Inspection Check List.pdf

PDF 135 KB Posted

Attached to
Building 802 Furniture Federal contract opportunity
Solicitation number
FA8601-21-Q-0129
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

This document is a combined synopsis and solicitation for modular furniture and modular walls for Building 802 at Wright Patterson Air Force Base. The Air Force Materiel Command Lifecycle Management Center requires delivery and installation of new modular furniture to furnish the building. Interested parties must submit fixed price quotes by August 31, 2021 to the email address provided, with the subject line "Building 802 Furniture". The contract will have a period of performance of 12 weeks after award and delivery is FOB destination. The evaluation criteria will consider technical quality and price, with award going to the offeror providing the best overall value. Site visits are available on August 12.

View the file

Other files for this federal contract opportunity

Other files attached to Building 802 Furniture, newest first.
File Type Posted
Response To Inquiries 3.pdf PDF
Updated B802 SOW.pdf PDF
Solicitation Amendment F.pdf PDF
Response To Inquiries 2.pdf PDF
Response To Inquiries .pdf PDF
Window Shade Image.jpg JPG image
I-2.pdf PDF
I-1.pdf PDF
Attachment 1 -B802 SOW.pdf PDF
I-3.pdf PDF
Attachement 3 - CLIN Structure Clauses and Provisions.pdf PDF
Instructions for Use of Government Sources.docx DOCX document
I-4.pdf PDF
Solicitation Amendment 1.pdf PDF
Attachment 7 - Map to B802.pdf PDF
Attachment 6 - Modular Wall Plan Drawing.pdf PDF
Attachment 4 - FAR 52.204-24.pdf PDF
Attachment 6 - Furniture Plan Drawing.pdf PDF
Attachment 3 - CLIN Structure Clauses and Provisions.pdf PDF
Attachment 1 -B802 SOW.pdf PDF
Attachment 5 -Memo for 2019-009 Interim FAR Rule.pdf PDF
Attachment 2 - Offeror Reps and Certs.pdf PDF
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment - (Inspection -Acc ptance Checklist)

Base/Location: Customer Organization / POC:

Contractor / Manufacturer:

Date of Walk through:

Contracting Officer Representative:

COR Signature:

Contractor Project Manager:

PM Signature:

Completed Delivery: YES NO Completed Project: YES NO

Evaluation Section / Item Service Requirement Description (See chart below) Comments

SG GENERAL SERVICES

SG01 The actual start date for the project coincided with the agreed upon date set by the Project

Manager.

SG02 The products specified were placed into the rooms and shown on the floor plans included in the purchasing package.

SG03 The Project Manager maintained an open line of communication with the COR with both verbal and written updates throughout the project.

SG04 Issues requiring a change of schedule were brought to the attention of the COR by the Project

Manager in a timely manor.

SG05 The labor turnover in key personnel was minimal and did not adversely affect the final product or schedule.

SG06 The products specified/ordered/installed fulfills the requirements of the facility and customer.

SD DESIGN SERVICES

SD01 Furniture fits properly within the given space, with all structural and other anomalies are taken into account.

SD02 Any existing government product was reused to its maximum when project includes add on parts to existing systems furniture.

SD03

All requested copies of archival drawings of furniture layouts have been received on a non-rewritable CD or DVD in both .dwg and .pdf formats unless otherwise specified in the contract.

SP PRODUCT MARKINGS/DOCUMENTATION/TOOLS

SP01 All documentation (Owner’s manuals, warranty information, assembly instructions, maintenance and care instructions, operating instructions, etc.) has been provided to and reviewed with the Contracting Officer Representative (COR).

SP02 Special assembly tools (security hardware wrench, spare parts provided with the furnishings, etc.)

have been provided to the Contracting Officer Representative (COR).

SP03 Any keys provided to the contractor have been returned to the Contracting Officer Representative (COR) and no keys or other means of access were duplicated.

Systems and Modular Inspection Acceptance Checklist

Completed Delivery: YES NO Completed Project: YES NO

Evaluation Section / Item Service Requirement Description (See chart below) Comments

SI INSTALLATION AND REMOVAL SERVICES

SI01 The systems and modular furniture has been installed in accordance with each requirement statement and basic component floorplan, panel plan and electrical plan, designed and provided by the contractor, and accepted by the Contracting Officer Representative (COR).

SI02 The contractors used on the job produced quality workmanship.

SI03 All existing furniture and building materials, to include carpet, existing within the space were adequately protected and there is no damage to report.

SI04 Assembly of all systems and modular furniture was accomplished in accordance with the manufacturer instructions.

SI05 Any item damaged during shipping has been identified, remains uninstalled, and is in the process of being replaced by the contractor unless otherwise directed by the Contracting Officer Representative (COR).

SI06 Final assembly of product to conforms to final Air Force approved design drawings.

SI07 Any furnishings attached to the building is attached securely.

SI08 All packing materials from the installation have been removed from the sight and disposed of according to state regulations, with all recyclable materials being deposited in an authorized recycling facility.

SI09

All excess product has been removed from the site and transported to the Air Force approved warehouse or other location when required and as specified by the local contracting officer.

SI10 All new products have been thoroughly cleaned using manufacturer recommended cleaning agents/products.

SI11 All trash and other debris associated with the assembly and disassembly of new office furniture has been removed from the site and disposed of according to state regulations, with all recyclable materials being deposited in an authorized recycling facility.

SI12 New light fixtures have appropriate lamps and are in working order.

SI13 All new components are completely assembled, installed, and operational.

SI14 New furniture, equipment, and accessories are level, square, and in proper alignment with adjoining furniture.

SI15 All drawers should operate smoothly and stay closed when not in use.

SI16 The new furniture is free of surface dirt and defects, the installation is complete, and the furniture is ready for use.

SI17 The Inspection Acceptance Checklist has been signed and a copy provided to the Contractor in accordance with the agreement.

Completed Delivery: YES NO Completed Project: YES NO

Evaluation Section / Item Service Requirement Description (See chart below) Comments

Rating Definition Note Exceptional Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with few minor problems for which corrective actions taken by the contractor was highly effective.

To justify an Exceptional rating, identify multiple significant events and state how they were of benefit to the Government. A singular benefit, however, could be of such magnitude that it alone constitutes an Exceptional rating. Also, there should have been NO significant weaknesses identified.

Very Good Performance meets contractual requirements and exceeds some to the Government’s benefit. The contractual performance of the element or sub-element being assessed was accomplished with some minor problems for which corrective actions taken by the contractor was effective.

To justify a Very Good rating, identify a significant event and state how it was a benefit to the Government. There should have been no significant weaknesses identified.

Satisfactory Performance meets contractual requirements. The contractual performance of the element or sub-element contains some minor problems for which corrective actions taken by the contractor appear or were satisfactory.

To justify a Satisfactory rating, there should have been only minor problems, or major problems the contractor recovered from without impact to the contract. There should have been NO significant weaknesses identified. Per DOD policy, a fundamental principle of assigning ratings is that contractors will not be assessed a rating lower than Satisfactory solely for not performing beyond the requirements of the contract.

Marginal Performance does not meet some contractual requirements. The contractual performance of the element or sub-element being assessed reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.

To justify Marginal performance, identify a significant event in each category that the contractor had trouble overcoming and state how it impacted the Government. A Marginal rating should be supported by referencing the management tool that notified the contractor of the contractual deficiency (e.g., management, quality, safety, or environmental deficiency report or letter).

Evaluation Ratings Definitions (CPARs definitions)

Completed Delivery: YES NO Completed Project: YES NO

Evaluation Section / Item Service Requirement Description (See chart below) Comments

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the element or sub-element contains a serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

To justify an Unsatisfactory rating, identify multiple significant events in each category that the contractor had trouble overcoming and state how it impacted the Government. A singular problem, however, could be of such serious magnitude that it alone constitutes an unsatisfactory rating. An Unsatisfactory rating should be supported by referencing the management tools used to notify the contractor of the contractual deficiencies (e.g., management, quality, safety, or environmental deficiency reports, or letters).

File details come from the government source that posted it. Updated .