DRAFT RFP.pdf
PDF 4 MB Posted
- Attached to
- TH-1H Depot Level Maintenance Federal contract opportunity
- Solicitation number
- FA8552-23-R-0006
About this file
This document is a draft request for proposal for TH-1H Depot Level Maintenance services. The solicitation is a competitive total small business set-aside issued by the Department of the Air Force Materiel Command Lifecycle Management Center. Services required include aircraft preparation and induction, teardown and inspection, programmed depot maintenance and repair labor and material, aircraft preparation and delivery, travel and per diem expenses, over and above labor and materials, contractor field team support, and unprogrammed depot level maintenance. The period of performance consists of one base year and seven option years. The response due date is December 15, 2023. Pricing will be on a firm-fixed-price basis for most items and cost reimbursement for materials and travel. The anticipated award date is within 120 days of the response due date.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT Attach 05_Cross Reference Matrix .pdf | ||
| DRAFT_Attach 08 Past Performance Questionnaire.pdf | ||
| DRAFT_Attach 10_Transmittal Letter.pdf | ||
| DRAFT_Attach 11_Subcontractor Consent.pdf | ||
| DRAFT_Attach 20_Preaward Survey.pdf | ||
| DRAFT_Attach 03_CDRLs.pdf | ||
| DRAFT_Attach 09_Relevancy Table.pdf | ||
| DRAFT_Attach 14_Fully Burdened Labor Rates.pdf | ||
| DRAFT_Attach 15_Material Add-on Factors.pdf | ||
| DRAFT_Attach 21_Subcontractor Committment.pdf | ||
| DRAFT_Attach 18_Transportation.pdf | ||
| DRAFT_Attach 12_Client Authorization.pdf | ||
| DRAFT_Attach 13_Labor Categories.pdf | ||
| DRAFT_Attach 16_Price Matrix.pdf | ||
| DRAFT_Attach 04_Sections L and M Provisions .pdf | ||
| DRAFT_Attach 07_FACTS Sheet.pdf | ||
| DRAFT_Attach 17_Packaging.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV. 9-97)
PREVIOUS EDITION NOT USABLE Prescribed by GSA – FAR (48 CFR) 53/214(c)
SOLICITATION, OFFER AND AWARD JS
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15CFR 7900)
RATING
DX: A1
Page of Page
2. CONTRACT NO. 3. SOLICITATION NO.
FA8552-23-R-0006
4. TYPE OF SOLICITATION
SEALED BID (IFB)
NEGOTIATED (RFP)
7. ISSUED BY
SOF/RW - ROTARY WING, AFLCMC/WIUKB RW
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 7227
ROBINS AFB GA 31098-1670
BUYER: Tarha A. Mazyck, Capt, USAF/WIUKB tarha.mazyck.2@us.af.mil Phone: (478) 926- 3952
FA8552 8. ADDRESS OFFER TO (If other than Item 7)
11. TABLE OF CONTENTS
(X) SEC. DESCRIPTON PAGE(S) (X) Sec. DESCRIPTION PAGE(S)
PART I - THE SCHEDULE PART II - CONTRACT CLAUSES
X A SOLICITATION/CONTRACT FORM
X B SUPPLIES OR SERVICES AND
C DESCRIPTION/SPECS/WORK STATEMENT
D PACKAGING AND MARKING
X E INPECTION AND ACCEPTANCE
X F DELIVERIES OR PERFORMANCE
X G CONTRACT ADMINISTRATION DATA
X H SPECIAL CONTRACT REQUIREMENTS
X I CONTRACT CLAUSES
PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER
X J LIST OF ATTACHMENTS
X K REPRESENTATIONS, CERTIFICATIONS AND
OTHER STATEMENTS OF OFFERORS
PART IV - REPRESENTATIONS AND INSTRUCTIONS
X L INSTRS., CONDS., AND NOTICES TO OFFERORS
X M EVALUATION AND FACTORS FOR AWARD
OFFER (Must be fully completed by offeror)
24. ADMINISTERED BY (If other than Item 7) SCD:C 25. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
28. AWARD DATE
X
5. DATE ISSUED 6.REQUISITION/PURCHASE NO
NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”.
9. Sealed offers in original and copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, in the depository located in until 4:30 (Hour) local time 15-DEC-2023 (Date).
CAUTION- LATE Submissions, Modifications, and Withdrawals: Section L, Provision No 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this section.
10. FOR INFORMATION
CALL:
A. NAME
Tarha A Mazyck
B. TELEPHONE (NO COLLECT CALLS)
NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.
12. In compliance with the above, the undersigned agrees, if this offer is accepted within 120 calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.
13. DISCOUNT FOR PROMPT PAYMENT(See Section I, Clause No 52.232-8)
10 CALENDAR DAYS 20 CALENDAR DAYS 30 CALENDAR DAYS CALENDAR DAYS
14. ACKNOWLEDGEMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated:
AMENDMENT NO. DATE AMENDMENT NO. DATE
15A. NAME AND
ADDRESS OF
OFFEROR
CODE FACILITY 16. NAME AND TITLE OF PERSON
AUTHORIZED TO SIGN OFFER (Type or print)
15B. TELEPHONE NO.
(Include Area Code)
15C.CHECK IF REMITTANCE ADDRESS
IS DIFFERENT FROM ABOVE-ENTER
SUCH ADDRESS IN SCHEDULE.
17. SIGNATURE 18. OFFER DATE
AWARD (To be completed by Government)
19. ACCEPTED AS TO ITEMS 20. AMOUNT
21. ACCOUNTING AND APPROPRIATION
SEE SCHEDULE
22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN
COMPETITION
10 U.S.C. 2304 (c) ( ) 41 U.S.C. 253 (c)
23. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
SOLICITATION
IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.
C. E-MAIL ADDRESS
tarha.mazyck.2@us.af.mil
DRAFT
FA8552-23-R-0006
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
Any questions relating to the issuance of Solicitation FA8552-23-R-0006 must be submitted to the Government no later than 09 November 2023 at 4:30 PM EST.
Notice to Offeror(s):
B.1. This acquisition is a competitive, total small business set-aside.
B.2. This is a solicitation for a Single Award Requirements Type Contract. Delivery or performance shall be made only as authorized orders issued in accordance with the ordering clause. The Contractor shall furnish to the Government, when and if ordered, services specified in this schedule up to and including the "maximum" amount.
B.3. The period of performance (PoP) will consist of one 12-month base year period with seven 12-month option year periods. The effective date for ordering under this contract is from the date of award of the Basic Requirements Contract through twelve months thereafter or until all options are exercised. Performance shall continue through completion of all orders properly issued hereunder.
B.4. Pursuant to FAR 52.232-18, “Funds are not presently available for this contract. The Government’s obligation under this contract is contingent upon the availability of appropriated funds from which payment for contract purposes can be made. No legal liability on the part of the Government for any payment may arise until funds are made available to the Contracting Officer for this contract and until the Contractor receives notice of such availability, to be confirmed in writing by the Contracting Officer.” The Government reserves the right to cancel this solicitation, either before or after the closing date. In the event the Government cancels this solicitation, the Government has no obligation to reimburse an offeror for any costs.
Aircraft Preparation & Induction (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Induction of Aircraft IAW PWS Revision 2 Paragraphs 4.8, 4.15, 4.21.3, 4.22.2, 4.26, 4.37.1, 4.37.2, 4.37.5, 5.5, 5.6, 5.7; Work Specification Sections 2.1.1, 2.1.2, 3.1, and 3.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Aircraft Preparation & Induction (FFP/BEQ)
Base Year Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Aircraft Teardown & Inspection (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Teardown & Inspection (FFP/BEQ) IAW PWS paragraphs 3.3, 3.3.1, 4.3.1, 4.3.8, 4.3.10, 4.5.2, 4.6, 4.7.4, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.9, 4.12, 4.13, 4.14, 4.15, 4.17, 4.23, 4.24, 4.29, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.2 & 3.3.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Programmed Depot Maintenance (PDM) & Repair - Labor (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Programmed Depot Maintenance (PDM) - Labor (FFP/BEQ) IAW PWS paragraphs 4.6, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.21, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed Delivery
3 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ)
Base Year Programmed Depot Maintenance (PDM) - Material (FFP/BEQ) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.5.2, 4.8, 4.9, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.19, 4.21, 4.23, 4.25, 4.26, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To PACRN Mark For
PAA
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed Delivery
3 EA
Aircraft Preparation & Delivery (FFP/BEQ)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Preparation & Delivery (FFP/BEQ) IAW PWS paragraphs 4.8, 4.9, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.15, 4.17, 4.19, 4.20, 4.21, 4.22, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.5, 2.1.6, 3.5 & 3.6.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Aircraft Preparation & Delivery (FFP/BEQ)
Base Year Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *260 Calendar Days
Proposed Delivery
3 EA
Travel & Per Diem (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Travel & Per Diem (CRNF) IAW PWS paragraph 4.27 and as authorized, in writing, by the PCO.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Travel schedule(s) will be authorized as needed and IAW the PWS.
Over and Above (O&A) - Labor (FFP)
Base Year Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
1 LO
Over and Above (O&A) - Labor (FFP) IAW PWS paragraphs 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.23.3, 4.23.4, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Over and Above (O&A) - Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Over and Above (O&A) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.23.3, 4.23.4, 4.23.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Over and Above (O&A) - Material (CRNF)
Base Year
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Labor (FFP)
Base Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Contractor Field Team (CFT) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9;
and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Contractor Field Team (CFT) - Labor (FFP)
Base Year
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Contractor Field Team (CFT) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.2, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
Contractor Field Team (CFT) - Material (CRNF)
Base Year
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP)
Base Year Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF)
Base Year Quantity U/I Total Estimated Cost
1 LO
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9;
and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachmennt 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
CAP and Long Lead Material (CRNF)
Base Year Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
CAP & Long Lead Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN. Estimated annual material is based on total material for CLINs X008, X010 and X012.
Priority: R ROUTINE
CAP and Long Lead Material (CRNF)
Base Year
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Exempt From Foreign Disclosure Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
The delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contract Data Requirements List (CDRLs) (NSP)
Base Year Item No.
Not Separately Priced Quantity U/I Unit Price
EA NSP
DATA
Contract Data Requirements List (CDRLs) Data IAW DD Form 1423-1 and PWS paragraph 4.2.
Exhibits A001, A002, A003, A004, A005, A006, A007, A008, A009, A00A, A00B, A00C, A00D & A00E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD Form 1423-1
Meeting Agenda
Base Year Item No.
0014AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A001 Authority: DI-ADMN-81249C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423
Meeting Minutes
Base Year Item No.
0014AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A002 Authority: DI-ADMN-81250C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Base Year Item No.
0014AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A003 Authority: DI-ADMN-81373
Base Year
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Trip/Travel Report
Base Year Item No.
0014AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A004 Authority: DI-MISC-81943
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Status Report
Base Year Item No.
0014AE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A005 Authority: DI-MGMT-80368A/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Technical Report - Study/Services
Base Year Item No.
0014AF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A006 Authority: DI-MISC-80508B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Government Property Inventory Report
Base Year Item No.
0014AG
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A007 Authority: DI-MGMT-80441D
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Item Unique Identification (IUID) Marking Plan
Base Year Item No.
0014AH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A008 Authority: DI-MGMT-81803A
Item Unique Identification (IUID) Marking Plan
Base Year
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
IUID Marking Activity, Validation & Verification Report
Base Year Item No.
0014AJ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A009 Authority: DI-MGMT-81804A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Counterfeit Prevention Plan
Base Year Item No.
0014AK
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00A Authority: DI-MISC-81832
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A
Accident/Incident Report
Base Year Item No.
0014AL
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00B Authority: DI-SAFT-81563
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Quality Assurance Program Plan
Base Year Item No.
0014AM
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00C Authority: DI-QCIC-81794A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Phase-In Transition Plan
Base Year Item No.
0014AN
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00D Authority: DI-SESS-82299
Phase-In Transition Plan
Base Year
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Phase-Out Transition Plan
Base Year Item No.
0014AP
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 0014 Data IAW DD1423-1 Exhibit A00E Authority: DI-MGMT-81945
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD1423-1
Aircraft Preparation & Induction (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Preparation and Induction of Aircraft IAW PWS Revision 2 Paragraphs 4.8, 4.15, 4.21.3, 4.22.2, 4.26, 4.37.1, 4.37.2, 4.37.5, 5.5, 5.6, 5.7; Work Specification Sections 2.1.1, 2.1.2, 3.1, and 3.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring
Aircraft Preparation & Induction (FFP/BEQ) Option Year I
AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
4 EA *45 Calendar Days
Proposed Delivery
4 EA
Aircraft Teardown & Inspection (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Aircraft Teardown & Inspection (FFP/BEQ) IAW PWS paragraphs 3.3, 3.3.1, 4.3.1, 4.3.8, 4.3.10, 4.5.2, 4.6, 4.7.4, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.9, 4.12, 4.13, 4.14, 4.15, 4.17, 4.23, 4.24, 4.29, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.2 & 3.3.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
4 EA *45 Calendar Days
Proposed Delivery
4 EA
Programmed Depot Maintenance (PDM) & Repair - Labor (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Programmed Depot Maintenance (PDM) - Labor (FFP/BEQ) IAW PWS paragraphs 4.6, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.21, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
4 EA *170 Calendar Days
Proposed Delivery
4 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Programmed Depot Maintenance (PDM) - Material (FFP/BEQ) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.5.2, 4.8, 4.9, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.19, 4.21, 4.23, 4.25, 4.26, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ) Option Year I
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
4 EA *170 Calendar Days
Proposed Delivery
4 EA
Aircraft Preparation & Delivery (FFP/BEQ) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
4 EA
Aircraft Preparation & Delivery (FFP/BEQ) IAW PWS paragraphs 4.8, 4.9, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.15, 4.17, 4.19, 4.20, 4.21, 4.22, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.5, 2.1.6, 3.5 & 3.6.
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
4 EA *260 Calendar Days
Aircraft Preparation & Delivery (FFP/BEQ) Option Year I
Proposed Delivery
4 EA
Travel & Per Diem (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Travel & Per Diem (CRNF) IAW PWS paragraph 4.27 and as authorized, in writing, by the PCO.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Travel schedule(s) will be authorized as needed and IAW the PWS.
Over and Above (O&A) - Labor (FFP) Option Year I
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
Over and Above (O&A) - Labor (FFP) Option Year I
1 LO To be Negotiated
Over and Above (O&A) - Labor (FFP) IAW PWS paragraphs 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.23.3, 4.23.4, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Over and Above (O&A) - Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Over and Above (O&A) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 4.5.2, 4.6, 4.7.4, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.23.3, 4.23.4, 4.23.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.3, 3.3.1.1, 3.4.3 & 3.5.16.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required
Over and Above (O&A) - Material (CRNF) Option Year I
Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Labor (FFP) Option Year I
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA To be Determined
Contractor Field Team (CFT) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9;
and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Contractor Field Team (CFT) - Labor (FFP) Option Year I
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contractor Field Team (CFT) - Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Contractor Field Team (CFT) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.2, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP) Option Year I
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
EA To be Determined
Unprogrammed Depot Level Maintenance (UDLM) - Labor (FFP) IAW PWS paragraphs 1.1, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.15, 4.16, 4.26, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.3.1.1 & 3.5.16.
An FFP loaded rate from Attachment 14 will apply for each individual labor category.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
LO TBC
Proposed Delivery
LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.6, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.19, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9;
and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachmennt 15 will be added to the cost of this CLIN.
Unprogrammed Depot Level Maintenance (UDLM) - Material (CRNF) Option Year I
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
ARO Notice to Proceed. Delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
CAP and Long Lead Material (CRNF) Option Year I
Item No.
Cost Reimbursement - No Fee Quantity U/I Total Estimated Cost
1 LO
CAP & Long Lead Material (CRNF) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.4.1, 4.5.2, 4.7, 4.8, 4.9, 4.12, 4.16, 4.18, 4.26.2, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraph 3.4.3. This shall be IAW DFARS 252.217-7028.
A material handling fee IAW Attachment 15 will be added to the cost of this CLIN. Estimated annual material is based on total material for CLINs X008, X010 and X012.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016
CAP and Long Lead Material (CRNF) Option Year I
Type / Ship To Quantity (U/I) To be cited on individual orders issued hereunder
_ Req No / Pri
Required Delivery
1 LO TBC
Proposed Delivery
1 LO
The delivery schedule will be negotiated as needed and IAW the PWS & Work Specification.
Contract Data Requirements List (CDRLs) (NSP) Option Year I
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Contract Data Requirements List (CDRLs) Data IAW DD Form 1423-1 and PWS paragraph 4.2.
Exhibits B001,B002, B003, B004, B005, B006, B007, B008, B009, B00A, B00B, B00C & B00E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD Form 1423-1
Meeting Agenda Option Year I
Item No.
1014AA
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B001
Meeting Agenda Option Year I
Authority: DI-ADMN-81249C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423
Meeting Minutes Option Year I
Item No.
1014AB
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B002 Authority: DI-ADMN-81250C
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Option Year I
Item No.
1014AC
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B003 Authority: DI-ADMN-81373
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B
Trip/Travel Report Option Year I
Item No.
1014AD
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B004 Authority: DI-MISC-81943
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Status Report Option Year I
Item No.
1014AE
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B005 Authority: DI-MGMT-80368A/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Technical Report - Study/Services Option Year I
Item No.
1014AF
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B006 Authority: DI-MISC-80508B
Technical Report - Study/Services Option Year I
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Government Property Inventory Report Option Year I
Item No.
1014AG
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B007 Authority: DI-MGMT-80441D
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Item Unique Identification (IUID) Marking Plan Option Year I
Item No.
1014AH
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B008 Authority: DI-MGMT-81803A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B
IUID Marking Activity, Validation & Verification Report Option Year I
Item No.
1014AJ
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B009 Authority: DI-MGMT-81804A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Counterfeit Prevention Plan Option Year I
Item No.
1014AK
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00A Authority: DI-MISC-81832
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Accident/Incident Report Option Year I
Item No.
1014AL
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00B Authority: DI-SAFT-81563
Accident/Incident Report Option Year I
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Quality Assurance Program Plan Option Year I
Item No.
1014AM
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00C Authority: DI-QCIC-81794A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B Quality Assurance: IAW DD1423-1
Phase-Out Transition Plan Option Year I
Item No.
1014AN
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Associated with LI: 1014 Data IAW DD1423-1 Exhibit B00E Authority: DI-MGMT-81945
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: B
Aircraft Preparation & Induction (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Preparation and Induction of Aircraft IAW PWS Revision 2 Paragraphs 4.8, 4.15, 4.21.3, 4.22.2, 4.26, 4.37.1, 4.37.2, 4.37.5, 5.5, 5.6, 5.7; Work Specification Sections 2.1.1, 2.1.2, 3.1, and 3.2.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Buy American Act/Balance of Payments Program Class I ODS Substance Application/Use Quantity None none Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Aircraft Teardown & Inspection (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Teardown & Inspection (FFP/BEQ) IAW PWS paragraphs 3.3, 3.3.1, 4.3.1, 4.3.8, 4.3.10, 4.5.2, 4.6, 4.7.4, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.9, 4.12, 4.13, 4.14, 4.15, 4.17, 4.23, 4.24, 4.29, 5.5, 5.6 & 5.9; and PDM Work Specification paragraphs 1.2, 2.1.3, 3.2 & 3.3.
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *45 Calendar Days
Proposed Delivery
3 EA
Programmed Depot Maintenance (PDM) & Repair - Labor (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Programmed Depot Maintenance (PDM) - Labor (FFP/BEQ) IAW PWS paragraphs 4.6, 4.8, 4.9, 4.10, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.21, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded
Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed
3 EA
Program Depot Maintenance (PDM) & Repair - Material (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Programmed Depot Maintenance (PDM) - Material (FFP/BEQ) IAW PWS paragraphs 3.0, 3.3.1, 3.5, 3.6, 4.5.2, 4.8, 4.9, 4.12, 4.13, 4.14, 4.15, 4.16, 4.17, 4.18, 4.19, 4.21, 4.23, 4.25, 4.26, 4.29, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.4 & 3.4.
Priority: R ROUTINE
Limitations of Liability: Other Than High Value Item
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship To Quantity (U/I) *ARO Funded Order Req No / Pri
Required Delivery
3 EA *170 Calendar Days
Proposed Delivery
3 EA
Aircraft Preparation & Delivery (FFP/BEQ) Option Year 2
Item No.
Firm Fixed Price Best Estimated Qty
U/I Unit Price Amount
3 EA
Aircraft Preparation & Delivery (FFP/BEQ) IAW PWS paragraphs 4.8, 4.9, 4.11.2, 4.11.3, 4.11.4, 4.11.5, 4.11.6, 4.12, 4.13, 4.15, 4.17, 4.19, 4.20, 4.21, 4.22, 4.23, 4.25, 4.26, 5.5, 5.5.2, 5.6 & 5.9; and PDM Work Specification paragraphs 2.1.5, 2.1.6, 3.5 & 3.6.
Aircraft Preparation & Delivery (FFP/BEQ) Option Year 2
Inspection: Origin Acceptance: Origin Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements The Contractor shall comply with the standard(s) listed below. (if more than one, check the appropriate standard.)
Title Number Date Tailoring AS9110 Rev. C 04NOV2016 ISO 9001-2008 2008 9001:2015 (Date: 2015-09)
Type / Ship…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .