Amendment_1_15-R-0041.pdf

PDF 31 KB Posted

Attached to
Repair Exterior Facility 20033, Project 111925A Federal contract opportunity
Solicitation number
FA8601-15-R-0041
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Wright Patterson Air Force Base

About this file

Amendment 1 to sign

View the file

Other files for this federal contract opportunity

Other files attached to Repair Exterior Facility 20033, Project 111925A, newest first.
File Type Posted
Pre_Award_RFI_Ansewrs_1.pdf PDF
Pre_Award_RFI_Answers_3.pdf PDF
Pre_Award_RFI_Answers_2.pdf PDF
Addendum_-_1.pdf PDF
Wage_Determination_OH20140114_Revised.pdf PDF
Site_Visit_Sign-In_Sheet.pdf PDF
Rules_of_Engagement.pdf PDF
Attachment_2_-_Specifications.pdf PDF
Attachment_3_-_Wage_Determination.pdf PDF
FA8601-15-R-0041.pdf PDF
Attachment_1_-_Drawings.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ZHTV111925A

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to:

1) Incorporate Addendum

2) To incorporate the latest Davis Bacon Wage Determination, OH150114, Modif ication 6, dated 7 July 15

3) Extend Proposal Due Date

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 17-Jul-2015

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X FA8601-15-R-0041

X 9B. DATED (SEE ITEM 11)

24-Jun-2015

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

17-Jul-2015

CODE

AFLCMC/PZIOCA - CONSTRUCTION SECTION A

POC: EVAN E KAUFMAN

1940 ALLBROOK DRIVE, ROOM 109

WRIGHT-PATTERSON AFB OH 45433-5344

FA8601 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

FA8601-15-R-0041

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The required response date/time has changed from 24-Jul-2015 01:00 PM to 28-Jul-2015 02:00 PM.

SECTION I - CONTRACT CLAUSES

The following have been modified:

252.236-7001 CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)

(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.

(b) The Contractor shall--

(1) Check all drawings furnished immediately upon receipt;

(2) Compare all drawings and verify the figures before laying out the work;

(3) Promptly notify the Contracting Officer of any discrepancies;

(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and

(5) Reproduce and print contract drawings and specifications as needed.

(c) In general--

(1) Large-scale drawings shall govern small-scale drawings; and

(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.

(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.

(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:

TITLE FILE DRAWING NO. DATE

COVER SHEET GENERAL G-001 08-Dec-2014 DEMOLITION NOTES ARCHITECTURAL ADOOO 08-Dec-2014 BASEMENT DEMOLITION PLAN ARCHITECTURAL AD100 08-Dec-2014 FIRST FLOOR DEMOLITION PLAN ARCHITECTURAL AD101 08-Dec-2014 SECOND FLOOR DEMOLITION PLAN ARCHITECTURAL AD102 08-Dec-2014 THIRD FLOOR DEMOLITION PLAN ARCHITECTURAL AD103 08-Dec-2014 BUILDING DEMOLITION ELEVATIONS ARCHITECTURAL AD201 08-Dec-2014

BUILDING DEMOLITION ELEVATIONS ARCHITECTURAL AD202 08-Dec-2014 BUILDING DEMOLITION ELEVATIONS ARCHITECTURAL AD203 08-Dec-2014 BUILDING REPAIR ELEVATIONS ARCHITECTURAL AR201 08-Dec-2014 BUILDING REPAIR ELEVATIONS ARCHITECTURAL AR202 08-Dec-2014 BUILDING REPAIR ELEVATIONS ARCHITECTURAL AR203 08-Dec-2014 GENERAL NOTES ARCHITECTURAL A-000 08-Dec-2014 BASEMENT FLOOR PLAN ARCHITECTURAL A-100 08-Dec-2014 FIRST FLOOR PLAN ARCHITECTURAL A-101 08-Dec-2014 SECOND FLOOR PLAN ARCHITECTURAL A-102 08-Dec-2014 THIRD FLOOR PLAN ARCHITECTURAL A-103 08-Dec-2014 BUILDING ELEVATIONS ARCHITECTURAL A-201 08-Dec-2014 BUILDING ELEVATIONS ARCHITECTURAL A-202 08-Dec-2014 BUILDING ELEVATIONS ARCHITECTURAL A-203 08-Dec-2014 WALL SECTIONS ARCHITECTURAL A-301 08-Dec-2014 WALL SECTIONS ARCHITECTURAL A-302 08-Dec-2014 ENLARGED FLOOR PLANS ARCHITECTURAL A-401 08-Dec-2014 DETAILS ARCHITECTURAL A-501 08-Dec-2014 CLADDING DETAILS ARCHITECTURAL A-511 08-Dec-2014 DOOR SCHEDULE AND DETAILS ARCHITECTURAL A-601 08-Dec-2014 DOOR DETAILS ARCHITECTURAL A-602 08-Dec-2014 WINDOW & LOUVER SCHEDULES ARCHITECTURAL A-611 08-Dec-2014 WINDOW DETAILS ARCHITECTURAL A-612 08-Dec-2014 GENERAL NOTES STRUCTURAL S-001 08-Dec-2014 GENERAL NOTES STRUCTURAL S-002 08-Dec-2014 DETAILS STRUCTURAL S-301 08-Dec-2014 FOUNDATION DETAILS STRUCTURAL S-501 08-Dec-2014 DETAILS STRUCTURAL S-701 08-Dec-2014

Addendum 1: Cladding – Plan Detail ARCHITECTURAL AD-1 16-Jul-2015

(End of clause)

SECTION J - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

The Table of Contents has changed from:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawings 34 08-DEC-2014 Attachment 2 Specifications 400 05-DEC-2014 Attachment 3 Wage Determination

OH150102

6 05-JUN-2015

to:

Exhibit/Attachment Table of Contents

DOCUMENT TYPE DESCRIPTION PAGES DATE

Attachment 1 Drawings 34 08-DEC-2014

Attachment 2 Specifications 400 05-DEC-2014 Attachment 3 Wage Determination

OH20140114

7 03-JUL-2015

Attachment 4 Addendum 1 4 17-JUL-2015

(End of Summary of Changes)

File details come from the government source that posted it. Updated .