Combined_CDRLs_(8_Sep_16).pdf

PDF 1 MB Posted

Attached to
Defense Injection/Reception Emergency Control and Command Terminal
Solicitation number
FA8523-16-R-0030
Issued by

About this file

Contract Data Requirement Lists

View the file

Other files

File Type Posted
Redacted_DIRECT_J_and_A_for_PEO_level_.pdf PDF
PWS.pdf PDF
Final_Solicitation.pdf PDF
Packaging.pdf PDF
Wages.pdf PDF
transportation.pdf PDF
QASP.pdf PDF
PWS.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO. F. CONTRACTOR

GENERAL DYNAMICS

17. PRICE

GROUP

1. DATA ITEM NO.

A00A

2. TITLE OF DATA ITEM

Software Test Description

3. SUBTITLE

4. AUTHORITY (Data Item Description No.)

DI-IPSC-81439A

5. CONTRACT REFERENCE

PWS Paragraph 4.2.8, 4.3.2, 4.3.2.1, 4.3.2.5.1

6. REQUIRING OFFICE

AFLCMC/WNYEDA

18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e pr o

16. REMARKS AFLCMC/WNYEDA 1 1 0

Block 4: Contractor format acceptable. Data Item to be used as a guide for content. 235 Byron Street Data item description is tailored as follows: Suite 19-A This information will reside within the FQT file cabinet located in the FQT test facility (site R) under the Robins AFB, GA specific software build: 31098-1813 All TPSs that were run during the FQT process and signed by the required attendees to include health of new build (HNB), regression test analysis (RTA), and modified/newly generated.

All PTRs that where run during the FQT process and signed by the required attendees to include the PTR scenario table and FQT tracking status printout where applicable, all referenced support data, to include but not limited to requirements specification tables and referenced PTRs.

Block 8: The contractor shall consider an item approved if no Government response is submitted within the 30-day notification period.

Block 10, 11, 12, 13: As required to support new versions of software.

Block 14: Distribution to be made to AFLCMC/WNYEDA upon request.

BLK 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies only (Administrative or Operational Use) (15 December 2006). Other requests for this document shall be referred to AFLCMC/WNYEDA, Robins AFB, GA 31098.

15. TOTAL Þ 1 1 0

G. PREPARED BY

MARTIN OKAIWELE

H. DATE

27 May. 2016

I. APPROVED BY J. DATE

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages

FD2060-15-90953

15 June 2016Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text

1042079746C Typewritten Text

1042079746C Typewritten Text

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.

B. EXHIBIT

A

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00B

2. TITLE OF DATA ITEM

Software Product Specification

3. SUBTITLE

4. AUTHORITY (Data Item Description No.)

DI-IPSC-81441A

5. CONTRACT REFERENCE

PWS Paragraph 4.3.2, 4.3.2.5.1

6. REQUIRING OFFICE

AFLCMC/WNYEDA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e pr o

16. REMARKS AFLCMC/WNYEDA 1 1 0

235 Byron Street Block 4: Block 4: Contractor format acceptable. Data Item to be used as a guide for content. Suite 19-A Robins AFB, GA

Data item description is tailored as follows: 31098-1813 Requirements, Item 4, subparagraph 6, delete.

Block 8: The contractor shall consider an item approved if no Government response is submitted within the 30-day notification period.

Block 10, 11, 12, 13: Changed pages or revisions at completion of period of task performance.

BLK 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies only (Administrative or Operational Use) (15 December 2006). Other requests for this document shall be referred to AFLCMC/WNYEDA, Robins AFB, GA 31098.

15. TOTAL Þ 1 1 0

G. PREPARED BY

MARTIN OKAIWELE

H. DATE

27 May. 2016

I. APPROVED BY

J. DATE

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages

FD2060-15-90953

1042079746C Typewritten Text

1042079746C Typewritten Text 15 June 2016

1042079746C Typewritten Text

1042079746C Typewritten Text Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text

1042079746C Typewritten Text

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

GROUP

1. DATA ITEM NO.

A00C

2. TITLE OF DATA ITEM

Software Design Description

DI-IPSC-81435A

5. CONTRACT REFERENCE

PWS Paragraph 4.3.2, 4.3.2.6, 4.3.2.5.1

6. REQUIRING OFFICE

AFLCMC/WNYEDA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e

Block 4: Contractor format acceptable. Data Item to be used as a guide for content. Suite 19-A Data item description is tailored as follows: Robins AFB, GA

Requirements, Item 4, subparagraph D, delete. 31098-1813 Requirements, Item 4, subparagraph 4.1. Item E, change to the following:

Include the following statement to address computer hardware resource utilization:

“Use of COTS equipment allows growth requirements to be readily met by adding memory, disk space, Processors.”

Requirements, Item 4, subparagraph 4.3, line one: Delete “the following” Requirements, Item 4, subparagraph 5, line one: Delete “the following”

Block 8: The contractor shall consider an item approved if no Government response is submitted within

Block 10, 11, 12, 13: Changed pages or revisions at completion of period of task performance.

FD2060-15-90953

1042079746C Typewritten Text

1042079746C Typewritten Text Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text

1042079746C Typewritten Text 15 June 2016

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-Issuing Contracting Officer for the Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

A

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO. F. CONTRACTOR

GENERAL DYNAMICS

17. PRICE

GROUP

1. DATA ITEM NO.

A00D

2. TITLE OF DATA ITEM

Request for Deviation

3. SUBTITLE

4. AUTHORITY (Data Item Description No.)

DI-CMAN-80640C

5. CONTRACT REFERENCE

PWS Paragraph 4.3.2, 4.3.2.5.1

6. REQUIRING OFFICE

AFLCMC/WNYEDA

18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e pr o

16. REMARKS AFLCMC/WNYEDA 1 1 0

235 Byron Street

Block 4: Contractor format acceptable on electronic media. Data Item to be used as a guide for content. Suite 19-A Robins AFB, GA

31098-1813

Block 8: The contractor shall consider an item approved if no Government response is submitted within the 30-day notification period.

Block 10, 11, 12, 13: As required.

BLK 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies only (Administrative or Operational Use) (15 December 2006). Other requests for this document shall be referred to AFLCMC/WNYEDA, Robins AFB, GA 31098.

15. TOTAL Þ 1 1 0

G. PREPARED BY

MARTIN OKAIWELE

H. DATE

27 May. 2016

I. APPROVED BY J. DATE

DD FORM 1423-1, JUN 90 Previous editions are obsolete Page 1 of 1 Pages

FD2060-15-90953

15 June 2016Michael Slyfield AFLCMC/WNYBBB

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

GROUP

1. DATA ITEM NO.

A00E

2. TITLE OF DATA ITEM

Specification Change Notice

DI-CMAN-80643C

5. CONTRACT REFERENCE

PWS Paragraph 4.3.2, 4.3.2.5.1

6. REQUIRING OFFICE

AFLCMC/WNYEDA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e

Suite 19-A Block 4: Contractor format acceptable. Data Item to be used as a guide for content. Robins AFB, GA

31098-1813

Block 8: The government shall have 30 days to the contractor regarding the approval/disapproval of this item.

Block 10, 11, 12, 13: As required.

FD2060-15-90953

1042079746C Typewritten Text Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 15 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

GROUP

1. DATA ITEM NO.

A00F

2. TITLE OF DATA ITEM

Security Vulnerability Analysis

DI-MISC-80841

5. CONTRACT REFERENCE

PWS Paragraph 4.1.7.5, 4.3.2.6

6. REQUIRING OFFICE

AFLCMC/WNYEDA, AFLCMC/WNYBBA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e

Block 4: Contractor format acceptable. Data Item to be used as a guide for content. 235 Byron St Data item description should be tailored as follows:

Reference paragraph 10.1.e, delete “Operations Security” Robins AFB, GA

AFLCMC/WNYEDA 1 1 0

235 Byron St

Block 8: The government shall have 30 days to the contractor regarding the approval/disapproval of this

Block 10, 11, 12, 13: Submit updates as required.

referred to AFLCMC/WNYEDA or AFLCMC/WNYBBA, Robins AFB, GA 31098.

15. TOTAL Þ 2 2 0

FD2060-15-90953

1042079746C Typewritten Text

1042079746C Typewritten Text Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 15 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

GROUP

1. DATA ITEM NO.

A00G

2. TITLE OF DATA ITEM

Security Evaluation Document (SED)

DI-MISC-81762

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e

16. REMARKS AFLCMC/WNYEDA

1 1 0

Refer to chapter 6 for details on Covert Channel Analysis Report

Refer to chapter 4 for details on Fail Safe Design and Analysis

AFLCMC/WNYBBA 1 1 0

235 Byron St

Block 8: The government shall have 30 days to the contractor regarding the approval/disapproval of this

Block 10, 11, 12, 13: Submit updates as required

FD2060-15-90953

1042079746C Typewritten Text

1042079746C Typewritten Text Michael Slyfield AFLCMC/WNYBBB

1042079746C

15 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government- Issuing Contracting Officer for the Contract/PR No. listed in Block E.

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00H

2. TITLE OF DATA ITEM

Parts Approval Request

3. SUBTITLE

Nonstandard Parts

4. AUTHORITY (Data Item Description No.)

DI-MISC-80071E

PWS Paragraph 4.1.11

AFLCMC/WNYEDA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B As required See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg Repro

16. REMARKS AFLCMC/WNYEDA 1 0

Block 4: Contractor format acceptable. Robins AFB, GA

Block 10, 11, 12, 13: Reports will only be generated when a substitute part is required. 31098-1813 Block 7: A letter of transmittal containing CDRL name, CDRL number, contract number and applicable DID will be sent to WR-ALC/PK contracting officer with each submission of this CDRL.

BLK 9: Distribution Statement B: Distribution authorized to U.S. Government Agencies only

15. TOTAL Þ 1 0

31 May. 2016

Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 15 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00J

2. TITLE OF DATA ITEM

GIDEP Alert Response

3. SUBTITLE

GIDEP Response

4. AUTHORITY (Data Item Description No.)

DI-QCIC-80125B

PWS Paragraph 4.1.13

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B As required See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F

235 Byron Street Blvd

Block 4: GIDEP Response format shall be at the contractor’s discretion. Contractor shall adhere to the Robins AFB, GA policies and directives of GIDEP. 31098-1813

Block 7: A letter of transmittal containing CDRL name, CDRL number, contract number and applicable AFLCMC/WNYBBA 1 0 DID will be sent to the WR-ALC/PK contracting officer with each submission of this CDRL. 235 Byron Street Blvd

15. TOTAL Þ 2 0

Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 15 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00K

2. TITLE OF DATA ITEM

Environmental Health and Safety Plan (HSP)

3. SUBTITLE

Safety and Health Plan

4. AUTHORITY (Data Item Description No.)

DI-ENVR-81375

5. CONTRACT REFERENCE

PWS Paragraph 5.5.4.1

6. REQUIRING OFFICE

AFLCMC/WNYBBA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

DD D See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e

16. REMARKS AFLCMC/WNYKA 1 1 0

ATTN: Brandi Moody 235 Byron Strret, Block 4 & 5: Contractor format acceptable. Contractor shall submit a Safety and Health Plan in Suite 19A accordance with the elements listed in PWS paragraph 5.5.4.1 Robins AFB, GA

Block 7: The Government will accept the Receiving Report through WAWF. Contractor shall submit the Receiving Report upon final submission. 78 ABW/SEG 1 1 0 675 Seventh Street Block 8, 10-12: Contractor shall submit a Health and Safety Plan within 10 working days after contract Bldg 707 award. Written Government acceptance/comments will be within 10 working days after receipt of data. Robins AFB, GA Contractor final submission shall be submitted within 10 working days of receiving Government 31098 comments. Acceptance by he Government is required prior to formal distribution.

Block 9: Distribution authorized to the Department of Defense and U.S DoD contractors only. AFLCMC/WNYBBA 1 1 0 Other requests shall be referred to the contract management team, WR-ALC/GRSKA, 235 Byron St., 235 Byron Street Suite 19A, Robins AFB, GA 31098. Suite 19-A Robins AFB, GA Block 11, 13: If, during the performance of this contract, changes to the Safety and Health Plan are 31098-1813 required, submit the revised Safety and Health Plan to AFLCMC/WNYKA and the Safety Office, 78 ABW/SEG. Procedures identified for blocks 8, 10-12 will apply. PRI/ALT COR 0 1 0

Block 14: Procurement officer(s) e-mail along with Integrated Product Team e-mail distro list will be DCMA/ACO 0 1 0 provided as required. Electronic media shall be provided by CD/DVD media in Microsoft Office compatible format.

15. TOTAL Þ 3 5 0

13 Jun. 2016

Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 15 June 2015

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00L

2. TITLE OF DATA ITEM

Interface Requirements Specification (IRS)

DI-IPSC-81434A

PWS Paragraph 4.3.2.2

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT C See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F

235 Byron St

Block 4: Contractor format is acceptable. Robins AFB, GA

Block 8: Government disposition will be provided within 20 working days after receipt. 31098-1813

BLK 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies and their contractors for Administrative or Operational Use as determined 1 Apr 10. Other requests for this document referred to AFLCMC/WNYEDA, Robins AFB, GA 31098.

26 May. 2016

Michael Slyfield AFLCMC/WNYBBB

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00M

2. TITLE OF DATA ITEM

Test/Inspection Report

DI-NDTI-80809B

PWS Paragraph 4.4.4, 4.2.9

ESTIMATED

TOTAL

PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

DD C One/R See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 N/A D

R A F

Attn: Martin Okaiwele 235 Byron Street Block 4: Report to cover pre-production first article, testing/inspection shall be submitted per contract Suite 19-A delivery schedule. Contractor format is acceptable. Test reports shall be certified by Government quality Robins AFB, GA assurance representative (QAR). MIL-HDBK-831 can be used for additional guidance. 31098-1813

Block 7: DD250 with final copy to AFLCMC/WNYED DID will be sent to the WR-ALC/PK contracting officer with each submission of this CDRL.

Block 8: Approval of test reports or comments shall be furnished with approval/rejection of first article.

Block 11-14: FIRST SUBMISSION SHALL ACCOMPANY DELIVERY OF THE FIRST ARTICLE(S)

TEST REPORT SUBMISSION SHALL BE DELIVERED IN MICROSOFT WORD FORMAT ON CD-ROM

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00N

2. TITLE OF DATA ITEM

Software Transition Plan

DI-IPSC-81429A

PWS Paragraph 4.3.2.6

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL See block 16 See block 16 See block 16 D

R A F

Block 4: Contractor format acceptable. Data Item to be used as a guide for content.

235 Byron St Data item description should be tailored as follows: Suite 19-A Requirements, paragraph 4: Change as follows: Robins AFB, GA

Subparagraph 1.4: Delete 31098-1813 Subparagraph 3.1: Delete and replace with “This paragraph shall describe the existing contractor software support facilities.”

Subparagraph 3.2: Delete items b, e, and g. Delete item d and replace with “identification of each hardware item the contractor uses to support the deliverable software. Provide a list of both the govern-ment furnished equipment and contractor owned/leased hardware. Identify type, model, year, etc and supplier (with address) for each item of equipment. Also identify which items of equipment are required to support each CDRL.” Delete item f and replace with “information on how the contractor is currently supporting the hardware identified in paragraph 3.2d.”

Subparagraph 3.3: Delete items b, e and g. Delete item d and replace with “identification of each software item the contractor uses to support the deliverable software. Provide a list of both the government furnished and contractor owned software. Identify type, version, year, etc and supplier (with address) for each item of software.” Delete item f and replace with “information on vendor support, licensing, and data rights, including how the contractor is currently supporting the software identified in paragraph 3.3d Subparagraph 3.4: Delete items b, c, d and f. Add item g to read “information about the contractor’s internal documenta-tion that supports the message generator.”

Subparagraph 3.5: Delete and replace with “this paragraph shall describe the current contractors staffing including security level and skills.”

Subparagraph 3.6: Delete and replace with “this paragraph shall describe the number and type of soft-ware media required for a software update and other consumables required to accomplish software support.”

Subparagraph 3.7: Delete Subparagraph 5: Delete Subparagraph 7: Delete

Block 8: The government shall have 30 days to the contractor regarding the approval/disapproval of this item.

Block 10, 11, 12, 13: Changed pages or revision 30 days prior to completion of period of task performance.

BLK 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies only (Administrative or Operational Use) (15 December 2006). Other requests for this document shall be referred to AFLCMC/WNYEDA, Robins AFB, GA 31098.

15. TOTAL Þ 1 0

Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 16 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00P

2. TITLE OF DATA ITEM

Database Design Description

DI-IPSC-81437A

PWS Paragraph 4.3.2.6

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL See block 16 See block 16 See block 16 D

R A F

Block 4: Contractor format acceptable. Data Item to be used as a guide for content. 235 Byron Data item description is tailored as follows: Suite 19-A Add “design pertaining to databases not maintainable by the user, will be presented in the SDD” Robins AFB, GA

Block 8: The government shall have 30 days to the contractor regarding the approval/disapproval of this

Block 10, 11, 12, 13: Changed pages or revisions due at completion of period of task performance.

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00Q

2. TITLE OF DATA ITEM

Data Accession List (DAL)

DI-MGMT-81453A

PWS Paragraph 4.3.9.1

AFLCMC/WNYEDA, AFLCMC/WNYEDA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B Monthly See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL See block 16 See block 16 See block 16 D

R A F

Block 4: Data item description is tailored as follows: 235 Byron Street Blvd

(1) Each successive DAL submission shall contain a cumulative list of data products generated Suite 19-A under/during the performance of integrated master plan (IMP). Note the IMP may indicate that certain Robins AFB, GA tasks will definitely require that the task related work be documented and that a data product thus be 31098-1813 Generated; e.g, qualification test would require the documenting of both test procedures and test results.

Note also that the DAL need not list any data items listed on and required by any CDRL exhibit of the AFLCMC/WNYBBA 1 0 contract. The DAL shall contain the following cumulative list of data: 235 Byron Street Blvd Technical Memos Suite 19-A Non-Deliverable Data Robins AFB, GA

White Papers 31098-1813 Trip Reports Developmental Data Contract Information List

(2) Contractor Format Acceptable. Data item to be used as a guide for content. In addition to Hardcopies, softcopies to be delivered on electronic media upon request.

(3) The contractor shall provide electronic access to both the DAL and the documents listed therein. If electronic access is not possible, then the contractor shall provide a hard copy (i.e. a paper copy) of the data upon the government ‘s request.

Block 8: The contractor shall consider an item approved if no government response is submitted within

Block 11, 12, 13: The DAL shall be submitted monthly but NLT the 15th day of each month.

Michael Slyfield AFLCMC/WNYBBB

1042079746C

16 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00R

2. TITLE OF DATA ITEM

Contract Funds Status Report (CFSR)

DI-MGMT-81468

PWS Paragraph 4.3.9.1

AFLCMC/WNYBBA, AFLCMC/WNYKA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B Quaterly See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL See block 16 See block 16 See block 16 D

R A F

16. REMARKS AFLCMC/WNYBBA 1 1 0

Block 8: The contractor shall consider an item approved if no government response is submitted within 31098-1813

AFLCMC/WNYKA 1 1 0

Block 11, 12, 13: First submittal 120 calendar days after contract award. Subsequent submittals quarterly 235 Byron Street Blvd NLT 30 calendar days after closeout. Suite 19-A

BLK 9: Distribution Statement C: Distribution authorized to U.S. Government Agencies only 31098-1813 referred to AFLCMC/WNYBBA, Robins AFB, GA 31098.

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENRAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00S

2. TITLE OF DATA ITEM

Test Plan

DI-NDTI-80566A

PWS Paragraph 4.3.16.1

ESTIMATE

D TOTAL

PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

DD C One/R See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 As required D

R A F T

Reg R e

Martin Okaiwele

Block 4: Contractor format is acceptable on electronic media. Excessive file size may require CDROM 235 Byron Street Hard copy. Data item shall be used as a guide for content. Suite 19-A Block 7: DD250 with final copy to AFLCMC/WNYED Robins AFB, GA 31098 DID will be sent to the WR-ALC/PK contracting officer with each submission of this CDRL

Block 8: Government has 15 days after meeting to review and forward comments. Contractor has 15

Attn: Martin Okaiwele days to resubmit.

Block 10: Draft and final copies.

Block 11, 12: 30 days before Test Readiness Review.

Block 13: Only draft and final copies required.

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00T

2. TITLE OF DATA ITEM

Management Plan

3. SUBTITLE

Mission Essential

4. AUTHORITY (Data Item Description No.)

DI-MGMT-80004

5. CONTRACT REFERENCE

PWS Paragraph 4.14.1

6. REQUIRING OFFICE

AFLCMC/WNYEDA, AFLCMC/WNYBBA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT C See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F

Block 4: Contractor format acceptable on electronic media. Data Item to be used as a guide for content. Robins AFB, GA

See paragraph 4.0 (GENERAL INFORMATION) under Mission Essential Functions for a 31098-1813 complete guide on the mission essential services.

Block 10, 11, 12, 13: As required. WR-ALC/GRWBBA 1 1 0 235 Byron Street Blvd document referred to AFLCMC/WNYEDA or AFLCMC/WNYBBA, Robins AFB, GA 31098.

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00U

2. TITLE OF DATA ITEM

Technical Manual Contract Requirements

TM-86-01D

5. CONTRACT REFERENCE

PWS Paragraph 4.3.2

6. REQUIRING OFFICE

AFLCMC/WNYBBA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL See block 16 As required See block 16 D

R A F

16. REMARKS AFLCMC/WNYBBA 1 0

Block 4: Contractor format acceptable. Data item to be used as a guide for content. 31098-1813

Block 8: The contractor shall consider an item approved if no government response is submitted within

Block 10: Provide only changes to DIRECT TO’s and commercial manuals previously delivered. All

References in parts A and B to “TO’s “ shall be construed to mean “changes and updates”.

Block 12 & 13: Deliver as required for NC2-ESI, emergency or block updates. Urgent changes affecting Operation or maintenance procedures shall be submitted separately as required.

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00V

2. TITLE OF DATA ITEM

GIDEP Alert/Safe-Alert Report

3. SUBTITLE

GIDEP Report

4. AUTHORITY (Data Item Description No.)

DI-QCIC-80126B

PWS Paragraph 4.1.13

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B As required See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F

Block 4: Contractor format is acceptable. Data item shall be used as a guide for content. Robins AFB, GA

AFLCMC/WNYBBA 1 0

Block 7: A letter of transmittal containing CDRL name, CDRL number, contract number and applicable 235 Byron Street Blvd DID will be sent to the WR-ALC/PK contracting officer with each submission of this CDRL. Suite 19-A

Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form to the Government-

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

DIRECT

E. CONTRACT / PR NO.

FD2060-15-90953

F. CONTRACTOR

GENERAL DYNAMICS 17. PRICE

GROUP

1. DATA ITEM NO.

A00W

2. TITLE OF DATA ITEM

Installation and Fielding Plan

DI-MGMT-81118

PWS Paragraph 4.3.10

WR-ALC/GRWEDA, WR-ALC/GRWBBA 18.

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT C See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F

Block 4: Contractor format is acceptable. Data item shall be used as a guide for content. Robins AFB, GA

DID will be sent to the WR-ALC/PK contracting officer with each submission of this CDRL. AFLCMC/GRWBBA 1 0 235 Byron Street Blvd

Block 10, 11, 12, 13: As required. Robins AFB, GA

Michael Slyfield AFLCMC/WNYBBB

1042079746C Typewritten Text 15 June 2016

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302, and to the Office of Management and Budget, Paperwork Reducing Project, (0704-0188), Washington, D.C., 20503. Please DO NOT RETURN your form to either of these addresses, send completed form

C. CATEGORY

TDP ________ TM ________ OTHER __X______

D. SYSTEM / ITEM

GROUP

1. DATA ITEM NO.

A00X

2. TITLE OF DATA ITEM

Trusted Facility Manual

DI-TMSS-81352

ESTIMATED

TOTAL PRICE

7. DD 250 REQ 9. DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST SUBMISSION

14. DISTRIBUTION

LT B See block 16 See block 16 b. COPIES

8. APP CODE 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE FINAL A See block 16 See block 16 D

R A F T

Reg R e

Data item description is tailored as follows: Suite 19-A Block 7, para 7.1, line 3, delete 3.2.2.1.1, 3.2.3.1.4, 3.2.4.2, 3.3.2.1.1, 3.3.2.2 Robins AFB, GA

Line 4, delete 3.3.3.1.4, 3.3.3.1.5, 3.3.4.2, and 4.1.3.2.4 31098-1813 Para 7.2 and 7.3, delete Block 10, para 10.3.1, delete “classes C2 and products and their equivalent systems” AFLCMC/WNYBBA 1 1 0 Para 10.3.3, 10.3.4, and 10.3.5, delete 235 Byron St Delete page 5 of 5, verification summary matrix Suite 19-A

Block 8: The government shall have 30 days to the contractor regarding the approval/disapproval of this

Block 10, 11, 12, 13: Submit updates as required.

FD2060-15-90953

1042079746C Typewritten Text

1042079746C Typewritten Text

1042079746C Typewritten Text Michael Slyfield AFLCMC/WNYBBB

1042079746C

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204,…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .