FA850914R30815.pdf
PDF 274 KB Posted
- Attached to
- Aircraft Structural Integrity Program (ASIP) / Mechanical Equipment and Subsystem Integrity Program (MECSIP)
- Solicitation number
- FA8509-12-R-30815
About this file
Solicitation
View the file
Other files
| File | Type | Posted |
|---|---|---|
| redacted_14-30815_JandA_with_CAD_signed_Redacted.pdf | ||
| CDRLS_2Jul14.pdf | ||
| 14_30815_PWS_as_of_1Jul14.pdf | ||
| 14-30815_AppxC_Safety_Health_Rqmt.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
4. SOLICITATION NUMBER
FA8509-14-R-30815
6.SOLICITATION ISSUE DATE
8. THIS ACQUISITION IS UNRESTRICTED OR SET ASIDE: % FOR
SMALL BUSINESS WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOSB PROGRAM
HUBZONE SMALL
BUSINESS EDWOSB
SERVICE-DISABLED VETERAN-
OWNED SMALL BUSINESS NAICS CODE:
8(A) SIZE STANDARD:
DATE SIGNED
28. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)
26. AWARD OF CONTRACT: YOUR OFFER ON SOLICITATION NUMBER
SHOWN IN BLOCK 4 INCLUDING ANY ADDITIONS OR CHANGES WHICH
ARE SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
ROUTINE
Subject to the terms and conditions stated herein, the Contractor agrees to hold its offered prices firm for 60 days.
SEE LINE ITEM SCHEDULE
22.
AMOUNT
16. AUTHORITY FOR USING OTHER THAN 10 USC 2304 41 USC 253
FULL AND OPEN COMPETITION (c) (1 ) (c) ( )
DATE SIGNED
27. SIGNATURE OF OFFEROR/CONTRACTOR
20.
UNIT
21.
UNIT PRICE
19.
QUANTITY
13. CONTRACTOR OFFEROR CODE FACILITY CODE
11. IF OFFER IS ACCEPTED BY THE GOVERNMENT WITHIN * ___ CALENDAR DAYS (60 CALENDAR
DAYS UNLESS OFFEROR INSERTS A DIFFERENT PERIOD) FROM THE DATE SET FORTH IN BLK 9
ABOVE, THE CONTRACTOR AGREES TO HOLD ITS OFFERED PRICES FIRM FOR THE ITEMS
SOLICITED HEREIN AND TO ACCEPT ANY RESULTING CONTRACT SUBJECT TO THE TERMS AND
CONDITIONS STATED HEREIN. *60
RATING
DO: A1
3. AWARD/EFFECTIVE DATE
FA8509
2. CONTRACT NO.
X
CHECK IF REMITTANCE IS DIFFERENT
AND PUT SUCH ADDRESS IN OFFER
17.
ITEM NO.
12. ADMINISTERED BY CODE
Estimated
SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK: 14
SCD:B
NAME AND TITLE OF SIGNER (TYPE OR PRINT) NAME OF CONTRACTING OFFICER
24. AWARD AMOUNT (FOR GOVT USE ONLY)
23. ACCOUNTING AND APPROPRIATION DATA
SEE SCHEDULE
5. SOLICITATION TYPE
SEALED BIDS NEGOTIATED
(IFB) (RFP)
15. PROMPT PAY DISCOUNT
25. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN 1
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND DELIVER ALL ITEMS SETFORTH
OR OTHERWISE IDENTIFIED ABOVE AND ON ANY CONTINUATION SHEETS SUBJECT
THE TERMS AND CONDITIONS SPECIFIED HEREIN.
10. ITEMS TO BE PURCHASED (BRIEF DESCRIPTION)
SUPPLIES SERVICES
9.
Offers will be received at the issuing office until the date and time specified below. Late offers are subject to late proposal provisions incorporated herein. All offers are subject to provisions, representations, certifications, and specifications as are attached or incorporated by reference.
13-AUG-2014 4:30PM
X
18.
SCHEDULE OF SUPPLIES/SERVICES
14. PAYMENT WILL BE MADE BY CODE
X
7. ISSUED BY CODE
SOF/PR - FIXED WING & ENG SUPPORT, AFLCMC/WIUKA
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 2208
ROBINS AFB GA 31098-1670
BUYER: Benjamin W. Wilton/WIUKB Benjamin.Wilton@robins.af.mil Phone: (478) 926- 2409 No Collect Calls
X
1. THIS CONTRACT IS A RATED ORDER
UNDER DPAS (15 CFR 350)SOLICITATION/CONTRACT
BIDDER/OFFEROR TO COMPLETE BLOCKS 11, 13, 15, 21, 22, & 27.
S
SF 1447 (rev 2/2012) BACK
NO RESPONSE FOR THE REASONS CHECKED
TYPE OR PRINT NAME AND TITLE OF SIGNER
SIGNATURENAME AND ADDRESS OF FIRM (Include Zip Code)
WE DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF
ITEMS INVOLVED
WE DO
OTHER (Specify)
CANNOT COMPLY WITH SPECIFICATIONS
CANNOT COMPLY WITH SPECIFICATIONS CANNOT MEET DELIVERY REQUIREMENT
FOLD
FOLD
FOLD
FOLD
SOLICITATION NO. FA850914R30815
DUE: 13 AUG 2014 4:30 PM
FROM: AFFIX
STAMP
HERE
TO:
ATTN: Benjamin W Wilton/WIUKB
SOF/PR - FIXED WING & ENG SUPPORT, AFLCMC/WIUKA
235 BYRON ST STE 19A
BLDG 300 CML PHN 478 926 2208
ROBINS AFB GA 31098-1670
Request for Proposal FA8509-14-R-30815
PART I - THE SCHEDULE
SECTION B
SUPPLIES OR SERVICES AND PRICES/COSTS
ENGINEERING SERVICES
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Class I ODS Substance Application/Use Quantity None
ENGINEERING SERVICES
Item No.
0001AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
0001AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
ENGINEERING SERVICES
1 LO
R425 Engineering Services IAW attached PWS.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
0001AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
ENGINEERING SERVICES
1 LO
ENGINEERING SERVICES
Item No.
0001AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
0001AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
TH-1N Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None
ENGINEERING SERVICES
Place of Perf Quantity (U/I) *ARO Written Notice of Award
_ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Class I ODS Substance Application/Use Quantity None
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
0002AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be approved by the Contracting Officer.
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
1 LO
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
0002AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be apporved in advance by the Contracting Officer.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
Item No.
0002AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases above $300 must be approved in advance by the Contracting Officer.
HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
Item No.
0002AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be approved in advance by the Contracting Officer UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
Item No.
0002AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LN
R425
Contractor furnished material in support of CLIN 0001. Purchases above $300 must be approved in advance by the Contracting Officer.
TH-1H Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LN *6 Months
Proposed Period of Performance
1 LN
TRAVEL and PER DIEM
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advanced by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
TRAVEL and PER DIEM
Item No.
0003AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel Reimbursed
IAW FAR 31.2
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
TRAVEL and PER DIEM
Place of Perf Quantity (U/I) *ARO Written Notice of Award
_ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
0003AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
0003AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Offer. Travel reimbursed
IAW FAR 31.2
HH-60G Aircraft (ANG)
TRAVEL and PER DIEM
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
0003AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
0003AE
TRAVEL and PER DIEM
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
TH-1N Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *6 Months
Proposed Period of Performance
1 LO
DATA REQUIREMENTS
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data requirements as outlined in Data Item Numbers/ELINs A001-A009 and IAW attached Contract Data Requirements Lists (DD Form 1423-1).
Exhibit: A
DATA REQUIREMENT - STATUS REPORT
Item No.
0004AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A001 Authority: DI-MGMT-80368A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1
DATA REQUIREMENT - STATUS REPORT
Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
DATA REQUIREMENTS - CONFERENCE AGENDA
Item No.
0004AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A002 Authority: DI-MGMT-81249A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - CONFERENCE MINUTES
Item No.
0004AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A003 Authority: DI-MGMT-81250A
DATA REQUIREMENTS - CONFERENCE MINUTES
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - TECHNICAL REPORT, STUDY SERVICES
Item No.
0004AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A004 Authority: DI-MISC-80508B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - FUNDS AND MAN HOUR EXPENDITURE REPORT
Item No.
0004AE
DATA REQUIREMENTS - FUNDS AND MAN HOUR EXPENDITURE REPORT
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced
DATA
Data Item Number: A005 Authority: DI-FNCL-80331A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - PRESENTATION MATERIAL
Item No.
0004AF
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A006 Authority: DI-ADMN-81373
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed
DATA REQUIREMENTS - PRESENTATION MATERIAL
1 LO
DATA REQUIREMENTS - PRODUCT DRAWINGS/MODELS & ASSOCIATED LISTS
Item No.
0004AG
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A007 Authority: DI-SESS 8100E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - ACCIDENT/INCIDENT REPORT
Item No.
0004AH
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A008 Authority: DI-SAFT-81563/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
DATA REQUIREMENTS - ACCIDENT/INCIDENT REPORT
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - TECHNICAL ORDER MGT CONTRACT RQMTS
Item No.
0004AJ
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A009 Authority: TM-86-01N
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - ENVIRONMENTAL HEALTH AND SAFETY PLAN
Item No.
0004AK
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A00A Authority: DI-ENVR-81375
Limitations of Liability: Other Than High Value Item
DATA REQUIREMENTS - ENVIRONMENTAL HEALTH AND SAFETY PLAN
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
OPTION PERIOD I: The 12 month period immediately following the basic contract period. The Option may be exercised on or before the last day of the contract period. An Option is determined to be exercised at time of the written notification to the contractor via emai.
ENGINEERING SERVICES
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Class I ODS Substance Application/Use Quantity None
ENGINEERING SERVICES
Item No.
1001AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
None
ENGINEERING SERVICES
Place of Perf Quantity (U/I) *ARO Written Notice of Award
_ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
1001AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
1001AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS HH-60G Aircraft (ANG)
ENGINEERING SERVICES
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
1001AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of
1 LO
ENGINEERING SERVICES
Item No.
1001AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
TH-1N Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Class I ODS Substance Application/Use Quantity None
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
1002AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be approved by the Contracting Officer.
HH-60G Aircraft (ACC)
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
1002AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be apporved in advance by the Contracting Officer.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of
Item No.
1002AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases above $300 must be approved in advance by the Contracting Officer.
HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
Item No.
1002AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be approved in advance by the Contracting Officer UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required
1 LO *12 Months
Proposed Period of Performance
1 LO
Item No.
1002AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LN
R425 Contractor furnished material in support of CLIN 0001. Purchases above $300 must be approved in advance by the Contracting Officer.
TH-1H Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LN *12 Months
Proposed Period of Performance
1 LN
TRAVEL and PER DIEM
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advanced by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
TRAVEL and PER DIEM
Item No.
1003AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel Reimbursed
IAW FAR 31.2
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
1003AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of
1 LO *12 Months
TRAVEL and PER DIEM
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
1003AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Offer. Travel reimbursed
IAW FAR 31.2
HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
1003AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required
TRAVEL and PER DIEM
Place of Perf Quantity (U/I) *ARO Written Notice of Award
_ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
1003AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
TH-1N Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
DATA REQUIREMENTS
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data requirements as outlined in Data Item Numbers/ELINs A001-A009 and IAW attached Contract Data Requirements Lists (DD Form 1423-1).
Exhibit: A
DATA REQUIREMENT - STATUS REPORT
Item No.
1004AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A001 Authority: DI-MGMT-80368A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
DATA REQUIREMENTS - CONFERENCE AGENDA
Item No.
1004AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A002 Authority: DI-MGMT-81249A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed
DATA REQUIREMENTS - CONFERENCE AGENDA
1 LO
DATA REQUIREMENTS - CONFERENCE MINUTES
Item No.
1004AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A003 Authority: DI-MGMT-81250A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - TECHNICAL REPORT, STUDY SERVICES
Item No.
1004AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A004 Authority: DI-MISC-80508B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
DATA REQUIREMENTS - TECHNICAL REPORT, STUDY SERVICES
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - FUNDS AND MAN HOUR EXPENDITURE REPORT
Item No.
1004AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced
DATA
Data Item Number: A005 Authority: DI-FNCL-80331A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - PRESENTATION MATERIAL
Item No.
1004AF
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A006 Authority: DI-ADMN-81373
DATA REQUIREMENTS - PRESENTATION MATERIAL
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - PRODUCT DRAWINGS/MODELS & ASSOCIATED LISTS
Item No.
1004AG
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A007 Authority: DI-SESS 8100E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - ACCIDENT/INCIDENT REPORT
Item No.
1004AH
DATA REQUIREMENTS - ACCIDENT/INCIDENT REPORT
1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A008 Authority: DI-SAFT-81563/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - TECHNICAL ORDER MGT CONTRACT RQMTS
Item No.
1004AJ
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A009 Authority: TM-86-01N
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of
DATA REQUIREMENTS - ENVIRONMENTAL HEALTH AND SAFETY PLAN
Item No.
1004AK
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A00A Authority: DI-ENVR-81375
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
OPTION PERIOD II: The 12 month period immediately following the basic contract period. The Option may be exercised on or before the last day of the contract period. An Option is determined to be exercised at time of the written notification to the contractor via emai.
ENGINEERING SERVICES
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Class I ODS Substance Application/Use Quantity None
ENGINEERING SERVICES
Item No.
2001AA
Cost Reimbursement - No Fee
ENGINEERING SERVICES
R425 Engineering Services IAW attached PWS.
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
2001AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of
ENGINEERING SERVICES
Item No.
2001AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
2001AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of
ENGINEERING SERVICES
Proposed Period of Performance
1 LO
ENGINEERING SERVICES
Item No.
2001AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Engineering Services IAW attached PWS.
TH-1N Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Class I ODS Substance Application/Use Quantity None
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
2002AA
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be approved by the Contracting Officer.
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Item No.
2002AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be apporved in advance by the Contracting Officer.
HH-60G Aircraft (AFRC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of
MATERIAL, SUBCONTRACTOR and OTHER DIRECT COSTS
Proposed Period of Performance
1 LO
Item No.
2002AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases above $300 must be approved in advance by the Contracting Officer.
HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
Item No.
2002AD
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
R425 Contractor furnished material in support of CLIN 0001. Purchases over $300 must be approved in advance by the Contracting Officer UH-1N Aircraft (AFGSC)
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
Item No.
2002AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LN
R425 Contractor furnished material in support of CLIN 0001. Purchases above $300 must be approved in advance by the Contracting Officer.
TH-1H Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Class I ODS Substance Application/Use Quantity None Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LN *12 Months
Proposed Period of
1 LN
TRAVEL and PER DIEM
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advanced by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
TRAVEL and PER DIEM
Item No.
2003AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel Reimbursed
IAW FAR 31.2
HH-60G Aircraft (ACC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
2003AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
HH-60G Aircraft (AFRC)
TRAVEL and PER DIEM
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
2003AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Offer. Travel reimbursed
IAW FAR 31.2
HH-60G Aircraft (ANG)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
2003AD
TRAVEL and PER DIEM
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
UH-1N Aircraft (AFGSC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of Performance
1 LO
TRAVEL and PER DIEM
Item No.
2003AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost
1 LO
TRAV
Travel and Per Diem in support of CLIN 0001 as approved in advance by the Contracting Officer. Travel reimbursed
IAW FAR 31.2.
TH-1N Aircraft (AETC)
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO Written
Notice of Award _ Req No / Pri
Required Period of Performance
1 LO *12 Months
Proposed Period of
DATA REQUIREMENTS
Item No.
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data requirements as outlined in Data Item Numbers/ELINs A001-A009 and IAW attached Contract Data Requirements Lists (DD Form 1423-1).
Exhibit: A
DATA REQUIREMENT - STATUS REPORT
Item No.
2004AA
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A001 Authority: DI-MGMT-80368A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Type / Ship To Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Delivery
1 LO
Proposed Delivery
1 LO
DATA REQUIREMENTS - CONFERENCE AGENDA
Item No.
2004AB
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A002 Authority: DI-MGMT-81249A
DATA REQUIREMENTS - CONFERENCE AGENDA
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - CONFERENCE MINUTES
Item No.
2004AC
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A003 Authority: DI-MGMT-81250A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - TECHNICAL REPORT, STUDY SERVICES
Item No.
2004AD
DATA REQUIREMENTS - TECHNICAL REPORT, STUDY SERVICES
1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A004 Authority: DI-MISC-80508B
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - FUNDS AND MAN HOUR EXPENDITURE REPORT
Item No.
2004AE
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced
DATA
Data Item Number: A005 Authority: DI-FNCL-80331A
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of
DATA REQUIREMENTS - PRESENTATION MATERIAL
Item No.
2004AF
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A006 Authority: DI-ADMN-81373
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of Performance
1 LO
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - PRODUCT DRAWINGS/MODELS & ASSOCIATED LISTS
Item No.
2004AG
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A007 Authority: DI-SESS 8100E
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance: Standard Inspection Place of Perf Quantity (U/I) *ARO IAW DD
FORM 1423-1
_ Req No / Pri
Required Period of
DATA REQUIREMENTS - PRODUCT DRAWINGS/MODELS & ASSOCIATED LISTS
Proposed Period of Performance
1 LO
DATA REQUIREMENTS - ACCIDENT/INCIDENT REPORT
Item No.
2004AH
Cost Reimbursement - No Fee Quantity U/I Est Unit Cost Total Estimated Cost 1 LO Not Separately Priced Not Separately Priced
DATA
Data Item Number: A008 Authority: DI-SAFT-81563/T
Limitations of Liability: Other Than High Value Item
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: IAW DD FORM 1423-1 Exhibit: A Quality Assurance:…