DRAFT_Attach 20_Preaward Survey.pdf
PDF 302 KB Posted
- Attached to
- TH-1H Depot Level Maintenance Federal contract opportunity
- Solicitation number
- FA8552-23-R-0006
About this file
This document is a pre-award survey checklist for a prospective contractor's accounting system. It contains 20 questions for the contractor to answer regarding its accounting practices and procedures. The questions address whether the contractor's accounting system provides for proper cost segregation and accumulation, timekeeping and labor distribution systems, interim cost determination, exclusion of unallowable costs, and maintenance of records suitable for pricing follow-on acquisitions. The contractor must explain its answers and provide copies of any relevant audit reports.
The related federal contract opportunity is for TH-1H depot level maintenance services to be awarded by the Department of the Air Force Materiel Command Lifecycle Management Center located at Robins Air Force Base. The pre-solicitation notice does not provide any additional details on required services, response dates, or other salient information.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| DRAFT Attach 05_Cross Reference Matrix .pdf | ||
| DRAFT_Attach 08 Past Performance Questionnaire.pdf | ||
| DRAFT_Attach 10_Transmittal Letter.pdf | ||
| DRAFT_Attach 11_Subcontractor Consent.pdf | ||
| DRAFT_Attach 12_Client Authorization.pdf | ||
| DRAFT_Attach 13_Labor Categories.pdf | ||
| DRAFT_Attach 16_Price Matrix.pdf | ||
| DRAFT RFP.pdf | ||
| DRAFT_Attach 04_Sections L and M Provisions .pdf | ||
| DRAFT_Attach 07_FACTS Sheet.pdf | ||
| DRAFT_Attach 17_Packaging.pdf | ||
| DRAFT_Attach 03_CDRLs.pdf | ||
| DRAFT_Attach 09_Relevancy Table.pdf | ||
| DRAFT_Attach 14_Fully Burdened Labor Rates.pdf | ||
| DRAFT_Attach 15_Material Add-on Factors.pdf | ||
| DRAFT_Attach 21_Subcontractor Committment.pdf | ||
| DRAFT_Attach 18_Transportation.pdf |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM CHECKLIST
PRE-AWARD SURVEY OF PROSPECTIVE CONTRACTOR ACCOUNTING SYSTEM
Date:
Company Name, Contract Number, and Full Address:
Commercial and Government Agency (CAGE) Code Number: (Found at https://cage.dla.mil/)
Cognizant Defense Contract Audit Agency (DCAA) office info (Address/phone number/E-mail) - (Found at http://www.dcaa.mil/Home/Locator)
Company Point of Contact:
(Name, Title, Phone Number, and E-mail address
If the accounting books and records are located at a physical address other than the address provided above, please indicate address here:
Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.
NAME
TITLE
E-MAIL ADDRESS
SIGNATURE DATE
PLEASE ANSWER THE QUESTIONS BELOW:
HAVE YOU READ THE REQUIREMENTS IN THE SF1408? (YES/NO)
HAVE YOU READ THE DCAA PUBLICATION DCAAM 7641.90 - "Information for Contractors"
DCAA'S WEBSITE at http:www.dcaa.mil/? (YES/NO)
For each question, check only one box. ALL questions must have explanatory narrative text entered in the boxes. Please provide sufficient detail to describe the process (Including Account Numbers/Process Flow etc.) Each Question must be complete. Do NOT refer to previous answers, (i.e. "See Question 3 Above").
Name, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting SName, Title, and signature of Company Principal (President/VP/Controller, etc) responsible for the design of the Accounting System.
NAMENAME
Pre-award Survey of Prospective Contractor Accounting System Checklist
1. Has your organization's Accounting System ever been audited by DCAA?
YES (if Yes, the Offeror should attach a copy of their most recent DCAA audit report to this Modified Pre-Award Survey) or provide the DCAA Report number or DCAA POC info.
NO (if NO, answer N/A to Questions 1.A., 1.B., and 1.C. below)
1.A. If the answer is "Yes" to Question 1 above, when was the audit performed?
Within the past Year
Within the past 3 Years
Greater than 3 Years (PROVIDE THE YEAR THE AUDIT WAS PERFORMED HERE - ).
N/A (Answer to Question 1 is NO)
1.B. If the answer is "Yes" to Question 1 above, did DCAA determine the Accounting System acceptable for award of prospective contracts?
YES
NO (If NO provide an explanation in thebox below)
N/A (Answer to Question 1 is NO)
1.C. If the answer is "Yes" to Question 1 above, have there been any changes to the Accounting System since the DCAAaudit?
YES (If YES, describe the changes in the box below
NO
N/A (Answer to Question 1 is NO)
NO (If NO provide an NO (If NO provide an explanation in theexplanation in theboxbox below)below)
N/A (Answer to Question 1 isN/A (Answer to Question 1 is NO)
2. Is your organization subject to CAS (48 CFR Chapter 99)?
YES (If YES, is it FULL or MODIFIED CAS?) FULL MODIFIED
(If YES (FULL or MODIFIED), the Offeror MUST attach a copy of their most recent audit reports/documentation regarding all CAS compliance or non-compliance issues to this Modified Pre-Award Survey)
NO (If NO provide an explanation in the box below why your organization is exempt and answer N/A to Questions 2.A., 2.B., and 2.C. below)
2.A. Has your organization submitted a CASB disclosure statement (CASB DS-1) to DCAA and has it been determined adequate?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (Answer to Question 2 is NO)
2.B. Has your organization been notified by DCAA that it is (or may be in) non-compliance with its disclosure statement or CAS?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, if the answer to Question 2 is NO) youryour organizationorganization (CASB(CASB 1) adequate?adequate?
(If(If YES,YES, provideprovide anan explanationexplanation thatthat validatesvalidates youryour answeranswer in the boxbox below)below)
NO (If NO provide an explanation in the boxNO (If NO provide an explanation in the box below)
N/A (Answer to Question 2 isN/A (Answer to Question 2 is NO)NO)
2.c. Is any aspect of this proposal inconsistent with your disclosed practices or applicable CAS?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, if the answer to Question 2 is NO or if you have no current, active proposal being considered)
Instruction: If the Contractor is planning on bidding on Cost Type Contracts, the contractor MUST provide explanatory narrative for all of the following questions:
3. Has your organization's Accounting System been audited by an outside Certified Public Accountant/Consultant or other Cognizant Federal Agency other than DCAA?
YES (If YES, the Offeror MUST attach a copy of their most recent audit report to this Modified Pre-Award Survey) NOTE: Do not submit your Annual Financial Audit.
NO
4. Is your organization's Accounting System currently in full operation?
YES (If YES, provide an explanation that validates your answer in the box below).
NO (If NO, provide an explanation in the box below which portions are (1) in operation, (2) set up, but not yet in operation, (3) anticipated, or (4) non-existent)
N/A (If N/A, provide an explanation in the box below)
YES (If YES, the Offeror YES (If YES, the Offeror MUSTMUST attach a copy of their most recent audit report to this Modified Preattach a copy of their most recent audit report to this Modified Pre--Award Survey) Award Survey) NOTE: Do not submit your NOTE: Do not submit your Annual Financial Audit.Annual Financial Audit.
5. Is your organization's Accounting System in accord with Generally Accepted Accounting Principles (GAAP) Applicable in the Circumstances?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
6. Is your organization's Accounting System ready for a DCAA audit?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below as to when you will be ready for an audit)
N/A (N/A, provide an explanation in the box below)
7. Are the loaded hourly labor rates proposed consistent with your established estimating and accounting principles and procedures and FAR Part 31, Cost Principles? (Answer this Questions "N/A" if you do not have an active proposal)
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
(If(If NONO provideprovide anan explanationexplanation inin thethe boxbox belowbelow asas to when you will be readyready for an audit)
N/A (N/A, provide an explanation in the boxN/A (N/A, provide an explanation in the box below)below)
8. Does the Accounting System provide for the proper segregation of Direct Costs from Indirect Costs?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
9. Does the Accounting System provide for the identification and accumulation of Direct Costs by contract?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
10. Does the Accounting System provide for a logical and consistent method for the allocation of Indirect Costs to intermediate and final cost objectives? (A contract is a final cost objective.)
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
(If(If YES,YES, provideprovide an explanationexplanation thatthat validatesvalidates youryour answer in the boxbox below)below)
NO (If NO provide an NO (If NO provide an explanation in the boxexplanation in the box below)
(N/A,(N/A, provide an explanationexplanation in thethe box below)
11. Does the Accounting System Provide for the accumulation of costs under general ledger control?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
12. Does the Accounting System provide for a timekeeping system that identifies employees' labor by intermediate or final cost objectives?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
13. Does the Accounting System provide for a labor distribution system that charges Direct and Indirect labor to the appropriate cost objectives?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
(If(If provideprovide explanationexplanation your below)below)
NO (If NO provide anNO (If NO provide an explanation in the boxexplanation in the box below)below)
14. Does the Accounting System provide for an interim (at least monthly) determination of costs charged to a contract through routine posting of books of account?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
15. Does the Accounting System provide for an exclusion of costs charged to government contracts of amounts which are not allowable in terms of FAR 31, Contract Cost Principles and Procedures, or other contract provisions?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
Pre-award Survey of Prospective Contractor Accounting System Checklist
16. Does the Accounting System provide for the identification of costs by contract line item and by units (as if each unit or line item were a separate contract) if required by the proposed contract?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
(N/A,(N/A, provideprovide anan explanationexplanation in thethe boxbox below)below)
17. Does the Accounting System provide for the segregation of preproduction costs from production costs?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
18. Does the Accounting System provide financial information required by contract clauses concerning limitation of cost (FAR 52.232.20) or limitation on payments (FAR 52.216-16)?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
19. Does the Accounting System provide financial information required to support requests for Progress Payments?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
(If(If YES,YES, provideprovide anan explanationexplanation thatthat validatesvalidates youryour answer in the boxbox below)below)
NO (If NO provide an explanation in the boxNO (If NO provide an explanation in the box below)
20. Is the Accounting System designed, and are the records maintained, in such manner that adequate, reliable data are developed for use in pricing follow-on acquisitions?
YES (If YES, provide an explanation that validates your answer in the box below)
NO (If NO provide an explanation in the box below)
N/A (N/A, provide an explanation in the box below)
21. Is your organization planning on submitting proposals on Cost-Type (FAR 16.3) contracts/task orders?
YES
NO (If NO provide an explanation in thebox below)
N/A (N/A, provide an explanation in the boxbelow)
22. Is your organization currently performing on Cost-Type (FAR 16.3) contracts/task orders?
YES
NO
N/A
NO (If NO provide an explanation in theNO (If NO provide an explanation in thebox below)below)
N/A (N/A, provide an explanation in the boxN/A (N/A, provide an explanation in the boxbelow)
File details come from the government source that posted it. Updated .