This document appears to be an attachment titled "Attachment 5 - B1624 Lighting Floor Plan.pdf" related to a federal contract opportunity for the Alter/Repair of Irish Hill B1624.

The key details are:

  • This is a lighting control plan for the first floor of Building 1624 at the Rome Research Site. It specifies the use of a WattStopper DLM lighting control system, including on/off room controllers, dimming room controllers, network bridges, and various WattStopper devices.
  • The plan provides detailed instructions for installing and configuring the lighting control system, including connecting motion sensors, switches, and room controllers, and integrating the system with the building's BACnet controls.
  • The federal contract opportunity has a solicitation number of FA875124B0002 and is being issued by the Department of the Air Force Materiel Command Research Laboratory (Air Force Research Laboratory). The opportunity is for the Alter/Repair of Irish Hill B1624, with a site visit scheduled.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

LMRC-11.1,2,3

(LOAD #3)

LMRC-10.1,2

(LOAD #1)

LMRC-11.6,7

(LOAD #2)

LMRC-11.1,2,3

(LOAD #2)

LMRC-11.6,7

(LOAD #1)

LMRC-11.1,2,3

(LOAD #1)

LMRC-10.3,4

(LOAD #1)

LMRC-10.3,4

(LOAD #2)

LMRC-11.4,5

(LOAD #1)

LMRC-10.5,6

(LOAD #1)

LMRC-10.5,6

(LOAD #2)

LMRC-10.1,2

(LOAD #2)

LMRC-10.7,8

(LOAD #1)

LMRC-10.7,8

(LOAD #2)

WS

WS

WS

WS

WS

WS

WS

WS

WS

LMDC-11.2.2

LMDC-11.6.2

LMDC-11.1.2

LMDC-11.4.2

LMDC-11.3.2

LMDC-10.2.2

LMDC-11.3.3

LMDC-10.1.4

LMDC-10.1.3

LMDC-10.3.1

LMDC-10.3.2

LMDW-10.5.1

LMDW-10.6.1

LMSW-11.6.1

LMSW-11.4.1

LMDM-11.3.1

LMSW-10.8.1

LMSW-10.7.1

LMDM-11.2.1

LMDM-10.1.2

LMDM-11.1.1

LMDM-10.2.1

LMDM-10.1.1

LMRC-11.4,5

(LOAD #2)

LMDW-11.5.1

LMBC

LMBC-10

LMRC

LMRC-10.3,4

PP-2 #2

LMRC

102LMRC-10.7,8

LMRC

LMRC-10.5,6

PP-2 #3

LMRC

LMRC-11.4,5

PP-2 #3

LMRC

212LMRC-10.1,2

PP-2 #1

LMRC

213 LMRC-11.1,2,3

PP-2 #4

LMBC

LMBC-11

LMRC

102 LMRC-11.6,7

PP-2 #5

PP-2

WS

PP-2 #2

SEGMENT

MANAGER

WattStopper Devices

LABEL PART # LOCATION

LMBC

CONNECTION

SERIAL

NUMBER

LMBC-10 LMBC-300 007 -

LMRC-10.1,2

LMRC-212 007 LMBC-10

LMDM-10.1.1 LMDM-101 007 LMBC-10

LMDM-10.1.2 LMDM-101 007 LMBC-10

LMDC-10.1.3 LMDC-100 007 LMBC-10

LMDC-10.1.4 LMDC-100 007 LMBC-10

LMDM-10.2.1 LMDM-101 004 LMBC-10

LMDC-10.2.2 LMDC-100 004 LMBC-10

LMRC-10.3,4

LMRC-102 003 LMBC-10

LMDC-10.3.1 LMDC-100 002 LMBC-10

LMDC-10.3.2 LMDC-100 001 LMBC-10

LMRC-10.5,6

LMRC-102 003 LMBC-10

LMDW-10.5.1 LMDW-101 014 LMBC-10

LMDW-10.6.1 LMDW-101 013 LMBC-10

LMRC-10.7,8

LMRC-102 007 LMBC-10

LMSW-10.7.1 LMSW-101 006 LMBC-10

LMSW-10.8.1 LMSW-101 005 LMBC-10

LMBC-11 LMBC-300 007 -

LMRC-11.1,2,3

LMRC-213 007 LMBC-11

LMDM-11.1.1 LMDM-101 010 LMBC-11

LMDC-11.1.2 LMDC-100 010 LMBC-11

LMDM-11.2.1 LMDM-101 008 LMBC-11

LMDC-11.2.2 LMDC-100 008 LMBC-11

LMDM-11.3.1 LMDM-101 003 LMBC-11

LMDC-11.3.2 LMDC-100 003 LMBC-11

LMDC-11.3.3 LMDC-100 003 LMBC-11

LMRC-11.4,5

LMRC-102 003 LMBC-11

LMSW-11.4.1 LMSW-101 011 LMBC-11

LMDC-11.4.2 LMDC-100 011 LMBC-11

LMDW-11.5.1 LMDW-101 012 LMBC-11

LMRC-11.6,7

LMRC-102 007 LMBC-11

LMSW-11.6.1 LMSW-101 009 LMBC-11

LMDC-11.6.2 LMDC-100 009 LMBC-11

LIGHTING CONTROL NOTES:

1. BASIS OF DESIGN IS WATTSTOPPER DLM SYSTEM. PROVIDE DEVICES AS SHOWN ON PROPOSED CEILING PLAN AND

WATTSTOPPER DEVICE SCHEDULE ON THIS PAGE.

2. MOUNT WALL AND CEILING DEVICES IN LOCATIONS AS SHOWN ACCORDING TO MANUFACTURER'S INSTRUCTIONS.

3. INSTALL ON/OFF RELAY ROOM CONTROLLERS (LMRC-102) WHERE CONVENIENT AND CONNECT TO LIGHTING LOADS

AS INDICATED ON DRAWING AND SCHEDULE ACCORDING TO MANUFACTURER'S INSTRUCTIONS. NOTE LOCATION

OF ROOM CONTROLLERS ON AS-BUILT DOCUMENTATION

4. INSTALL DIMMING ROOM CONTROLLERS (LMRC-212, LMRC-213) WHERE CONVENIENT AND CONNECT TO LIGHTING

LOADS AS INDICTED ON DRAWING AND SCHEDULE ACCORDING TO MANUFACTURER'S INSTRUCTIONS. NOTE

LOCATION OF ROOM CONTROLLERS ON AS-BUILT DOCUMENTATION.

5. INSTALL NETWORK BRIDGES WHERE CONVENIENT FOR LOCAL ROOM NETWORK AND BACNET MS/TP BUS

CONNECTION. CONNECT NEW MS/TP BUS TO NEWLY INSTALLED AUTOMATIC TEMPERATURE CONTROL (ATC)

BACNET MS/TP BUS. COORDINATE WITH ATC ELECTRICIAN FOR BUS LOCATION. MAINTAIN "DAISY CHAIN" BUS

CONFIGURATION FOR BACNET BUS.

6. CONNECT MOTION SENSORS, SWITCHES AND ROOM CONTROLLERS TOGETHER USING PLENUM RATED CAT 5e

CABLE WITH RJ-45 ENDS. IT IS RECOMMENDED THAT FIELD FABRICATED CABLES BE TESTED FOR PROPER

OPERATION BEFORE BEING CONNECTED. IT IS CRITICAL THAT "LOCAL NETWORK" DEVICES ARE CONNECTED

CORRECTLY TO EACH NETWORK BRIDGE DEVICE (LMBC-300). "LOCAL NETWORKS" ARE FREE TOPOLOGY

NETWORKS AND DEVICES CAN BE CONNECTED TO EACH OTHER THROUGH ANY OPEN RJ-45 PORT.

7. PROVIDE AND INSTALL NEW BACNET ROUTER (NB-ROUTER) IN ENCLOSURE IN LOCATION SHOWN IN ELECTRIC

ROOM 005. PROVIDE POWER TO ENCLOSURE AND PROVIDE 1/2" EMT PATHWAY FROM ENCLOSURE TO NEAREST

CABLE TRAY FOR NETWORK CONNECTION. CONNECT NEW BACNET MSTP BUS TO SEGMENT MANAGER.

8. IT IS CRITICAL THAT SERIAL NUMBERS FOR ALL DEVICES ARE NOTED UPON INSTALLATION. SPACE HAS BEEN

PROVIDED IN THE WATTSTOPPER DEVICE SCHEDULE ON THIS PAGE TO AFFIX SERIAL NUMBER STICKERS INCLUDED

WITH ALL DEVICES. ALSO NOTE ON AS-BUILT DOCUMENTATION ACTUAL LOCATIONS OF ALL DEVICES, ALONG WITH

MS/TP NETWORK WIRING ROUTES. IF THERE ARE QUESTIONS ABOUT CONNECTING DEVICES, PLEASE CONTACT

AFRL/RIOCC CIVIL ENGINEERING AT x7634.

R - +

ZONE LIGHTING

LOAD

ZONE LIGHTING

FEED CIRCUIT

R - +

Red

Yel

Blu

V i o

G r y

Vio

Gry

Vio

Gry

Vio

Gry

V i o

G r y

V i o

G r y

Earth

Ground

Grn

RJ45

(Typical)

LIGHTING LOAD 1

LIGHTING LOAD 2

LIGHTING LOAD 3

ZONE LIGHTING

FEED CIRCUIT

date date date date

Air Force Research Laboratory Rome Research Site, New York

ROME RESEARCH SITE

PROJECT MANAGER:

DESIGNER:

DRAFTER:

SHEET TITLE:

PROJECT TITLE:

DATE:SHEET:DRAWING NO: FACILITY NO:

PROJECT NO:

OF

ALTER/REPAIR

BUILDING 1624, IRISH HILL

1 29 FEB 2024

MWF

ULDF16-0307

BLDG.1624

ELECTRICAL

PROPOSED LIGHTING

CONTROL PLANS

E-201 1

MWF

MWF

DateRev. Description Drawn Approved

N

1/8"=1'-0"LIGHTING CONTROL PLAN

B1624 FIRST FLOOR PLAN

ON/OFF ROOM CONTROLLER

WATTSTOPPER DEVICE DETAIL

DIMMING ROOM CONTROLLER

WATTSTOPPER DEVICE DETAIL

AutoCAD SHX Text

LMBC-300

AutoCAD SHX Text

LMRC-101

AutoCAD SHX Text

FROM LAST MS/TP DEVICE

AutoCAD SHX Text FOR LAST DEVICE ON BUS PROVIDE 120 OHM RESISTOR BETWEEN "+" AND "-" TERMINAL FOR END-OF LINE TERMINATION.

AutoCAD SHX Text

TO NEXT MS/TP DEVICE

AutoCAD SHX Text

LMPC-100

AutoCAD SHX Text

TO OTHER DLM DEVICES THAT ARE DESIGNATED TO THE SAME LMBC-300

AutoCAD SHX Text

LMBC-300

AutoCAD SHX Text

FROM LAST MS/TP DEVICE

AutoCAD SHX Text Class 2 0-10 Volt Control Wiring

AutoCAD SHX Text

LMRC-213

AutoCAD SHX Text

LMDM-101

AutoCAD SHX Text

TO OTHER DLM DEVICES THAT ARE DESIGNATED TO THE SAME LMBC-300

AutoCAD SHX Text

LMDC-100

AutoCAD SHX Text

TO NEXT MS/TP DEVICE

AutoCAD SHX Text FOR LAST DEVICE ON BUS PROVIDE 120 OHM RESISTOR BETWEEN "+" AND "-" TERMINAL FOR END-OF LINE TERMINATION.