Elevator_Locations_Attachment_1.pdf

PDF 17 KB Posted

Attached to
VTE-ELEVATOR MAINTENANCE Federal contract opportunity
Solicitation number
FA8501-15-R-0002
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Elevator Locations

View the file

Other files for this federal contract opportunity

Other files attached to VTE-ELEVATOR MAINTENANCE, newest first.
File Type Posted
1423_CDRL_A001-A004.pdf PDF
Elevator_Maint_QASP_150932 _04_apr_15.pdf PDF
FA8501-15-R-0002_s.pdf PDF
1423_CDRL_A005.pdf PDF
Elevator_Mx_PWS _150932.pdf PDF
Maintenance_Control_Plan_Attachment_2.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT

UNIT LOCATION AND TYPE – 45 ELEVATORS, 6 PLATFORM LIFTS

(1) Building 91 Center office area. National hydraulic passenger, 3 stop.

4,000 lb. high use, fire service.

Virginia Controls relay logic, GAL 2 speed horizontally sliding doors.

Elevator installed 1991, dry pump unit. New controller and 3rd floor added 1997.

Test month: May

(2) Building 125 Northwest side. Dover hydraulic passenger, 2 stop.

5,000 lb. High use, fire service, battery lowering.

Dover relay logic (WCR), Dover 2 speed horizontally sliding doors Elevator installed 1993, dry pump unit.

Test month: April

(3) Building 125 Northeast side. Southeastern hydraulic freight, 2 stop.

15,000 lb. 8 ft. high x 20 ft. wide doors MCE microprocessor controller, Peelle powered vertical by-parting doors Elevator installed 1956, dry pump unit. New pump unit and doors installed 1971.

New control system and pump motor installed 2007.

Test month: April

(4) Building 166 South side. Dover hydraulic passenger, 2 stop.

4,000 lb. 2 front, 1 rear opening Dover relay logic (WCR), Dover 2 speed horizontally sliding doors Elevator installed 1989, wet pump unit.

Test month: July

(5) Building 169 Southwest corner. General hydraulic freight, 2 stop.

5,000 lb.

VMI microprocessor controller, Manual vertical counter balanced gates Elevator installed 1951. New control system and wet pump unit installed 2001.

Test month: November

(6) Building 210 East annex, controlled access. Dover hydraulic freight (dumbwaiter), 2 stop.

2,000 lb.

Dover relay logic (WCR), Courion manual vertical by-parting doors Installed 1981, dry pump unit.

Test month: August

(7) Building 210 East annex, controlled access. Dover hydraulic passenger, 3 stop.

3,500 lb. high use, fire service.

Dover relay logic (WCR), Dover center open, horizontally sliding doors Elevator installed 1981, dry pump unit. Fire service added 2004 Test month: February

(8) Building 210 center wing, controlled access. Dover electric (traction) freight, 3 stop.

3,500 lb. fire service.

Virginia Controls relay logic, 2 speed AC, Courion power vertical by-parting doors Elevator machine, ropes, governor, control system, doors, car station, and signal fixtures installed 1994.

Test month: May, 5 year tests due 2019.

(9) Building 210 West annex, controlled access. National hydraulic passenger, 3 stop.

2,100 lb. fire service MCE microprocessor, GAL 1 speed horizontally sliding doors Elevator installed 1989. Control system installed 2003, wet pump unit.

Test month: February

(10) Building 215 South wing. National hydraulic passenger, 3 stop.

3,500 lb. fire service Baxco microprocessor, GAL 2 speed horizontally sliding doors Elevator installed 1989, wet pump unit.

Test month: November

(11) Building 220, Main wing, controlled access. Dover hydraulic passenger, 2 stop.

2,000 lb. fire service, battery lowering.

Dover microprocessor (DMC), Dover 1 speed horizontally sliding doors Elevator installed 1996, wet pump unit.

Test month: April

(12) Building 229S-A East side, controlled access. U S Elevator hydraulic freight, 3 stop.

10,000 lb. 3 front, 1 rear opening U S Elevator relay logic, Courion power vertical by-parting doors Elevator installed 1979, dry pump unit.

Test month: August

(13) Bld.229S-B Center area, controlled access. Southeastern hydraulic freight, 3 stop.

4,000 lb. fire service Virginia Controls relay logic, Guilbert power vertical by-parting doors Elevator installed 1974, dry pump unit.

Controller, car station, and signal fixtures replaced 1999.

Test month: June

(14) Building 229C-A, Front Lobby. Thyssen Krupp hydraulic passenger, 2 stop.

2500Lb. Fire Service Wet pumping unit Tact 22 Controller Installed 2010 Test month: December

(15) Building 229C-B Center area, controlled access. Thyssen Krupp hydraulic freight, 4stop 10,000 Lb. Dry pumping unit Tact 22 Controller Installed 2010

Test Month December

(16) Building 229N East side, controlled access. Albany hydraulic freight, 3 stop.

10,000 lb. 3 front 1 rear opening MCE Controller, Peelle power vertical by-parting doors

Elevator installed 1983, dry pump unit.

Test month: May

(17) Building 229E West side, controlled access. National hydraulic passenger, 3 stop 22,000 lb. C2 loading, fire service, dual pumping units, 3 front, 1 rear opening 8 ft. x 8 ft. doors, total of 4 door operators Maida Technologies relay logic, GAL 2 speed horizontally sliding center open doors Elevator installed 1996, dry pump unit.

Test month: January

(18) Building 255 West side, main entrance. Dover hydraulic passenger, 2 stop.

3,500 lb. Fire service Dover relay logic (WCR), Dover 1 speed horizontally sliding doors Elevator installed 1993, wet pump unit.

Test month: June

(19) Building 300 West side, near North end. Dover hydraulic passenger, 3 stop.

4,000 lb. Fire service, battery lowering Dover relay logic (WCR), Dover 2 speed horizontally sliding doors Elevator installed 1994, wet pump unit.

Test month: September

(20) Building 301 West side, near North end. National hydraulic passenger, 3 stop.

5,000 lb. High use, fire service Baxco microprocessor, GAL 2 speed horizontally sliding doors Elevator installed 1993, wet pump unit.

Test month: January

(21) Building 323 North side, main entrance. National hydraulic pass/freight, 3 stop.

12,800 lb. fire service, 2 front,3 rear opening Sterling microprocessor. Front doors - GAL 1 speed center opening horizontally sliding.

Rear doors - Peelle power vertical by-parting.

Elevator installed 1991, dry pump unit.

Test month: September

(22) Bld. 350 West side, controlled access. Dover hydraulic passenger, 2 stop.

3,500 lb. fire service, battery lowering Dover relay logic (WCR), Dover 1 speed horizontally sliding doors Elevator installed 1994, wet pump unit.

Test month: August

(23) Building 350 North side at entrance to U-2 Section, controlled access.

Concord Vertical Platform Lift.

Model Number: P.A.L.

Installed 2005 Test month: March, 5 year tests due 2015.

(24) Building 542 East side near front entrance.

SAVARIA Vertical Platform Lift.

Model Number: V-1504

Installed 2001 Test month: May, 5 year tests due 2016.

(25) Bld.640 North side, controlled access. National electric (traction) freight, 3 stop.

6,000 lb. fire service, 3 front, 1 rear opening , Virginia Controls relay logic, DC motor-generator set Courion power vertical by-parting doors Elevator installed 1989. Controller replaced 2004 Test month: October, 5 year tests due 2019.

(26) Building 640 North side, controlled access. National hydraulic passenger, 2 stop.

2,500 lb. fire service, 2 front, 1 rear opening Virginia Controls relay logic, GAL center opening horizontally sliding doors Elevator installed 1988, wet pump unit. Controller replaced 2004.

Test month: October

(27) Building 640 center area, controlled access. National hydraulic freight, 2 stop.

3,000 lb. Fire Service Virginia Controls relay logic, Harris Preble power vertical by-parting doors Elevator installed 1989, wet pump unit. Controller replaced 2004 Test month: March

(28) Building 640 South side, controlled access. Gemco hydraulic pass/freight, 3 stop.

13,000 lb. fire service, 2 front, 1 rear opening Virginia Controls relay logic, Front doors - MAC 2 speed center opening horizontally sliding, Rear doors - Courion powered vertical by-parting.

Elevator installed 1989, dry pump unit.

Test month: January

(29) Building 645 East side, controlled access. National hydraulic freight, 2 stop.

4,000 lb.

Baxco microprocessor, Harris Preble power vertical by-parting doors Elevator installed 1989, wet pump unit.

Test month: March

(30) Building 660 North side at entrance to Commissary.

Graventa Vertical Platform Lift.

Model Number: P.A.L.

Installed 2012 Test month: July, 5 year tests due 2017.

(31) Building 675 Southwest corner. National hydraulic freight, 3 stop.

6,500 lb. fire service, mission critical Baxco microprocessor, Harris Preble power vertical by-parting doors Elevator installed 1989, wet pump unit.

Test month: July

(32) Building 700A Main Entrance. Dover hydraulic passenger 2 stop 3,500 lb. fire service, battery lowering Dover microprocessor (DMC) Dover center opening horizontally sliding doors

Elevator installed 2000, wet pump unit.

Test month: July

(33) Building 700A North Hallway. Dover hydraulic passenger, 3 stop 4,000 lb. fire service, battery lowering 2 front, 1 rear opening Dover LMH-PLC Controller Dover 2 speed horizontally sliding doors Elevator installed 2000, dry pump unit.

Test month: July

(34) Building 826 Main entrance. Macon Elevator hydraulic passenger, 2 stop 2,000 lb. fire service, battery lowering MCE microprocessor controller GAL 1 speed horizontally sliding doors Elevator installed March 2001, dry pump unit.

Test month: March

(35) Building 905 Main lobby. Dover hydraulic passenger, 2 stop.

2,500 lb.

Dover solid state, Dover center opening horizontally sliding doors Elevator installed 1981, dry pump unit.

Test month: December

(36) Building 905 Library, East side. Dover hydraulic passenger, 2 stop.

2,100 lb.

Dover solid state, Dover 1 speed horizontally sliding doors Elevator installed 1981, dry pump unit.

Test month: December

(37) Building 1008 Northwest entrance. Dover hydraulic passenger, 2 stop.

3,000 lb. fire service, battery lowering Dover microprocessor (DMC), Dover 1 speed horizontally sliding doors Elevator installed 1999, wet pump unit.

Test month: March

(38) Building 1400 Main entrance. Dover electric (traction) passenger, 6 stop.

6,700 lb. fire service, Dover relay logic, DC motor-generator set, Dover center opening horizontally sliding doors Elevator installed 1985, 5 year tests due 2018.

Test month: March,

(39) Building 1500 South wing. Dover hydraulic passenger, 3 stop.

3,500 lb. fire service, high use Dover solid state, Dover center opening horizontally sliding doors Elevator installed 1992, wet pump unit.

Test month: June

(40) Building 1506 Main entrance. Dover hydraulic passenger, 2 stop.

2,500 lb. fire service, battery lowering

Dover microprocessor (DMC), Dover 1 speed horizontally sliding doors Elevator installed 1998, wet pump unit.

Test month: June

(41) Building 2039 Front entrance. Mowrey hydraulic passenger, 2 stop.

3,500 lb. fire service Mowrey relay logic, MAC center opening horizontally sliding doors Elevator installed 1995, wet pump unit.

Test month: October

(42) Building 2039 Rear entrance. Mowrey hydraulic passenger, 2 stop.

5,000 lb. fire service Mowrey relay logic, MAC 2 speed horizontally sliding doors Elevator installed 1995, wet pump unit.

Test month: October

(43) Building 2045 Front entrance. National hydraulic passenger, 2 stop.

2,500 lb. fire service, battery lowering Maida Technologies relay logic, GAL center opening horizontally sliding doors Elevator installed 1996, dry pump unit.

Test month: March

(44) Building 2051 Northwest entrance. Mowrey hydraulic passenger, 2 stop.

4,500 lb. fire service, battery lowering Virginia Controls relay logic, GAL 2 speed horizontally sliding doors Elevator installed 1998, dry pump unit.

Test month: April

(45) Building 2051 Northeast entrance. Mowrey hydraulic passenger, 2 stop.

2,500 lb. fire service, battery lowering Virginia Controls relay logic, GAL center opening horizontally sliding doors Elevator installed 1998, dry pump unit.

Test month: April

(46) Building 2051 Southwest entrance. Mowrey hydraulic passenger, 2 stop.

4,500 lb. fire service, battery lowering Mowrey / Omron PLC, GAL 2 speed horizontally sliding doors Elevator installed 1999, wet pump unit.

Test month: February

(47) Building 2051 Southeast entrance. Mowrey hydraulic passenger, 2 stop.

2,500 lb. fire service, battery lowering Mowrey / Omron PLC, GAL center opening horizontally sliding doors Elevator installed 1999, wet pump unit.

Test month: February

(48) Building 2072 Front entrance. Mowrey hydraulic passenger, 2 stop.

3,500 lb. fire service Mowrey Microprocessor, GAL center opening horizontally sliding doors Elevator installed 2004, wet pump unit.

Test month: November

(49) Building 641 Front entrance.

Savaria Vertical Platform Lift Model Number V- 1504 Installed June 2008 Test month June, 5 Year test due 2013

(50) Building 385 Front entrance.

Savaria Vertical Platform Lift Model Number V- 1504 Installed May 2008 Test month May, 5 Year test due 2018.

(51) Building 189 East side Wildeck Material lift Model Mechanical VRC Installed 2014

File details come from the government source that posted it. Updated .