LTS_Altus_AFB,_OK_FA8773-19-Q-A015_Amendment_01_dated_4_Jun_2019.pdf
PDF 239 KB Posted
- Attached to
- Local Telecommunication Services for Altus AFB, OK Federal contract opportunity
- Solicitation number
- FA8773-19-Q-A015
About this file
Amendment 01
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Attch_2-LTS_Pricing_Schedule_Altus_AFB_OK_3_Jun_19.xlsx | XLSX spreadsheet | |
| Attch_1-LTS_PWS_V2_Altus_AFB_OK_3_Jun_2019.pdf | ||
| LTS_Combined_Syn-Sol_-_Altus_AFB_OK_-_FA8773-19-Q-A015_-_22_Apr_2019.pdf | ||
| Attch_5-LTS_Q_&_A_Spreadsheet_23_May_2018.xlsx | XLSX spreadsheet | |
| Attch_4-LTS_Addendum_to_52.212-2_Eval_Factors_2_Oct_2018.pdf | ||
| Attch_3-LTS_Addendum_to_52.212-1_Instructions_to_Offerors_2_Oct_2018.pdf | ||
| Attch_2-LTS_Pricing_Schedule_Altus_AFB_OK_21_Mar_19.xlsx | XLSX spreadsheet | |
| Attch_1-LTS_PWS_V1_Altus_AFB_OK_15_Jan_2019.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation: FA8773-19-Q-A015 Amendment 01
Local Telecommunication Services – Altus AFB, Oklahoma Date: 4 June 2019
FIRST: This amendment hereby extends the vendor quote due date for Altus AFB, Oklahoma’s local telecommunication services solicitation (LTS).
SECOND: The quote due date is extended as follows:
• Delete previous date of 24 May 2019/ 3:00 PM (CST)
• Updated to a new Quote Due Date of 11 June 2018 / 3:00 PM (CST)
THIRD: Attch 1 - LTS PWS V1 Altus AFB OK 15 Jan 2019 is hereby replaced in its entirety with Attch 1
– LTS PWS V2 Altus AFB OK 3 Jun 2019 with the complete removal of the table in Appendix 1 paragraph 5.6 Transport Channels as follows:
FROM:
5.6. Transport Channels.
Circuit ID/Name Type Demarcation Destination Estimated Mileage
Circuit Description
91.PLNT.026737 Voice 2-wire Automatic Signaling
Altus AFB OK, 3001 Falcon Rd. Bldg. 215
Altus AFB OK, Bldg. 46
2 Private line
91.PLNT.850081 Control Remote Metering
Altus AFB OK, 3001 Falcon Rd. Bldg. 215
Altus AFB OK, 3001 Falcon Rd.
Bldg. 600 South side Highway 62
0 DC Alarm
91.PLNT.850082 Control Remote Metering
Altus AFB OK, 3001 Falcon Rd. Bldg. 215
Altus AFB OK, 3001 Falcon Rd.
Bldg. 600 South side Highway 62
0 DC Alarm
91.PLNT.850083 Control Remote Metering
Altus AFB OK, 3001 Falcon Rd. Bldg. 215
Altus AFB OK, 3001 Falcon Rd.
Bldg. 600 South side Highway 62
0 DC Alarm
91.PLNT.850084
Control Remote Metering
Altus AFB OK, 3001 Falcon Rd. Bldg. 215
Altus AFB OK, 3001 Falcon Rd.
Bldg. 600 South side Highway 62
0 DC Alarm
TO:
5.6. Transport Channels. N/A
FOURTH: Attch 2 - LTS Pricing Schedule Altus AFB OK 21 Mar 2019 is hereby replaced in its entirety with Attch 2 – LTS Pricing Schedule Altus AFB OK 3 Jun 2019 with the complete removal of Transport Channels as follows:
FROM:
E
Local Exchange Digital ISDN (PRI) (PWS Appendix 1, Para 5.4.3)
E A ISDN Primary Rate Interface EA 6 E B PRI Individual D-Channel EA 6 E C Flat Rate, Basic Services, PRI Individual B-Channel 2 Way (2W) EA 138 E D Local Number Portability Pool Fee EA 6 E E - EZ Reserved
F
Transport Channels (PWS Appendix 1, Para 5.6)
F A Alarm Circuit & Terminations EA 4 F B 2-Wire Voice Circuit & Terminations EA 1 F C 2-Wire Voice Circuit Transport Mileage, Per Mile MI 2 F D - FZ Reserved
G
Public Listings (PWS Appendix 1, Para 5.9)
G A Public Listings EA 1 G B Additional Listing EA 6 G C - LZ Reserved
E
Local Exchange Digital ISDN (PRI) (PWS Appendix 1, Para 5.4.3)
E A ISDN Primary Rate Interface EA 6 E B PRI Individual D-Channel EA 6 E C Flat Rate, Basic Services, PRI Individual B-Channel 2 Way (2W) EA 138 E D Local Number Portability Pool Fee EA 6 E E - EZ Reserved
F
Public Listings (PWS Appendix 1, Para 5.9)
F A Public Listings EA 1 F B Additional Listing EA 6 F C - FZ Reserved
FIFTH: The following List of Attachments have been revised associated with Synopsis/Solicitation.
FROM:
Attch # DOCUMENT DATE PAGES
1 PWS V1 15 Jan 2019 24 2 Pricing Schedule 21 Mar 2019 6 3 Instruction to Offerors 2 Oct 2018 4 4 Evaluation Factors 27 Dec 2018 3 5 Q & A Spreadsheet 10 Jan 2019 1
Attch # DOCUMENT DATE PAGES 1 PWS V2 3 Jun 2019 22 2 Pricing Schedule 3 Jun 2019 6 3 Instruction to Offerors 2 Oct 2018 4 4 Evaluation Factors 27 Dec 2018 3 5 Q & A Spreadsheet 10 Jan 2019 1
SIXTH: Aside from the amended Quote Due Date all other terms and conditions of the combined Synopsis/Solicitation remain unchanged.
All Offerors are required to acknowledge this amendment with their signature and submit with their quote package by the suspense date 11 June 2019, 3:00 PM (CST).
Julie A. Cody/ GS-12/DAF Contracting Officer 38 CON’s/PKB
| 2019-06-04T15:00:27-0500 | |
| CODY.JULIE.A.1239576172 |
File details come from the government source that posted it.