RFI_21_to_25_with_sketch.pdf
PDF 113 KB Posted
- Solicitation number
- FA8601-17-B-0002
About this file
RFI 21-25
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment_FA8601-17-B-0002.pdf | ||
| Updated_Drawings_and_Specifications_9_march_2017.pdf | ||
| Rules_of_Engagement.pdf | ||
| Attendence_list.pdf | ||
| RFI_11-21_Response.pdf | ||
| Preaward_RFI__1-21_response.docx | DOCX document | |
| Rules_of_engagement.pdf | ||
| Amendment_02.pdf | ||
| Site_visit_Attendence.pdf | ||
| Amendment_1.pdf | ||
| Drawings.pdf | ||
| Wage_Decision_OH170102.pdf | ||
| Specifications.pdf | ||
| FA8601-17-B-0002.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RFI 23-26 Pre-award Project 051940
21. Notes 1 and 2 on drawing E104 state the replacement panels to be installed in place of panels L5D-1 and L5C-1 are to include 200% rated neutrals. Do the existing panels L5D-1 and L5C-1 have 200% rated neutrals?
Response: Expect current panels to not meet 200% capacity rating. See RFI question 22.
#22 (E104) Are we pulling new wire or is the panelboard just to have a 200% rated neutral bar? Can we reuse the existing feeder?
Response: Pull new neutral wire meeting 200% rating.
#23 Will EMT conduit be permitted on the 24V DC that feeds the actuator on the windows?
Response: EMT conduit is permitted for the 24V DC feeds of the window actuators. 120V AC supply is not to run in same conduit as 24V DC feeds.
#24 is it possible to schedule a secondary walk for further examination of the project? If so, could we gain access to panelboards and locations which they are fed from?
Response: Second site visit was scheduled. See attached sketch 1/SK-1 for approximate location of feeder for panel L5C-1. Feeder panel for L5D-1 is located in caged area approximately 30 feet away from panel.
#25 -What is the floor weight rating in the areas where a lift would be required?
Response: Government Response: Detail of floor construction is undetermined at this time.
Coordinate with 88th CE representative during construction for acceptable areas for lift use.
| RFI Preaward 21 to 25_Response |
| RFI 24 sketch |