum amounts of insurance:
TYPE AMOUNT
Workers' Compensation & Employer's Liability $100,000 Insurance General Liability Insurance (Bodily Injury) $500,000 per occurrence Automobile Liability $200,000 per person $500,000 per occurrence for bodily injury $20,000 per occurrence for property damage
AEDC-H007 SAFETY (JUL 2012)
1.0 The contractor shall obtain AEDC/SE coordination to assure adequate safety practices. The contractor shall take or cause to be taken such additional measures as the Contracting Officer may determine to be reasonably necessary for the protection of life and health of employees and other persons and for prevention of damage to property, materials, supplies or equipment. The Contractor shall comply with safety rules (tags and work clearances) the AEDC Support Contractor at interface points of new construction and modifications to existing systems and with AEDC Base Safety Standards
2.0 In addition, Contractor shall comply with FAR 52.236-13, Accident Protection and the Voluntary Protection Program.
2.1 VPP requires that contractors performing on Air Force installations provide their employees safety and health protection equal in quality to that provided to Air Force employees. However, the contractor will be responsible for managing their health and safety program.
2.2 VPP is applicable to contractors whose employees work more than 1000 hours per quarter on an Air Force installation. Applicable contractors are required to flow down VPP requirements to all subcontractors who qualify as applicable contractors under their contract.
2.3 Applicable contractors are required to submit a safety and health plan and corresponding site safety checklist to the Contracting Officer within 10 days after contract award. The plan shall be made available to the installation safety office through the Contracting Officer for acceptance prior to contract performance.
2.4 Applicable contractors are required to submit their TCIR and DART rates prior to contract award.
The TCIR and DART rates will be reviewed and may used to determine contractor responsibility.
2.5 Applicable contractor's performance will be accountable for compliance with their safety and health plan, to include mishap reporting.
2.6 Applicable contractors shall ensure their employees and subcontractors promptly report pertinent facts regarding mishaps involving reportable damage or injury. Applicable contractors will cooperate in any safety investigation, to include toxicology testing.
2.7 Applicable contractors are required to provide their TCIR and DART rates and the OSHA Form 300A to the Contracting Officer by the 15th of January for annual submission in the installation's annual VPP self evaluation report. The information will be provided to the designated VPP Office of Office of Primary Responsibility (OPR).
2.8 Applicable contractors are required to identify the processes and procedures used to track compliance with the Safety and Health Plan.
2.9 Applicable contractors shall review the VPP site URL, <http://www.osha.gov/dcsp/vpp/index.html> to understand VPP and how performance is linked to the AF installation's pursuit of VPP recognition.
3.0 The Contractor Safety and Health Plan must demonstrate a management commitment to employee safety and health. The plan shall include application to subcontractors and shall include the following elements:
3.1 Worksite hazard analysis with base-line hazard identification and required control measures.
3.2 Job site analysis which lists the hazards associated with performing the task and the applied control measures.
3.3 Corrective action plan for identified hazards.
3.4 Inspection program for each worksite to include identifying the individual conducting the inspection and the frequency of inspection.
3.5 Employee hazard reporting procedures.
3.6 Procedures for accident investigation and reporting.
3.7 Emergency response plan including first aid/injury procedures.
3.8 Employee safety and health training requirements and documentation process.
3.9 All applicable safety rules and regulations.
3.10 Roles and responsibilities of management, supervisors, employees and contractor safety coordinator.
DEFINITIONS
Applicable Contractor. A contractor whose employees worked at least 1,000 hours at the site in any calendar quarter within the last 12 months and is NOT directly supervised by the applicant (installation).
Days Away, Restricted, and or Transfer Case Incident Rate (DART). The number of recordable injuries and illness cases per 100 full-time employees resulting in days away from work, restricted work activity, and/or job transfer that a site has experienced in a given time frame.
Total Case Incidence Rate (TCIR) - Total number of recordable injuries and illness cases per 100 full-time employees that a site has experienced in a given time frame.
Voluntary Protection Program - The Voluntary Protection Program (VPP) promotes effective worksite-based safety and health. In the VPP, management, labor, and OSHA establish cooperative relationships at workplaces that have implemented a comprehensive safety and health management system. Approval into VPP is OSHA's official recognition of the outstanding efforts of employers and employees who have achieved exemplary occupational safety and health.
AEDC-H008 SANITATION (JUL 2012)
The Contractor shall provide temporary toilet facilities in a ratio of not fewer than one for each 30 persons or fraction thereof. Connections to existing sanitary sewer manholes may be made. The Contractor shall supply drinking water from connections to the existing potable water system. The Contractor shall take proper precautions to protect the water system from damage and contamination. Any temporary connections made for drinking water or toilet facilities shall be removed by the Contractor in a manner satisfactory to the Contracting Officer before final acceptance of the work.
AEDC-H009 PERIOD OF PERFORMANCE (JUL 2014)
Period of Performance shall be 280 calendar days after Notice to Proceed.
AEDC-H010 TECHNICAL SURVEILLANCE (JUL 2012)
The Government designates the Air Force Project Engineer and the AEDC Support Contractor to perform technical surveillance. They will recommend to the Contracting Officer acceptance or rejection of work under this contract. All references to the "Government representative " within the specification or other project documents shall mean the Air Force Project engineer or the AEDC Support contractor personnel performing technical surveillance on behalf of the Government. As used in the specification or other project documents, the term "construction monitor" shall be understood as referring to the AEDC Support Contractor personnel performing technical surveillance on behalf of the Government.
AEDC-H011 UTILITIES AVAILABLE (JUL 2012)
(a) Water: All reasonable required amounts of potable and raw water will be made available without cost to the Contractor from existing systems, outlets, and supplies near the vicinity of the work. All water shall be carefully conserved. All temporary connections and piping installed by the Contractor shall be removed in a manner satisfactory to the Contracting Officer prior to final acceptance of the work.
(b) Electricity: All reasonably required amounts of 60 HZ electric power at 110V and 480V will be made available without cost to the Contractor from existing electrical systems near the vicinity of the of the work.
The Contractor shall install and maintain at no cost to the Government any necessary supply connections and facilities in a manner satisfactory to the Contracting Officer. All electrical service shall be removed in a manner satisfactory to the Contracting Officer.
AEDC-H012 CONTRACTOR IDENTIFICATION (JUL 2012)
(a) Contractor personnel and their subcontractors must identify themselves as Contractors or subcontractors during meetings, telephone conversations, in electronic messages, or correspondence related to this contract.
(b) Contractor-occupied facilities (on AFMC or other Government installations) such as offices, separate rooms, or cubicles must be clearly identified with Contractor supplied signs, name plates or other identification, showing that these are work areas for Contractor or subcontractor personnel.
AEDC-H013 VISIT AUTHORIZATIONS (JUN 2014)
Arnold Engineering Development Center (AEDC) is a U.S. Government Air Force installation. In accordance with AEDC Installation Security Instructions (ISI-31-101), all visitors to Arnold AFB must adhere to the following guidelines: U.S. citizens and lawful permanent residents are authorized to visit the facility and require a picture ID as identification at the time of visit. Permanent residents are required to present their "Permanent Resident/Alien Registration Card" as their form of identification. Foreign nationals who work in the U.S. must submit their visit request on their firm's letterhead through their AEDC POC to the Foreign Disclosure Office, stating the purpose and length of the intended visit. Two weeks advance notice for processing is required for these visits.
AEDC-H014 UNCLASSIFIED SECURITY (JUL 2014)
SECURITY: The contractor shall be required to comply with all security directives and other security requirements identified in this contract. These requirements apply to all contractors on Arnold AFB in the performance of their contract.
(a) Pass and Identification Items: The contractor shall ensure the pass and identification items required for contract performance are obtained for employees and non-Government-owned vehicles. The contractor shall retrieve all identification media from employees who depart for any reason before the contract expires, e.g., terminated for cause, retirement, etc.
The contractor shall comply with all installation access requirements as directed in Arnold Air Force Base (AAFB) 31-101, Integrated Defense Plan. The AEDC/CC reserves the right to refuse entry and/or re-entry of any person to AEDC for just cause to protect personnel, facilities, and property under their control through the use of a barment order when such actions are deemed necessary.
(b) Freedom of Information Act (FOIA): The contractor shall comply with Freedom of Information Act (FOIA) requirements IAW DOD 5400.7-R, FOIA Program, Chapter 4.
(c) For Official Use Only (FOUO): The contractor shall safeguard FOUO information provided under this contract as specified in DODM 5200.01-V4, DoD Information Security Program: Controlled Unclassified Information (CUI). CUI is information that does not meet the standards for National Security
Classification under Executive Order 13526, dtd Dec 2009, but is pertinent to the national interests of the United States or to the important interests of entities of the Federal Government, and under law or policy that requires protection from unauthorized disclosure, special handling safeguards, or prescribed limits on exchange or dissemination. If FOUO information is lost, misused, compromised, or accessed by unauthorized persons, it could adversely affect U.S. national interest, the conduct of DoD programs, or the privacy of DoD personnel. CUI comes in many forms: personal data under the Privacy Act, personnel records, privileged data (chaplain and judge advocate records), investigative data, scientific and technical information (STINFO), export controlled data (critical technologies), proprietary data, or FOUO data. Sensitive information meets the criteria for exemption from mandatory public disclosure under FOIA. For guidance with marking CUI, contact AEDC/TSD-IP at (931) 454-3290.
(1) If access to CUI / Export Control / STINFO information is required, the contractor shall be required to be registered as a certified Government contractor through the Joint Certification Office, Defense Logistics Information Service (DLIS). To request DLIS Certification, submit a DD Form 2345, Militarily Critical Technical Data Agreement, to the DLIS, Battle Creek, MI address indicated at the top of the DD Form 2345 along with a copy of the company's state business license, incorporation certificate, sales tax identification form, or other documentation, which verifies the legitimacy of the company. A copy of their DD2345, Militarily Critical Technical Data Agreement, must be provided when issued.
Except as allowed by DFARS 252.225-7048, Export-Controlled Items, foreign nationals shall not have access to export-controlled information without an export license. All export control laws as stipulated in both Export Administration Regulation and International Traffic in Arms Regulation must be followed without exception. For guidance in applying appropriate export control markings, contact AEDC/XP2 at
(931) 454-7329.
(2) The contractor must obtain Foreign Disclosure Office (FDO) approval through the Contracting Officer prior to allowing any non-U.S. or un-validated U.S. Lawful Permanent Resident persons access to CUI or export-controlled information. (Also, see DFARS Clause 252.225-7048, Export-Controlled Items).
(d) Reporting Requirements: Contractor personnel shall report to an appropriate authority any information or circumstances of which they are aware may pose a threat to the security of DOD personnel, contractor personnel, resources, and classified or unclassified defense information.
Contractor employees shall be briefed by their immediate supervisor upon initial on-base assignment.
(e) Physical Security: The contractor shall be responsible for safeguarding all Government property and controlled forms provided for contractor use. At the end of each work period, all Government facilities, equipment, and materials shall be secured.
(f) Computer Security (COMPUSEC) / Automated Information System (AIS) Requirements: If access to unclassified computer systems is required, the following requirements apply: Users must be a U.S. citizen or receive AEDC or Air Force Materiel Command (AFMC) Foreign Disclosure Office (FDO) approval prior to access being granted; requestor must have a favorable National Agency Check with Inquiries (NACI) clearance or an approved Interim AIS request on file; and requestor must complete the Air Force (AF) Information Assurance (IA) Training. To request access to an unclassified computer system, users must complete an AEDC Government Contractor (GC) Form 591, Request for Authorized Use of Central Computer Systems. Users bringing portable electronic devices (PEDs) on base and wanting to connect to AEDC computer systems / networks shall comply with AFPD 33-2, Information Assurance Program, and AFI 33-200, Information Assurance (IA) Management. Employees shall complete any additional computer security training requirements mandated by the host base.
(g) Information Security (INFOSEC): Information, regardless of media, shall be controlled and maintained in accordance with (IAW) with the National Industrial Security Program Operating Manual (NISPOM) and guidance provided by the Servicing Security Activity (SSA), AEDC/TSD-IP.
(h) Privacy Act: Comply with AFI 33-332, Privacy Act Program, when collecting and maintaining information protected by the Privacy Act of 1974, Title 5, U.S.C., Section 552a. Remove or destroy official records only IAW Air Force Records Information Management System, (AFRIMS) located on the internet at: <https://www.my.af.mil/gcss-af61a/afrims/afrims/rds/rds_series.cfm>.
(i) Operations Security (OPSEC): Comply with AFPD 10-7, Information Operations; AFI 10-701, Operations Security; DoD 5220.22-R, Industrial Security Regulation (ISR), Chapter 10; and local plans and publications.
(j) Antiterrorism (AT) Training: DoD contractors shall be provided AT information as required by DFARS Clause 252.225-7043, Antiterrorism / Force Protection for Defense Contractors Outside the United States. Level 1 AT Awareness Training shall be provided to all DoD contractor employees.
(k) Contractor Consent to Background Checks: The Contractor shall not employ persons to perform under this contract if such employee is deemed or identified as a potential threat to the health, safety, security, general well-being, or operational mission of the installation and its population; nor shall the Contractor or subcontractor employ persons under this contract who have an outstanding criminal warrant as identified by the Tennessee Information Enforcement System (TIES) through the National Crime Information Center. TIES checks will verify if a person is wanted by local, state, or federal agencies. All contractor and subcontractor personnel must consent to TIES background checks. Contractor and subcontractor personnel who do not consent to a TIES check will be denied access to the installation.
Information required to conduct a TIES check includes: full name, driver's license number, and/or social security number, date of birth of the person entering the installation, and completion of a background check questionnaire. The contractor must have this information ready to provide to the Visitor Control Center, if requested.
(1) Contractors must ensure their employees and those of their subcontracts have the proper credentials allowing them to work in the United States. Persons without proper credentials will be remanded to the appropriate authorities.
(2) The contractor shall not be entitled to any compensation for delays or expenses associated with complying with the provisions of this clause. Furthermore, nothing in this clause shall excuse the contractor from proceeding with the contract as required.
(l) Access to Installation During Force Protection Conditions (FPCONs): Gaining access to the installation during FPCONs will be done IAW the requirements outlined in the local Antiterrorism / Integrated Defense Plan(s). Contractors will be assigned a mission essential designation IAW requirements contained in Antiterrorism / Integrated Defense Plan(s). Only the installation commander or the unit commander requesting contract support will assign the mission essential designation.
(m) Property Protection: Property protection for the facility where the contractor's primary work center is located will be the responsibility of the local facility manager and local security manager, or their duly authorized representative IAW AFI 31-101, Integrated Defense, and command / local directives to include AAFB Plan 31-101. The contractor must safeguard all Government-owned equipment and materials in their possession or use.
PART II - CONTRACT CLAUSES
SECTION I - CONTRACT CLAUSES
SECTION I FA9101-14-R-0019
Contract Clauses in this section are from the FAR, Defense FAR Sup, Air Force FAR Sup, and the Air Force
Materiel Command FAR Sup, and are current through the following updates:
Database_Version: 6.14.x.2200; Issued: 7/8/2014; FAR: FAC 2005-74(Partial)- 2005-75;
DFAR: DPN 20140624; DL.: DL 98-021; Class Deviations: CD 2014-O0018;
AFFAR: 2002 Edition; AFAC: AFAC 2014-0421; IPN: 98-009
I. NOTICE: The following contract clauses pertinent to this section are hereby incorporated by reference:
A. FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES
52.202-01 DEFINITIONS (NOV 2013)
52.203-03 GRATUITIES (APR 1984)
52.203-05 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
52.203-06 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
52.203-07 ANTI-KICKBACK PROCEDURES (MAY 2014)
52.203-08 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(OCT 2010)
52.204-04 PRINTED OR COPIED DOUBLE-SIDED ON POSTCONSUMER FIBER CONTENT
PAPER (MAY 2011)
52.204-09 PERSONAL IDENTITY VERIFICATION OF CONTRACTOR PERSONNEL (JAN 2011)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (JUL 2013)
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JUL 2013)
52.209-06 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(AUG 2013)
52.211-10 COMMENCEMENT, PROSECUTION, AND COMPLETION OF WORK (APR 1984)
(a) Number of calendar days is '10'
(c) Number of days or calendar date is '280 calendar days after receipt of Notice to
Proceed'
52.215-02 AUDIT AND RECORDS -- NEGOTIATION (OCT 2010)
52.219-04 NOTICE OF PRICE EVALUATION PREFERENCE FOR HUBZONE SMALL BUSINESS
CONCERNS (JAN 2011)
52.219-06 NOTICE OF TOTAL SMALL BUSINESS SET-ASIDE (NOV 2011)
52.219-08 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2014)
52.219-14 LIMITATIONS ON SUBCONTRACTING (NOV 2011)
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)
52.222-01 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
52.222-03 CONVICT LABOR (JUN 2003)
52.222-04 CONTRACT WORK HOURS AND SAFETY STANDARDS - OVERTIME
COMPENSATION (MAY 2014)
52.222-06 CONSTRUCTION WAGE RATE REQUIREMENTS (MAY 2014)
52.222-07 WITHHOLDING OF FUNDS (MAY 2014)
52.222-08 PAYROLLS AND BASIC RECORDS (MAY 2014)
52.222-09 APPRENTICES AND TRAINEES (JUL 2005)
52.222-10 COMPLIANCE WITH COPELAND ACT REQUIREMENTS (FEB 1988)
52.222-11 SUBCONTRACTS (LABOR STANDARDS) (MAY 2014)
52.222-12 CONTRACT TERMINATION -- DEBARMENT (MAY 2014)
52.222-13 COMPLIANCE WITH CONSTRUCTION WAGE RATE REQUIREMENTS AND
RELATED REGULATIONS (MAY 2014)
52.222-14 DISPUTES CONCERNING LABOR STANDARDS (FEB 1988)
52.222-15 CERTIFICATION OF ELIGIBILITY (MAY 2014)
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)
52.222-26 EQUAL OPPORTUNITY (MAR 2007)
52.222-27 AFFIRMATIVE ACTION COMPLIANCE REQUIREMENTS FOR CONSTRUCTION (FEB
1999)
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (SEP 2010)
52.222-36 AFFIRMATIVE ACTION FOR WORKERS WITH DISABILITIES (OCT 2010)
52.222-37 EMPLOYMENT REPORTS ON VETERANS (SEP 2010)
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR RELATIONS
ACT (DEC 2010)
52.222-50 COMBATING TRAFFICKING IN PERSONS (FEB 2009)
52.222-99 ESTABLISHING A MINIMUM WAGE FOR CONTRACTORS (DEVIATION) (JUN 2014)
52.223-03 HAZARDOUS MATERIAL IDENTIFICATION AND MATERIAL SAFETY DATA (JAN
1997) Para (b), Material Identification No: '________'
52.223-05 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
52.223-06 DRUG-FREE WORKPLACE (MAY 2001)
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (AUG 2011)
52.225-09 BUY AMERICAN - CONSTRUCTION MATERIALS (MAY 2014)
Para (b)(2). Insert excepted materials or "none". 'None'
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
52.227-01 AUTHORIZATION AND CONSENT (DEC 2007)
52.227-02 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (DEC 2007)
52.227-04 PATENT INDEMNITY -- CONSTRUCTION CONTRACTS (DEC 2007)
52.228-02 ADDITIONAL BOND SECURITY (OCT 1997)
52.228-05 INSURANCE -- WORK ON A GOVERNMENT INSTALLATION (JAN 1997)
52.228-11 PLEDGES OF ASSETS (JAN 2012)
52.228-12 PROSPECTIVE SUBCONTRACTOR REQUESTS FOR BONDS (MAY 2014)
52.228-14 IRREVOCABLE LETTER OF CREDIT (MAY 2014)
52.228-15 PERFORMANCE AND PAYMENT BONDS - CONSTRUCTION (OCT 2010)
52.229-03 FEDERAL, STATE, AND LOCAL TAXES (FEB 2013)
52.232-05 PAYMENTS UNDER FIXED-PRICE CONSTRUCTION CONTRACTS (MAY 2014)
52.232-17 INTEREST (MAY 2014)
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
52.232-27 PROMPT PAYMENT FOR CONSTRUCTION CONTRACTS (MAY 2014)
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER - SYSTEM FOR AWARD
MANAGEMENT (JUL 2013)
52.233-01 DISPUTES (MAY 2014)
52.233-03 PROTEST AFTER AWARD (AUG 1996)
52.233-04 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
52.236-02 DIFFERING SITE CONDITIONS (APR 1984)
52.236-03 SITE INVESTIGATION AND CONDITIONS AFFECTING THE WORK (APR 1984)
52.236-04 PHYSICAL DATA (APR 1984)
Description of investigational methods used: 'surveys' Summary of weather records and warnings '
(1) The location of the work is subject to atmospheric temperature ranging from minus 10 degrees F to plus 105 degrees F. The average annual rainfall is about 54 inches and the average annual snowfall is about 4 inches.
(2) Time Extensions for Unusually Severe Weather
a. Based on data from the National Oceanic and Atmospheric Agency (NOAA), the following number of adverse weather days can be anticipated at Arnold AFB, TN in the month indicated.
JAN 16 MAY 8 SEP 7
FEB 13 JUN 6 OCT 5
MAR 9 JUL 8 NOV 7
APR 7 AUG 5 DEC 13
b. From receipt of Notice to Proceed throughout the contract performance period, the Government Project Officer will record daily the actual number of adverse weather days which prevent work for at least 50 percent of the contractor's workday.
c. Only after the cumulative number of "adverse weather days" as defined in b., above, has reached the total calculated from the monthly figures listed in a., above, or the proportionate number for partial calendar months in the performance period, will the Contracting Officer consider a time extension in accordance with the clause entitled "Default (Fixed-Price Construction)." A time extension will be granted on a day-for-day basis if the Contracting Officer determines that additional adverse weather days prevent work for at least 50 percent of the contractor's workday and delay work critical to the timely completion of the contract.
d. The contractor's schedule must reflect the delays associated with the anticipated adverse weather days listed in a., above. The Contracting Officer will grant no time extensions for adverse weather days within the cumulative total of the monthly numbers listed.'
Summary of transportation facilities providing access from the site ' Transportation Facilities to AEDC Fenced Area
(1) Highways. U.S. Highway 41A is a paved road passing through
Tullahoma, Tennessee. U.S. Highway 41 and Interstate 24 are paved roads passing through Manchester, Tennessee. State Highway 55 is a paved road connecting U.S.
Highway 41 and 41A at Manchester and Tullahoma, respectively.
Access to the AEDC area can be gained from State Highway 55 near Tullahoma via new paved highway intersecting U.S. Highway 41, 5.5 miles southwest of Manchester and 3.8 miles from the area entrance, and Interstate 24, 3.5 miles southeast of Manchester and
2.5 miles from the area entrance. Concrete pavements have been constructed within the AEDC area and may be used subject to the restrictions set forth herein. Access to the sites of work from the paved areas and other routes shall be provided and maintained by and at the expense of the Contractor. The route for equipment which is not permitted to operate on the concrete pavement shall be as approved by the Contracting Officer. No construction truck or trailer vehicles shall be operated upon pavements of the AEDC area except within the following load limitations.
(d) Travel Within the AEDC Area
(1) Streets and Roadways. Streets have been constructed within the
AEDC area and may only be used subject to the restrictions set forth herein.
a. A "Special Permit" is required for the movement of all construction equipment, unless hereinafter provided otherwise, which is to be moved over streets or over areas containing underground ducting, piping, or overhead utilities. Application for the Special permit to move heavy equipment will be submitted to the Contracting Officer. Application for such movements will be made sufficiently in advance of the time needed to avoid delays in movement. Only wheel or tire vehicles which fall under the following maximum allowable load limitations may operate without permit upon AEDC streets:
DESIGN AXLE AND WHEEL LOADS ON STREETS
Maximum Allowable Loads in Pounds
*Truck or Trailer **Large Tire Equipment Streets Per Axle Per Wheel Per Axle Per Wheel
Avenues A, B, and C and 2nd Street 18,000 9,000 25,200 12,600 Avenue E 24,000 12,000 33,600 16,800 1st, 4th, and 5th Streets 24,000 12,000 36,600 16,800 3rd Street between Avenues B and C 18,000 9,000 25,200 12,600 3rd Street between C and E 24,000 12,000 33,600 16,000
*Axles must be spaced greater than 40" apart.
**Equipment with tires wider than 16", such as large earth moving equipment.
These restrictions permit the operation of fully loaded DW-10's with No. 10 scrapers only on pavements with a maximum allowable load of 33,600 pounds. The axle load for large tire equipment shall be based upon the manufacturer's specified weights for fully loaded equipment.
b. If any equipment exceeds the above load limitations, or any track vehicles are used, the pavement must be protected with earth or fiber at the expense of the Contractor. Compliance with the above requirements does not preclude the Contractor's liability for any damage which results from his travel over AEDC streets.
(2) Other Routes. Routes for use of equipment which is not permitted on AEDC streets shall be as shown on the drawings, or as approved by the Contracting Officer. Access to the sites of work from the paved areas, and other routes, shall be provided and maintained by and at the expense of the Contractor.
(3) Traffic Regulations. The Contractor shall be cognizant of and comply with all AEDC traffic regulations as published and enforced on the AEDC Installation.'
Other pertinent information: 'None'
52.236-05 MATERIAL AND WORKMANSHIP (APR 1984)
52.236-06 SUPERINTENDENCE BY THE CONTRACTOR (APR 1984)
52.236-07 PERMITS AND RESPONSIBILITIES (NOV 1991)
52.236-08 OTHER CONTRACTS (APR 1984)
52.236-09 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES,
AND IMPROVEMENTS (APR 1984)
52.236-10 OPERATIONS AND STORAGE AREAS (APR 1984)
52.236-11 USE AND POSSESSION PRIOR TO COMPLETION (APR 1984)
52.236-12 CLEANING UP (APR 1984)
52.236-13 ACCIDENT PREVENTION (NOV 1991)
52.236-14 AVAILABILITY AND USE OF UTILITY SERVICES (APR 1984)
52.236-15 SCHEDULES FOR CONSTRUCTION CONTRACTS (APR 1984)
52.236-17 LAYOUT OF WORK (APR 1984)
52.236-21 SPECIFICATIONS AND DRAWINGS FOR CONSTRUCTION (FEB 1997)
52.236-26 PRECONSTRUCTION CONFERENCE (FEB 1995)
52.242-13 BANKRUPTCY (JUL 1995)
52.242-14 SUSPENSION OF WORK (APR 1984)
52.243-04 CHANGES (JUN 2007)
52.244-06 SUBCONTRACTS FOR COMMERCIAL ITEMS (MAY 2014)
52.246-21 WARRANTY OF CONSTRUCTION (MAR 1994)
52.248-03 VALUE ENGINEERING -- CONSTRUCTION (OCT 2010)
Para (i), Contract number. 'See SF 1442, Block 4'
52.249-02 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE) (APR
2012) - ALTERNATE I (SEP 1996)
52.249-03 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (DISMANTLING,
DEMOLITION, OR REMOVAL OF IMPROVEMENTS) (APR 2012) - ALTERNATE I (SEP
1996)
52.249-10 DEFAULT (FIXED-PRICE CONSTRUCTION) (APR 1984)
52.253-01 COMPUTER GENERATED FORMS (JAN 1991)
B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER DEFENSE-
CONTRACT-RELATED FELONIES (DEC 2008)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS (SEP
2013)
252.204-7000 DISCLOSURE OF INFORMATION (AUG 2013)
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
252.204-7006 BILLING INSTRUCTIONS (OCT 2005)
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS (DEC
1991)
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A TERRORIST COUNTRY (MAR 2014)
252.211-7003 ITEM UNIQUE IDENTIFICATION AND VALUATION (DEC 2013)
Para (c)(1)(i). Line Item exceptions or n/a. '?????' Para (c)(1)(ii). If items are identified in the Schedule, insert "See Schedule" '?????' Para (c)(1)(iii). Attachment Nr. '?????' Para (c)(1)(iv). Attachment Nr. '?????' Para (f)(2)(iii). Line item number or n/a. '?????'
252.223-7006 PROHIBITION ON STORAGE AND DISPOSAL OF TOXIC AND HAZARDOUS
MATERIALS (APR 2012)
252.223-7008 PROHIBITION OF HEXAVALENT CHROMIUM (JUN 2013)
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)
252.225-7016 RESTRICTION ON ACQUISITION OF BALL AND ROLLER BEARINGS (JUN 2011)
252.227-7033 RIGHTS IN SHOP DRAWINGS (APR 1966)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(JUN 2012)
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
252.236-7000 MODIFICATION PROPOSALS--PRICE BREAKDOWN (DEC 1991)
252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
Para (e). Identify drawings. 'VKF Revitalization (HVAC- MT&L dated 30 May 2014'
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
252.247-7023 TRANSPORTATION OF SUPPLIES BY SEA - BASIC (APR 2014)
252.247-7024 NOTIFICATION OF TRANSPORTATION OF SUPPLIES BY SEA (MAR 2000)
C. AIR FORCE FEDERAL ACQUISITION REGULATION SUPPLEMENT CONTRACT CLAUSES
5352.201-9101 OMBUDSMAN (APR 2014)
Para (c). Ombudsmen names, addresses, phone numbers, fax, and email addresses. ' Air Force Test Center Vice Commander
1 South Rosamond Blvd Edwards AFB, CA 93524-3784 Phone: 661-227-2810 Fax: (661) 277-7593' 5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (NOV
2012)
5352.242-9000 CONTRACTOR ACCESS TO AIR FORCE INSTALLATIONS (NOV 2012)
Para (b), Any additional requirements to comply with local security procedures 'ALL
OTHER BASE REQUIREMENTS'
Para (d). Additional requirements. 'AEDC Security Procedures'
II. NOTICE: The following contract clauses pertinent to this section are hereby incorporated in full text:
FEDERAL ACQUISITION REGULATION CONTRACT CLAUSES IN FULL TEXT
52.223-09 ESTIMATE OF PERCENTAGE OF RECOVERED MATERIAL CONTENT FOR EPA-
DESIGNATED ITEMS (MAY 2008)
(a) Definitions. As used in this clause-
"Postconsumer material" means a material or finished product that has served its intended use and has been discarded for disposal or recovery, having completed its life as a consumer item. Postconsumer material is a part of the broader category of "recovered material."
"Recovered material" means waste materials and by-products recovered or diverted from solid waste, but the term does not include those materials and by-products generated from, and commonly reused within, an original manufacturing process.
(b) The Contractor, on completion of this contract, shall-
(1) Estimate the percentage of the total recovered material content for EPA-designated item(s) delivered and/or used in contract performance, including, if applicable, the percentage of postconsumer material content; and
(2) Submit this estimate to _____ (Contracting Officer complete in accordance with agency procedures).
52.252-02 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es): http://farsite.hill.af.mil/
52.252-06 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter
1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
PART III - LIST OF DOCUMENTS, EXHIBITS & ATTACHMENTS
SECTION J - LIST OF ATTACHMENTS
SECTION J FA9101-14-R-0019
DOCUMENT PGS DATE TITLE
ATTACHMENT 1 306 30 MAY 2014 CONSTRUCTION SPECIFICATION FOR VKF
REVITALIZATION (HVAC-MT&L)
ATTACHMENT 2 60 30 MAY 2014 DRAWINGS
ATTACHMENT 3 6 24 JUL 2014 INSTRUCTIONS TO OFFERORS
ATTACHMENT 4 3 24 JUL 2014 EVALUATION CRITERIA
ATTACHMENT 5 4 17 JUL 2014 PAST PERFORMANCE QUESTIONNAIRE
ATTACHMENT 6 3 03 JAN 2014 WAGE DETERMINATION
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K - REPRESENTATIONS, CERTIFICATIONS AND OTHER STATEMENTS OF OFFERORS
SECTION K FA9101-14-R-0019
PAGE K - 1 of 13
I. NOTICE: The following solicitation provisions pertinent to this section are hereby incorporated by reference:
A. FEDERAL ACQUISITION REGULATION SOLICITATION PROVISIONS
52.222-38 COMPLIANCE WITH VETERANS' EMPLOYMENT REPORTING REQUIREMENTS
(SEP 2010)
52.223-04 RECOVERED MATERIAL CERTIFICATION (MAY 2008)
B. DEFENSE FEDERAL ACQUISITION REGULATION SUPPLEMENT SOLICITATION PROVISIONS
252.209-7001 DISCLOSURE OF OWNERSHIP OR CONTROL BY THE GOVERNMENT OF A
TERRORIST COUNTRY (JAN 2009)
II. NOTICE: The following solicitation provisions pertinent to this section are hereby incorporated in full text:
A. FEDERAL ACQUISITION REGULATION SOLICITATION PROVISIONS IN FULL TEXT
52.204-08 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAY 2014)
(a)
(1) The North American Industry Classification System (NAICS) code for this acquisition is 236220.
(2) The small business size standard is $33,500,000.00.
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)
(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
(2) If the provision at 52.204-7 is not included in this solicitation, and the offeror is currently registered in the System for Award Management (SAM), and has completed the Representations and Certficiations section of SAM electronically, the offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certification in the solicitation. The offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c)
PAGE K - 2 of 13
(1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated,…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .