QUESTIONS_&_ANSWERS.docx

DOCX document 12 KB Posted

Attached to
Upgrade Force Protection, Tanner Hill Federal contract opportunity
Solicitation number
FA875119BA007
Issued by
Department of the Air Force Materiel Command Research Laboratory

View the file

Other files for this federal contract opportunity

Other files attached to Upgrade Force Protection, Tanner Hill, newest first.
File Type Posted
QUESTIONS_&_ANSWERS_2.docx DOCX document
Attachment_5_Wage_Decision_No_NY20190031.pdf PDF
Attachment_4_AFRL_Supplemental_Requirements.pdf PDF
Attachment_3_Drawings.pdf PDF
Attachment_6_RRS_Visit_Authorization_Rqst.pdf PDF
Attachment_1_Statement_of_Work_(SOW).pdf PDF
Attachment_2_Project_Specifications.pdf PDF
Solicitation_-_FA875119BA007.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

QUESTIONS & ANSWERS

FA875119BA007

Force Protection Upgrades - Tanner Hill

27 AUG 2019

QUESTION: On the drawings there are allowances for conduit for a traffic sensing loop. These are typically laid in the ground as a preformed loop with a lead out to wire into the controls area of the barrier. Could it be allowed that this loop or loops be laid and set within the roadway fully formed and ready to be wired at a later date?

ANSWER: The traffic sensing “loop” that the drawings are referring too are an IR transmitter. Each stanchion has an IR sensor on it and the conduit is a pathway connecting the sensors. If the IR beam between the sensors is broken (Meaning a vehicle is in its path) the drop arm gate will not close on it. This needs to be completed now rather than at a later date.