STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

4. SOLICITATION NUMBER

FA8509-15-R-94201

6.SOLICITATION ISSUE DATE

8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR

SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)

ELIGIBLE UNDER THE WOSB PROGRAM

HUBZONE SMALL

BUSINESS EDWOSB

SERVICE-DISABLED VETERAN-

OWNED SMALL BUSINESS NAICS CODE: 541330

8(A) SIZE STANDARD: $15.00

DATE SIGNED

28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER

SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH

ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

ROUTINE

Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 90 days.

SEE LINE ITEM SCHEDULE

22.

AMOUNT

16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253

FULL AND OPEN COMPETITION (c) (1 ) (c) ( )

DATE SIGNED

27. SIGNATURE OF OFFEROR/CONTRACTOR

20.

UNIT

21.

UNIT PRICE

19.

QUANTITY

13. CONTRACTOR OFFEROR CODE FACILITY CODE

11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR

DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9

ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS

SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND

CONDITIONS STATED HEREIN. *90

RATING

DO: A1

3. AWARD/EFFECTIVE DATE

FA8509

2. CONTRACT NO.

X

CHECK IF REMITTANCE IS DIFFERENT

AND PUT SUCH ADDRESS IN OFFER

17.

ITEM NO.

12. ADMINISTERED BY CODE

Total

SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14

SCD:B

NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER

24. AWARD AMOUNT (FOR GOVT USE ONLY)

23. ACCOUNTING AND APPROPRIATION DATA

SEE SCHEDULE

5. SOLICITATION TYPE

SEALED BIDS NEGOTIATED

(IFB) (RFP)

15. PROMPT PAY DISCOUNT

25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH

OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT

THE TERMS AND CONDITIONS SPECIFIED HEREIN.

10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)

SUPPLIES SERVICES Engineering Services

9.

Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.

21-MAY-2015 4:30PM

X

18.

SCHEDULE OF SUPPLIES/SERVICES

14. PAYMENT WILL BE MADE BY CODE

X

7. ISSUED BY CODE

SOF/PR - FIXED WING & ENG SUPPORT, AFLCMC/WIUKA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 2208

ROBINS AFB GA 31098-1670

BUYER: Jarteau C. Hodges Jarteau.Hodges@robins.af.mil Phone: (478) 222- 0441 Fax: (000 No Collect Calls

X

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT

BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.

JSU

SF 1447 (rev 2/2012) BACK

NO RESPONSE FOR THE REASONS CHECKED

TYPE OR PRINT NAME AND TITLE OF SIGNER

SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)

WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF

ITEMS INVOLVED

WE DO

OTHER (Specify)

CANNOT COMPLY WITH SPECIFICATIONS

CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT

FOLD

FOLD

SOLICITATION NO. FA850915R94201

DUE: 21 MAY 2015 4:30 PM

FROM: AFFIX

STAMP

HERE

TO:

ATTN: Jarteau C Hodges

SOF/PR - FIXED WING & ENG SUPPORT, AFLCMC/WIUKA

235 BYRON ST STE 19A

BLDG 300 CML PHN 478 926 2208

ROBINS AFB GA 31098-1670

Request for Proposal FA8509-15-R-94201

PART I - THE SCHEDULE

SECTION B

SUPPLIES OR SERVICES AND PRICES/COSTS

LOGISTICS SUPPORTABILITY ANALYSIS (LSA)

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Logistics Supportability Analysis (LSA) AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0001

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

CONFIGURATION MANAGEMENT

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Configuration Management AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0002

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

CONFIGURATION MANAGEMENT

1 LO *36 Months

Proposed Period of Performance

1 LO

PROGRAM MANAGEMENT SUPPORT

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Program Management Support AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0003

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

ENGINEERING DATA

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Engineering Data AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0004

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

ENGINEERING DATA

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

PROVISIONING SUPPORT

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Provisioning Support AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0005

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

TECHNICAL DATA DEVELOPMENT

Item No.

Cost Plus Fixed Fee Quantity U/I Estimated Cost Fixed Fee Est Total Cost

1 LO

R425 Technical Data Development AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0006

Class I ODS Substance Application/Use Quantity None

TECHNICAL DATA DEVELOPMENT

Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

DATA AND TECHNICAL MANUAL

Item No.

DATA

IAW DD-1423 attached Associated Document(s) Line Item(s)

FD20601594201 0007

Exhibit: A

MONTHLY STATUS REPORT

Item No.

0007AA

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

MONTHLY STATUS REPORT ELIN: A002

DATA ACQUISITION DOCUMENT NO: DI-MGMT-80368A IAW PWS para. 4.4.2, 4.6.1 and 4.6.4

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

ERIN.TAYLOR.1@ROBINS.AF.MIL (IAW DD1423-1)

FOR PURPOSES OF WAWF, UTILIZE DODAAC FA8509 AS SHIP TO.

LOGISTICS PRODUCT DATA

Item No.

0007AB

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

LOGISTICS PRODUCT DATA ELIN: A003

DATA ACQUISITION DOCUMENT NO: DI-SESS-81758/T IAW PWS para. 4.4.4 and 4.6.6

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

ENGINEERING DATA FOR PROVISIONING

0007AC

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

ENGINEERING DATA FOR PROVISIONING ELIN: A004

DATA ACQUISITION DOCUMENT NO: DI-SESS-81874 IAW PWS para. 4.4.4 and 4.6.7

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

LOGISITICS PRODUCT DATA SUMMARIES

0007AD

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

LOGISTICS PRODUCT DATA SUMMARIES ELIN: A005

DATA ACQUISITION DOCUMENT NO: DI-SESS-81759/T IAW PWS para. 4.4.4, 4.4.4.1 and 4.6.8

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR)

0007AE

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR) ELIN: A006

DATA ACQUISITION DOCUMENT NO: TM-86-01N IAW PWS para. 4.4.7

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

TECHNICAL MANUAL CONTRACT REQUIREMENT (TMCR)

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

MEETING AGENDA

0007AF

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

MEETING AGENDA ELIN: A007

DATA ACQUISITION DOCUMENT NO: DI-ADMN-81249A IAW PWS para. 4.5, 4.5.1, 4.5.2, 4.5.3, 4.5.4, 4.5.5, 4.5.6 and 4.6.3

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

MEETING MINUTES

0007AG

Firm Fixed Price

MEETING MINUTES

Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

MEETING MINUTES ELIN: A008

DATA ACQUISITION DOCUMENT NO: DI-MGMT-81250A IAW PWS para. 4.5, 4.5.1, 4.5.2, 4.5.3, 4.5.4, 4.5.5, 4.5.6 and 4.6.3

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

CONTRACT FUNDS STATUS REPORT

0007AH

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

CONTRACT FUNDS STATUS REPORT ELIN: A009

DATA ACQUISITION DOCUMENT NO: DI-MGMT-81468/T IAW PWS para. 4.4.2

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

INTERGRATED PROGRAM MANAGEMENT REPORT

0007AJ

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

INTEGRATED PROGRAM MANAGEMENT REPORT ELIN: A011

DATA ACQUISITION DOCUMENT NO: DI-MGMT-81861/T IAW PWS para. 4.6.5

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

ENVIRONMENTAL HEALTH AND SAFETY PLAN (HSP)

0007AK

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

ENVIRONMENTAL HEALTH AND SAFETY PLAN (HSP) ELIN: A012

DATA ACQUISITION DOCUMENT NO: DI-ENVR-81375/T IAW PWS para. 5.5.4.1

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS

0007AL

Firm Fixed Price Quantity U/I Unit Price Amount

1 LO

DATA

PRODUCT DRAWINGS/MODELS AND ASSOCIATED LISTS ELIN: A001

DATA ACQUISITION DOCUMENT NO: DI-SESS-81000E/T IAW PWS para. 4.4.1 and 4.6.4

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required

ENGINEERING DRAWING TREE

0007AM

Firm Fixed Price Quantity U/I Unit Price Amount 1 LO Not Separately Priced Not Separately Priced

DATA

ENGINEERING DRAWING TREE ELIN: A00C

DATA ACQUISITION DOCUMENT NO: DI-DRPR-81961 IAW PWS para. 4.4.1.3

IAW DD-1423 ATTACHED

Associated Document(s) Line Item(s)

FD20601594201 0007

Limitations of Liability: Other Than High Value Item

ENGINEERING DRAWING TREE

Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: IAW DD-1423

* 10 DAYS ALLOWED FOR GOVERNMENT APPROVAL/DISAPPROVAL

SUBMIT ONE COPY ELECTRONICALLY TO CINDY.HALL@US.AF.MIL AND

TRAVEL

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R425 Travel AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0008

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

MATERIAL

Item No.

Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost

1 LO

R425

MATERIAL

Material AC-130J Precision Strike Package (PSP) IAW PWS dated 22 Aug 2014 Applicable to the AC-130J Associated Document(s) Line Item(s)

FD20601594201 0009

Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO From Date of Award to Date of Completion

_ Req No / Pri

Required Period of Performance

1 LO *36 Months

Proposed Period of Performance

1 LO

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

INSPECTION AND ACCEPTANCE (SEP 1999)

(IAW FAR 46.401(b), FAR 46.503) Government Contract Quality Assurance Inspection and Acceptance will be at destination(s) specified herein (Final).

Item No(s): 0007AA, 0007AB, 0007AC, 0007AD, 0007AE, 0007AF, 0007AG, 0007AH, 0007AJ, 0007AK, 0007AL, 0007AM

PART I - THE SCHEDULE

SECTION F

DELIVERIES OR PERFORMANCE

52.211-8 TIME OF DELIVERY (JUN 1997)

(IAW FAR 11.404(a)(2)) DELIVERY FOR EACH ITEM IS ANNOTATED IN THE SCHEDULE (PART I SECTION B) UNDER EACH LINE

ITEM.

52.242-15 STOP-WORK ORDER (AUG 1989)

(IAW FAR 42.1305(b)(1))

52.242-15 STOP-WORK ORDER -- ALTERNATE I (APR 1984)

(IAW FAR 42.1305(b)(2))

52.242-17 GOVERNMENT DELAY OF WORK (APR 1984)

(IAW FAR 42.1305(c))

52.247-34 F.O.B. DESTINATION (NOV 1991)

(IAW FAR 47.303-6(c))

PART II - CONTRACT CLAUSES

SECTION I

CONTRACT CLAUSES

252.201-7000 CONTRACTING OFFICER'S REPRESENTATIVE (DEC 1991)

(IAW DFARS 201.602-70)

5352.201-9101 OMBUDSMAN (NOV 2014)

(IAW AFFARS 5301.9103)

(c) If resolution cannot be made by the contracting officer, interested party may contact the ombudsman, Kim McDonald at 478 222 -1088 , FAX 478 222 -1855 , email kimberly.mcdonald@us.af.mil . Concerns, issues, disagreements, and recommendations that cannot be resolved at the Center/MAJCOM/DRU/HQ AFICA/SMC ombudsman level, may be brought by the interested party for further consideration to the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.

52.202-1 DEFINITIONS (NOV 2013)

(IAW FAR 2.201)

52.203-3 GRATUITIES (APR 1984)

(IAW FAR 3.202)

52.203-5 COVENANT AGAINST CONTINGENT FEES (MAY 2014)

(IAW FAR 3.404)

52.203-6 RESTRICTIONS ON SUBCONTRACTOR SALES TO THE GOVERNMENT (SEP 2006)

(IAW FAR 3.503-2)

52.203-7 ANTI-KICKBACK PROCEDURES (MAY 2014)

(IAW FAR 3.502-3)

52.203-8 CANCELLATION, RESCISSION, AND RECOVERY OF FUNDS FOR ILLEGAL OR

IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(a))

52.203-10 PRICE OR FEE ADJUSTMENT FOR ILLEGAL OR IMPROPER ACTIVITY (MAY 2014)

(IAW FAR 3.104-9(b))

52.203-12 LIMITATION ON PAYMENTS TO INFLUENCE CERTAIN FEDERAL TRANSACTIONS

(OCT 2010)

(IAW FAR 3.808(b))

52.203-13 CONTRACTOR CODE OF BUSINESS ETHICS AND CONDUCT (APR 2010)

(IAW FAR 3.1004(a))

252.203-7000 REQUIREMENTS RELATING TO COMPENSATION OF FORMER DOD OFFICIALS

(SEP 2011)

(IAW DFARS 203.171-4(a), DFARS 212.301(f)(ii))

252.203-7001 PROHIBITION ON PERSONS CONVICTED OF FRAUD OR OTHER

DEFENSE-CONTRACT-RELATED FELONIES (DEC 2008)

(IAW DFARS 203.570-3)

252.203-7002 REQUIREMENT TO INFORM EMPLOYEES OF WHISTLEBLOWER RIGHTS

(SEP 2013)

(IAW DFARS 203.970)

252.203-7003 AGENCY OFFICE OF THE INSPECTOR GENERAL (DEC 2012)

(IAW DFARS 203.1004(a), DFARS 212.301(f)(iii))

252.203-7004 DISPLAY OF FRAUD HOTLINE POSTERS (JAN 2015)

(IAW FAR 203.1004(b)(2)(ii))

(b) Display of fraud hotline poster(s).

(2) If the contract is funded, in whole or in part, by Department of Homeland Security (DHS) disaster relief funds, the DHS fraud hotline poster shall be displayed in addition to the DoD fraud hotline poster. If a display of a DHS fraud hotline poster is required, the Contractor may obtain such poster from:

[Contracting Officer shall insert the appropriate DHS contact information or Web site.]

252.203-7999 PROHIBITION ON CONTRACTING WITH ENTITIES THAT REQUIRE CERTAIN

INTERNAL CONFIDENTIALITY AGREEMENTS (DEVIAITON 2015-O0010) (FEB 2015)

(IAW DARS Tracking # 2015-O0010)

52.204-4 PRINTED OR COPIED DOUBLE-SIDED ON RECYCLED PAPER (MAY 2011)

(IAW FAR 4.303)

52.204-10 REPORTING EXECUTIVE COMPENSATION AND FIRST-TIER SUBCONTRACT

AWARDS (JUL 2013)

(IAW FAR 4.1403(a))

52.204-18 COMMERCIAL AND GOVERNMENT ENTITY CODE MAINTENANCE (NOV 2014)

(IAW FAR 4.1804(c), FAR 12.301(d))

52.204-19 INCORPORATION BY REFERENCE OF REPRESENTATIONS AND CERTIFICATIONS

(DEC 2014)

(IAW FAR 4.1202(b))

252.204-7003 CONTROL OF GOVERNMENT PERSONNEL WORK PRODUCT (APR 1992)

(IAW DFARS 204.404-70(b))

252.204-7012 SAFEGUARDING OF UNCLASSIFIED CONTROLLED TECHNICAL INFORMATION

(NOV 2013)

(IAW DFARS 204.7304, DFARS 212.301(f)(vi))

252.204-7015 DISCLOSURE OF INFORMATION TO LITIGATION SUPPORT CONTRACTORS

(FEB 2014)

(IAW DFARS 204.7403(c), DFARS 212.301(f)(ix))

252.205-7000 PROVISION OF INFORMATION TO COOPERATIVE AGREEMENT HOLDERS

(DEC 1991)

(IAW DFARS 205.470, DFARS 212.301(f)(x))

52.209-6 PROTECTING THE GOVERNMENT'S INTEREST WHEN SUBCONTRACTING WITH

CONTRACTORS DEBARRED, SUSPENDED, OR PROPOSED FOR DEBARMENT

(AUG 2013)

(IAW FAR 9.409)

52.209-9 UPDATES OF PUBLICLY AVAILABLE INFORMATION REGARDING

RESPONSIBILITY MATTERS (JUL 2013)

(IAW FAR 9.104-7(c))

252.209-7004 SUBCONTRACTING WITH FIRMS THAT ARE OWNED OR CONTROLLED BY THE

GOVERNMENT OF A COUNTRY THAT IS A STATE SPONSOR OF TERRORISM

(DEC 2014)

(IAW DFARS 209.409)

52.211-15 DEFENSE PRIORITY AND ALLOCATION REQUIREMENTS (APR 2008)

(IAW FAR 11.604(b))

This is a rated order certified for national defense , emergency preparedness, and energy program use, and the Contractor shall follow all the requirements of the Defense Priorities and Allocations System regulation (15 CFR 700).

252.211-7007 REPORTING OF GOVERNMENT-FURNISHED PROPERTY (AUG 2012)

(IAW DFARS 211.274-6(b), DFARS 212.301(f)(xiv))

52.215-2 AUDIT AND RECORDS--NEGOTIATION (OCT 2010)

(IAW FAR 15.209(b)(1))

52.215-8 ORDER OF PRECEDENCE--UNIFORM CONTRACT FORMAT (OCT 1997)

(IAW FAR 15.209(h), AFFARS 53.15.209(h))

52.215-10 PRICE REDUCTION FOR DEFECTIVE CERTIFIED COST OR PRICING DATA

(AUG 2011)

(IAW FAR 15.408(b))

52.215-12 SUBCONTRACTOR CERTIFIED COST OR PRICING DATA (OCT 2010)

(IAW FAR 15.408(d))

52.215-14 INTEGRITY OF UNIT PRICES (OCT 2010)

(IAW FAR 15.408(f)(1))

52.215-15 PENSION ADJUSTMENTS AND ASSET REVERSIONS (OCT 2010)

(IAW FAR 15.408(g))

52.215-18 REVERSION OR ADJUSTMENT OF PLANS FOR POSTRETIREMENT BENEFITS

(PRB) OTHER THAN PENSIONS (JUL 2005)

(IAW FAR 15.408(j))

52.215-19 NOTIFICATION OF OWNERSHIP CHANGES (OCT 1997)

(IAW FAR 15.408(k))

52.215-21 REQUIREMENTS FOR CERTIFIED COST OR PRICING DATA AND DATA OTHER

THAN CERTIFIED COST OR PRICING DATA--MODIFICATIONS (OCT 2010)

(IAW FAR 15.408(m))

52.215-23 LIMITATIONS ON PASS-THROUGH CHARGES (OCT 2009)

(IAW FAR 15.408(n)(2))

252.215-7000 PRICING ADJUSTMENTS (DEC 2012)

(IAW DFARS 215.408(1))

252.215-7002 COST ESTIMATING SYSTEM REQUIREMENTS (DEC 2012)

(IAW DFARS 215.408(2))

52.216-7 ALLOWABLE COST AND PAYMENT (JUN 2013)

(IAW FAR 16.307(a))

(a) Invoicing.

(3) The designated payment office will make interim payments for contract financing on the _**** day

52.216-8 FIXED FEE (JUN 2011)

(IAW FAR 16.307(b))

52.216-11 COST CONTRACT--NO FEE (APR 1984)

(IAW FAR 16.307(e)(1))

52.216-18 ORDERING (OCT 1995)

(IAW FAR 16.506(a))

(a) Such orders may be issued from .

52.216-19 ORDER LIMITATIONS (OCT 1995)

(IAW FAR 16.506(b))

(a) Minimum order. When the Government requires supplies or services covered by this contract in an amount of less than $100.00 , the Government is not obligated to purchase, nor is the Contractor obligated to furnish, those supplies or services under the contract.

(b) Maximum order. The Contractor is not obligated to honor--

(1) Any order for a single item in excess of $18,000,000.00;

(2) Any order for a combination of items in excess of $18,000.000.00; or

(3) A series of orders from the same ordering office within 30 days that together call for quantities exceeding the limitation in subparagraph (b)(1) or (2) of this section.

(c) If this is a requirements contract (i.e., includes the Requirements clause at subsection 52.216-21 of the Federal Acquisition Regulation (FAR)), the Government is not required to order a part of any one requirement from the Contractor if that requirement exceeds the maximum-order limitations in paragraph (b) of this section.

(d) Notwithstanding paragraphs (b) and (c) of this section, the Contractor shall honor any order exceeding the maximum order limitations in paragraph (b), unless that order (or orders) is returned to the ordering office within 30 days after issuance, with written notice stating the Contractor's intent not to ship the item (or items) called for and the reasons. Upon receiving this notice, the Government may acquire the supplies or services from another source.

(The above Clause/Provision has been modified.)

52.219-8 UTILIZATION OF SMALL BUSINESS CONCERNS (MAY 2014)

(IAW FAR 19.708(a))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN -- ALTERNATE II (OCT 2001)

(IAW FAR 19.708(b)(1))

52.219-9 SMALL BUSINESS SUBCONTRACTING PLAN (DEVIATION 2013-O0014)

(AUG 2013)

(IAW DARS Tracking # 2013-O0014)

(2) SSR.

(i) Reports submitted under individual contract plans—

[DFARS Deviation language:]

(C) If a prime Contractor and/or subcontractor is performing work for more than one executive agency, a separate report shall be submitted to each executive agency covering only that agency’s contracts, provided at least one of that agency’s contracts is over $650,000 (over $1.5 million for construction of a public facility) and contains a subcontracting plan. For DoD, a consolidated report shall be submitted for all contracts awarded by military departments/agencies and/or subcontracts awarded by DoD prime Contractors.

(D) The consolidated SSR shall be submitted annually for the twelve month period ending September 30. The report is due 30 days after the close of the reporting period.

52.219-16 LIQUIDATED DAMAGES--SUBCONTRACTING PLAN (JAN 1999)

(IAW FAR 19.708(b)(2))

52.219-28 POST-AWARD SMALL BUSINESS PROGRAM REREPRESENTATION (JUL 2013)

(IAW FAR 19.309(c))

(g) If the Contractor does not have representations and certifications in SAM, or does not have a representation in SAM for the NAICS code applicable to this contract, the Contractor is required to complete the following rerepresentation and submit it to the contracting office, along with the contract number and the date on which the rerepresentation was completed:

The Contractor represents that it [ ] is, [ ] is not a small business concern under NAICS Code _____________ assigned to contract number ______________________________.

[Contractor to sign and date and insert authorized signer's name and title].

252.219-7003 SMALL BUSINESS SUBCONTRACTING PLAN (DoD CONTRACTS) (DEVIATION

2013-O0014) (AUG 2013)

(IAW DARS Tracking # 2013-O0014)

This clause supplements the Federal Acquisition Regulation 52.219-9, Small Business Subcontracting Plan, clause of this contract.

(a) Definitions.

"Historically black colleges and universities," as used in this clause, means institutions determined by the Secretary of Education to meet the requirements of 34 CFR Section 608.2. The term also means any nonprofit research institution that was an integral part of such a college or university before November 14, 1986.

"Minority institutions," as used in this clause, means institutions meeting the requirements of Section 1046(3) of the Higher Education Act of 1965 (20 U.S.C. 1135d-5(3)). The term also include Hispanic-serving institutions as defined in Section 316(b)(1) of such Act (20 U.S.C. 1059c(b)(1)).

“Summary Subcontract Report (SSR) Coordinator,” means the individual who is registered in eSRS at the Department of Defense (9700).

(b) Except for company or division-wide commercial items subcontracting plans, the term "small disadvantaged business," when used in the FAR 52.219-9 clause, includes historically black colleges and universities and minority institutions, in addition to small disadvantaged business concerns.

(c) Work under the contract or its subcontracts shall be credited toward meeting the small disadvantaged business concern goal required by paragraph (d) of the FAR 52.219-9 clause when:

(1) It is performed on Indian lands or in joint venture with an Indian tribe or a tribally-owned corporation, and

(2) It meets the requirements of 10 U.S.C. 2323a.

(d) Subcontracts awarded to workshops approved by the Committee for Purchase from People Who are Blind or Severely Disabled (41 U.S.C. 8502-8504), may be counted toward the Contractor s small business subcontracting goal.

(e) A mentor firm, under the Pilot Mentor-Protege Program established under section 831 of Pub. L. 101-510, as amended, may count toward its small disadvantaged business goal, subcontracts awarded--

(1) Protege firms which are qualified organizations employing the severely disabled; and

(2) Former protege firms that meet the criteria in Section 831(g)(4) of Pub. L. 101-510.

(f) The master plan is approved by the Contractor's cognizant contract administration activity.

(g) In those subcontracting plans which specifically identify small businesses, the Contractor shall notify the Administrative Contracting Officer of any substitutions of firms that are not small business firms, for the small business firms specifically identified in the subcontracting plan. Notifications shall be in writing and shall occur within a reasonable period of time after award of the subcontract. Contractor-specified formats shall be acceptable.

(h) (1) For DoD, the Contractor shall submit reports in eSRS as follows:

(i) The Individual Subcontract Report (ISR) shall be submitted to the contracting officer at the procuring contracting office, even when contract administration has been delegated to the Defense Contract Management Agency.

(ii) To submit the consolidated SSR for an individual subcontracting plan in eSRS, the contractor identifies the Government Agency in Block 7 (“Agency to which the report is being submitted”) by selecting the “Department of Defense (DoD) (9700)” from the top of the second dropdown menu.

Do not select anything lower.

(2) For DoD, the authority to acknowledge receipt or reject reports in eSRS is as follows:

(i) The authority to acknowledge receipt or reject the ISR resides with the contracting officer who receives it, as described in paragraph (h)(1)(i) of this clause.

(ii) The authority to acknowledge receipt or reject SSRs in eSRS resides with the SSR Coordinator.

52.222-1 NOTICE TO THE GOVERNMENT OF LABOR DISPUTES (FEB 1997)

(IAW FAR 22.103-5(a), AFFARS 5322.101-1)

52.222-2 PAYMENT FOR OVERTIME PREMIUMS (JUL 1990)

(IAW FAR 22.103-5(b))

(a) overtime premium does not exceed ___*___

*Overtime Premium $

52.222-3 CONVICT LABOR (JUN 2003)

(IAW FAR 22.202)

52.222-21 PROHIBITION OF SEGREGATED FACILITIES (FEB 1999)

(IAW FAR 22.810(a)(1))

52.222-26 EQUAL OPPORTUNITY (MAR 2007)

(IAW FAR 22.810(e))

52.222-35 EQUAL OPPORTUNITY FOR VETERANS (JUL 2014)

(IAW FAR 22.1310(a)(1), DFARS 222.1310(a)(1))

52.222-36 EQUAL OPPORTUNITY FOR WORKERS WITH DISABILITIES (JUL 2014)

(IAW FAR 22.1408(a))

52.222-37 EMPLOYMENT REPORTS ON VETERANS (JUL 2014)

(IAW FAR 22.1310(b))

52.222-40 NOTIFICATION OF EMPLOYEE RIGHTS UNDER THE NATIONAL LABOR

RELATIONS ACT (DEC 2010)

(IAW FAR 22.1605)

52.222-50 COMBATING TRAFFICKING IN PERSONS (MAR 2015)

(IAW FAR 22.1705(a)(1))

252.222-7006 RESTRICTIONS ON THE USE OF MANDATORY ARBITRATION AGREEMENTS

(DEC 2010)

(IAW DFARS 222.7405)

52.223-6 DRUG-FREE WORKPLACE (MAY 2001)

(IAW FAR 23.505)

52.223-11 OZONE-DEPLETING SUBSTANCES (MAY 2001)

(IAW FAR 23.804(a))

(b) The Contractor shall label products which contain or are manufactured with ozone-depleting substances in the manner and to the extent required by 42 U.S.C. 7671j(b), (c), and (d) and 40 CFR Part 82, Subpart E, as follows:

WARNING

Contains (or manufactured with, if applicable) ________________________*, a substance(s) which harm(s) public health and environment by destroying ozone in the upper atmosphere.

*The Contractor shall insert the name of the substance(s).

52.223-18 ENCOURAGING CONTRACTOR POLICIES TO BAN TEXT MESSAGING WHILE

DRIVING (AUG 2011)

(IAW FAR 23.1105)

5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODSs)

(NOV 2012)

(IAW AFFARS 5323.804-90)

52.225-13 RESTRICTIONS ON CERTAIN FOREIGN PURCHASES (JUN 2008)

(IAW FAR 25.1103(a))

252.225-7004 REPORT OF INTENDED PERFORMANCE OUTSIDE THE UNITED STATES AND

CANADA -- SUBMISSION AFTER AWARD (OCT 2010)

(IAW DFARS 225.7204(b))

252.225-7012 PREFERENCE FOR CERTAIN DOMESTIC COMMODITIES (FEB 2013)

(IAW DFARS 225.7002-3(a), DFARS 212.301(f)(xxvii))

252.225-7048 EXPORT-CONTROLLED ITEMS (JUN 2013)

(IAW DFARS 225.7901-4)

252.226-7001 UTILIZATION OF INDIAN ORGANIZATIONS, INDIAN-OWNED ECONOMIC

ENTERPRISES, AND NATIVE HAWAIIAN SMALL BUSINESS CONCERNS

(SEP 2004)

(IAW DFARS 226.104)

52.227-1 AUTHORIZATION AND CONSENT (DEC 2007)

(IAW FAR 27.201-2(a)(1))

52.227-2 NOTICE AND ASSISTANCE REGARDING PATENT AND COPYRIGHT

INFRINGEMENT (DEC 2007)

(IAW FAR 27.201-2(b))

252.227-7001 RELEASE OF PAST INFRINGEMENT (AUG 1984)

(IAW DFARS 227.7009-2(a))

252.227-7013 RIGHTS IN TECHNICAL DATA--NONCOMMERCIAL ITEMS (FEB 2014)

(IAW DFARS 227.7102-4(b), DFARS 227.7103-6(a))

(e) (3) The Contractor asserts for itself, or the persons identified below, that the Government's rights to use, release, or disclose the following technical data should be restricted—

Technical Data to be Furnished With Restrictions*

Basis for Assertion**

Asserted Rights Category***

Name of person Asserting Restrictions****

(LIST) (LIST) (LIST) (LIST)

*If the assertion is applicable to items, components, or processes developed at private expense, identify both the data and each such item, component, or process.

**Generally, the development of an item, component, or process at private expense, either exclusively or partially, is the only basis for asserting restrictions on the Government's rights to use, release, or disclose technical data pertaining to such items, components, or processes. Indicate whether development was exclusively or partially at private expense. If development was not at private expense, enter the specific reason for asserting that the Government's rights should be restricted.

***Enter asserted rights category (e.g., government purpose license rights from a prior contract, rights in SBIR data generated under another contract, limited or government purpose rights under this or a prior contract, or specifically negotiated licenses).

****Corporation, individual, or other person, as appropriate.

Date ___________________________________ Printed Name ___________________________________ and Title ___________________________________ Signature ___________________________________

(End of identification and assertion)

(f) (2) Government purpose rights markings.

Data delivered or otherwise furnished to the Government purpose rights shall be marked as follows:

GOVERNMENT PURPOSE RIGHTS

Contract No __________________________________ Contractor Name __________________________________ Contractor Address

Expiration Date __________________________________

The Government's rights to use, modify, reproduce, release, perform, display, or disclose these technical data are restricted by paragraph (b)(2) of the Rights in Technical Data--Noncommercial Items clause contained in the above identified contract. No restrictions apply after the expiration date shown above. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.

(End of Legend)

(3) Limited rights markings.

Data delivered or otherwise furnished to the Government with limited rights shall be marked with the following legend:

LIMITED RIGHTS

Contract No __________________________________ Contractor Name __________________________________ Contractor Address __________________________________

The Government's rights to use, modify, reproduce, release, perform, display, or disclose these technical data are restricted by paragraph (b)(3) of the Rights in Technical Data--Noncommercial Items clause contained in the above identified contract. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings. Any person, other than the Government, who has been provided access to such data must promptly notify the above name Contractor.

(End of legend)

(4) Special license rights markings.

(i) Data in which the Government's rights stem from a specifically negotiated license shall be marked with the following legend:

SPECIAL LICENSE RIGHTS

The Government's rights to use, modify, reproduce, release, perform, display, or disclose these data are restricted by Contract No. __________ (Insert contract number)_______, License No. __________ (Insert license identifier)______. Any reproduction of technical data or portions thereof marked with this legend must also reproduce the markings.

(End of legend)

252.227-7037 VALIDATION OF RESTRICTIVE MARKINGS ON TECHNICAL DATA (JUN 2013)

(IAW DFARS 227.7102-4(c), DFARS 227.7103-6(e)(3), DFARS 227.7104(e)(5), DFARS 227.7203-6(f))

52.228-7 INSURANCE--LIABILITY TO THIRD PERSONS (MAR 1996)

(IAW FAR 28.311-1)

52.229-4 FEDERAL, STATE, AND LOCAL TAXES (STATE AND LOCAL ADJUSTMENTS)

(FEB 2013)

(IAW FAR 29.401-3(b))

52.230-2 COST ACCOUNTING STANDARDS (MAY 2014)

(IAW FAR 30.201-4(a))

52.230-6 ADMINISTRATION OF COST ACCOUNTING STANDARDS (JUN 2010)

(IAW FAR 30.201-4(d)(1))

252.231-7000 SUPPLEMENTAL COST PRINCIPLES (DEC 1991)

(IAW DFARS 231.100-70)

52.232-1 PAYMENTS (APR 1984)

(IAW FAR 32.111(a)(1))

52.232-8 DISCOUNTS FOR PROMPT PAYMENT (FEB 2002)

(IAW FAR 32.111(b)(1))

52.232-11 EXTRAS (APR 1984)

(IAW FAR 32.111(c)(2))

52.232-17 INTEREST (MAY 2014)

(IAW FAR 32.611(a), FAR 32.611(b))

52.232-20 LIMITATION OF COST (APR 1984)

(IAW FAR 32.706-2(a))

52.232-23 ASSIGNMENT OF CLAIMS (MAY 2014)

(IAW FAR 32.806(a)(1))

52.232-25 PROMPT PAYMENT (JUL 2013)

(IAW FAR 32.908(c)) Notwithstanding any other payment clause in this contract, the Government will make invoice payments under the terms and conditions specified in this clause. The Government considers payment as being made on the day a check is dated or the date of an electronic funds transfer (EFT). Definitions of pertinent terms are set forth in sections 2.101, 32.001, and 32.902 of the Federal Acquisition Regulation. All days referred to in this clause are calendar days, unless otherwise specified. (However, see paragraph (a)(4) of this clause concerning payments due on Saturdays, Sundays, and legal holidays.)

(a) Invoice payments—

(1) Due date.

(i) Except as indicated in paragraphs (a)(2) and (c) of this clause, the due date for making invoice payments by the designated payment office is the later of the following two events:

(A) The 30th day after the designated billing office receives a proper invoice from the Contractor (except as provided in paragraph (a)(1)(ii) of this clause).

(B) The 30th day after Government acceptance of supplies delivered or services performed. For a final invoice, when the payment amount is subject to contract settlement actions, acceptance is deemed to occur on the effective date of the contract settlement.

(ii) If the designated billing office fails to annotate the invoice with the actual date of receipt at the time of receipt, the invoice payment due date is the 30th day after the date of the Contractor's invoice, provided the designated billing office receives a proper invoice and there is no disagreement over quantity, quality, or Contractor compliance with contract requirements.

(2) Certain food products and other payments.

(i) Due dates on Contractor invoices for meat, meat food products, or fish; perishable agricultural commodities; and dairy products, edible fats or oils, and food products prepared from edible fats or oils are--

(A) For meat or meat food products, as defined in section 2(a)(3) of the Packers and Stockyard Act of 1921 (7 U.S.C. 182(3)), and as further defined in Pub. L. 98-181, including any edible fresh or frozen poultry meat, any perishable poultry meat food product, fresh eggs, and any perishable egg product, as close as possible to, but not later than, the 7th day after product delivery.

(B) For fresh or frozen fish, as defined in section 204(3) of the Fish and Seafood Promotion Act of 1986 (16 U.S.C. 4003(3)), as close as possible to, but not later than, the 7th day after product delivery.

(C) For perishable agricultural commodities, as defined in section 1(4) of the Perishable Agricultural Commodities Act of 1930 (7 U.S.C. 499a(4)), as close as possible to, but not later than, the 10th day after product delivery, unless another date is specified in the contract.

(D) For dairy products, as defined in section 111(e) of the Dairy Production Stabilization Act of 1983 (7 U.S.C. 4502(e)), edible fats or oils, and food products prepared from edible fats or oils, as close as possible to, but not later than, the 10th day after the date on which a proper invoice has been received. Liquid milk, cheese, certain processed cheese products, butter, yogurt, ice cream, mayonnaise, salad dressings, and other similar products, fall within this classification. Nothing in the Act limits this classification to refrigerated products. When questions arise regarding the proper classification of a specific product, prevailing industry practices will be followed in specifying a contract payment due date. The burden of proof that a classification of a specific product is, in fact, prevailing industry practice is upon the Contractor making the representation.

(ii) If the contract does not require submission of an invoice for payment (e.g., periodic lease payments), the due date will be as specified in the contract.

(3) Contractor's invoice. The Contractor shall prepare and submit invoices to the designated billing office specified in the contract. A proper invoice must include the items listed in paragraphs (a)(3)(i) through (a)(3)(x) of this clause. If the invoice does not comply with these requirements, the designated billing office will return it within 7 days after receipt (3 days for meat, meat food products, or fish; 5 days for perishable agricultural commodities, dairy products, edible fats or oils, and food products prepared from edible fats or oils), with the reasons why it is not a proper invoice. The Government will take into account untimely notification when computing any interest penalty owed the Contractor.

(i) Name and address of the Contractor.

(ii) Invoice date and invoice number. (The Contractor should date invoices as close as possible to the date of the mailing or transmission.)

(iii) Contract number or other authorization for supplies delivered or services performed (including order number and contract line item number).

(iv) Description, quantity, unit of measure, unit price, and extended price of supplies delivered or services performed.

(v) Shipping and payment terms (e.g., shipment number and date of shipment, discount for prompt payment terms). Bill of lading number and weight of shipment will be shown for shipments on Government bills of lading.

(vi) Name and address of Contractor official to whom payment is to be sent (must be the same as that in the contract or in a proper notice of assignment).

(vii) Name (where practicable), title, phone number, and mailing address of person to notify in the event of a defective invoice.

(viii) Taxpayer Identification Number (TIN). The Contractor shall include its TIN on the invoice only if required elsewhere in this contract.

(ix) Electronic funds transfer (EFT) banking information.

(A) The Contractor shall include EFT banking information on the invoice only if required elsewhere in this contract.

(B) If EFT banking information is not required to be on the invoice, in order for the invoice to be a proper invoice, the Contractor shall have submitted correct EFT banking information in accordance with the applicable solicitation provision (e.g., 52.232-38, Submission of Electronic Funds Transfer Information with Offer), contract clause (e.g., 52.232-33, Payment by Electronic Funds Transfer—System for Award Management, or 52.232-34, Payment by Electronic Funds Transfer--Other Than System for Award Management), or applicable agency procedures.

(C) EFT banking information is not required if the Government waived the requirement to pay by EFT.

(x) Any other information or documentation required by the contract (e.g., evidence of shipment).

(4) Interest penalty. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if payment is not made by the due date and the conditions listed in paragraphs (a)(4)(i) through (a)(4)(iii) of this clause are met, if applicable. However, when the due date falls on a Saturday, Sunday, or legal holiday, the designated payment office may make payment on the following working day without incurring a late payment interest penalty.

(i) The designated billing office received a proper invoice.

(ii) The Government processed a receiving report or other Government documentation authorizing payment, and there was no disagreement over quantity, quality, or Contractor compliance with any contract term or condition.

(iii) In the case of a final invoice for any balance of funds due the Contractor for supplies delivered or services performed, the amount was not subject to further contract settlement actions between the Government and the Contractor.

(5) Computing penalty amount. The Government will compute the interest penalty in accordance with the Office of Management and Budget prompt payment regulations at 5 CFR part 1315.

(i) For the sole purpose of computing an interest penalty that might be due the Contractor, Government acceptance is deemed to occur constructively on 7th day (unless otherwise specified in this contract) after the Contractor delivers the supplies or performs the services in accordance with the terms and conditions of the contract, unless there is a disagreement over quantity, quality, or Contractor compliance with a contract provision. If actual acceptance occurs within the constructive acceptance period, the Government will base the determination of an interest penalty on the actual date of acceptance. The constructive acceptance requirement does not, however, compel Government officials to accept supplies or services, perform contract administration functions, or make payment prior to fulfilling their responsibilities.

(ii) The prompt payment regulations at 5 CFR 1315.10(c) do not require the Government to pay interest penalties if payment delays are due to disagreement between the Government and the Contractor over the payment amount or other issues involving contract compliance, or on amounts temporarily withheld or retained in accordance with the terms of the contract. The Government and the Contractor shall resolve claims involving disputes and any interest that may be payable in accordance with the clause at FAR 52.233-1, Disputes.

(6) Discounts for prompt payment. The designated payment office will pay an interest penalty automatically, without request from the Contractor, if the Government takes a discount for prompt payment improperly. The Government will calculate the interest penalty in accordance with the prompt payment regulations at 5 CFR part 1315.

(7) Additional interest penalty. (i) The designated payment office will pay a penalty amount, calculated in accordance with the prompt payment regulations at 5 CFR part 1315 in addition to the interest penalty amount only if--

(A) The Government owes an interest penalty of $1 or more;

(B) The designated payment office does not pay the interest penalty within 10 days after the date the invoice amount is paid; and

(C) The Contractor makes a written demand to the designated payment office for additional penalty payment, in accordance with paragraph (a)(7)(ii) of this clause, postmarked not later than 40 days after the invoice amount is paid.

(ii)(A) The Contractor shall support written demands for additional penalty payments with the following data. The Government will not request any additional data. The Contractor shall--

(1) Specifically assert that late payment interest is due under a specific invoice, and request payment of all overdue late payment interest penalty and such additional penalty as may be required;

(2) Attach a copy of the invoice on which the unpaid late payment interest is due;

and

(3) State that payment of the principal has been received, including the date of receipt.

(B) If there is no postmark or the postmark is illegible--

(1) The designated payment office that receives the demand will annotate it with the date of receipt, provided the demand is received on or before the 40th day after payment was made; or

(2) If the designated payment office fails to make the required annotation, the Government will determine the demand's validity based on the date the Contractor has placed on the demand, provided such date is no later than the 40th day after payment was made.

(iii) The additional penalty does not apply to payments regulated by other Government regulations (e.g., payments under utility contracts subject to tariffs and regulation).

(b) Contract financing payment. If this contract provides for contract financing, the Government will make contract financing payments in accordance with the applicable contract financing clause.

(c) Fast payment procedure due dates. If this contract contains the clause at 52.213-1, Fast Payment Procedure, payments will be made within 15 days after the date of receipt of the invoice.

(d) Overpayments. If the Contractor becomes aware of a duplicate contract financing or invoice payment or that the Government has otherwise overpaid on a contract financing or invoice payment, the Contractor shall—

(1) Remit the overpayment amount to the payment office cited in the contract along with a description of the overpayment including the—

(i) Circumstances of the overpayment (e.g., duplicate payment, erroneous payment, liquidation errors, date(s) or overpayment);

(ii) Affected contract number and delivery order number if applicable;

(iii) Affected contract line item or subline item, if applicable; and

(iv) Contractor point of contact.

(2) Provide a copy of the remittance and supporting documentation to the Contracting Officer.

(The above Clause/Provision has been modified.)

52.232-39 UNENFORCEABILITY OF UNAUTHORIZED OBLIGATIONS (JUN 2013)

(IAW FAR 32.706-3)

52.232-40 PROVIDING ACCELERATED PAYMENTS TO SMALL BUSINESS

SUBCONTRACTORS (DEC 2013)

(IAW FAR 32.009-2)

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

(IAW DFARS 232.7102)

52.233-1 DISPUTES (MAY 2014)

(IAW FAR 33.215)

52.233-3 PROTEST AFTER AWARD (AUG 1996)

(IAW FAR 33.106(b))

52.233-3 PROTEST AFTER AWARD -- ALTERNATE I (JUN 1985)

(IAW FAR 33.106(b))

52.233-4 APPLICABLE LAW FOR BREACH OF CONTRACT CLAIM (OCT 2004)

(IAW FAR 33.215(b))

252.237-7010 PROHIBITION ON INTERROGATION OF DETAINEES BY CONTRACTOR

PERSONNEL (JUN 2013)

(IAW DFARS 237.173-5)

52.242-1 NOTICE OF INTENT TO DISALLOW COSTS (APR 1984)

(IAW FAR 42.802)

52.242-4 CERTIFICATION OF FINAL INDIRECT COSTS (JAN 1997)

(IAW FAR 42.703-2(f))

(c) The certificate of final indirect costs shall read as follows:

CERTIFICATE OF FINAL INDIRECT COSTS

This is to certify that I have reviewed this proposal to establish final indirect cost rates and to the best of my knowledge and belief:

1. All costs included in this proposal (identify proposal and date) to establish final indirect costs rates for (identify period covered by rate) are allowable in accordance with the cost principles of the Federal Acquisition Regulation (FAR) and its supplements applicable to the contracts to which the final indirect cost rates will apply; and

2. This proposal does not include any costs which are expressly unallowable under applicable cost principles of the FAR or its supplements.

Firm:…