Clarifications_to_RFI_Answers_3_thru_6.docx

DOCX document 21 KB Posted

Attached to
Repair Storm Drains WPAFB Area B Federal contract opportunity
Solicitation number
FA8601-18-B-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Additional clarifications to RFI Answer Set 3 through 6

View the file

Other files for this federal contract opportunity

Other files attached to Repair Storm Drains WPAFB Area B, newest first.
File Type Posted
Amendment_SF_30_U0002.docx DOCX document
Specifications_amended_warranty_period.pdf PDF
Attachment_4_WDOL_update_07.06.18.pdf PDF
Updated_WD_OH20180002.pdf PDF
Addendum_1_SF30.docx DOCX document
RFI_Answers_Set_3_thru_6.docx DOCX document
Site_Visit_Attendance_Sheet.pdf PDF
090235_PreAward_RFIs_set_2.docx DOCX document
090235_-_RFI_1_-_Summary_of_Structures_Pipes.xlsx XLSX spreadsheet
Wage_Determination_OH20180002.pdf PDF
BID_SCHEDULE.doc DOC document
Project_Drawing_Set_1_of_3.pdf PDF
Project_Drawing_Set_3_of_3.pdf PDF
Specifications.pdf PDF
Project_Drawing_Set_2_of_3.pdf PDF
IFB_FA8601-18-B-0002.docx DOCX document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Project 090235 Repair Storm Drains Further Clarifications to RFI Set 3 7/10/2018

1) There are 14 runs of pipe that state the existing material is RCP. If that is truly reinforced concrete pipe, can those runs really be burst? Also there are some runs that are very small. By the time pits are excavated it would already have been open cut.

Answer: Performing either pipe-bursting or open cut to replace the RCP pipe is contractor's 'means and method' choice. Bid what is comfortable for the contractor's performance. The A/E designer opined that pipe bursting is possible for RCP, and the Government Client believes they have completed several projects that did pipe-bursting for RCP, but doing so or not on this project would fall under a contractor's "means and method" decision in deciding how to perform the requirement. The requirement is to replace the existing pipe with new a pipe either with "cut and replace" or "pipe bursting". If the contractor sees the pipe bursting is not feasible, then it should bid pricing with open cut. The list of RCP pipe to be replaced has been provided previously.

2) Will the CIPP warranty period in the Specifications Attachment stay at a 5 year warranty period?

Answer: As is indicated in Addendum 2 to the Solicitation now posted on FBO.gov, the CIPP warranty period has been amended from 5 years to 1 year.

3) In RFI Answer set 3, answers to questions 3 and 7 discussed “capturing” steam used to treat pipes. What does the Government envision “capture” to entail?

Answer: The intent of the answer was to indicate the capture requirement is for Contractors to capture only any condensation/moisture that results from the steam curing process. Steam can still be released from a pipe vent, yes. Any smell, moisture, heat, or other impact to pedestrian traffic from the venting process would need to mitigated as much as practicable.