16-01191_QASP.pdf

PDF 659 KB Posted

Attached to
Repair ALQ-161 Oscillators Federal contract opportunity
Solicitation number
FA8522-18-R-0011
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

QUASP

View the file

Other files for this federal contract opportunity

Other files attached to Repair ALQ-161 Oscillators, newest first.
File Type Posted
2294041_PWS.pdf PDF
2523825_PKGRQMT_REPORT.pdf PDF
EXPORT_CONTROL_NOTICE.pdf PDF
2528873_ATTACH_Ins_2875.pdf PDF
2528872_ATTACH_2875.pdf PDF
16-01191_SGFP.pdf PDF
FA852218R0011.pdf PDF
16-01191_CDRLS_DIDs_signed_and_approved.pdf PDF
CAV_AF_SOW.pdf PDF
2524667_TRNSPDATA_REPORT.pdf PDF
Wage_Determination.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PR: FD2060-16-01191 QASP 1

Quality Assurance Surveillance Plan (QASP) for

AN/ALQ-161A Oscillators and Yttrium Iron Garnet

Filters Purchase Request: FD2060-16-01191

Date: 27 March 2018

PR: FD2060-16-01191 QASP 2

1.0 Purpose

This Quality Assurance Surveillance Plan (QASP) is a government-developed document used to determine if the contractor’s performance meets the performance standards contained in the contract. The QASP establishes procedures on how this assessment/inspection process will be conducted. It provides the details associated with a continuous oversight process, to include:

What will be monitored How monitoring will take place Who will conduct the monitoring How monitoring efforts and results will be documented

1.1 The contractor is responsible for implementing and delivering performance that meets contract standards using its own quality control plan. The QASP provides the structure for the government’s surveillance of the contractor’s performance to ensure that it meets contract standards. It is the government’s responsibility to be objective, fair and consistent in evaluating contractor performance.

1.2 The QASP is not part of the contract nor is it intended to duplicate the contractor’s quality control plan. This QASP is a living document. Flexibility in the QASP is required to allow for an increase or decrease in the level of surveillance necessary based on contractor performance.

Copies of the QASP and any revisions shall be provided to the contractor and the Contracting Officer's Representative (COR) to facilitate implementation of surveillance activities. In addition, the QASP should recognize and accommodate unforeseen or uncontrollable circumstances which might occur that are outside the control of the contractor.

1.3 Objective(s)

This QASP describes the services required to perform the requirements of depot level maintenance for the AN/ALQ-161A Electronic Countermeasures/Radio Frequency Surveillance (AN/ALQ-l6lA ECM/RFS) System. These services include repairing and returning units to the Air Force to meet user demands and performance requirements. The objective of this effort is to award a follow-on contract which results in the timely delivery of serviceable items, the delivery of quality products, prompt data deliverables, as well as relaying notification of production problems affecting deliveries and potential delivery schedule slippages. The Contractor shall provide timely response to MICAP and Surge requirements, as well as timely and accurate reporting in the Commercial Asset Visibility Air Force (CAV-AF) system. This effort shall provide a continued flow of serviceable assets to the warfighter that will maintain the war readiness of the AN/ALQ-161A weapon system.

1.4 Result(s)

The QASP is used for managing contractor performance assessment by ensuring that systematic quality assurance methods validate that contractor quality control efforts are timely, effective, and are delivering the results specified in the contract or task order. The QASP directly corresponds to the performance objectives and standards specified in the PWS. It provides specific details on how the Government will survey, observe, test, sample, evaluate, and document contractor performance results to determine if the contractor has met the required performance standards for each objective in the PWS. Successful completion of the objectives for the performance of the contract constitutes success of the program.

PR: FD2060-16-01191 QASP 3

1.5 Authority

Generally, Authority for issuance of this QASP is provided under Part 46 of the Federal Acquisition Regulation, Inspection of Services clauses, which provide for inspection, acceptance and documentation of the service called for in the contract or order. If commercial, quality assurance will be applied in accordance with commercial items clause.

2.0 Assessment Management

2.1 Services Summary

Performance Objective

PWS

Reference

Performance Threshold Method of Surveillance

Comply with the quality levels of repair necessary to return assets in serviceable condition.

4.10 There shall be no more than

one Product Quality Deficiency Report (PQDR) per NSN per twelve month period determined the fault of the Contractor. For orders over 200 items, no more than three PQDRs per twelve month period determined the fault of the contractor.

COR will monitor the investigation of 100% of PQDRs submitted against this contract.

Surveillance will be monitored quarterly and Performance Assessment Report (PARs) issued as required. At a minimum, performance will be documented annually by the COR in the (Contractor Performance Assessment Reporting) CPAR.

Meet the delivery schedule for non- Surge/MICAPs

4.3.2 Repaired assets shall be delivered in accordance with the negotiated quantity and delivery shall be in accordance with the schedule defined by the contract.

There shall be no more than one late delivery(ies) per month. The Contractor shall notify the Government if the delivery of any asset will not meet the scheduled delivery date and negotiate a revised delivery date.

PMS will monitor production in CAVAF against negotiated schedule.

Surveillance will be monitored quarterly and PARs issued as required. At a minimum, performance will be documented annually by the COR in the

CPAR.

Meet the delivery schedule (DS) established for MICAP and Surge requirements

4.4.1 Delivery schedule shall be

met in accordance with the negotiated schedule.

Satisfaction of all Surge and MICAPs shall be met within 15 days.

PMS will monitor production in CAVAF against negotiated schedule.

Surveillance will be monitored quarterly and PARs issued as required. At a minimum, performance will be documented

PR: FD2060-16-01191 QASP 4

annually by the COR in the

CPAR.

CAV-AF

reporting

4.2.1 The Contractor shall report

production in CAV-AF. The Contractor shall provide data on the actions conducted for each unit. The Contractor shall report as actions occur.

PMS will monitor CAVAF transactions.

Surveillance will be monitored quarterly and PARs issued as required. At a minimum, performance will be documented annually by the COR in the

CPAR.

Quality of CDRL deliverable

4.2.7 There shall be no more than

one rejection of any deliverable. There shall be no more than two total rejection(s) of deliverables per contract year. The Government will reject a deliverable if one or more technical errors or two or more minor errors are found within the deliverable. The rejected deliverable shall be corrected and resubmitted within ten business days of notification of Government rejection.

Surveillance will be conducted by the PMS/COR monitoring receipt of deliverables and noting acceptance/rejection.

Surveillance will be monitored quarterly and PARs issued as required. At a minimum, performance will be documented annually by the COR in the

CPAR.

Receipt of CDRL deliverable

4.2.8 There shall be no more than

one late submission(s) of deliverables per contract year.

The Contractor shall notify the Government if the delivery of any data/document will not meet the scheduled delivery date and negotiate a revised delivery date. The data/document shall be delivered by the revised delivery date acceptable to the Government.

Surveillance will be conducted by the PMS/COR monitoring receipt of deliverables and noting acceptance/rejection.

Surveillance will be monitored quarterly and PARs issued as required. At a minimum, performance will be documented annually by the COR in the

CPAR.

Contractor Manpower Reporting

5.7 Within 30 calendar days of

contract/order award, the Contractor shall establish a record for the contract/order in eCMRA including Order Data, Contact Data and Location Data.

Surveillance will be conducted by the COR monitoring eCMRA.

Surveillance will be documented annually by the COR in the PAR.

PR: FD2060-16-01191 QASP 5

The Contractor shall provide a count of contractor/subcontractor personnel performing services for each fiscal year and report all contractor/subcontractor labor hours required for performance of services for each fiscal year. All data shall be reported no later than October 31 of the following fiscal year.

Adherence to Contractor Quality Management System (QMS)

5.9 100% compliance with the QMS is required.

Surveillance will be conducted by the COR reviewing the contractor’s QMS to ensure that it is effective in bringing the desired results (performance is equal to or greater than the SS metrics).

Surveillance will be monitored quarterly and PARS issued as required. At a minimum, performance will be documented annually by the COR in the

CPAR.

2.2 COR Online File Documentation

The COR will establish and maintain an online file containing training and surveillance documentation (COR Profile and COR Online File in the CORT Tool). At a minimum, the following documentation will be uploaded in the CORT Tool by the COR or PCO as applicable.

a. COR INFORMATION (COR Profile):

Training and Appointment:

DAU CLC 222 Contracting Officers Representative (COR) Online Training DAU CLM 003 Overview of Acquisition Ethics DoD Combatting Trafficking in Persons for Acquisition & Contracting Professionals Wide Area Workflow training/iRAPT Overview QAPC-Led Training (Level C) Contract-Specific Training Refresher training

b. QASP

c. Designation of Contracting Officer’s Representative

d. Annual COR File Inspection Checklist(s)

PR: FD2060-16-01191 QASP 6

e. COR ONLINE FILE:

i. COR Status Reports/Surveillance:

PAR(s) CAR(s)

ii. COR Trip Reports (if applicable):

iii. COR Correspondence Reports:

Meeting Minutes Contractor correspondence

iv. Miscellaneous Documents:

Contract, including modifications (if not in EDA) PWS, including revisions (if not in EDA) Amended QASP DD Form 254 (if not in EDA) CDRL(s) (if not in EDA) CDRL/Deliverables (if not in WAWF) Contractor Safety Plan Applicable status report(s) Master/Delivery Schedules Customer Complaint Records CAV-AF Repair Item Actions Report(s) iRAPT report(s) and/or other documentation of Contractor payment (if not in WAWF)

2.3 Plan for Corrective Action

2.3.1 Unsatisfactory Contractor performance will result in the COR issuing a negative PAR. The COR will set a suspense date and forward the PAR to the PCO for submission to the Contractor.

The PCO will submit the PAR to the Contractor for corrective action. The Contractor shall explain the deficiency and identify the corrective action they shall take to resolve the deficiency and prevent recurrence. The Contractor shall sign and return a negative PAR to the PCO by the suspense date. The COR will upload the PAR in the CORT Tool under COR Status Reports.

2.3.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR will initiate the CAR process.

However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. The PCO will set a suspense date and submit the CAR to the Contractor for corrective action. The Contractor shall sign and return the CAR, with a corrective action plan, to the PCO for acceptance by the MFT by the suspense date. The corrective action will be tracked and documented until the deficiency is resolved to the satisfaction of the MFT.

The COR will upload the CAR in the CORT Tool under COR Status Reports. The CAR will become part of the PCO contract file. If the CAR process fails to resolve the deficiency, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order.

PR: FD2060-16-01191 QASP 7

2.3.3 CORs shall establish a tracking system for corrective actions that includes date COR submitted CAR to PM/FSM, date reviewed by PM/FSM, date reviewed by CO, date issued by CO, contractor’s identified root cause, proposed corrective action, contractor follow-up actions, and get-well date.

2.4 Acceptance of Services

2.4.1 The Contractor shall submit/process payment requests and receipt/acceptance documents via Wide Area WorkFlow e-Business Suite / Invoicing, Receipt, Acceptance, and Property Transfer (iRAPT). Services will be accepted by the COR.

2.4.2 CDRL deliverables may be submitted using iRAPT or be submitted directly to the MFT member identified on the CDRL. The CDRL will determine submittal requirements; however, separately priced data must be accepted in iRAPT in order for the Contractor to receive payment, and both separately priced and non-separately priced data must be accepted in iRAPT in order for the contract line item to be closed out.

3.0 Roles and Responsibilities of Multi-Functional Team (MFT)

3.1 General Responsibilities

3.1.1 The MFT is responsible for ensuring the acquisition utilizes Performance-Based Service(s) Acquisition (PBSA) methods including establishment of performance thresholds, procedures to evaluate Contractor performance and positive/negative incentives to encourage the highest quality of services.

3.1.2 The MFT is responsible for conducting surveillance of Contractor performance to ensure Government requirements including quality of services, cost and schedule are met. The MFT will provide the results of their surveillance to the Contracting Officer’s Representative (COR) for input into the Performance Assessment Report (PAR) and to the MFT member updating the Contractor Performance Assessment Reporting System (CPARS).

3.1.3 For contracts requiring higher-level quality requirements, the MFT is responsible for developing metrics in tracking the effectiveness of the contractors Quality Management System (QMS) that tie to the SS, QASP, and CPARS. Ensure contracts requiring higher-level contract quality requirements include a SS performance objective that encompasses MFT goals related to quality directly relates to the CPARS category of “Quality”.

3.1.4 The MFT ensures contract oversight focuses on the adequacy and adherence of the contractor to their proposed QMS. The MFT shall focus on whether the COR or contractor is first in detecting defects and trends, who (COR or contractor) accomplishes more inspections, and, whether the contractor is proactively pursuing key QMS functions to ensure quality related problems or defects do not recur.

3.2 Contracting Officer’s Representative (COR)

PR: FD2060-16-01191 QASP 8

3.2.1 Registers in Wide Area Workflow (WAWF) as a Contracting Officer Representative Tracking (CORT) Tool user. Self-nominates in the CORT Tool as the designated COR for the contract. If required, files an Office of Government Ethics (OGE) Form 450, Confidential Financial Disclosure Report. Establishes and maintains an online file containing training and surveillance documentation (COR Profile and COR Online File in the CORT Tool).

3.2.2 Registers for an Enterprise Contractor Manpower Reporting Application (eCMRA) account after designation as a COR. No later than 60 calendar days after contract/order award, verifies the Contractor has established a record for the contract/order in eCMRA. Reviews and, if required, corrects the Contractor record (Order Data, Contact Data, Location Data, etc.). Enters the National Defense Authorization Act (NDAA) Elements and the Fund Cite Data. Verifies the Contractor has reported all data for each fiscal year, including an annual count of contractor/subcontractor personnel performing services and the total of contractor/subcontractor labor hours, no later than October 31 of the following fiscal year.

3.2.3 Works with the MFT in conducting and documenting surveillance on Contractor performance. Reports unethical conduct and instances of fraud, waste and/or abuse to the Procuring Contracting Officer (PCO). Inspects and accepts/rejects deliverables during contract/order performance and at close-out to ensure contract/order terms and conditions are met. Develop an inspection schedule that shall comprise of at least ten percent of non-services summary items, but no more than twenty percent. Monitors control and disposition of Government property. Monitors Contractor payment and verifies it is commensurate with Contractor performance. Documents Contractor performance via PARs, Corrective Action Report(s) (CAR), etc. Surveillance will be monitored quarterly and PARs issued as required.

3.2.4 Ensure contractor’s accepted Quality Management System (QMS) complies with contract requirements. In post award, CORs need to place special emphasis in ensuring the contractor’s QMS is being followed as written, plus is effective in bringing about the desired results – performance equal to or greater than the SS metrics, plus an inspection and corrective action program that identifies and fixes issues without having to be identified by the Government.

3.3 Contracting Officer’s Representative (COR) Supervisor

3.3.1 Upon PCO request for COR support, selects a qualified nominee. Confirms the COR nominee has no personal conflicts of interest with performing the responsibilities to be delegated by the PCO. Verifies the COR nominee has the appropriate clearance for the contract/order. If required, ensures the COR nominee files an OGE Form 450. Ensures the COR takes initial, annual and any additional training required by the contracting activity. Ensures the COR completes 16 hours of refresher training every three years after completion of the QAPC-Led Training.

3.3.2 Ensures the COR registers in WAWF as a CORT Tool user. Ensures the COR self-nominates as the designated COR for the contract in the CORT Tool. Upon notification of the COR self-nomination, approves the nomination in the CORT Tool. Reviews the COR Profile

PR: FD2060-16-01191 QASP 9

and COR Online File, at a minimum, annually. Considers performance of COR duties in their appraisal.

3.4 Procuring Contracting Officer (PCO)

3.4.1 Only individual authorized to enter into contracts for supplies and/or services by obligating the Government. Determines if a COR is required to conduct/document surveillance of Contractor performance. If the requiring activity has not initiated a COR nomination in the CORT Tool, submits a Request for Contracting Officer’s Representative Support memorandum to the requiring activity. Determines whether a COR is required to file an OGE Form 450.

Provides Contract-Specific Training to the COR.

3.4.2 Upon notification of COR Supervisor approval of the COR self-nomination, approves the nomination in the CORT Tool. Before contract/order award, submits a Designation of Contracting Officer’s Representative memorandum to the COR and Contractor for signature thereby ensuring the Contractor is notified of the COR assigned to the contract/order and their areas of responsibility and limitation of authority. Uploads the Designation memorandum in the CORT Tool under Contracting Officer / Appointment Letter. Upon transfer/termination of the COR, issues a Revocation (Termination) of Designation of Contracting Officer’s Representative memorandum. Uploads the Termination memorandum in the CORT Tool under COR Revocation.

3.4.3 After the COR is designated, uploads a blank copy the COR File Annual Checklist to the CORT Tool under Annual COR File Inspection Checklist to guide the COR in constructing the COR Online File. Reviews the COR reports on Contractor performance in the CORT Tool.

Approves/Rejects PARS and any CAR(s). Reviews the COR Profile and COR Online File, at a minimum, annually. Documents the results of their review on the Annual COR File Inspection Checklist. Uploads the checklist in the CORT Tool under Annual COR File Inspection Checklist.

3.5 Program Manager (PM): Responsible for overall program. Serves as MFT lead. Works with the MFT to identify Government requirements and prepare Purchase Request (PR) package. Prepares and submits Contractor Performance Assessment Reports (CPAR).

3.6 Engineer: Works with MFT in conducting market research. Responsible for providing technical and engineering support to IPT members as required. Prepares market research report. Prepares Air Force Materiel Command (AFMC) Form 807, Recommended Quality Assurance Provisions and Special Inspection Requirements. Prepares technical Department of Defense (DD) Form 1423- 1(s), Contract Data Requirements List (CDRL). Works with MFT in developing other technical requirements for PR package. Requests, reviews and approves Engineering Change Proposal(s)

(ECP).

3.7 Production Management Specialist (PMS) - Seller: Is responsible for initiation, preparation, and coordination of non-organic funding documents (i.e. PR, MIPR, etc.) for repair requirements with IPT members. Ensures funding documents comply with applicable guidance and policy. Coordinates and informs IPT of any contractor repair issues. Provide repair-related support to IPT members to includes, but are not limited to; file maintenance, budget preparation, program reviews.

PR: FD2060-16-01191 QASP 10

3.8 Inventory Management Specialist (IMS): Coordinates customer issues with IPT as needed to provide response to customer. Initiate and coordinate in conjunction with IPT members all cataloging and disposal actions. Identifies the requirement(s) and initiates, prepares, and coordinates funding documents (i.e. PR, MIPR) for buys and passes the repair requirements to PMS Buyer. Provide item-related support to IPT members. Examples include, but are not limited to, identifying requirement, file maintenance, budget/requirement review, budget preparation, and other program reviews.

3.9 Equipment Specialist (ES): Responsible for reporting all technical issues to the IPT. Primary point of contact for configuration control and configuration management. Responsible for technical documentation updates and accuracy and identifying such to the IPT. Examples include, but are not limited to, Time Compliance Technical Orders (TCTOs), Technical Orders (TOs), AFTO 22s, 202s and 252s, etc. Provides technical support to the IPT including but not limited to the following; file maintenance and requirements methodology, failure data analyses via maintenance data documentation, configuration management, provisioning, Deficiency Report resolution via Material Improvement Project (MIP), IDEA evaluation and implements enhancements or modifications.

3.10 Quality Assurance Program Coordinator (QAPC)

3.10.1 Supports the MFT in the development of the contract/order quality assurance requirements specifically ensuring the requirements are clearly stated and enforceable. Prior to contract/order award, provides training to CORs and COR management [e.g., FC/FD. COR supervisor, etc.]

3.10.2 Provides functional, not technical, support for CORT Tool users including assistance with registration, role activation and CORT Tool training. Monitors records of COR and COR management training in the CORT Tool.

3.11 Contractor

3.11.1 Participates as a member of the MFT upon approval of the Justification & Approval (J&A) or Sole Source Justification (SSJ) if the acquisition is sole source and upon contract/order award if it is competitive.

3.11.2 The Contractor shall ensure the quality of services through a quality and/or inspection system. In order to meet the government’s quality requirements, a contractor’s QMS should be robust enough and resourced adequately to execute four key quality functions: 1) Detection of quality program problems and defects; 2) Identification of root causes for quality related problems/defects; 3) Correction of root causes related to detected problems/defects; and, 4) Follow-up to ensure quality related problems/defects do not recur; a mature QMS requires the contractor be the proactive party on quality issues. The goal is to obtain performance reflective of continuous improvement with no reliance on COR’s surveillance to detect problems/defects, determine root causes, or ensure quality related problems/defects do not recur.

3.11.3 Maintains an inspection process acceptable to the Government and records of inspections, which shall be made available to the Government as long as the contract requires in accordance with the Inspection of Supply/Services clause(s) identified in the contract/order.

PR: FD2060-16-01191 QASP 11

3.11.4 Signs and returns a positive PAR within five business days. Signs and returns a negative PAR with corrective action identified by the suspense date. Signs and returns a CAR with a corrective action plan by the suspense date.

3.11.5 Establishes a record for the contract/order in eCMRA no later than 30 calendar days after contract/order award. Enters Order Data, Contact Data and Location Data. Provides an annual count of contractor/subcontractor personnel performing services for each fiscal year if the Department of Defense (DoD) is the requiring activity, if the acquisition is using United States (U.S.) Government appropriated funds, and if the acquisition is in excess of $3,000,000.00.

Reports all Contractor labor hours, including subcontractor labor hours, required for performance of the services provided under the contract/order for each fiscal year in eCMRA.

3.12 Functional Commander/Functional Director (FC/FD)

The Functional Commander or civilian equivalent has determined these services are not mission-essential and will not continue in the event of a crisis. Reference PWS and QASP signature page.

4.0 Management Strategy

4.1 The MFT will meet and record minutes quarterly to review contractor’s performance. The COR will issue PARs, documenting both satisfactory and unsatisfactory Contractor performance, at a minimum, annually. The COR will forward the PAR to the PCO for submission to the Contractor. The PCO will submit the PAR to the Contractor. The Contractor shall sign and return a positive PAR to the PCO within five business days. The COR will upload the PAR in the CORT Tool under COR Status Reports. Unsatisfactory Contractor performance will result in the COR issuing a negative PAR.

4.2 If repetitive negative PARs or a single negative PAR identifying critical Contractor non-compliance are issued without satisfactory resolution, the COR will issue a CAR. However, the MFT reserves the right to issue a CAR at any time based on the severity of the Contractor non-compliance. If the CAR process fails to resolve the unsatisfactory Contractor performance, the PCO has the right to invoke the Inspection of Supply/Services clause(s) identified in the contract/order

4.3 Incentives

4.3.1 If Contractor performance meets or exceeds contractual requirements, positive incentives may include, but are not limited to, decreased surveillance, favorable CPARs and exercising options.

4.3.2 If Contractor performance does not meet contractual requirements, negative incentives may include, but are not limited to, increased surveillance, unfavorable CPARs, not exercising options and Government recourse authorized by the Inspection of Supply/Services clause(s) identified in the contract/order

PR: FD2060-16-01191 QASP 12

5.0 Annual COR Online File Inspection: The COR, the COR Supervisor and the PCO will review the COR Profile and COR Online File, at a minimum, annually. The PCO will document the results of their review on the Annual COR File Inspection Checklist. After the COR and COR supervisor sign the checklist, the PCO will upload the checklist in the CORT Tool under Annual COR File Inspection Checklist.

6.0 Contractor Performance Assessment Reporting System (CPARS): The total estimated value of the contract exceeds $1,000,000.00; therefore, CPARS reporting is required.

6.1 The MFT will evaluate Contractor performance. The COR will, at a minimum, review the PARs and other information contained in the COR Online File to prepare and substantiate the CPAR. CPARS will be updated, at a minimum annually, documenting Contractor performance for the contract/order. More frequent updates may be made, as required, to document a significant improvement or decline in the level of Contractor performance.

6.2 The Contractor shall have input into the CPAR prior to it being finalized. For each reporting period, the COR will provide the Contractor a draft CPAR with no ratings, only justifications, to examine for seven calendar days. After MFT review of the Contractor’s response, the CPAR will be coordinated through management up to the Division level. Once approved, the CPAR will be sent to the Contractor via CPARS for the official 60 calendar day review. The Contractor shall have the option to concur or non-concur, with comments, via CPARS.

6.3 In evaluating the quality of contractor’s performance, the following performance ratings are used in documenting past performance. The areas rated may include: Quality of Service, Business Relations, Management, Cost Control (if applicable), and Schedule.

Performance Rating

Criteria

Exceptional Performance meets contractual requirements and exceeds many to the government’s benefits. The contractual performance of the element or sub-element being assessed was accomplished with no problems and contractor actions were highly effective.

Very Good Performance meets contractual requirements and exceeds some to the government benefits. The contractual performance was accomplished with few minor problems for which corrective actions taken by the contractor were effective.

Satisfactory Performance meets contractual requirements. The contractual performance contains some minor problems for which corrective actions taken by the contractor were satisfactory.

Marginal Performance does not meet some contractual requirements. The contractual performance reflects a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear marginally effective or were not fully implemented.

Unsatisfactory Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance contains serious problem(s) for which the contractor’s corrective actions appear or were ineffective.

PR: FD2060-16-01191 QASP 13

7.0 Safety Requirements

7.1 Mishap Notification/Investigation: The Contractor shall report mishaps including damage to DoD property; occupational illness to DoD military or civilian personnel; injury to on- or off-duty DoD military personnel; injury to on-duty DoD civilian personnel; and damage to public or private property or injury or illness to non-DoD personnel caused by Government operations.

The Contractor shall ensure the Safety Office and the PCO are notified of mishaps. The Contractor shall contact the MFT (COR, if available, or another MFT member) by telephone within 48 business hours. The Contractor shall cooperate with Government safety investigations.

7.2 MFT Surveillance: MFT member(s) will report any potential safety hazards or actual mishaps to the COR. The COR will monitor Contractor reporting and review any mishap notifications. The COR will address safety and/or health issues in the PAR or in a CAR as applicable.

8.0 Trafficking in Persons: The MFT must inform the PCO if the contractor/subcontractor fails to comply with the requirements of FAR 52.222.50, Combating Trafficking in Persons. The PCO must convey the information to DoD Combat Trafficking in Persons (CTIP) Law Enforcement and Support / Office of the Under Secretary of Defense (OUSD) Personnel and Readiness (P&R) Defense Human Resources Activity (DHRA).

PR: FD2060-16-01191 QASP 14

9.0 Signatures

By signing below, you are appointed to the MFT for this acquisition and accept the above responsibilities.

X Helen Porter, QAPC, 16-01191

AFSC/PZCA 478-222-1136

COR Date Kimberly Urzua

COR Supervisor Date Wesley Lister

PCO Date John Middlebrooks

Contractor Date Crane Electronics, Inc.

By signing below, you are identifying that these services are not mission-essential.

Functional Director Date Levern Keels

2018-05-21T15:52:28-0400
MIDDLEBROOKS.JOHN.W.1065249908

File details come from the government source that posted it.