Duluth FA860421RB017 Question Set 1 2 and 3 -336.pdf

PDF 127 KB Posted

Attached to
FA8604/Storage Aid System/Duluth/MMHS Federal contract opportunity
Solicitation number
FA860421RB017
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document contains a solicitation for a Storage Aid System project at Duluth Air National Guard Base in Minnesota. The solicitation will result in a fixed price contract awarded to the technically acceptable, responsible offeror providing the lowest price. The work includes performance, design, fabrication, installation, and testing of storage cabinets and related equipment in accordance with purchase descriptions and drawings. Offerors must be registered in SAM and proposals are due by May 26, 2021. Evaluation will be based on lowest price technically acceptable. The contractor must complete all work within 238 days of award. Questions will be accepted until May 19. The solicitation is designated for small businesses with a size standard of 500 employees and is subject to limitations on subcontracting.

View the file

Other files for this federal contract opportunity

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Duluth FA8604-21-R-B017 RFP Question as of 5/26/2021

Question Set 3

1. In Appendix B, Section 3.2.10 3 calls for lighting to be installed under the Mezzanine. Please advise on the closest electrical box that we would be connecting to on Drawing NDL 102-01 and confirm that the responsibility for running power to the Mezz is the successful bidder.

a. To budget for a conduit and conductor run to the nearest open power source, of up to 250 feet.

End of Question and Answers Set 3

Duluth FA8604-21-R-B017 RFP Questions and Answers as of 5/11/2021

Answer posted 5/19/2021

Question and Answer Set 2

1. RE: App. B – Maxi Mezz – 3.2.6. chart show drawer “C” configuration 1 wide, 1 deep. Does this mean no dividers?

a. That is correct. There are no dividers.

2. RE: App. A – Wide Span – 3.2.2. below frame chart mentions a type “D” – not seeing type “D” mentioned anywhere else or not seeing on the drawing.

b. The language regarding type “D” wide span shelving should have been deleted. There is no longer any type “D” wide span shelving associated with the project. Please see App A (REV1) for clarification.

End of Question and Answers Set 2

Duluth FA8604-21-R-B017 RFP Questions and Answers as of 5/5/2021 Answer posted 5/5/2021

Question Set 1

Question:

c. After reading through the spec sheets, I noticed the Type I, 30”W x 59” H cabinets call for (3) 3.875” (30 point drawer), (4) 5.375”(40 point drawer), and (2) 7” (50 point) drawers.

For a Vidmar 340 model cabinet housing that is 59” high, the drawer points requested would be 350 exceeding the allowable 340 drawer points.

I just need to reduce the points by 10 total to make it work. Could I make (2) of the 40’s into (2) 35’s (4.625”usable height) instead?

Answer:

1. I do not see an issue with this. Just make sure that the descending order is still kept.

-Top- 3x 30 point 2x 35 point (*formerly 2x 40 point*) 2x 40 point 2x 50 point -Bottom-

Please contact the Contract Specialist Melissa Sanders for any additional questions @ Melissa.Sanders.5@us.af.mil