AF66_Building_81.xls
XLS spreadsheet 37 KB Posted
- Attached to
- BLDG 81 Roof Replacement Federal contract opportunity
- Solicitation number
- FA8501-15-R-0004
About this file
Submittal Register
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| BLDG_81_Contractor_Questions_and_Answers3.docx | DOCX document | |
| BLDG_81_Contractor_Questions_and_Answers2.docx | DOCX document | |
| BLDG_81_Contractor_Questions_and_Answers.docx | DOCX document | |
| Amendment_0003.pdf | ||
| BLDG_81_Site_Visit_Sign-in.pdf | ||
| B81_Drawings.pdf | ||
| Amendment_0002.pdf | ||
| Amendment_0001.pdf | ||
| 040134_-_Specifications(SOW)(Rev_20150420).pdf | ||
| FA8501-15-R-0004_RFP.pdf | ||
| DFARS_Tax_Liability_Provision.doc | DOC document | |
| Special_Standards_of_Responsibility_Building_81.doc | DOC document | |
| 040134_-_Specifications(SOW).pdf | ||
| App_C_UHHZ_040134.doc | DOC document | |
| Wage_Determination_GA152.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| SCHEDULE OF MATERIAL SUBMITTALS | |||||||||||
| (AF Form 66) | PROJECT NO. | PROJECT TITLE | SOLICITATION/CONTRACT NO. | ||||||||
| UHHZ040134 | Replace Roof on Building 81 | ||||||||||
| TO BE COMPLETED BY PROJECT ENGINEER | |||||||||||
| NO. OF COPIES REQUIRED | |||||||||||
| BEFORE CONSTR | AFTER CONSTR | ||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | OTHER MATERIAL OR DATA | CLOSEOUT | REQUIRED SUBMITTAL | |||||||
| DATE | DATE |
RECEIVED
IN
CONTRACTING DATE
TO
CIVIL
ENGR. RETURN
SUSPENSE
| DATE | FOLLOW-UP | DATE CONTRACTOR NOTIFIED | CONTRACTOR RESUBMITTAL | FINAL | ||||||
| APPROVAL | REMARKS | |||||||||
| APPROVED | DISAPPROVED | |||||||||
| 1 | AF Form 3064 & 3065 | 4 | Within 14days of NTP | |||||||
| 2 | Schedule of Prices | 4 | Within 14days of NTP | |||||||
| 3 | Roofing Material | 4 | Within 30 days of NTP | |||||||
| 4 | Sample Warranty | 4 | Within 30 days of NTP | |||||||
| 5 | Design Analysis | 4 | Within 30 days of NTP | Must submit with #4 | ||||||
| 6 | Lightning Protection (Drawings and Materials) | 4 | Within 30 days of NTP | |||||||
| 7 | Engineered Shop Drawings | 4 | Within 30 days of NTP | Must submit with #3 | ||||||
| 8 | Erection Drawings | 4 | Within 30 days of NTP | |||||||
| 9 | Solid Waste Disposal Plan | 4 | Within 14 days of NTP | |||||||
| 10 | List of Proposed Subcontractors | 4 | Within 14 days of NTP | |||||||
| 11 | Superintendant & Certified Foreman | 4 | Within 14days of NTP | |||||||
| 12 | Auto Cad & PDF Drawings , Closeout Package | 4 | BY Final Inspection | Hardcopy provided at Beneficial Occupancy | ||||||
| 13 | Warranty | 4 | Prior to Close-out | |||||||
| 14 | Manufacter's Inspection Report | 4 | Prior to Close-out | |||||||
| NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements. |