Atch__27_-_BLANK_SAMPLE_AF_Form_66_SUBMITTAL_REGISTER_-_CEMACC_(INITIAL).pdf
PDF 32 KB Posted
- Attached to
- Civil Engineering Multiple Award Construction Contract (CEMACC) Federal contract opportunity
- Solicitation number
- FA8501-17-R-0001
About this file
Blank Sample AF Form 66
View the file
Other files for this federal contract opportunity
Show all 50
Civil Engineering Multiple Award Construction Contract (CEMACC) has more files on GovTribe.
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
FA4600-11-B-0025
Attachment 3
PROJECT NO.
UHHZXXXXXX
APPROVED DISAPPROVED
1 Topographic and Utility Surveys D-NTP + XX
2 60% Design Submittal D-NTP + XX
60% Design List of Material Submittals (see Material Submittals below) D-NTP + XX
4 First Final Design Submittal D-NTP + XX
First Final Design List of Material Submittals (see Material Submittals below) D-NTP + XX
6 Check-Set Design Submittal D-NTP + XX
7 Corrected Final Design Submittal D-NTP + XX
8 AF2519 Welding and Safety Checklist D-NTP + XX
9 ODS (by CEMACC AE) D-NTP + XX
10 Contractor's Kickoff Meeting Checklist At Kick-off
Meeting
11 Stormwater Permit Application C-NTP + 14
12 Work Plan C-NTP + 15
13 Solid Waste Disposal Plan C-NTP + 16
14 Storage and Trailer Request C-NTP + 17
15 Time Schedule C-NTP + 18
16 List of Values C-NTP + 19
17 AF Form 3064 & 3065 C-NTP + 20
18 List of Proposed Subcontractors C-NTP + 21
19 Superintendent & Certified Formen (if req'd) C-NTP + 22
20 Systems Functional Test Report 7 Days prior to Pre-Final Insp.
21 Request for Final Inspection 7 Days prior to Pre-Final Insp.
22 Operations and Maintenance Manuals Prior to Closeout
23 As-built Drawings Prior to Closeout
24 Warranties Prior to Closeout
Construction List of Material Submittals (see Material Submittals below) Prior to Closeout
Construction List of Material Submittals (see Material Submittals below) Prior to Closeout Material Submittals List below all mat. submittals (design and constr.)
C A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
N D
C
LO
S
E O
U T
C
LO
S E
O U
T
O P
E R
A
TI
G
IN
S
TR
U C
TI
O
N S
DATE
TO
CIVIL
ENGR.
S H
O P
D R
A W
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
E R
M A
TE
R
IA
L
O R
A
TA
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
'S
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M A
N U
FA
C
TU
R
E
W
R R
A N
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
XXXX FA8501-XXXX
SAMPLE SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY CEMACC CONTRACTOR
FA4600-11-B-0025
Attachment 3
1B-2
PROJECT NO.
UHHZXXXXXX
APPROVED DISAPPROVEDC
A
TA
LO
G D
A
TA
LI
N
E N
U M
B E
R
S A
M P
LE
S
C E
R
TI
FI
C
A
TI
O N
O F
C O
M P
LI
A
N C
E A
C
LO
S
E O
U T
C
LO
S E
O U
T
O P
E R
A
TI
G
IN
S
TR
U C
TI
O
N S
DATE
TO
CIVIL
ENGR.
S H
O P
D R
A W
IN
G
S
FOLLOW-UPREQUIRED
SUBMITTAL
DATE
DATE
RECEIVED
IN
CONTRACT
ING
O
TH
E R
M A
TE
R
IA
L
O
TA
C O
LO
R
S E
LE
C
TI
O
N
M A
N U
FA
C
TU
R
E
E
C O
M M
E N
D A
TI
O
N S
ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,
TYPE OF SUBMITTAL
RETURN
SUSPENSE
DATE
DATE CONTRACTOR NOTIFIED REMARKSFINAL
APPROVAL
CONTRACTOR
RESUBMITTAL
BEFORE CONSTR AFTER CONSTR
M A
N U
FA
C
TU
R
E
W
R R
A N
TY
SOLICITATION/CONTRACT NO.PROJECT TITLE
XXXX FA8501-XXXX
SAMPLE SCHEDULE OF MATERIAL SUBMITTALS
ROBINS AFB
NO. OF COPIES REQUIRED
TO BE COMPLETED BY CEMACC CONTRACTOR
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.
LEGEND:
D-NTP = Design NTP, C-NTP = Construction NTP