RFI_21_to_25_with_sketch.pdf

PDF 113 KB Posted

Attached to
Repair and Replace Motorized Windows in Facilities 20024C and 20025A Project-ZHTV051940
Solicitation number
FA8601-17-B-0002
Issued by

About this file

RFI 21-25

View the file

Other files

File Type Posted
Amendment_FA8601-17-B-0002.pdf PDF
Updated_Drawings_and_Specifications_9_march_2017.pdf PDF
Rules_of_Engagement.pdf PDF
Attendence_list.pdf PDF
RFI_11-21_Response.pdf PDF
Preaward_RFI__1-21_response.docx DOCX document
Rules_of_engagement.pdf PDF
Amendment_02.pdf PDF
Site_visit_Attendence.pdf PDF
Amendment_1.pdf PDF
Drawings.pdf PDF
Wage_Decision_OH170102.pdf PDF
Specifications.pdf PDF
FA8601-17-B-0002.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RFI 23-26 Pre-award Project 051940

21. Notes 1 and 2 on drawing E104 state the replacement panels to be installed in place of panels L5D-1 and L5C-1 are to include 200% rated neutrals. Do the existing panels L5D-1 and L5C-1 have 200% rated neutrals?

Response: Expect current panels to not meet 200% capacity rating. See RFI question 22.

#22 (E104) Are we pulling new wire or is the panelboard just to have a 200% rated neutral bar? Can we reuse the existing feeder?

Response: Pull new neutral wire meeting 200% rating.

#23 Will EMT conduit be permitted on the 24V DC that feeds the actuator on the windows?

Response: EMT conduit is permitted for the 24V DC feeds of the window actuators. 120V AC supply is not to run in same conduit as 24V DC feeds.

#24 is it possible to schedule a secondary walk for further examination of the project? If so, could we gain access to panelboards and locations which they are fed from?

Response: Second site visit was scheduled. See attached sketch 1/SK-1 for approximate location of feeder for panel L5C-1. Feeder panel for L5D-1 is located in caged area approximately 30 feet away from panel.

#25 -What is the floor weight rating in the areas where a lift would be required?

Response: Government Response: Detail of floor construction is undetermined at this time.

Coordinate with 88th CE representative during construction for acceptable areas for lift use.

RFI Preaward 21 to 25_Response