Attachment_1__AFRL_D-CEE_Mobile_SCIF_Requirements_v_20141114-1416.pdf

PDF 217 KB Posted

Attached to
International Standards Organization (ISO) Shelter Federal contract opportunity
Solicitation number
FA8751-15-R-0015
Issued by
Department of the Air Force Materiel Command Research Laboratory

About this file

Attachment 1

View the file

Other files for this federal contract opportunity

Other files attached to International Standards Organization (ISO) Shelter, newest first.
File Type Posted
15R15_Additional_Information__3.docx DOCX document
15R15_Additional_Information__2.docx DOCX document
15R15_Additional_Information__1.docx DOCX document
Attachment_2_Offeror_Representations_and_Certifications--Commercial_Items_(Short_Form).docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Air Force Research Laboratory (AFRL) Deployable Cyber Experimentation Environment (CEE) – Mobile Sensitive Compartmented Information Facility (SCIF) Project Requirements

Document Version:

20141114-1416 Project Lead: Nelson Lee, AFRL/RIGB Last Updated: 14 Nov 2014

General: This effort is for the delivery of a mobile (a.k.a. temporary, transportable, tactical) SCIF. From the outside, there shall be no external conspicuous markings or indications that can associate it as a SCIF, with the exception of connections for electrical, phone/data and air intake/exhausts. Internally, the SCIF shall contain adequate lighting, desk work spaces, equipment racks, AC electrical outlets, data ports and an HVAC system. Please refer to Diagram A for additional supporting information and approximated floor layout.

Dimensions:

• Minimum external dimensions: 20’ long x 8’ wide and 8’ high

• Maximum road height, when mounted to trailer, is 13’ 6”.

Security:

• The SCIF shall be constructed in compliance with Intelligence Community Directive (ICD) 705.

Transportability:

• The SCIF shall be installed, mounted, or built on top of an appropriately weight/load distributed 5th wheel trailer assembly.

• Minimum of fifteen (15) tie down points on the floor of the trailer to secure equipment while in transit.

Furniture:

• Two (2) designated workspaces that will each include a drop-down or fold-away table/desk/or appropriate workbench supporting the following dimensions: minimum 8’ wide x3’4” deep

• One (1) 60 inch monitor, wall mounted above Workspace 1, supporting a minimum of 3 HDMI/DVI input ports

• One (1) large format whiteboard, wall mounted above Workspace 2

• Two (2) equipment storage cabinets w/ secure storage for materials during transit

• Minimum of (4) chairs that can be secured during transit

HVAC:

• SCIF shall include 2.5 TON Bard heat pump or equivalent to provide cooling and heating for up to 28,000 British Thermal Units (BTUs)

Attachment 1

Telecommunications:

• The SCIF shall contain space for two racks, placed adjacent to each wall and opposing one another (refer to diagram for additional information and approximation of location), for the mounting of servers and telecommunications equipment.

• One rack will be permanently installed while the other rack space will be setup (electrical) for a mobile rack that can be wheeled in and out of the SCIF. The permanent rack shall be included as part of the proposal. The mobile rack will be supplied by an end user/customer and will not be included as part of the proposal.

• The height of the permanent rack shall span the optimum usage of distance from the floor to ceiling. There will be a minimum clearance of 24” in front of, and behind the rack.

• The permanent rack shall be permanently attached to the trailer, such that a static load of 2500 lbs within the rack is safely secured for road transport.

• Appropriate tie-downs will be provided in the mobile rack area such that a mobile rack can be temporarily attached & secured, such that a static load of 1500 lbs within the rack is safely secured for road transport.

• Communications Waterfall Pan with minimum (12) ST connectors

Electrical:

• The SCIF shall include one (1) 100 amp breaker panel 120/230V

• The following 220V receptacles are required at specific locations:

o One (1) L6-20R at Workspace 1 o One (1) L6-20R at Workspace 2 o Two (2) L6-30R at the Permanent Rack o Two (2) L6-30R at the Mobile Rack

• One (1) 100 amp pin and plug shore connector, for use with external shore power hook up

• Emergency Backup Lighting

• Installed 20KW/100 AMP generator w/ Automatic Transfer Switch (ATS) and electric start, fuel tank to provide a minimum twelve (12) hours of uninterrupted power without refueling

• Generator has voltage regulation within +/- 1%

• Adequate Lighting for work area

• A metered and switched PDU that is wall mounted above the work surface in each designated workspace, for a total of two (2) PDUs within the trailer.

• The permanent rack shall be grounded to the electrical subsystem.

• A grounding point shall be provided in the mobile rack area.

Accreditation: The contractor shall guarantee that the unit will be delivered ready for accreditation by the accreditation authority.

Delivery: The SCIF shall be delivered to the following address: F4HBL1/Transportation Officer, Depot 2, 148 Electronic Pkwy, M/F: RIOLSC, Rome NY 13441-4516.

Mobile SCIF 20x8x8

Workspace 1 96"x28"x30"

19 sq. ft.

Workspace 2 96"x28"x30"

19 sq. ft. 30"

Cabinet 36"x18"x82

5 sq. ft.

Permanent Rack 42"x24"x47"

7 sq. ft.

Mobile Rack 42"x24"x47"

7 sq. ft.

PDU

PDU

L6-30R

L6-30R

24"

Cabinet 36"x18"x82

5 sq. ft.

L6-30R

L6-30R

L6-20R

L6-20R

60" monitor mounted above drop down desk

4’ x 5’ white board mounted above work area 2

Diagram A

Diagram A

HVAC

Tiedowns

File details come from the government source that posted it. Updated .