FA853320R0013.pdf
PDF 85 KB Posted
- Attached to
- Sustaining Engineering Services for Benchtop Reconfigurable Automatic Tester (BRAT) System Federal contract opportunity
- Solicitation number
- FA853320R0013
About this file
This is a solicitation for sustaining engineering services to identify a replacement Phase Noise Measurement Module for the Benchtop Reconfigurable Automatic Tester (BRAT) system. The requirement includes technical analysis, analysis of alternatives with procurement costs and technical specifications, determination of replacement module, prototypes, integration into the system, and first article and qualification testing. The contract will have a 14-month period of performance and be awarded as a definitive C-type contract. Cost reimbursement will be used for travel. Firm-fixed-price will be used for the engineering services, first article testing, and two prototype modules. The solicitation was issued on May 4, 2020 by the Department of the Air Force Materiel Command Lifecycle Management Center located at Robins Air Force Base. Questions must be submitted by email to the listed contracting officer by the response date. The proposed sole-source recipient is Advanced Testing Technologies, which owns the required technical data.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Packaging Requirements.pdf | ||
| CDRLs.pdf | ||
| First Article Requirements.pdf | ||
| Performance Work Statement REV 1.pdf | ||
| Transportation Requirements.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 1447 (REV. 8/2016)
PREVIOUS EDITION NOT USABLE Prescribed by GSA - FAR (48 CFR) 53.214(d)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
24. TOTAL AWARD AMOUNT (For Government Use Only)
TELEPHONE NUMBER
UNIQUE ENTITY
IDENTIFIER
CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN OFFER
NO COLLECT CALLS
4. SOLICITATION NUMBER
FA8533-20-R-0013
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS: 334515
8(A) SIZE STANDARD: 500
DATE SIGNED
28. UNITED STATES OF AMERICA (Signature of Contracting Officer)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 120 days.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLOCK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *120
RATING
DO: A7
3. AWARD/EFFECTIVE DATE
FA8533
2. CONTRACT NUMBER
X
17.
ITEM NUMBER
12. ADMINISTERED BY CODE
Total
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14 EFT:T
SCD:B
NAME AND TITLE OF SIGNER (Type or Print) NAME OF CONTRACTING OFFICER
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAYMENT DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (Brief Description)
SUPPLIES SERVICES Instrument Manufacturing for Measuring and Testing Electricity and Electrical Signals
9. (Agency Use)
Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
4-JUN-2020 12:00PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
(SEE ESP CLAUSE 252.232-7003.)
X
7. ISSUED BY CODE
BASE & A/C SUPPORT/ATS/HUMAN SYSTEM, AFLCMC/WNKAB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 222 1902
ROBINS AFB GA 31098-1670
BUYER: Amber N. Mathe/WNKAB amber.mathe@us.af.mil Phone: (478) 222- 1873 Fax: (000) 000-0000
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 700)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
JS
STANDARD FORM 1447 (REV. 8/2016) BACK
NO RESPONSE FOR REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
UNABLE TO IDENTIFY THE ITEM(S)
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
DO NOT REGULARILY MANUFACTURE OR SELL THE TYPE
OF ITEMS INVOLVED
DATE AND LOCAL TIME 4 JUN 2020 12:00 PM
SOLICITATION NUMBER FA853320R0013
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Amber N Mathe/WNKAB
BASE & A/C SUPPORT/ATS/HUMAN SYSTEM, AFLCMC/WNKAB
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 222 1902
ROBINS AFB GA 31098-1670
FA8533-20-R-0013
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
General Information
Overview: This Request for Proposal (RFP) is issued with the intent to establish a 14 month contract in support of the Automatic Test Systems and Support Equipment and Vehicles Contracting Branch (AFLCMC/WNKA), Warner Robins Air Logistics Complex, Georgia for Sustaining Engineering services to identify a replacement Phase Noise Measurement Module. The requirement includes technical analysis, analysis of alternatives with procurement costs and technical specification, determination of replacement BRAT Phase Noise Measurement Module, prototypes, integration of solutions into the overall BRAT system, and First Article & Qualification Testing. The Contractor shall perform the requirements in accordance with the Performance-Based Work Statement dated 26 Mar 2020, as revised, and associated Contract Data Requirements Lists (CDRLs) referenced in this document.
Contract Type: This is a definitive C type contract with a period of performance of 14 months. CLINs for Sustaining Engineering, First Article & Qualification Testing, and two prototype Phase Noise Measurement Modules will be Firm-Fixed-Price. Cost Reimbursement No Fee (CRNF) will be used for the travel in support of this requirement. CDRLs will be Not Separately Priced (NSP).
Sustaining Engineering
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
14 MO
R425 Sustaining Engineering Engineering Services IAW PWS 4.3 Replacement for Phase Noise Measurement Module, P/N 94101130-01 Associated Document(s) Line Item(s)
FD20602030982 0001
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None
First Article and Qualification Test/Acceptance
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
1 LO
FA
FIRST ARTICLE
First Article and Qualification Test IAW PWS 4.3.2. See attached First Article Requirements for detailed instructions.
Associated Document(s) Line Item(s)
FD20602030982 0002
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity
NONE
None
Travel
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
TRAVEL AS APPROVED IN ADVANCE BY CONTRACTING OFFICER
TRAVEL IN SUPPORT OF CLINs 0001, 0002 and 0004 IAW PWS 4.4.4. TRAVEL REIMBURSED IAW FAR 31.2.
Associated Document(s) Line Item(s)
FD20602030982 0003
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: WAWF Quality Assurance: Standard Inspection
Prototype Phase Noise Measurement Module
Item No.
Firm Fixed Price Quantity U/I Unit Price Amount
2 EA
NSN: 6625-01-495-5469
Prototype Production
Prototype Phase Noise Measurement Module
IAW PWS 4.3
Associated Document(s) Line Item(s)
FD20602030982 0004
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Data
Item No.
Not Separately Priced Quantity U/I Unit Price
1 LO NSP
DATA
Exhibit A CDRLs A001 - A012 in support of CLINs 0001 through 0004.
Associated Document(s) Line Item(s)
FD20602030982 0005
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection
PART I - THE SCHEDULE
SECTION E
INSPECTION AND ACCEPTANCE
52.246-4 INSPECTION OF SERVICES--FIXED-PRICE (AUG 1996)
(IAW FAR 46.304)
52.246-5 INSPECTION OF SERVICES--COST-REIMBURSEMENT (APR 1984)
(IAW FAR 46.305)
INSPECTION AND ACCEPTANCE (SEP 1999)
(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).
Item No(s): 0001, 0002, 0003, 0004, 0005
PART I - THE SCHEDULE
SECTION F
DELIVERIES OR PERFORMANCE
52.242-15 STOP-WORK ORDER (AUG 1989)
(IAW FAR 42.1305(b)(1))
52.242-15 STOP-WORK ORDER -- ALTERNATE I (APR 1984)
(IAW FAR 42.1305(b)(2))
PART I - THE SCHEDULE
SECTION G
CONTRACT ADMINISTRATION DATA
252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)
(IAW DFARS 232.7004(b), PGI 232.7004(b)(1), DFARS 212.301(f)(liii))
(f) WAWF payment instructions. The Contractor must use the following information when submitting payment requests and receiving reports in WAWF for this contract/order:
(1) Document type. The Contractor shall use the following document type(s).
(Contracting Officer: Insert applicable document type(s).
Note: If a “Combo” document type is identified but not supportable by the Contractor’s business systems, an “Invoice” (stand-alone) and “Receiving Report” (stand-alone) document type may be used instead.)
(2) Inspection/acceptance location. The Contractor shall select the following inspection/acceptance location(s) in WAWF, as specified by the contracting officer.
(Contracting Officer: Insert inspection and acceptance locations or “Not applicable.”)
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table* Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC Issue By DoDAAC Admin DoDAAC Inspect By DoDAAC Ship To Code Ship From Code Mark For Code Service Approver (DoDAAC) Service Acceptor (DoDAAC) Accept at Other DoDAAC LPO DoDAAC DCAA Auditor DoDAAC Other DoDAAC(s) (*Contracting Officer: Insert applicable DoDAAC information or “See schedule” if multiple ship to/acceptance locations apply, or “Not applicable.”)
(4) Payment request and supporting documentation. The Contractor shall ensure a payment request includes appropriate contract line item and subline item descriptions of the work performed or supplies delivered, unit price/cost per unit, fee (if applicable), and all relevant back-up documentation, as defined in DFARS Appendix F, (e.g.
timesheets) in support of each payment request.
(5) WAWF email notifications. The Contractor shall enter the e-mail address identified below in the “Send Additional Email Notifications” field of WAWF once a document is submitted in the system.
(Contracting Officer: Insert applicable email addresses or “Not applicable.”)
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity’s WAWF point of contact.
(Contracting Officer: Insert applicable information or “Not applicable.”)
(2) For technical WAWF help, contact the WAWF helpdesk at 866-618-5988.
PART II - CONTRACT CLAUSES
SECTION I
CONTRACT CLAUSES
252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)
(IAW DFARS 201.602-70)
5352.201-9101 OMBUDSMAN (JUN 2016)
(IAW AFFARS 5301.9103)
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, Timothy R.
Inman at 478 222 -4097 , FAX 000 000 -0000 , email timothy.inman@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
52.202-1 DEFINITIONS (NOV 2013)
(IAW FAR 2.201)
52.203-3 GRATUITIES (APR 1984)
(IAW FAR 3.202)
52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)
(IAW FAR 3.404)
52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)
(IAW FAR 3.503-2)
52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)
(IAW FAR 3.502-3)
52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR
IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(a))
52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)
(IAW FAR 3.104-9(b))
52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS
(OCT 2010)
(IAW FAR 3.808(b))
52.203-19 PROHIBITION ON REQUIRING CERTAIN INTERNAL CONFIDENTIALITY
AGREEMENTS OR STATEMENTS (JAN 2017)
(IAW FAR 3.909-3 (b))
252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(SEP 2011)
(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))
252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER
DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)
(IAW DFARS 203.570-3)
252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS
(SEP 2013)
(IAW DFARS 203.970)
52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)
(IAW FAR 4.303)
52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT
AWARDS (OCT 2018)
(IAW FAR 4.1403(a))
52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (OCT 2018)
(IAW FAR 4.1105(b))
52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (JUL 2016)
(IAW FAR 4.1804(c), FAR 12.301(d))
52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS
(DEC 2014)
(IAW FAR 4.1202(b))
52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR INFORMATION SYSTEMS
(JUN 2016)
(IAW FAR 4.1903)
52.204-23 PROHIBITION ON CONTRACTING FOR HARDWARE, SOFTWARE, AND SERVICES
DEVELOPED OR PROVIDED BY KASPERSKY LAB AND OTHER COVERED
ENTITIES (JUL 2018)
(IAW FAR 4.2004)
52.204-25 PROHIBITION ON CONTRACTING FOR CERTAIN TELECOMMUNICATIONS AND
VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (AUG 2019)
(IAW 4.2105(b))
252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)
(IAW DFARS 204.404-70(b))
252.204-7009 LIMITATIONS ON THE USE OR DISCLOSURE OF THIRD-PARTY CONTRACTOR
REPORTED CYBER INCIDENT INFORMATION (OCT 2016)
(IAW DFARS 204.7304(b))
252.204-7012 SAFEGUARDING COVERED DEFENSE INFORMATION AND CYBER INCIDENT
REPORTING (DEC 2019)
(IAW DFARS 204.7304(c))
252.204-7015 NOTICE OF AUTHORIZED DISCLOSURE OF INFORMATION FOR LITIGATION
SUPPORT (MAY 2016)
(IAW DFARS 204.7403(b), DFARS 212.301(f)(i)(F))
252.204-7018 PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE
TELECOMMUNICATIONS EQUIPMENT OR SERVICES (DEC 2019)
(IAW DFARS 204.2105(c))
252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS
(DEC 1991)
(IAW DFARS 205.470, DFARS 212.301(f)(x))
52.209-3 FIRST ARTICLE APPROVAL--CONTRACTOR TESTING (SEP 1989)
(IAW FAR 9.308-1(a)(1), FAR 9.308-1(b)(1))
(a) The Contractor shall test ** unit(s) of Lot/Item * as specified in this contract. At least *** calendar days before the beginning of first article tests, the Contractor shall notify the Contracting Officer, in writing, of the time and location of the testing so that the Government may witness the tests.
*Lot/Item ***Calendar Days Before Test **Quantity
(b) The Contractor shall submit the first article test report within ___**___ calendar days from the date of this contract to ___***___ marked "FIRST ARTICLE TEST REPORT: Contract No. Lot/Item No. ___*___” Within ___****___ calendar days after the Government receives the test report, the Contracting Officer shall notify the Contractor, in writing, of the conditional approval, approval, or disapproval of the first article. The notice of conditional approval or approval shall not relieve the Contractor from complying with all requirements of the specifications and all other terms and conditions of this contract. A notice of conditional approval shall state any further action required of the Contractor. A notice of disapproval shall cite reasons for the disapproval.
*Lot/Item ****Approval Days ELIN No.
FA Test Report Item ***Type/Location **Calendar Days
52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH
CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT
(OCT 2015)
(IAW FAR 9.409)
52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING
RESPONSIBILITY MATTERS (OCT 2018)
(IAW FAR 9.104-7(c))
52.209-10 PROHIBITION ON CONTRACTING WITH INVERTED DOMESTIC CORPORATIONS
(NOV 2015)
(IAW FAR 9.108-5(b))
252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE
GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM
(MAY 2019)
(IAW DFARS 209.409)
52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)
(IAW FAR 11.604(b)) This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).
252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)
(IAW DFARS 211.274-6(b), DFARS 212.301(f)(iv))
52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)
(IAW FAR 15.209(b)(1))
52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)
(IAW FAR 15.209(h), AFFARS 53.15.209(h))
52.216-7 ALLOWABLE COST AND PAYMENT (AUG 2018)
(IAW FAR 16.307(a))
(a) Invoicing.
(3) The designated payment office will make interim payments for contract financing on the _30th day
52.216-11 COST CONTRACT--NO FEE (APR 1984)
(IAW FAR 16.307(e)(1))
52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (OCT 2018)
(IAW FAR 19.708(a))
52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (DEVIATION 2018-O0018)
(AUG 2018)
(IAW DARS TRCKING # 2018-O0018)
52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)
(IAW FAR 19.708(b)(2))
52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (MAR 2020)
(IAW FAR 19.309(c))
(h) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:
(1) The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code ________ assigned to contract number _______________.
(2) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not, a small disadvantaged business concern as defined in 13 CFR 124.1002.
(3) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a women-owned small business concern.
(4) Women-owned small business (WOSB) concern eligible under the WOSB Program.
[Complete only if the Contractor represented itself as a women-owned small business concern in paragraph (h)(3) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a WOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(4)(i) of this clause is accurate for each WOSB concern eligible under the WOSB Program participating in the joint venture.
[The Contractor shall enter the name or names of the WOSB concern eligible under the WOSB Program and other small businesses that are participating in the joint venture: _______________________________.] Each WOSB concern eligible under the WOSB Program participating in the joint venture shall submit a separate signed copy of the WOSB representation.
(5) Economically disadvantaged women-owned small business (EDWOSB) concern.
[Complete only if the Contractor represented itself as a women-owned small business concern eligible under the WOSB Program in (h)(4) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not an EDWOSB concern eligible under the WOSB Program, has provided all the required documents to the WOSB Repository, and no change in circumstances or adverse decisions have been issued that affects its eligibility; and
(ii) It [ ] is, [ ] is not a joint venture that complies with the requirements of 13 CFR part 127, and the representation in paragraph (h)(5)(i) of this clause is accurate for each EDWOSB concern participating in the joint venture.
[The Contractor shall enter the name or names of the EDWOSB concern and other small businesses that are participating in the joint venture: ___________________________________.] Each EDWOSB concern participating in the joint venture shall submit a separate signed copy of the EDWOSB representation.
(6) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that it [ ] is, [ ] is not a veteran-owned small business concern.
(7) [Complete only if the Contractor represented itself as a veteran-owned small business concern in paragraph (h)(6) of this clause.] The Contractor represents that it [ ] is, [ ] is not a service-disabled veteran-owned small business concern.
(8) [Complete only if the Contractor represented itself as a small business concern in paragraph (h)(1) of this clause.] The Contractor represents that—
(i) It [ ] is, [ ] is not a HUBZone small business concern listed, on the date of this representation, on the List of Qualified HUBZone Small Business Concerns maintained by the Small Business Administration, and no material changes in ownership and control, principal office, or HUBZone employee percentage have occurred since it was certified in accordance with 13 CFR part 126; and
(ii) It [ ] is, [ ] is not a HUBZone joint venture that complies with the requirements of 13 CFR part 126, and the representation in paragraph (h)(8)(i) of this clause is accurate for each HUBZone small business concern participating in the HUBZone joint venture.
[The Contractor shall enter the names of each of the HUBZone small business concerns participating in the HUBZone joint venture: _________________________________________.] Each HUBZone small business concern participating in the HUBZone joint venture shall submit a separate signed copy of the HUBZone representation.
[Contractor to sign and date and insert authorized signer’s name and title.]
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEC 2019)
(IAW DFARS 219.708(b)(1)(A), DFARS 219.708(b)(1)(A)(1))
252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS)--ALTERNATE I
(DEC 2019)
(IAW DFARS 219.708(b)(1)(A)(2), DFARS 219.708(b)(1)(A)(1))
252.219-7004 SMALL BUSINESS SUBCONTRACTING PLAN (TEST PROGRAM) (MAY 2019)
(IAW DFARS 219.708(b)(1)(B))
52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)
(IAW FAR 22.103-5(a), AFFARS 5322.101-1)
52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)
(IAW FAR 22.103-5(b))
(a) overtime premium does not exceed ___*___
*Overtime Premium $
52.222-3 CONVICT LABOR (JUN 2003)
(IAW FAR 22.202)
52.222-6 CONSTRUCTION WAGE RATE REQUIREMENTS (AUG 2018)
(IAW FAR 22.407(a)(1))
52.222-21 PROHIBITION OF SEGREGATED FACILITIES (APR 2015)
(IAW FAR 22.810(a)(1))
52.222-26 EQUAL OPPORTUNITY (SEP 2016)
(IAW FAR 22.810(e))
52.222-35 EQUAL OPPORTUNITY FOR VETERANS (OCT 2015)
(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))
52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)
(IAW FAR 22.1408(a))
52.222-37 EMPLOYMENT REPORTS ON VETERANS (FEB 2016)
(IAW FAR 22.1310(b))
52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR
RELATIONS ACT (DEC 2010)
(IAW FAR 22.1605)
52.222-41 SERVICE CONTRACT LABOR STANDARDS (AUG 2018)
(IAW FAR 22.1006(a))
52.222-50 COMBATING TRAFFICKING IN PERSONS (JAN 2019)
(IAW FAR 22.1705(a)(1))
52.222-55 MINIMUM WAGES UNDER EXECUTIVE ORDER 13658 (DEC 2015)
(IAW FAR 22.1906)
252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS
(DEC 2010)
(IAW DFARS 222.7405)
52.223-5 POLLUTION PREVENTION AND RIGHT-TO-KNOW INFORMATION (MAY 2011)
(IAW FAR 23.1005(a))
52.223-6 DRUG-FREE WORKPLACE (MAY 2001)
(IAW FAR 23.505)
52.223-10 WASTE REDUCTION PROGRAM (MAY 2011)
(IAW FAR 23.705(a))
52.223-11 OZONE-DEPLETING SUBSTANCES AND HIGH GLOBAL WARMING POTENTIAL
HYDROFLUOROCARBONS (JUN 2016)
(IAW FAR 23.804(a)(1))
(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j(b), (c), (d), and (e) and 40 CFR Part 82, Subpart E, as follows:
WARNING
Contains (or manufactured with, if applicable) ________________________*, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.
* The Contractor shall insert the name of the substance(s).
52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE
DRIVING (AUG 2011)
(IAW FAR 23.1105)
52.223-20 AEROSOLS (JUN 2016)
(IAW FAR 23.804(a)(3))
52.223-21 FOAMS (JUN 2016)
(IAW FAR 23.804(a)(4))
5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODSs)
(NOV 2012)
(IAW AFFARS 5323.804-90)
52.224-3 PRIVACY TRAINING (JAN 2017)
(IAW FAR 24.302(a))
52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)
(IAW FAR 25.1103(a))
252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (DEC 2017)
(IAW DFARS 225.7002-3(a))
252.225-7013 DUTY-FREE ENTRY (MAY 2016)
(IAW DFARS 225.1101(4))
252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)
(IAW DFARS 225.7901-4)
252.225-7052 RESTRICTION ON THE ACQUISITION OF CERTAIN MAGNETS, TANTALUM, AND
TUNGSTEN (DEVIATION 2020-O0006) (FEB 2020)
(IAW DEVIATION 2020-O0006)
252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC
ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS
(APR 2019)
(IAW DFARS 226.104)
52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)
(IAW FAR 27.201-2(a)(1))
52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT
INFRINGEMENT (DEC 2007)
(IAW FAR 27.201-2(b))
52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS (MAR 1996)
(IAW FAR 28.311-1)
52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)
(FEB 2013)
(IAW FAR 29.401-3(b))
252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)
(IAW DFARS 231.100-70)
52.232-1 PAYMENTS (APR 1984)
(IAW FAR 32.111(a)(1))
52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)
(IAW FAR 32.111(b)(1))
52.232-11 EXTRAS (APR 1984)
(IAW FAR 32.111(c)(2))
52.232-17 INTEREST (MAY 2014)
(IAW FAR 32.611(a), FAR 32.611(b))
52.232-20 LIMITATION OF COST (APR 1984)
(IAW FAR 32.706-2(a))
52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)
(IAW FAR 32.806(a)(1))
52.232-25 PROMPT PAYMENT (JAN 2017)
(IAW FAR 32.908(c))
(a) Invoice payments—
(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.
(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on the 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.
52.232-33 PAYMENT BY ELECTRONIC FUNDS TRANSFER--SYSTEM FOR AWARD
MANAGEMENT (OCT 2018)
(IAW FAR 32.1110(a)(1))
52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)
(IAW FAR 32.706-3)
52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS
SUBCONTRACTORS (DEC 2013)
(IAW FAR 32.009-2)
252.232-7003 ELECTRONIC SUBMISSION OF PAYMENT REQUESTS AND RECEIVING REPORTS
(DEC 2018)
(IAW DFARS 232.7004(a))
(a) Definitions. As used in this clause—
(1) “Contract financing payment” and “invoice payment” have the meanings given in section 32.001 of the Federal Acquisition Regulation.
(2) “Electronic form” means any automated system that transmits information electronically from the initiating system to all affected systems. Facsimile, e-mail, and scanned documents are not acceptable electronic forms for submission of payment requests. However, scanned documents are acceptable when they are part of a submission of a payment request made using Wide Area WorkFlow (WAWF) or another electronic form authorized by the Contracting Officer.
(3) “Payment request” means any request for contract financing payment or invoice payment submitted by the Contractor under this contract.
(b) Except as provided in paragraph (c) of this clause, the Contractor shall submit payment requests and receiving reports using WAWF, in one of the following electronic formats that WAWF accepts: Electronic Data Interchange, Secure File Transfer Protocol, or World Wide Web input. Information regarding WAWF is available on the Internet at https://wawf.eb.mil/ .
(c) The Contractor may submit a payment request and receiving report using other than WAWF only when—
(1) The Contracting Officer authorizes use of another electronic form. With such an authorization, the Contractor and the Contracting Officer shall agree to a plan, which shall include a timeline, specifying when the Contractor will transfer to WAWF;
(2) DoD is unable to receive a payment request or provide acceptance in electronic form;
(3) The Contracting Officer administering the contract for payment has determined, in writing, that electronic submission would be unduly burdensome to the Contractor. In such cases, the Contractor shall include a copy of the Contracting Officer’s determination with each request for payment; or
(4) DoD makes a payment for commercial transportation services provided under a Government rate tender or a contract for transportation services using a DoD-approved electronic third party payment system or other exempted vendor payment/invoicing system (e.g., PowerTrack, Transportation Financial Management System, and Cargo and Billing System).
(d) The Contractor shall submit any non-electronic payment requests using the method or methods specified in Section G of the contract.
(e) In addition to the requirements of this clause, the Contractor shall meet the requirements of the appropriate payment clauses in this contract when submitting payment requests.
252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)
(IAW DFARS 232.7102)
52.233-1 DISPUTES (MAY 2014)
(IAW FAR 33.215)
52.233-3 PROTEST AFTER AWARD (AUG 1996)
(IAW FAR 33.106(b))
52.233-3 PROTEST AFTER AWARD -- ALTERNATE I (JUN 1985)
(IAW FAR 33.106(b))
52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)
(IAW FAR 33.215(b))
252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR
PERSONNEL (JUN 2013)
(IAW DFARS 237.173-5)
52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)
(IAW FAR 42.802)
52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)
(IAW FAR 42.703-2(f))
(c) The certificate of final indirect costs shall read as follows:
CERTIFICATE OF FINAL INDIRECT COSTS
This is to certify that I have reviewed this proposal to establish final indirect cost rates and to the best of my knowledge and belief:
1. All costs included in this proposal (identify proposal and date) to establish final indirect costs rates for (identify period covered by rate) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) and its supplements applicable to the contracts to which the final indirect cost rates will apply; and
2. This proposal does not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements.
Firm: ___________________________________________________ Signature: _______________________________________________ Name of Certifying Official: __________________________________ Title: ____________________________________________________ Date of Execution: _________________________________________
52.242-5 PAYMENTS TO SMALL BUSINESS SUBCONTRACTORS (JAN 2017)
(IAW FAR 42.1504)
52.242-13 BANKRUPTCY (JUL 1995)
(IAW FAR 42.903)
252.242-7004 MATERIAL MANAGEMENT AND ACCOUNTING SYSTEM (MAY 2011)
(IAW DFARS 242.7204)
52.243-1 CHANGES--FIXED-PRICE (AUG 1987)
(IAW FAR 43.205(a)(1))
52.243-1 CHANGES--FIXED-PRICE -- ALTERNATE I (APR 1984)
(IAW FAR 43.205(a)(2))
52.243-2 CHANGES--COST-REIMBURSEMENT (AUG 1987)
(IAW FAR 43.205(b)(1))
52.243-2 CHANGES--COST-REIMBURSEMENT -- ALTERNATE I (APR 1984)
(IAW FAR 43.205(b)(2))
252.243-7001 PRICING OF CONTRACT MODIFICATIONS (DEC 1991)
(IAW DFARS 243.205-70)
252.243-7002 REQUESTS FOR EQUITABLE ADJUSTMENT (DEC 2012)
(IAW DFARS 243.205-71)
52.244-2 SUBCONTRACTS (OCT 2010)
(IAW FAR 44.204(a)(1), FAR 44.204(a)(3))
(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting Officer's written consent before placing the following subcontracts:
Subcontracts
(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:
Subcontracts
52.244-5 COMPETITION IN SUBCONTRACTING (DEC 1996)
(IAW FAR 44.204(c))
52.244-6 SUBCONTRACTS FOR COMMERCIAL ITEMS (AUG 2019)
(IAW FAR 44.403)
252.244-7001 CONTRACTOR PURCHASING SYSTEM ADMINISTRATION--BASIC (MAY 2014)
(IAW DFARS 244.305-71)
52.245-1 GOVERNMENT PROPERTY (JAN 2017)
(IAW FAR 45.107(a), DFARS 237.7003(c), DFARS 245.107)
52.245-9 USE AND CHARGES (APR 2012)
(IAW FAR 45.107(c))
252.245-7001 TAGGING, LABELING, AND MARKING OF GOVERNMENT-FURNISHED PROPERTY
(APR 2012)
(IAW DFARS 245.107(2))
252.245-7002 REPORTING LOSS OF GOVERNMENT PROPERTY (DEVIATION 2020-O0004)
(FEB 2020)
(IAW Deviation 2020-O0004)
252.245-7003 CONTRACTOR PROPERTY MANAGEMENT SYSTEM ADMINISTRATION (APR 2012)
(IAW DFARS 245.107(4))
252.245-7004 REPORTING, REUTILIZATION, AND DISPOSAL (DEC 2017)
(IAW DFARS 245.107(5))
52.246-25 LIMITATION OF LIABILITY--SERVICES (FEB 1997)
(IAW FAR 46.805(a)(4))
52.248-1 VALUE ENGINEERING (OCT 2010)
(IAW FAR 48.201(b), FAR 48.201(f))
52.249-2 TERMINATION FOR CONVENIENCE OF THE GOVERNMENT (FIXED-PRICE)
(APR 2012)
(IAW FAR 49.502(b)(1)(i))
52.249-6 TERMINATION (COST-REIMBURSEMENT) (MAY 2004)
(IAW FAR 49.503(a)(1))
52.249-8 DEFAULT (FIXED-PRICE SUPPLY AND SERVICE) (APR 1984)
(IAW FAR 49.504(a)(1))
52.249-14 EXCUSABLE DELAYS (APR 1984)
(IAW FAR 49.505(b))
52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)
(IAW FAR 52.107(b)) This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text.
Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
Regulations URLs: (Click on the appropriate regulation.)
https://acquisition.gov/browse/index/far https://acquisition.gov/dfars https://acquisition.gov/affars
NOTE: After selecting the appropriate regulation above, at the "Table of Contents" page, conduct a search for the desired regulation reference using your browser's FIND function. When located, click on the regulation reference (hyperlink).
52.252-6 AUTHORIZED DEVIATIONS IN CLAUSES (APR 1984)
(IAW FAR 52.107(f))
(a) The use in this contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this contract of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2).clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
52.253-1 COMPUTER GENERATED FORMS (JAN 1991)
(IAW FAR 53.111)
PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS
SECTION J
LIST OF ATTACHMENTS
Form Number Description/File Name Date Number of Pages FORM 158 Packaging Requirements 30MAR2020 2
DDFORM 1658 Transportation Requirements 31MAR2020 3
First Article Requirements 06MAR2020 2
Performance Work Statement REV 1 26MAR2020 13
Exhibit A – CDRLs 27APR2020 12
PART IV - REPRESENTATIONS AND INSTRUCTIONS
SECTION K
REPRESENTATIONS, CERTIFICATIONS, AND OTHER STATEMENTS
OF OFFERORS OR RESPONDENTS
252.203-7005 REPRESENTATION RELATING TO COMPENSATION OF FORMER DOD OFFICIALS
(NOV 2011)
(IAW DFARS 203.171-4(b), DFARS 212.301(f)(iv))
52.204-8 ANNUAL REPRESENTATIONS AND CERTIFICATIONS (MAR 2020)
(IAW FAR 4.1202(a)) (a)(1) The North American Industry Classification System (NAICS) code for this acquisition is 334515 .
(2) The small business size standard is 500 .
(3) The small business size standard for a concern which submits an offer in its own name, other than on a construction or service contract, but which proposes to furnish a product which it did not itself manufacture, is 500 employees.
(b)(1) If the provision at 52.204-7, System for Award Management, is included in this solicitation, paragraph (d) of this provision applies.
((2) If the provision at 52.204–7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (d) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
[ ] (i) Paragraph (d) applies.
[ ] (ii) Paragraph (d) does not apply and the offeror has completed the individual representations and certifications in the solicitation.
(c) (1) The following representations or certifications in SAM are applicable to this solicitation as indicated:
(i) 52.203-2, Certificate of Independent Price Determination. This provision applies to solicitations when a firm-fixed-price contract or fixed-price contract with economic price adjustment is contemplated, unless—
(A) The acquisition is to be made under the simplified acquisition procedures in Part 13;
(B) The solicitation is a request for technical proposals under two-step sealed bidding procedures;
or
(C) The solicitation is for utility services for which rates are set by law or regulation.
(ii) 52.203-11, Certification and Disclosure Regarding Payments to Influence Certain Federal Transactions.
This provision applies to solicitations expected to exceed $150,000.
(iii) 52.203-18, Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation. This provision applies to all solicitations.
(iv) 52.204-3, Taxpayer Identification. This provision applies to solicitations that do not include the provision at 52.204-7, System for Award Management.
(v) 52.204-5, Women-Owned Business (Other Than Small Business). This provision applies to solicitations that—
(A) Are not set aside for small business concerns;
(B) Exceed the simplified acquisition threshold; and
(C) Are for contracts that will be performed in the United States or its outlying areas.
(vi) 52.204–26, Covered Telecommunications Equipment or Services—Representation. This provision applies to all solicitations.
(vii) 52.209-2, Prohibition on Contracting with Inverted Domestic Corporations—Representation.
(viii) 52.209-5, Certification Regarding Responsibility Matters. This provision applies to solicitations where the contract value is expected to exceed the simplified acquisition threshold.
(ix) 52.209-11, Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law. This provision applies to all solicitations.
(x) 52.214-14, Place of Performance--Sealed Bidding. This provision applies to invitations for bids except those in which the place of performance is specified by the Government.
(xi) 52.215-6, Place of Performance. This provision applies to solicitations unless the place of performance is specified by the Government.
(xii) 52.219-1, Small Business Program Representations (Basic, Alternate I, and II). This provision applies to solicitations when the contract will be performed in the United States or its outlying areas.
(A) The basic provision applies when the solicitations are issued by other than DoD, NASA, and the Coast Guard.
(B) The provision with its Alternate I applies to solicitations issued by DoD, NASA, or the Coast Guard.
(C) The provision with its Alternate II applies to solicitations that will result in a multiple-award contract with more than one NAICS code assigned.
(xiii) 52.219-2, Equal Low Bids. This provision applies to solicitations when contracting by sealed bidding and the contract will be performed in the United States or its outlying areas.
(xiv) 52.222-22, Previous Contracts and Compliance Reports. This provision applies to solicitations that include the clause at 52.222-26, Equal Opportunity.
(xv) 52.222-25, Affirmative Action Compliance. This provision applies to solicitations, other than those for construction, when the solicitation includes the clause at 52.222-26, Equal Opportunity.
(xvi) 52.222-38, Compliance with Veterans' Employment Reporting Requirements. This provision applies to solicitations when it is anticipated the contract award will exceed the simplified acquisition threshold and the contract is not for acquisition of commercial items.
(xvii) 52.223-1, Biobased Product Certification. This provision applies to solicitations that require the delivery or specify the use of USDA-designated items; or include the clause at 52.223-2, Affirmative Procurement of Biobased Products Under Service and Construction Contracts.
(xviii) 52.223-4, Recovered Material Certification. This provision applies to solicitations that are for, or specify the use of, EPA- designated items.
(xviv) 52.223-22, Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation. This provision applies to solicitations that include the clause at 52.204-7
(xx) 52.225-2, Buy American Certificate. This provision applies to solicitations containing the clause at 52.225-1.
(xxi) 52.225-4, Buy American--Free Trade Agreements--Israeli Trade Act Certificate. (Basic, Alternate I, II, and III) This provision applies to solicitations containing the clause at 52.225- 3.
(A) If the acquisition value is less than $25,000, the basic provision applies.
(B) If the acquisition value is $25,000 or more but is less than $50,000, the provision with its Alternate I applies.
(C) If the acquisition value is $50,000 or more but is less than $83,099,, the provision with its Alternate II applies.
(D) If the acquisition value is $83,099, or more but its less than $100,000, the provision with its Alternate III applies.
(xxii) 52.225-6, Trade Agreements Certificate. This provision applies to solicitations containing the clause at 52.225-5.
(xxiii) 52.225-20, Prohibition on Conducting Restricted Business Operations in Sudan--Certification. This provision applies to all solicitations.
(xxiv) 52.225-25, Prohibition on Contracting with Entities Engaging in Certain Activities or Transaction Relating to Iran—Representation and Certifications. This provision applies to all solicitations.
(xxv) 52.226-2, Historically Black College or University and Minority Institution Representation. This provision applies to solicitations for research, studies, supplies, or services of the type normally acquired from higher educational institutions.
(2) The following representations or certifications are applicable as indicated by the Contracting Officer:
[Contracting Officer check as appropriate.]
X __ (i) 52.204-17, Ownership or Control of Offeror.
X __ (ii) 52.204-20, Predecessor of Offeror.
__ (iii) 52.222-18, Certification Regarding Knowledge of Child Labor for Listed End Products.
(see note) (iv) 52.222-48, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment -- Certification. ). (Note: If this clause is applicable it will be listed in the appropriate clause section of this document.)
__ (v) 52.222-52 Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Certification.
(see note) (vi) 52.223-9, with its Alternate I, Estimate of Percentage of Recovered Material Content for EPA-Designated Products (Alternate I only). (Note: If this clause and it’s Alternate I are applicable they will be listed in the appropriate clause section of this document.)
(vii) 52.227-6, Royalty Information.
__(A) Basic.
__ (B) Alternate I.
__(viii) 52.227-15, Representation of Limited Rights Data and Restricted Computer Software.
(d) The Offeror has completed the annual representations and certifications electronically in SAMaccessed through https://www.sam.gov. After reviewing the SAM information, the Offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in paragraph (c) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by clause number, title, date].
These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR Clause # Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result in an update to the representations and certifications posted on SAM.
252.204-7007 ALTERNATE A, ANNUAL REPRESENTATIONS AND CERTIFICATIONS (DEC 2019)
(IAW DFARS 204.1202)
Substitute the following paragraphs (b), (d), and (e) for paragraphs (b) and (d) of the provision at FAR 52.204-8:
(b)(1) If the provision at FAR 52.204-7, System for Award Management, is included in this solicitation, paragraph (e) of this provision applies.
(2) If the provision at FAR 52.204-7, System for Award Management, is not included in this solicitation, and the Offeror has an active registration in the System for Award Management (SAM), the Offeror may choose to use paragraph (e) of this provision instead of completing the corresponding individual representations and certifications in the solicitation. The Offeror shall indicate which option applies by checking one of the following boxes:
___ (i) Paragraph (e) applies.
___ (ii) Paragraph (e) does not apply and the Offeror has completed the individual representations and certifications in the solicitation.
(d) (1) The following representations or certifications in the SAM database are applicable to this solicitation as indicated:
(i) 252.204–7016, Covered Defense Telecommunications Equipment or Services—Representation. Applies to all solicitations.
(ii) 252.209-7003, Reserve Officer Training Corps and Military Recruiting on Campus--Representation.
Applies to all solicitations with institutions of higher education.
(iii) 252.216-7008, Economic Price Adjustment--Wage Rates or Material Prices Controlled by a Foreign Government--Representation. Applies to solicitations for fixed-price supply and service contracts when the contract is to be performed wholly or in part in a foreign country, and a foreign government controls wage rates or material prices and may during contract performance impose a mandatory change in wages or prices of materials.
(iv) 252.225-7042, Authorization to Perform. Applies to all solicitations when performance will be wholly or in part in a foreign country.
(v) 252.225-7049, Prohibition on Acquisition of Certain Foreign Commercial Satellite Services—Representation. Applies to solicitations for the acquisition of commercial satellite services.
(vi) 252.225-7050, Disclosure of Ownership or Control by the Government of a Country that is a State Sponsor of Terrorism. Applies to all solicitations expected to result in contracts of $150,000 or more.
(vii) 252.229-7012, Tax Exemptions (Italy)--Representation. Applies to solicitations when contract performance will be in Italy.
(viii) 252.229-7013, Tax Exemptions (Spain)--Representation. Applies to solicitations when contract performance will be in Spain.
(ix) 252.247-7022, Representation of Extent of Transportation by Sea. Applies to all solicitations except those for direct purchase of ocean transportation services or those with an anticipated value at or below the simplified acquisition threshold.
(2) The following representations or certifications in SAM are applicable to this solicitation as indicated by the Contracting Officer; [Contracting Officer check as appropriate.] __ _ (i) 252.209-7002, Disclosure of Ownership or Control by a Foreign Government.
__ _ (ii) 252.225-7000, Buy American —Balance of Payments Program Certificate.
__ _ (iii) 252.225-7020, Trade Agreements Certificate.
__ _ Use with Alternate I __ _ (iv) 252.225-7031, Secondary Arab Boycott of Israel.
__ _ (v) 252.225-7035, Buy American —Free Trade Agreements—Balance of Payments Program Certificate.
__ _ Use with Alternate I.
__ _ Use with Alternate II.
__ _ Use with Alternate III.
__ _ Use with Alternate IV.
__ _ Use with Alternate V.
(e) The offeror has completed the annual representations and certifications electronically via the SAM website at https://acquisition.gov/ . After reviewing the ORCA database information, the offeror verifies by submission of the offer that the representations and certifications currently posted electronically that apply to this solicitation as indicated in FAR 52.204-8© and paragraph (d) of this provision have been entered or updated within the last 12 months, are current, accurate, complete, and applicable to this solicitation (including the business size standard applicable to the NAICS code referenced for this solicitation), as of the date of this offer, and are incorporated in this offer by reference (see FAR 4.1201); except for the changes identified below [offeror to insert changes, identifying change by provision number, title, date]. These amended representation(s) and/or certification(s) are also incorporated in this offer and are current, accurate, and complete as of the date of this offer.
FAR/DFARS Provision# Title Date Change
Any changes provided by the offeror are applicable to this solicitation only, and do not result…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .