Text version
PERFORMANCE WORK STATEMENT FOR
SNOW/ICE REMOVAL SERVCIES STOCKBRIDGE RESEARCH FACILITY
5251 BURLESON ROAD
ONEIDA, NY 13421
ULDF: 17-0512
AIR FORCE RESEARCH LABORATORY ROME RESEARCH SITE
ROME, NY
26 September 2016
Performance Work Statement
1. OBJECTIVE
The contractor shall provide all management, tools, supplies, equipment, and labor necessary to ensure that snow/ice removal services are performed at Stockbridge Research Facility in a manner that will maintain a satisfactory and safe environment.
1.1. DESCRIPTION OF SERVICES
The contractor shall remove snow and ice from, and/or apply sand/salt to road network, hardstands, parking areas and work areas at the Stockbridge Research Facility, as shown in Appendix B. The contractor shall remove snow, including drifts or piles, from all paved surfaces such as roads and parking lots as shown on the map in Appendix B. The snow shall be removed when accumulation reaches four (4) inches or within one (1) hour after snowfall stops. This may require multiple snow/ice removals each day. The contractor must not place excess snow in the points identified in Appendix B.
1.1.1 Remove Ice. The contractor shall immediately remove ice to provide secure footing and safe driving conditions by the snow removal operation, or by sanding/salting. The contractor will provide all sand/salt.
1.1.2 At the completion of the snow removal season, the contractor shall sweep Stockbridge Research facility site and remove the sand off the roadways and parking lot areas.
1.1.3 It shall be the responsibility of the contractor to ascertain at all times the road and weather conditions at the facility. The contractor shall, as a minimum, ensure availability of daily travel and accessibility at the facility to accommodate the work shifts at the Stockbridge site. The hours for shift changes are as follows:
| 0730 hours - 0800 hours |
| 1530 hours - 1600 hours |
| 2330 hours - 2400 hours |
1.1.4 When icy/slippery conditions exist, sanding/salting operations shall begin within one hour, twenty four hours a day, seven days a week, including holidays.
1.1.5 If the contractor fails to keep the site open, necessitating assistance and use of available Government snow removal equipment, the contractor will be required to reimburse the Government. The amount of reimbursement will be based on the current RS Means price for the specific piece of equipment used with operator.
1.2. SUPPLIES
The Contractor shall furnish a complete list of all supplies that are anticipated to be used during the contract period to the CO, no later than the pre-performance conference, for acceptance by the CO. After award, any new supplies added to the contract will need acceptance before being used on the installation. The supply inventory supply list shall contain the following information:
a) Product name
b) Manufacturer
c) Item use
d) Disposal procedures if material remains after usage
e) Storage provisions for item
The contractor shall be responsible for the proper disposal of all supplies.
A Safety Data Sheet (SDS) shall also be provided for all supplies. The contractor employees will be trained, by the contractor, on the proper use and disposal of each item.
NOTE: Products containing chlorofluorocarbons (CFCs) or ozone depleting substances shall not be allowed or approved for use.
1.3. PERFORMANCE
The performance of these services is not considered to be mission essential during time of crisis. Should a crisis be declared, the Contracting Officer or his/her representative will advise the contractor of any revised requirements, followed by written direction.
1.4. PERIOD OF PERFORMANCE
The period of performance includes a base year of 04 November 2016 through 03 November 2017, and includes four (4) Options Years as follows:
Option Year 1: 04 Nov2017 - 03 Nov 2018 Option Year 2: 04 Nov 2018 -03 Nov 2019 Option Year 3: 04 Nov 2019 - 03 Nov 2020 Option Year 4: 04 Nov 2020 - 03 Nov 2021
2. SERVICES SUMMARY
The contract service requirements are summarized in Performance Objectives that relate directly to mission essential items. The performance threshold briefly describes the minimally acceptable levels of service required for each requirement. The Services Summary (SS) and the contractor’s Quality Control Plan provide information on contract requirements, the expected level of contractor performance and the expected method of government validation and confirmation of services provided. These thresholds are critical to mission success. Procedures as set forth in the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance, will be used to remedy all deficiencies. During the first initial 30 days of the contract, two additional defects on each work item shall be allowed in an effort to identify normal phase-in problems.
| Performance Objective |
| PWS Para |
| Performance Threshold |
| Remove Snow/Ice and Apply sand/salt |
| 1.1 |
| No more than 2 valid defects per month |
| Remove Sand Off Roadways And Parking Lot Areas |
| 1.1.2 |
| No more than 1 valid defects per season |
2.1. QUALITY CONTROL
Contractor shall develop and maintain a quality program to ensure services are performed in accordance with commonly accepted commercial practices for meeting the objectives of this Performance Work Statement. The contractor shall develop and implement procedures to identify and prevent defective services from recurring.
2.2. QUALITY ASSURANCE
The government shall inspect and evaluate the contractor’s performance to ensure services are received in accordance with requirements set forth in this PWS. The CO or COR shall inspect by validating actual work performance, checking an attribute of the completed task, checking a management information report, investigating customer complaints, conferring with facility managers, or otherwise inspecting the task or its results to determine whether or not performance meets the standards contained in this PWS. The CO or COR will use the contractor’s work schedule or modified version thereof, to record validation results. Results of the validation then become the official Air Force record of the Contractor’s performance. When a performance threshold has not been met or contractor performance has not been accomplished, the COR will initiate and provide the Contracting Officer a Contract Discrepancy Report (CDR) DD Form 2772 for issuance to the contractor. The contractor shall respond to the CDR IAW instructions provided and return it to the Contracting Officer within 10 calendar days of receipt.
2.3. PERIODIC VALIDATIONS
This method requires the COR to employ a “spot check” style of evaluation based on the contractor’s schedule. Periodic validations will be conducted on a scheduled basis (daily, weekly, monthly, or quarterly) and may be adjusted, based on quality trends. Any unsatisfactory inspection (defect) result shall be recorded, and the Contractor shall re-perform the service after notification by the CO or COR. Failing to meet the performance threshold as outlined in the SS for any of these performance objectives in any one month period shall result in a warning or letter of concern from the CO. Failing to meet the performance threshold as outlined in the SS of these performance objectives in any combination for any two, or more consecutive or non-consecutive months during a contract period shall constitute an immediate Progress Meeting with the Multi-functional Team.
2.4. PERIODIC PROGRESS MEETINGS
The CO, Director of Safety, COR, other government personnel as appropriate, and the Contractor shall periodically meet to discuss the Contractor’s performance. The following issues shall be discussed, opportunities to improve the contract, any modifications required of the contract, unsatisfactory inspections and trends against each performance objective observed, positive performance and steps taken by the Contractor to prevent unsatisfactory occurrences in the future. The Contractor shall provide a summation of unsatisfactory inspections and customer complaints and provide insight into any identified trends. The minutes of these meetings will be reduced to writing, signed by the CO and any other signatures as deemed appropriate, distributed to the functional area and the contractor. Should the contractor not concur with the minutes, the contractor shall provide a written notification to the CO identifying areas of non-concurrence for resolution.
2.5. GOVERNMENT REMEDIES
Exceeding the performance threshold for performance objective for any two, or more consecutive or non- consecutive months during a contract period may constitute an immediate Progress Meeting with the CO and COR. All remedies shall be in accordance with the FAR 52.212-4 (a), Contract Terms and Conditions - Commercial Items, Inspection/Acceptance for contractor’s failure to perform satisfactory services or failure to correct non-conforming services.
2.6. CUSTOMER COMPLAINTS
The COR will receive and investigate complaints. The COR shall be responsible for initially validating customer complaints. The CO shall make final determination of the validity of customer complaint(s) in cases of disagreement with the COR and the Contractor. Validated customer complaints shall be re-performed after notification by the CO or COR.
3. GOVERNMENT FURNISHED PROPERTY AND SERVICES
3.1. UTILITIES
The government will furnish a reasonable amount of utilities necessary to accomplish the work in accordance with this contract. The Contractor shall not change or modify any utility system or component; or connect any Contractor property, equipment or system without prior CO review and approval. The contractor shall practice energy conservation in the Government provided facilities.
4. GENERAL INFORMATION
4.1. DAMAGES TO GOVERNMENT BUILDINGS, EQUIPMENT OR VEGETATION
Damages to Government buildings, equipment, or vegetation are addressed in clause 52.237-2 – Protection of Government Buildings, Equipment, and Vegetation. The Contractor shall use reasonable care to avoid damaging existing buildings, equipment, and vegetation on the Government installation. If the Contractor's failure to use reasonable care causes damage to any of this property, the Contractor shall replace or repair the damage at no expense to the Government as the Contracting Officer directs. If the Contractor fails or refuses to make such repair or replacement, the Contractor shall be liable for the cost, which may be deducted from the contract price.
4.2. ENVIRONMENTAL REQUIREMENTS
In addition to all applicable Federal, State and local environmental codes and regulations, the following specific guidance is provided:
4.2.1. HAZARDOUS MATERIALS
The Environmental Safety and Occupational Health Office (RIOCV) at 330-2098 shall approve all hazardous materials brought on-site by the contractor prior to use. The contractor shall obtain approval using the application requirements of the AF Form 3952. Once the process is implemented and contractor is trained, the contractor may submit the AF Form 3952 electronically. RIOCV has the right to prohibit the use of hazardous materials it deems to be especially hazardous to human health and environment. In the event RIOCV does not approve a hazardous material for use, RIOCV may provide the contractor a list of suitable substitutes; however, the contractor shall retain responsibility for finding an acceptable substitute. The contractor shall take appropriate actions to comply with waste minimization and pollution prevention practices and policies.
4.2.2. SPILL RESPONSE
The contractor shall maintain spill control material on hand at all times sufficient to contain a worse case spill, both volume and hazard level. Care will be taken to minimize or avoid fuel spills when refueling equipment. If a fuel spill does occur, it shall be reported immediately to the Environmental Safety and Occupational Health Office (RIOCV) at 330-2098. The fuel spill will be contained and cleaned up immediately upon notification. If the fuel is spilled after regular working hours security police will be called at 330-2961.
4.2.3. PESTICIDES
Contractor is not authorized to use pesticides/herbicides at any time.
4.2.4. HAZARDOUS MATERIALS INVENTORY
The contractor shall maintain an up-to-date hazardous material inventory with copies of SDS(s) for all materials used on the job site. The contractor shall maintain a complete copy of all approved SDS and AF Form 3952s.
4.2.5. HAZARDOUS MATERIALS MANAGEMENT
The contractor shall remove all hazardous materials by the end of each workday unless prior approval is granted by RIOCV detailing the amounts and location.
4.3. PERMITS, LICENSES AND CERTIFICATIONS (RESERVED)
4.4. HOURS OF OPERATION
The contractor shall perform services during normal duty hours which are 0800-1600 Monday – Friday, excluding Federal Holidays. The contractor may work weekends and holidays if approved in advance at his convenience. Work required outside of the standard work hours shall be coordinated with RIOC, and RRS Security forces.
4.5. RECOGNIZED HOLIDAYS
The contractor is not required to provide service on federal holidays, except in emergency situations. The holidays are as follows:
New Year’s Day - 1 January Martin Luther King Day - 3rd Monday in January Washington’s Birthday - 3rd Monday in February Memorial Day - last Monday in May Independence Day - 4 July Labor Day - 1st Monday in September Columbus Day - 2nd Monday in October Veteran’s Day - 11 November Thanksgiving Day - 4th Thursday in November Christmas Day - 25 December
If these holidays fall on Saturday, the preceding Friday will be the observed holiday. If these holidays fall on Sunday, the following Monday will be the observed holiday. If a holiday falls on a scheduled service day, the Contractor will be responsible for rescheduling services for the first day post the holiday observance.
4.6. SITE CLOSURES
In addition to the federal holidays identified above, the AFRL Site Director may limit access due to emergency conditions. These conditions may include inclement weather conditions, power outages, and/or other unexpected emergency situations. The Director will announce through public channels, either delayed reporting or closure of RRS facilities due to emergency conditions. This announcement is made solely for safety and security purposes and to inform all personnel (Government and Contractor) of site closure/delayed reporting. The Director is not authorizing time off for contractor employees and is not authorizing payment for work not performed.
Contractors shall take all appropriate actions to notify their employees of closure/delayed reporting and make alternate work/schedule arrangements, if necessary.
The above applies to emergency situations only. Facilities will remain open for contractor personnel during unscheduled federal closures (e.g., National Day of Mourning) or other instances where Government employees are granted administrative leave in non-emergency situations. Work scheduled but not accomplished because of site closure will be accomplished as soon as possible after reopening the site.
4.7. SECURITY
4.7.1. ACCESS CONTROL
The work to be done under this contract is located in and around areas that are under the scrutiny of the USAF Civilian Police assigned to Rome Laboratory. To gain access to the area(s) to examine the work to be done for job estimation purposes, arrangements must be made through the Contracting Office. Contractor personnel will be escorted into the area(s) for the purpose of project estimation.
4.7.2. VISIT REQUESTS
The Visit Request can be done via RRS Visit Request Form 31 or a simple Company Letterhead letter identifying all personnel who will be employed during the work will be necessary prior to work commencement. The Visit Request Form 31 or Visit
Request letter shall be signed by the Company President or Director of Human Resources. The Contractor will supply the Visit Request to the Security Office (AFRL/RIOF) and Contracting Office (AFRL/RIKO). The request will contain the full name of each individual, to include a middle initial, date of birth, state of driver’s license issuance and city and state of birth. If the individual is not a US citizen they will not be allowed within the complex or facilities. If the individual is not a US citizen but has a Green Card, Form I-551 or has the I-551 stamp on their passport, the Security Office will need to see either one. No foreign national workers are allowed on the Rome Research Site.
4.7.3. CONTRACTOR POINT OF CONTACT (POC)
The Contractors phone number and a Project Leader or Supervisor/Foreman contact number is necessary for use by the Law Enforcement Desk Sergeant. The 24 hour Desk Sergeant can be reached at 330-2961.
4.7.4. BUILDING ACCESS
All Rome Research Site facilities are entered using a proximity entry badge. Any personnel such as Supervisor/Foreman or Project Leaders who may need building access for meetings etc., during the contract period, can acquire a Local Contractor Entry Badge from the Security Office located in the lobby of Building 3, West Wing with a valid visit request. This badge will be worn at all times and will be returned to the Contracting Officer’s Technical Representative upon completion of the final inspection and acceptance of work. Any badges lost during the period of work will be reported to the Security Office as soon as possible.
4.7.5. ROME RESEARCH SITE (RRS) COMPLEX ACCESS CONTROL
Access to the RRS Complex is controlled by a main gate on Brooks Rd, located just west of the Otis St. & Brooks Rd. intersection. Identification for the Contractor to enter with a vehicle will be on an access list supported by the magnetic media entry badge issued.
4.7.6. STOCKBRIDGE SITES ACCESS CONTROL
Access to the Stockbridge site will follow the same visit request requirements and site access will be coordinated through RIO Facility Managers.
4.7.7. COMMERCIAL VEHICLES
All commercial vehicles are searched prior to entry into the RRS Complex. Vehicle operators will be aware of the vehicle search pull-off area prior to approaching the main gate. A search of the vehicle will be conducted prior to its entry. All vehicles not needed for delivery of equipment or tools will be parked in the visitor parking area unless cleared through the Security Office. No vehicles (other than mowers) are allowed within 25 meters (80 ft.) of the RRS facilities. One-time deliveries can be escorted from the gate to delivery point by project personnel.
4.7.8. POSTED SIGNAGE
All contractor personnel will be aware that the Stockbridge Research Site is property of the United States Air Force and they will follow all posted signage
4.7.9. EMERGENCIES REQUIRING EVACUATION
Contractor personnel will be notified by RRS Police of any emergencies which would require an evacuation or work stoppage, such as an increase in the Force Protection Condition.
4.7.10. PHOTOGRAPHY AND VIDEOGRAPHY
Photography and videography of RRS facilities and surroundings is strictly prohibited.
4.7.11. CONTRACTOR/EMPLOYEE SITE PASS AND IDENTIFICATION
The contractor shall comply with all requirements and procedures IAW AFFAR 5352.242-9000, Contractor Access to Air Force Installations. All required documentation shall be submitted at the pre- performance conference.
4.8. TRAFFIC LAWS
The Contractor and its employees shall comply with all site traffic regulations.
4.9. WEAPONS, FIREARMS, AND AMMUNITION
Contractor employees are prohibited from possessing weapons, firearms, or ammunition, on themselves or within their Contractor-owned or privately owned vehicle while on the AFRL/Rome Research Site.
4.10. PERFORMANCE OF SERVICE DURING CRISIS OR HEIGHTENED SECURITY
Services requirements under this PWS are not essential to be performed during a declared crisis.
4.11. GOVERNMENT INTERFACE
Do not unduly interfere with regularly scheduled Government operational activities in the performance of contract requirements. In the event a Government supervisor so requests, temporarily cease work in the area and report the instructions, to include name of the Government person involved, to the CO immediately by the most expedient means. Notify the CO verbally of disputes with customers or other base contractors and follow-up in writing.
4.12. CONTRACTING OFFICER AND CONTRACTING OFFICER REPRESENTATIVE
The Contracting Officer will appoint a primary and alternate representative for management of the day to day activities of the contract. The identity, title, and authority of this representative will be provided in writing to the contractor after contact award.
4.13. SAFETY
The contractor shall comply with all applicable Occupational Safety and Health Administration (OSHA) standards, federal, state, and local laws, regulations, and requirements regarding worker safety while performing on the Air Force Research Laboratory, Rome Research Site. Compliance shall also include following industry standards concerning worker safety and personal protective equipment. Comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment including utilizing proper guards on equipment and powering down equipment when pedestrians and vehicles are within range of possible projectiles being thrown from equipment.
4.13.1. SAFETY REPORTS
Provide a verbal report to the CO as soon as possible of each occurrence of damage to Government property or an accident resulting in death, injury, occupational disease, or adverse environmental impact. Provide a completed copy of required Accident Investigation Reports to the CO within five calendar days of each occurrence.
4.13.2. SPECIFIC SITE REQUIREMENTS
4.13.2.1. Occupational Safety And Health Administration (OSHA) Standards
Comply with all safety and health requirements necessary for the protection of personnel, facilities and equipment including, but not limited to all applicable Occupational Safety and Health Administration (OSHA) standards, while performing this contract at the AFRL/Rome Research Site.
4.13.2.2. Written Safety Program
The contractor will maintain a written Safety Program, as required by OSHA and make said plan available for review by the Government upon request by the contracting officer.
4.13.2.3. Mishaps
In the event of a mishap during the performance of this contract on AFRL/RRS premise, notify the contracting officer in an expeditious manner.
4.13.2.4. Mishap Documentation Requirement
a. Contract, Contract number, Name and Title of Person(s) Reporting
b. Date, Time and exact location of accident/incident
c. Brief Narrative of accident/incident (events leading to accident/incident)
d. Cause of accident/incident (if known)
e. Estimated cost of accident/incident (material and labor to replace/repair)
f. Nomenclature of equipment and personnel involved in accident/incident
g. Corrective Actions (taken or proposed)
h. Other pertinent information
4.13.2.5. Safety And Health Management System
AFRL RRS uses a Safety and Health Management System to implement and manage its safety programs. A SHMS is a systematic approach to managing safety and health activities by integrating occupational safety and health programs, policies, and objectives into organizational policies and procedures. Simply stated, a SHMS is a set of safety and health program components that interact in an organized way. An effective SHMS consists of five critical elements that apply safety and health management practices of employers who have been successful in protecting the safety and health of their employees. All contractors are required to familiarize themselves with the requirements of a SHMS. An example of a SHMS is OSHA’s Voluntary Protection Program (VPP). Detailed information on VPP is available at the OSHA website at http://www.osha.gov/dcsp/vpp/index.html. On-site contractors are required to attend a Local Conditions Course as part of in-processing at AFRL RRS.
4.13.2.6. OSHA COMPLIANCE
If working more than 1000 cumulative hours per quarter on site, the Contractor must provide an OSHA Form 300, Log of Work-Related Injuries and Illnesses, to the DET 4 Safety Office by the end of the contract work season and for work seasons of any subsequently awarded option years.
4.14. EQUIPMENT OPERATORS
Equipment operators must possess current and appropriate operator license or certificate for the equipment utilized.
4.15. WORKMANSHIP
All work shall be performed by qualified, experienced contractor personnel.
4.16. TOOLS
All tools shall be furnished by the Contractor.
4.17. TEST EQUIPMENT
The Contractor shall furnish his own test equipment.
4.18. SANITARY FACILITIES
The contractor's workmen may use the existing facilities, subject to the regulations governing their use by Government personnel in the buildings in which the work is being accomplished.
4.19. FOR OFFICIAL USE ONLY (FOUO)
The Contractor shall comply with DoD 5400-7-R, Chapter 4, DoD Freedom of Information Act (FOIA) Program requirements. This regulation sets policy and procedures for the disclosure of records to the public and for marking, handling, transmitting, and safeguarding FOUO material.
4.20. CONTRACT MANAGER
The Contractor shall establish and maintain an office through which the contract manager or alternate(s) can be contacted during work hours. The contract manager or alternate shall be available (within 1 hour) during normal duty hours to meet on the site with the government personnel designated by the CO to discuss problem areas. The Contractor shall provide the CO with telephone number(s) where validation results and complaints can be reported. The Contractor shall also provide to the CO the names and phone numbers of Contractor POCs for after business hours including nights, weekends, and holidays. This information will be kept updated by the Contractor whenever personnel changes occur. The contract manager or alternate shall have full authority to act for the Contractor on all contract matters relating to the daily operation of this contract.
4.21. PERSONNEL
Contractor personnel shall present a neat appearance. Contractor personnel shall be easily recognizable while on the installation in conjunction with this contract. This shall be accomplished through the wear of distinctive clothing, overcoats, or hats, bearing the company name or logo. The coloring or design of the items selected should be such that identifies personnel easily and quickly for reasons of safety and personal protection.
The government is authorized to restrict the employment under the contract of any Contractor employee or prospective Contractor employee, who is identified as a potential threat to the health, safety, security, general well- being, or operational mission of the installation and its population.
LIST OF APPENDICES
| APPENDIX A: | Standard Estimated Workload Data |
| APPENDIX B: | Map/Site Plan |
APPENDIX A: STANDARD ESTIMATED WORKLOAD DATA
ITEM
NAME
ESTIMATED QUANTITY
| 1. |
| Roads/Parking Lots (Stockbridge) |
| 9,900 |
| Square Yards |
APPENDIX B: MAP / SITE PLA
image1.jpeg