Submittal Register

View the file

Other files for this federal contract opportunity

Other files attached to BLDG 81 Roof Replacement, newest first.
File Type Posted
BLDG_81_Contractor_Questions_and_Answers3.docx DOCX document
BLDG_81_Contractor_Questions_and_Answers2.docx DOCX document
BLDG_81_Contractor_Questions_and_Answers.docx DOCX document
Amendment_0003.pdf PDF
BLDG_81_Site_Visit_Sign-in.pdf PDF
B81_Drawings.pdf PDF
Amendment_0002.pdf PDF
Amendment_0001.pdf PDF
040134_-_Specifications(SOW)(Rev_20150420).pdf PDF
FA8501-15-R-0004_RFP.pdf PDF
DFARS_Tax_Liability_Provision.doc DOC document
Special_Standards_of_Responsibility_Building_81.doc DOC document
040134_-_Specifications(SOW).pdf PDF
App_C_UHHZ_040134.doc DOC document
Wage_Determination_GA152.doc DOC document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Sheet1

SCHEDULE OF MATERIAL SUBMITTALS
(AF Form 66)PROJECT NO.PROJECT TITLESOLICITATION/CONTRACT NO.
UHHZ040134Replace Roof on Building 81
TO BE COMPLETED BY PROJECT ENGINEER
NO. OF COPIES REQUIRED
BEFORE CONSTRAFTER CONSTR
LINE NUMBERITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTALOTHER MATERIAL OR DATACLOSEOUTREQUIRED SUBMITTAL
DATEDATE

RECEIVED

IN

CONTRACTING DATE

TO

CIVIL

ENGR. RETURN

SUSPENSE

DATEFOLLOW-UPDATE CONTRACTOR NOTIFIEDCONTRACTOR RESUBMITTALFINAL
APPROVALREMARKS
APPROVEDDISAPPROVED
1AF Form 3064 & 30654Within 14days of NTP
2Schedule of Prices4Within 14days of NTP
3Roofing Material4Within 30 days of NTP
4Sample Warranty4Within 30 days of NTP
5Design Analysis4Within 30 days of NTPMust submit with #4
6Lightning Protection (Drawings and Materials)4Within 30 days of NTP
7Engineered Shop Drawings4Within 30 days of NTPMust submit with #3
8Erection Drawings4Within 30 days of NTP
9Solid Waste Disposal Plan4Within 14 days of NTP
10List of Proposed Subcontractors4Within 14 days of NTP
11Superintendant & Certified Foreman4Within 14days of NTP
12Auto Cad & PDF Drawings , Closeout Package4BY Final InspectionHardcopy provided at Beneficial Occupancy
13Warranty4Prior to Close-out
14Manufacter's Inspection Report4Prior to Close-out
NOTE: This Submittal Schedule is for the Contractor's use in assembling and organizing the Submittals to be made to the Government. See individual specification sections for possible additional submittal requirements.