Pre-prop.ConferenceComments-QuestionswithGov.Responses.doc

DOC document 39 KB Posted

Attached to
Repair/Replace Roofs Base Wide, Robins Air Force Base, Georgia Federal contract opportunity
Solicitation number
FA8501-07-R-0021
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Robins Air Force Base

About this file

Pre-proposal Conference Comments/Questions With Government Responses

View the file

Other files for this federal contract opportunity

Other files attached to Repair/Replace Roofs Base Wide, Robins Air Force Base, Georgia, newest first.
File Type Posted
1_NoticetoOfferors.doc DOC document
Amendment0001.doc DOC document
Comments 3.doc DOC document
Pre-ProposalConferenceAttendees.pdf PDF
QuesAnsFedZBPosting(2).doc DOC document
Ques-AnsBedBPosting.doc DOC document
ATTACHMENT1.doc DOC document
ATTACHMENT6.doc DOC document
ATTACHMENT7.doc DOC document
ATTACHMENT3.doc DOC document
FinalSolicitation.rtf RTF text file
ATTACHMENT2.DOC DOC document
ATTACHMENT8.doc DOC document
NoticetoOfferors.doc DOC document
ATTACHMENT5.doc DOC document
ATTACHMENT4.doc DOC document
Show all 16

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Comment/Question No. 1: The Means doesn’t work sometimes on specific jobs. If there’s not a Line Item to fit, what are we going to do and how do we price it?”

Government’s response to Comment/Question No. 1: “Roof” components are usually in the Means. If there’s a component required by a specific Task Order that is not in the Means, the Contractor(s) would separately identify it in his proposal. Then, subsequent to Government evaluation of the proposal, the Government and the Contractor would negotiate a price for that component (non pre-priced item). Reference Page 10 of 43, Clause C-900. If the non pre-priced item becomes a continuing requirement, a Modification to the basic IDIQ Contract would be issued that incorporated the item as a pre-priced item.

Comment/Question No. 2: Regarding non pre-priced items, there’s a lot of stuff not in the Means. This Solicitation states (on Page 9 of 43, Clause B-900) that “Task orders shall not be issued which contain more than 15% non pre-priced items.” A more realistic determination of current conditions would dictate that this requirement be eliminated.

Government’s response to Comment/Question No. 2: The Government has looked at several IDIQ requirements at Robins AFB that have 15% in place for non pre-priced items, and they all seem to be working well. Clause B-900 (NON PRE-PRICED ITEMS), Page 9 of 43 of the Solicitation, will not be amended at this time.

Comment/Question No. 3: Different types of roofs require different labor burdens, so in effect, different types of roofs require different coefficients. How does a Contractor propose one (1) coefficient for all types of roofs?

Government’s response to Comment/Question No. 3: The coefficient table will not be amended at this time. The premium a Contractor pays for Liability Insurance is determined by the risk involved in the job, as well as the extent of claims he has had in the past. The rate charged by an insurance company, however, should be the same for “roofing” work, no matter what kind of roofing work is performed. Accordingly, multiple coefficients for different roof types are not considered warranted.