Addendum_01_M401.pdf
PDF 232 KB Posted
- Attached to
- Replace Cooling Tower Federal contract opportunity
- Solicitation number
- FA860115R0039
About this file
Addendum 1 Drawings
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA8601-15-R-0039-0003.pdf | ||
| FFP_Addendum_02_SOW.pdf | ||
| RFI_Responses_29_JUL_15.pdf | ||
| FA8601-15-R-0039-P0002_Addendum_1.pdf | ||
| FFP_Addendum_01_SOW.pdf | ||
| FA8601-15-R-0039-0001_Amendment_1.pdf | ||
| General_Decision_Number_OH150102_21_Jul_15.pdf | ||
| 16._Rules_of_Engagement.pdf | ||
| sign-in_sheet.pdf | ||
| Drawings_Rpl_Cooling_Tower_F10262.pdf | ||
| FA8601-15-R-0039.pdf | ||
| General_Decision_Number_OH150102_5_Jun_15.pdf | ||
| Specifications_Rpl_Cooling_Tower_F10262_.pdf |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
M
FD
FD
FD
FD
FD
CH-3
CH-2
CH-1
FD
FD
FD
FD
FD
FD
51x23 W/
INSULATION
51x23 W/
INSULATION
ELECTRICAL MAIN
DISTRIBUTION PANEL
(MDP)
ELECTRICAL MOTOR
CONTROL PANEL (MCC-2)
CHILLER 3
POWER PANEL
CHILLER 2
POWER PANEL
CHILLER 1
POWER PANEL
8" (BOP 10'-5"AFF)
8" (BOP 8'-8"AFF)
12"
12"
8"
8"
16" (BOP 10'-0"AFF)
12"
6"
6"
10" 10"
8" FROM BLDG 266
8" TO BLDG 266
TO BLDG 262 BASEMENT W.
FROM BLDG 262 BASEMENT W.
FD
(BOD 8'-0"±
AFF)
(BOD 8'-0"±
AFF)
8"
10"
12"
12"
03 16
04 16
04 16
04 16
DN
7'-10" BOP
CHR
VENTILATION
DUCT (TYP)
CONCRETE
PAD (TYP)
16" (BOP
8'-10"AFF)
12" (BOP 10'-0" AFF)
12" (BOP
10'-0" AFF)
8" (BOP
10'-2" AFF)
TO BLDG 262 BASEMENT E.
FROM BLDG 262 BASEMENT E.
8" (BOP 9'-1" AFF)
12" (BOP 10'-3" AFF)
12" (BOP 10'-3" AFF)
10"
20" (BOP 8'-3" AFF)
CONDENSER
WATER RETURN
20" (BOP 0'-8" AFF)
CONDENSER
WATER SUPPLY
10" CHS & CHR UP TO
1ST & 2ND FLOORS
OF BLDG 262
(BOP 10'-3" AFF)
UH
12" (BOP 8'-6" AFF)
EXISTING PIPING
BOP 9'-2"
CHR
CHS
UH
CHS
UTILITY SINK
FD
FD
CHR
REDLIGHT
WARNING SIGN
FLOOR
TRENCH
W/COVER
(TYP)
CONCRETE
PAD (TYP)
CONCRETE
PAD (TYP)
3"
3"
TO COOLING TOWERS
CHP-1
CHP-2
CHP-4
CHP-3
CWP-1
CWP-4
(STANDBY)
CWP-2
CWP-3
10" UP TO BLDG. 262
FIRST AND SECOND
FLOOR
CHR
CHS
CHS
CHR
CHS
CHR
CHS
CHS
CHR
CHR
CWR
CWS
CWS
CWR
CWS
CWR
ELECTRICAL MOTOR
CONTROL PANEL (MCC-1)
RUPTURE DISC
RELIEF PIPING
40 41
TYP
12"
TYP
DN
12"
PROVIDE
SHUTOFF
VALVE (TYP)
8"
12"
12"
12"
12"
34"x34" METAL
DOORS AND OPENING
BUS DUCT
ON TOP
48" ±
CLEAR
COORDINATOR ENGINEERING CHIEF
DATE REVISION BY
NO. DATE NO. REVISION BY
C
I
V
I
L
E N
G
I
N
E
E
R
US AF
OF
DESIGN CHIEF
DATEDRAWNDESIGNED CHECKED
CONTRACT: FA8601-12-D-0005PROJECT - ZHTV040019
WPAFB
WRIGHT-PATTERSON AIR FORCE BASE
21 JUL 15
88TH ABW
SEAL
K Z
F
ADDENDUM #01 - 21 JULY 2015
F U
L L
S
I Z
E
P
R I N
T
X
PARTIAL ENLARGED BASEMENT FLOOR PLAN
BUILDING 10262 CHILLER PLANT
01 CONDENSER WATER PUMP: B&G MODEL VSCS-F-9.5-BF-RHR,
1800 GPM, 60 FT. HEAD, 40 HP, 460 VOLT, 3 PHASE
02 CONDENSER WATER PUMP: B&G MODEL VSCS-F-11-BF-RHR,
3900 GPM, 77 FT. HEAD, 100 HP, 460 VOLT, 3 PHASE
03 CHILLED WATER PUMP: B&G MODEL VSC-11.25-BF-C-RHR,
1440 GPM, 125 FT. HEAD, 75 HP, 460 VOLT, 3 PHASE
04 CHILLED WATER PUMP: B&G MODEL VSC-12.75-BF-O-RHR,
3120 GPM, 150 FT. HEAD, 200 HP, 460 VOLT, 3 PHASE
05 CHILLER: YORK MODEL YKN43G4-CTL-YDHA-41DD, NOMINAL 596 TON
(R22 REFRIGERANT).
06 CHILLER: YORK MODEL YKQ4R3H2-DBC-YDHB-57DD, NOMINAL 1300 TON
(R22 REFRIGERANT).
07 AIR SEPARATOR WITH MAKE UP WATER CONNECTION
08 EXPANSION TANK
09 CHILLED WATER CHEMICAL SHOT FEEDER
10 EXHAUST FAN
11 CONDENSER WATER BLOW DOWN.
12 STRAINER, BUTTERFLY VALVE AND FLEX, IN VERTICAL SUPPLY WATER PIPE.
13 FLEX AND BUTTERFLY VALVE IN RETURN WATER PIPE WITH GAUGE & THERMOMETER.
14 BUTTERFLY VALVE FLEX AND SUCTION DIFFUSER IN PUMP SUCTION PIPE.
15 BUTTERFLY VALVE AND FLEX IN PUMP SUCTION VERTICAL PIPE.
16 FLEX AND TRIPLE DUTY VALVE IN PUMP DISCHARGE VERTICAL PIPE.
17 AIR COMPRESSOR
18 AIR DRYER
19 COMPRESSED AIR TANK
20 BUTTERFLY VALVE (NORMALLY CLOSED).
21 18" BYPASS PIPE WITH MOTOR OPERATED BUTTERFLY VALVE IN VERTICAL.
22 10" BALANCING VALVE. SET @ 1800 GPM.
23 3" WATER SUPPLY WITH 3" REDUCED PRESSURE BACK FLOW PREVENTER.
24 2" REDUCED PRESSURE BACK FLOW PREVENTER FOR CHILLED WATER MAKE UP.
25 CONDENSER WATER TREATMENT RACKED ON WALL AND FLOOR MOUNTED TANKS
AND FILL SYSTEM WITH 2" AND 3" REDUCED PRESSURE BACK FLOW PREVENTERS.
26 TRANE REFRIGERANT MONITOR PANEL MG MODEL WITH RED LIGHT.
27 LAKOS FILTERS TBX-0400-SRV, 400 GPM & 7.5 HP, 460V, 3 PH.
28 BUTTERFLY VALVE IN VERTICAL PIPE.
29 BUTTERFLY VALVE IN VERTICAL PIPE WITH GAUGE.
30 COMBO EMERGENCY EYEWASH / SHOWER.
31 3" WELDED PIPE DOWN TO RELIEF VALVES WITH FLEX CONNECTOR IN VERTICAL.
32 BUTTERFLY VALVE IN VERTICAL.
33 YORK RECYCLING / STORAGE TANK ON WHEELS.
34 LOCATED OUTSIDE ROOM IN CORRIDOR. BOTH DEVICES ARE TO REMAIN AND ARE PART OF
REFRIGERANT MONITORING SYSTEM.
35 ROUTE TEMPORARY 12" CHS & CHR PIPING OUT TO RENTAL CHILLERS AND PROVIDE PIPING MANIFOLDS
CONNECTING HOSES FROM EACH CHILLER INTO MANIFOLDS. PROVIDE SHUTOFF VALVES TO EACH
CONNECTION. REFER TO SITE PLAN FOR LOCATION OF RENTAL CHILLERS..
36 FIELD VERIFY EXACT LOCATION OF METAL WALL PANEL TO USE AS OPENING INTO
CHILLER ROOM.
37 PROVIDE FULL DRIP PAN AND DRAIN OUT OF DRIP PAN UNDER PIPING AND ABOVE
ELECTRIC GEAR.
38 FIELD VERIFY EXACT ROUTING OF TEMPORARY CHS & CHR PIPING.
39 BEFORE TEMPORARY CONNECTIONS ARE MADE TO PIPING SHUTOFF AND ISOLATE CHILLERS
AND PUMPS THAT WILL NOT BE USED DURING TEMPORARY SETUP AS REQUIRED BY CLOSING
SHUTOFF VALVES AT EQUIPMENT.
40 RECONNECT CONDENSER WATER BLOWDOWN AND MAKEUP WATER CONNECTIONS TO NEW PIPING.
41 AFTER NEW UNDERGROUND PIPING IS STUBBED THROUGH THE BUILDING WALL INTO THE CHILLER
ROOM TRANSITION TO SCH 40 STEEL PIPE. PROVIDE FLANGE CONNECTORS AT WALL SIMILAR TO
EXISTING. PROVIDE WATERTIGHT SEALS AT PIPING PENETRATIONS IN WALL.
42 AFTER NEW COOLING TOWER SYSTEM I S OPERATIONAL DISCONNECT AND REMOVE TEMPORARY
RENTAL CHILLERS AND TEMPORARY CHILLED WATER PIPING AND RESTORE EXISTING SYSTEM TO
ORIGINAL CONDITION AND OPERATION.
43 APPROXIMATE PIPING PATH, FIELD VERIFY.
EXISTING EQUIPMENT AND NEW WORK, ETC. INFORMATION
LIGHT LINE WORK IS EXISTING TO REMAIN
DARK LINE WORK IS NEW WORK
LEGEND
07/21/15 ADDENDUM #01 JCN01
01 01
File details come from the government source that posted it. Updated .