About this file

Blank Sample AF Form 66

View the file

Other files for this federal contract opportunity

Other files attached to Civil Engineering Multiple Award Construction Contract (CEMACC), newest first.
File Type Posted
Copy_of_REVISED_Atch__8_-_BLANK_SAMPLE_AF_Form_3052_Breakdown_of_work_to_be_accomplished__.xls XLS spreadsheet
Notice_to_Offerors_Attachment_8.docx DOCX document
N27 Utility Pit_03.JPG JPG image
Bldg 149 Addition existing Electrical Panel HAA.jpg JPG image
Bldg 149 Addition existing Electrical Panel HAA schedule.jpg JPG image
N27 Utility Pit_02.JPG JPG image
YKAA-FP0001_BLDG_140_MAIN_FLOOR.dwg DWG drawing
Bldg 140 Existing Mezz HVAC Unit to be demoed_01.jpg JPG image
N27 Utility Pit_01.JPG JPG image
Bldg_140_Existing_Mezz_HVAC_information.zip ZIP file
Lighting Panel in adjacent fabric structure.JPG JPG image
Bldg 140 Existing Mezz view looking down into Engraving Shop.jpg JPG image
Bldg 140 Existing Mezz HVAC Unit to be demoed_03.jpg JPG image
Bldg 140 Existing Mezz Access Ladder.jpg JPG image
Bldg_149_Addition_existing_Electrical_Panel_HAA_and_LAA.zip ZIP file
YKAA-FP0002_BLDG_140_MEZZANINE.dwg DWG drawing
N27 Utility Pit_02.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
Lighting Panel in adjacent fabric structure.JPG JPG image
N27 Utility Pit_03.JPG JPG image
N27 Utility Pit_01.JPG JPG image
Bldg 149 Addition existing Electrical Panel LAA.jpg JPG image
Bldg_149_Exterior_Daikin_HVAC_Unit_02.jpg JPG image
Atch__37_Matrix.pdf PDF
N27_Utility_Photos.zip ZIP file
Atch__22_-_Robins_Roof_Requirements_UHHZ160306_MAR2016.docx DOCX document
RFI__1.docx DOCX document
Bldg_149_As-Built_AutoCAD_Files.zip ZIP file
Atch__35_-_UFC_4_010_05_Sensitive_Compartmented_Information_Facilities_Planning,_Design,_and_Construction.pdf PDF
Atch__20_-_BLANK_SAMPLE_DD_Form_1354_Transfer_and_Acceptance_of_DoD_Real_Property.pdf PDF
Atch__2_-_Robins_BASE_FACILITY_STANDARDS_REV_23_June_14.pdf PDF
Atch__24_-_AFSC_Energy_Metering_Requirements_24_June_2016.pdf PDF
Atch__21_-_BLANK_SAMPLE_AF_Form_911_Engineering_Review_Comments.pdf PDF
Atch__32_-_Air_Force_Manual_32_1084_Civil_Engineering_Facility_Requirements.pdf PDF
Atch__7_-_Robins_AFB_Asbestos_Management_Plan_-_January_2015.pdf PDF
Atch__10_-_BLANK_SAMPLE_AF_Form__3065.pdf PDF
Atch__14_Wage_Determination_Highway.pdf PDF
Atch__11_-_BLANK_SAMPLE_AF_Form_3000_with_digital_signatures.pdf PDF
Atch__6_-_Robins_AFB_Architectural_Compatiblity_Standards_18_Aug_2015.pdf PDF
Atch__23_-_Technical_Spec_for_ICD705_version1.2_April_23_2012.pdf PDF
Atch__5_Appendix_C.docx DOCX document
Atch__19_Tax_Liability_Form.pdf PDF
Atch__3_-_PROCEDURAL_GUIDE_FOR_DESIGNERS_INCLUDING_AE_FIRMS_29_May_15.pdf PDF
Atch__12_Wage_Determination_Buidling_CEMACC.pdf PDF
Atch__26_-_Form20SP.STANDARDSensitiveEquipmentPropertyRequest.pdf PDF
Atch__16_Pricing_Sheet.xlsx XLSX spreadsheet
Atch__9__Blank_Sample_AF_Form_3064.pdf PDF
Atch__28_-_AFI_31-204_RAFB_Sup_1_Motor_Vehicle_Traffic_Supervision.pdf PDF
Show all 50

Civil Engineering Multiple Award Construction Contract (CEMACC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FA4600-11-B-0025

Attachment 3

PROJECT NO.

UHHZXXXXXX

APPROVED DISAPPROVED

1 Topographic and Utility Surveys D-NTP + XX

2 60% Design Submittal D-NTP + XX

60% Design List of Material Submittals (see Material Submittals below) D-NTP + XX

4 First Final Design Submittal D-NTP + XX

First Final Design List of Material Submittals (see Material Submittals below) D-NTP + XX

6 Check-Set Design Submittal D-NTP + XX

7 Corrected Final Design Submittal D-NTP + XX

8 AF2519 Welding and Safety Checklist D-NTP + XX

9 ODS (by CEMACC AE) D-NTP + XX

10 Contractor's Kickoff Meeting Checklist At Kick-off

Meeting

11 Stormwater Permit Application C-NTP + 14

12 Work Plan C-NTP + 15

13 Solid Waste Disposal Plan C-NTP + 16

14 Storage and Trailer Request C-NTP + 17

15 Time Schedule C-NTP + 18

16 List of Values C-NTP + 19

17 AF Form 3064 & 3065 C-NTP + 20

18 List of Proposed Subcontractors C-NTP + 21

19 Superintendent & Certified Formen (if req'd) C-NTP + 22

20 Systems Functional Test Report 7 Days prior to Pre-Final Insp.

21 Request for Final Inspection 7 Days prior to Pre-Final Insp.

22 Operations and Maintenance Manuals Prior to Closeout

23 As-built Drawings Prior to Closeout

24 Warranties Prior to Closeout

Construction List of Material Submittals (see Material Submittals below) Prior to Closeout

Construction List of Material Submittals (see Material Submittals below) Prior to Closeout Material Submittals List below all mat. submittals (design and constr.)

C A

TA

LO

G D

A

TA

LI

N

E N

U M

B E

R

S A

M P

LE

S

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E A

N D

C

LO

S

E O

U T

C

LO

S E

O U

T

O P

E R

A

TI

G

IN

S

TR

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

S H

O P

D R

A W

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

E R

M A

TE

R

IA

L

O R

A

TA

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E

'S

E

C O

M M

E N

D A

TI

O

N S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M A

N U

FA

C

TU

R

E

W

R R

A N

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

XXXX FA8501-XXXX

SAMPLE SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CEMACC CONTRACTOR

FA4600-11-B-0025

Attachment 3

1B-2

PROJECT NO.

UHHZXXXXXX

APPROVED DISAPPROVEDC

A

TA

LO

G D

A

TA

LI

N

E N

U M

B E

R

S A

M P

LE

S

C E

R

TI

FI

C

A

TI

O N

O F

C O

M P

LI

A

N C

E A

C

LO

S

E O

U T

C

LO

S E

O U

T

O P

E R

A

TI

G

IN

S

TR

U C

TI

O

N S

DATE

TO

CIVIL

ENGR.

S H

O P

D R

A W

IN

G

S

FOLLOW-UPREQUIRED

SUBMITTAL

DATE

DATE

RECEIVED

IN

CONTRACT

ING

O

TH

E R

M A

TE

R

IA

L

O

TA

C O

LO

R

S E

LE

C

TI

O

N

M A

N U

FA

C

TU

R

E

E

C O

M M

E N

D A

TI

O

N S

ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE,

TYPE OF SUBMITTAL

RETURN

SUSPENSE

DATE

DATE CONTRACTOR NOTIFIED REMARKSFINAL

APPROVAL

CONTRACTOR

RESUBMITTAL

BEFORE CONSTR AFTER CONSTR

M A

N U

FA

C

TU

R

E

W

R R

A N

TY

SOLICITATION/CONTRACT NO.PROJECT TITLE

XXXX FA8501-XXXX

SAMPLE SCHEDULE OF MATERIAL SUBMITTALS

ROBINS AFB

NO. OF COPIES REQUIRED

TO BE COMPLETED BY CEMACC CONTRACTOR

NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.

LEGEND:

D-NTP = Design NTP, C-NTP = Construction NTP