ATTACHMENT 2
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 1_NoticetoOfferors.doc | DOC document | |
| Pre-prop.ConferenceComments-QuestionswithGov.Responses.doc | DOC document | |
| Amendment0001.doc | DOC document | |
| Comments 3.doc | DOC document | |
| Pre-ProposalConferenceAttendees.pdf | ||
| QuesAnsFedZBPosting(2).doc | DOC document | |
| Ques-AnsBedBPosting.doc | DOC document | |
| ATTACHMENT1.doc | DOC document | |
| ATTACHMENT6.doc | DOC document | |
| ATTACHMENT7.doc | DOC document | |
| ATTACHMENT3.doc | DOC document | |
| FinalSolicitation.rtf | RTF text file | |
| ATTACHMENT8.doc | DOC document | |
| NoticetoOfferors.doc | DOC document | |
| ATTACHMENT5.doc | DOC document | |
| ATTACHMENT4.doc | DOC document |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT # UHHZ 070800
indefinIte DELIVERY Indefinite quantitY ROOFING contract maintenance engineering
78 CEs/CEAE
775 MACON STREET
ROBINS AFB, GA. 31098-2207
PROJECT MANAGER
KEVIN SWOGGER
REPLACE AND REPAIR ROOFS
ROBINS AFB, GEORGIA
TECHNICAL SPECIFICATIONS
PROJECT UHHZ 070800
TABLE OF CONTENTS
SPECIFICATION SECTION
NUMBER
TITLE
PAGES
Division 1 – General Requirements
01005
STATEMENT OF WORK
01005-1 thru01005-3
01010
GENERAL REQUIREMENTS
01010-1 thru 01010-8
01100
ENVIRONMENTAL PROTECTION
01100-1 thru 01100-10
01200
PROJECT SUBMITTALS
01200-1 thru 01200-6
01580
SAFETY REQUIREMENTS
01580-1 thru 01580-7
Division 2 – Sitework Construction
02050
DEMOLITION
02050-1 thru 02050-3
02080
DEMOLITION/ABATEMENT OF
ASBESTOS MATERIAL
02080-1 thru 02080-27
02090
LEAD-BASED PAINT (LBP) REMOVAL
02090-1 thru 02090-8
02820
TURF
02820-1 thru 02820-4
02950
TREES, SHRUBS, GROUND COVERS,
AND VINES
02950-1 thru 02950-10
Division 3 - Concrete
03520
INSULATING CONCRETE ROOF DECKS
03520-1 thru 03520-2
Division 5 - Metals
05500
MISCELLANEOUS METAL
05500-1 thru 05500-4
Division 6 – Woods & Plastics
06100
ROUGH CARPENTRY
06100-1 thru 06100-8
06200
FINISH CARPENTRY
06200-1 thru 06200-4
Division 7 – Thermal & Moisture Protection
07220
TWO LAYER ROOF INSULATION FOR
METAL DECKS
07200-1 thru 07200-6
07222
ROOF INSULATION FOR CONCRETE
DECKS
07222-1 thru 07222-5
07225
ROOF INSULATION FOR WOOD DECKS
07225-1 thru 07225-6
07229
ROOF INSULATION FOR NAILABLE
CEMENTITIOUS DECKS (One Layer
Over Nailed Base Sheet)
07229-1 thru 07229-6
07230
ROOF INSULATION FOR NAILABLE
CEMENTITIOUS DECKS (2 Layers
Over Nailed Base Sheet)
07230-1 thru 07230-6
07231
RETROFIT ONE LAYER ROOF
INSULATION
07231-1 thru 07231-5
07233
TWO LAYER ROOF INSULATION
(Cold Adhere)
07233-1 thru 07233-5
07234
TAPERED ROOF INSULATION
07234-1 thru 07234-3
07236
ROOF INSULATION FOR WOOD DECKS
(Two Layers over Nailed Base Sheet)
07236-1 thru 07236-5
07311
ROOFING, STRIP SHINGLES
07311-1 thru 07311-4
07413
METAL ROOFING, PLAIN
07413-1 thru 07413-8
07415
METAL ROOFING, FACTORY –
COLOR - FINISHED
07415-1 thru 07415-10
07500
METAL RE-ROOFING ADJUSTABLE
SPACE SYSTEM
07500-1 thru 07500-6
07510
BUILT-UP ROOFING SYSTEM
(Hot Application)
07510-1 thru 07510-9
07510.1
HIGH PERFORMANCE BUILT-UP
ROOFING SYSTEM (Hot Application)
07510.1-1 thru 07510.1-10
07515
BUILT-UP ROOFING SYSTEM
(Cold Process)
07515-1 thru 07515-8
07515.1
HIGH PERFORMANCE BUILT-UP
ROOFING SYSTEM (Cold Process)
07515.1-1 thru 07515.1-8
07530
ELASTOMERIC ROOFING (EPDM)
07530-1 thru 07530-5
07540
BUR RESTORATION: ODORLESS
RESATURANT (Cold Tar Pitch or
Asphalt Roofs)
07540-1 thru 07540-10
07540.1
BUR RESTORATION
(Hot Modified Coal Tar Pitch)
07540.1 thru 07540.1-9
07540.2
BUR RESTORATION
(High Performance Kettle Modified
Asphalt Roofs)
07540.2-1 thru 07540.2-10
07540.3
FLUID APPLIED ROOFING (OVER
EXISTING SUBSTRATE)
07540.3-1 thru 07540.3-7
Division 7 – Thermal & Moisture Protection (cont’d)
07542
FLUID APPLIED ROOFING; ASPHALT
COATINGS FOR SMOOTH SURFACED
ROOFS
07542-1 thru 07542-7
07550
MODIFIED BITUMEN BUILT-UP ROOFING
07550-1 thru 07550-9
07550.1
HIGH PERFORMANCE MODIFIED
BITUMENT BUILT-UP ROOFING
07550.1-1 thru 07550.1-11
07600
SHEET METAL WORK, GENERAL
07600-1 thru 07600-11
07620
FLEXIBLE FLASHING & SHEET
METAL MULTIPLY FLASHINGS
07620-1 thru 07620-9
07710
SINGLE PLY FASCIA ROOF EDGING
07710-1 thru 07710-3
07711
BUR FASCIA/GRAVEL STOP SYSTEM
07711-1 thru 07711-3
07712
MODULAR COPING SYSTEM
07712-1 thru 07712-3
07920
CAULKING AND SEALANTS
07920-1 thru 07920-5
Division 9 - Finishes
09871
COATING SYSTEMS FOR METAL ROOFS
09871-1 thru 09871-5
09900
PAINTING, GENERAL
09900-1 thru 09900-8
Division 15 - Mechanical
15400
ROOF DRAINS
15400-1 thru 15400-3
REPLACE AND REPAIR ROOFS
ROBINS AFB, GEORGIA
TECHNICAL SPECIFICATIONS
(Updated 28 June 2007)
SECTION 01005
STATEMENT OF WORK
Project Description:
This is an indefinite delivery, indefinite quantity contract (IDIQ) for construction efforts at Robins AFB, GA. Each construction project will be awarded by an individual Task Order (T.O.) issued against the basic contract and specifying work in support of equipment installation and real property maintenance, repair, alteration, and new construction. The Base Civil Engineer (BCE) will identify construction tasks required to complete each specific job and the Contracting Office (CO) will issue Requests for Proposal (RFPs) and award individual T.O.s to the contractors to complete those jobs. It is anticipated that the majority of the Task Orders will be awarded based on competition. The contractors shall furnish all materials, equipment and personnel necessary to manage and accomplish the work unless otherwise directed by the government.
The contractors shall provide sufficient technical support and project management to assure quality and completeness of designs and drawings, accuracy of estimates; accommodate a number of concurrent “active” projects; provide flexibility of management staff, in-house work force, and subcontractor pool to handle rapid increases in work volume, perform according to schedule, process submittals in a timely manner; and present a professional demeanor.
This is a general overview of the project. Follow details shown by the overall project specifications, and the specifications and drawings from each Task Order, interpreted in accordance with contract clauses.
Work by the Government
The Government reserves the right to accomplish work, the same type or similar work as contracted for herein, using Government or other contractor work forces, as the Government deems necessary or desirable, and to do so will not breach or otherwise violate this contract.
Unit Price Book and Cost Estimating Requirements
Definitions Unit Price Book (UPB): The list and price information for all pre-priced items covered in this contract. The R.S. Means Facilities Construction Cost Data Guide shall be used for the purpose of this IDIQ contract. Two current volumes shall be provided to the government by each contractor during each year of the contract. The volumes become the property of the Government.
Line item: An item or system denoted in the UPB by a unique line item number.
Coefficient: Factor(s) applied to UPB price data (bare cost) to calculate Task Order prices. Coefficients cover costs such as overhead, profit, minimum design costs, and G&A expenses including employee access needs, bond premiums, and gross receipts taxes. Note UPB line items specified in the Pre-Priced Unit Price Book, shall be covered by the contractors’ coefficients. Since costs for work in secure areas is added to the total cost of a Task Order, the coefficient for work in secure areas should only include additional costs, and not duplicate costs in other coefficients.
Non-pre-priced line item (NPI): An item or system not covered in the UPB.
Special Robins Item (SRI): An NPI that will be used repeatedly over the duration of the contract.
Conventional line item: A very specific item listed in the UPB. These are the vast majority of the line items contained in the UPB.
Selective demolition line item: The removal of material with no concern for its replacement. If a line item can be found in the UPB for selective demolition, that line item will be used. If there is no line item for selective demolition, the Contractors will locate the material line item in the UPB. Then the Contractors will create an alternate pre-priced line item removing the cost for the material, and the remaining amounts in labor and equipment will be multiplied by 50%. This will be used as the means to demolish that item. This line item will be pre-priced. If the line item cannot be found in the UPB, the demolition will be an NPI.
Removal and replacement line item: An item that is to be removed and then replaced without damaging the item. If a line item can be found in the UPB for removal and replacement, that line item will be used. If there is no line item for removal and replacement, the Contractors will locate the material line item in the UPB. Then the Contractors will create an alternate pre-priced line item removing the cost for the material, and the remaining amounts in labor and equipment will be multiplied by 150%. This will be used as the means to remove and replace that UPB line item. This line item will be pre-priced. If the line item cannot be found in the UPB, the demolition will be an NPI.
Bare costs: The UPB cost of a line item without any multiplier or coefficient applied.
Multiplier: The City Cost Indexes (CCIs) for task orders at Robins AFB, GA will use the Weighted Average CCIs for labor and materials for Macon, GA. Note CCI adjustments are updated quarterly. Quarterly updates shall be provided by the contractor. The UPB is updated annually.
4. Commencement, Prosecution and completion of Work A. Response Time: Projects ordered under this contract will be classified as routine, urgent, or emergency and the contractors shall respond accordingly. If the project is to be classified as urgent or emergency it will be so noted in the SOW.
1. For emergency work, contractors shall respond to the Government’s requirements by arriving at the job site within 24 hours of notification, including weekends and holidays, prepared to commence work immediately and upon verbal approval/direction of the CO. Emergency work shall consist of major roof damages or repairs, mission essential requirements (IAW DODI 302037) or damage to mission critical facilities shall only include work necessary to alleviate emergency conditions. Any follow on work shall be subject to routine work procedures and coefficients. The contractor may expect 3 to 5% of work to be classified as Emergency.
2. For urgent work, contractors will be required to conduct a site-visit with the CE representative within 2 calendar days of receiving an initial RFP/SOW and providing a complete proposal within 5 calendar days of the site visit. The contractor may expect 5 to 10% of work to be classified as Urgent. Upon verbal direction of the CO or his/her designated representative, the contractor shall commence work.
3. For routine work, contractors will be required to conduct a site-visit with the CE representative within 2 calendar days of receiving an initial RFP/SOW and providing a complete proposal within 14 calendar days of the site visit.
4. For Warranty Work, contractors will be required to respond to warranty calls within 24 hrs after being notified by contracting officer. A detailed letter of how much time it will take and when the work can start can be coordinated between the contractor, Civil Engineering Project Manager and the contracting officer. All warranty repairs and work will be tracked by CE and contracting office.
REPLACE AND REPAIR ROOFS
ROBINS AFB, GEORGIA
TECHNICAL SPECIFICATIONS
SECTION 01010
GENERAL REQUIREMENTS
1. SUMMARY OF WORK: The work covered by these specifications consists of furnishing all plant, labor, equipment and materials and to perform all operations in connection with replacing, repairing, maintaining, up keeping, and inspection of the roofs on structures located at Robins AFB, Georgia, in strict accordance with these specifications and applicable drawings and subject to terms and conditions of the contract. The work generally consists of, but is not limited to, the following:
A. Removal of some to all existing shingles, tile, or built up roofing, metal roofing, felt, flashing and equipment from the roof of single and multi-level structures.
B. Repair or replace existing shingles, tile, or built up roofing, metal roofing, felt, flashing and equipment from the roof of single and multi-level structures.
C. Repair or replace damaged fascia boards, soffits, decking, and rafters and decking in areas when required and directed.
D. Repair of porch overhangs, awnings, and framing as directed.
E. Install new or replace with existing the flashing at the drip edges, roof penetrations, expansion joints, roof to wall, roof to fascia, and roof to gutter meetings.
F. Install new felt moisture barrier and insulation as directed.
G. Install new roof shingles, metal roofing, awnings, overhangs, tiles, or built up roof systems as directed.
H. Painting of sheet metal flashing and new wood components and reinstall and/or relocation of equipment as directed.
I. Routinely inspect building roofs as directed.
J. Conduct moisture tests on roof systems as directed.
K. Remove, clean, reinstall, or replace gutters, downspouts, roof drains, lightning arrester conductors, and gravel stops and curbs as directed.
L. Raise existing roof equipment, vent piping, stacks, etc., when installing tapered insulation or when required for other reasons, specified by the Project Officer (PO). Note: Project Officer and Project Manager are used interchangeably
Throughout this specification.
M. Remove and reinstall roof(s) and/or replace roof hatches when required to install new.
N. Remove and replace roof scuppers when required.
O. Replace materials in kind on historical buildings and houses unless otherwise specified.
P. Protect all landscaping around and near the construction site.
2. BUILDING OCCUPANCY: Any of these buildings may be occupied during the duration of the work.
3. SCHEDULE OF WORK: The Contractor shall submit a schedule indicating the actual working performance period for each specific job. The form for the schedule will be provided to the Contractor at the pre-construction conference.
3.1 General: In general, the Contractor will be able to accomplish this work during normal work hours from (7:00 a.m. to 4:30 p.m.). The Contractor will not normally be permitted to work on weekends or on the following legal holidays (or the day the Federal Government observes these holidays) unless he has coordinated such work with the PO at least forty-eight (48) working hours in advance:
A. New Year's Day
F. Washington's Birthday
B. M. L. King, Jr.'s Birthday
G. Memorial Day
C. Independence Day
H. Columbus Day
D. Veteran's Day
I. Thanksgiving Day
E. Labor Day
J. Christmas Day
The Contractor shall coordinate his work with the PO to avoid interference with necessary activities within the buildings and coordinate the work of all trades to prevent any conflicts. The Contractor, before proceeding with the construction, shall resolve any conflicts of components and notify the Project Manager (PM) two weeks in advance before starting work on a Delivery Order.
4. CONTRACTOR DEVIATION: When an "or equal" item or a "deviation" is submitted for the government's review and approval the Contractor shall submit the substitute product on AF Form 3000 provided by the Contracting Officer (CO) or PO. The Contractor shall submit all substitutions prior to the purchase for government review and approval (or disapproval). Refer to Section 01200, Project Submittals. All deviation submittals shall be accompanied with a deviation letter explaining the reasons for the deviation, including all cost differences.
5. REFERENCED PUBLICATIONS: Any publication referenced in this specification, but not shown in each part under paragraph entitled "APPLICABLE PUBLICATIONS," also form a part of these specifications to the extent referenced. It is the responsibility of the Contractor to use the most recent edition of any referenced publications. Any questions about referenced publications should be directed to the CO or the Project Officer.
6. GOVERNMENT FURNISHED MATERIALS: The government maintains the right to supply material required for any or all work at its discretion.
7. REMOVED ITEMS: All removed items that are not indicated to be reused shall be removed from the site by the Contractor. Those items that are indicated to be reused shall be stored out of the weather in a secure area during the work. As soon as practical the equipment shall be reinstalled and tested for operability. All unused material or debris will be removed from Government-controlled property and disposed of following all local, state and federal regulations. All costs in connection with disposing of the materials will be at the Contractor's expense. All liability of any nature resulting from disposal of the materials will be the responsibility of the Contractor. All disposal areas whether on or off Government controlled lands will be subject to the approval of the PO. Use of Government contracted dumpsters is prohibited. All items designated as salvageable shall be removed and delivered to the Government.
8. EXCAVATION: RESERVED
9. GROUND FAULT CIRCUIT INTERRUPTERS: Whenever the Contractor uses portable electrical tools or equipment in an outside location or in an interior wet location where floor is conductive such as concrete, the Contractor shall provide and use a portable ground fault circuit interrupter (GFCI). The Contractor shall be responsible for maintaining the GFCI in operating condition and testing it before each use.
10. FIRE REGULATIONS: The Contractor will comply with all aspects of the National Fire Protection Association (NFPA) publication 241, "Safeguarding Building Construction and Demolition Operations," dated 1980 and "AU Fire Prevention and Protection Standards for Contractors" dated 1985.
11. ASBESTOS: No friable asbestos containing materials will be installed as a part of this contract. Spray application of asbestos or asbestos containing materials to exposed walls, ceilings, ducts, columns, etc. is prohibited. In the event friable asbestos containing materials are encountered during "rip out,” and demolition operations, the Contractor shall stop work immediately and notify the CO and PO who will take appropriate action.
12. DRAWINGS: All drawings provided by the PO and CO are diagrammatic and are intended to qualify the materials specified and indicate their intended relationship to each other. The drawings are not to be scaled, rather field conditions should dictate placement. The various scales used on the drawings may not allow the indications of all fittings, offsets, and accessories that may be required. The Contractor is to carefully investigate the conditions that would affect the work to be performed and shall arrange such work accordingly.
12.1 Details: Built-up Roofing (including Modified BUR) Details shall comply with National Roofing Contractors Association (NRCA), 1989, Details A through Y. EPDM Single ply details shall comply with NRCA, 1989 Details B through H.
13. As Built Drawings: As directed by the PO and at no additional cost, the Contractor shall submit a set of As Built Drawings on all roofing systems that are installed as new and that change the existing roofing system or condition. Drawings shall show insulation lay out including slopes to drain, BUR membrane composition, and any flashing details (i.e., walls, curbs, expansion joints, etc.).
14. CONTRACTOR MAINTENANCE: At the end of each working day the Contractor shall police and clean up the work area, any associated storage areas or trailer areas and the area immediately surrounding the work area of all work-related debris. Disposal of all materials not specified or shown to be salvaged and/or reused and all debris shall be the responsibility of the Contractor. These materials shall be removed from government lands and shall be disposed of off base in a permitted landfill. The Contractor shall comply with the U.S. Army Corps of Engineers "Safety and Health Requirements Manual"(EM-385-1-1, 3 NOV 03), safety requirements and shall conduct his operations in a manner to insure an accident-free environment.
Contractor shall keep all grassed areas within his work area in a neatly trimmed state during the growing season. Stacked materials shall not be within 25 feet of an active roadway and shall not block emergency vehicles’ access to the housing unit or the street.
14.1 Non Hazardous Material: Debris and rubbish shall be removed from the project and disposed of off base in a permitted landfill. The Contractor shall comply with Georgia EPD.
14.2 Hazardous Material: Debris and rubbish shall be removed from the project site off base. Disposal shall be in a permitted landfill. All Demolition construction debris shall be disposed of in accordance with the Georgia EPD. The Contractor shall notify Georgia EPD in writing ten (10) working days prior to any demolition occurring. This notification and completion of the attached form, is required by 40 C.F.R. Part 61.145(c). A copy of the completed form(s) as furnished from the Georgia EPD shall be furnished to the PO and CO prior to contract completion and final payment.
NOTE: Applicable disposal shall be recommended in the delivery order.
15. Delivery Orders: Delivery Orders (DO) will be issued against the contract, and will incorporate the terms and conditions of the work to be accomplished and the pricing. The Contractor is expected to make site visits with the CO; the Contracting Officer’s designated Representative (COR) or the PO prior to a delivery order being issued. A Performance Period, Statement of Work, and Progress Schedule (for work over 60 days) will accompany the DO. The Delivery order will be based on the Unit Price Schedule (UPS) also referred to in the solicitation/award as the Bidding Schedule.
15.1 An Urgent Delivery Order (UDO) may be issued to the Contractor for emergency repairs as opposed to a DO. An UDO will allow the Contractor to proceed with repairs based upon receipt of verbal direction and from the CO. UDOs will require the Contractor to start work within 24 hours after notification. The contactor may expect 3 to 5% of the work to be issued as a UDO. The CO will notify the Contractor if the DO is to be classified as urgent.
15.2 A Repair Delivery Order (RDO) may be issued to the Contractor for immediate repairs on several facilities. An RDO will allow the Contractor to proceed with repairs based upon receipt of verbal direction and from the CO. RDOs will require the Contractor to start work within 2-5 days after notification. The contactor may expect 2 to 5% of the work to be issued as a RDO. The CO will notify the Contractor if the DO is to be classified as repair.
Upon the issue of a RDO, the Contractor will be provided an initial location and scope of a roof repair. The Contractor, upon receipt of verbal direction from the CO, shall proceed to each facility (accompanied by the PO), identify the location of the repair work and make all necessary (immediate) repairs. The Contractor is to use line item # X220AA, per facility for assessment of the damage and any immediate repair. In addition to the assessment line item, the Contractor is to use the UPS for the quantities of materials used in the repair.
The Contractor can expect that a RDO will be limited in scope (requiring a minimum amount of materials) and, as such, will include several different facilities bundled together. The amount of work to be accomplished shall determine the number of facilities to be issued per RDO. The mobilization charge (line item # X246A__) per RDO shall be no more than 20% of the maximum amount of work to be accomplished (including each assessment line item). The overall delivery order shall only incur one mobilization charge.
15.3 Contractor may receive preliminary notice of a pending requirement for roofing services by receipt of a preliminary work order from the PO. Upon receipt, the contractor and CO, COR or PO shall visit the project site to become familiar with the project scope. Procedures, requirements, site conditions, etc., shall be discussed and resolved at this time. After the site visit, the contractor shall prepare and submit a proposal to the CO, with copy to PO, within 14 days. The negotiated rates contained in the UPS of the basic contract shall serve as the basis for establishing the cost of the work to be performed. Upon receipt of the contractor’s proposal, the Government will review for completeness. If necessary, the contractor, CO and PO shall meet to resolve any major differences in the proposed quantities, non-pre priced items, and the performance period required. At the conclusion of negotiations, the delivery order will be issued based upon the terms and conditions agreed upon.
15.4 The contractor shall prepare and provide a schedule of on-going delivery orders. The schedule shall be submitted no later than the 10th day of each month to the CO and PO. The schedule (usually a spreadsheet) shall be in an approved format (by the CO and PM) and contain at a minimum the following information of each DO: the description, start date, estimated completion date, and current status (percentage) complete.
16. Communication: The Contractor shall maintain a 24 hour per day telephone number for response to emergency and warranty calls regarding buildings on which he is working. The Contractor shall respond to all emergency calls within two (2) hours. This requirement includes weekends and Holidays. Emergency calls may include water leaks, safety issues, severe weather conditions, or loose debris.
For coordination purposes of each DO, the Contractor is to provide the PO with a list of job foremen and their alternates.
17. WARRANTIES:
17.1 CONTRACTOR WARRANTY: If the warranty option is ordered, the Contractor shall provide the Government with a Written Warranty for Workmanship. The Warranty shall cover the period of years ordered and start from the date of the Government’s acceptance of installation. If, within the warranty period, the roof leaks, the contractor shall repair the roof at no additional cost to the Government. The Contractor shall also provide the Government with a written set of instructions of how the Government is to report items of warranty work to the contractor for repairs, a Point of Contact within his organization that is authorized to speak in the contractor's behalf, and a definite and acceptable time frame the contractor will be on the site to make repairs.
17.2 MANUFACTURER’S WARRANTY: The Contractor shall also provide the Government with a manufacturer's written warranty for the roofing material. The warranty shall cover the period of years exercised and start from the date of the Government’s acceptance of the installation. If, within the warranty period, the roofing material fails and it is determined that it is by manufacturer’s defect, the Contractor and manufacturer shall replace the roof at no cost (including both labor and materials) to the Government.
17.3 The contractor is to provide the Government with a metal sign with the following Warranty information:
A. The Contractor’s name, address and phone number.
B. The Contractor’s Point of Contact.
C. The Project Officer’s name, base organization, and phone number.
D. The date the Roof was accepted by the Government.
E. The date the Warranty expires.
F. The Project Number.
The sign shall be brown with white lettering and shall not be more than 24”x18”. A copy of the Base Sign Standards will be provided by the PO or CO for the Contractor’s use. The number (maximum 3 per facility) and location of the signs shall be determined by the PO and the CO. The sign is to be mechanically attached to the facility at each major access point to the roof.
18. PROTECTION OF EXISTING LANDSCAPE DURING CONSTRUCTION
18.1 The following requirements shall be observed by the Contractor in order to protect existing landscape and facilities during construction operations:
A. If any failure to comply with the General or Contract Specification occurs during installation, maintenance or warranty, the Contractor shall be held responsible. The Contractor, at no cost to the government, shall repair any damage occurring to government property during execution of this contract to government standards. Repair work shall be inspected and accepted by the government.
B. No vehicle parking shall be allowed under canopies of existing trees within the drip line root zone of protected trees.
C. No storage of materials shall be allowed under protected tree canopies or beside existing shrub plantings.
D. No storage of materials on turf areas shall be allowed unless the PO has given prior approval. If any lawn damage occurs, even with special permission, Contractor shall be responsible for damages to lawn, for restoring lawn to base standards, matching surrounding areas, and replacing damaged turf with sod.
E. No driving across, parking on or other operation of equipment shall occur on existing turf unless coordinated and approved by the PO prior to need. If any lawn damage occurs, even with special permission, Contractor shall be responsible for damages to lawn, for restoring lawn to base standards, matching surrounding areas and replacing damaged turf with sod.
F. No pruning or breaking off of existing trees or shrubs shall be permitted unless coordinated and approved by the PO and base landscape architect prior to need. Any pruning or cutting of shrubs or trees must have prior approval or Contractor shall be responsible for damages to government property.
G. No work shall damage the health of any tree which roots extend into the construction site. No fences, ropes, cables, signs or any devices shall be attached to any tree unless coordinated and approved by the PO.
H. The CO shall be notified immediately of any damage occurring to a tree in the construction site. The CO shall direct measures to treat the injury. The government shall incur no additional cost for any corrective measures including, but not limited to, total tree removal, replacement or “No Action Required”.
I. If the Contractor causes the death or 60% decline to any protected tree within a 24 month period, the Contractor shall remove the damaged tree and replace with size and species of tree as directed by the base landscape architect. Size of new tree shall equal caliper size of removed tree.
J. Any damage by the Contractor to turf areas shall be repaired to match surrounding areas, or dominate sod type. Repair of area shall be by sod only. The use of grass seed to repair Contractor damage to turf is not permitted on Robins AFB.
END OF SECTION
REPLACE AND REPAIR ROOFS
ROBINS AFB, GEORGIA
TECHNICAL SPECIFICATIONS
SECTION 01100
ENVIRONMENTAL PROTECTION
1. GENERAL:
1.1 The action required by this section consists of furnishing all labor, materials, and equipment and performing all work required for the abatement and prevention of pollution during and as the result of construction operations under this contract, except for those measures set forth in other Sections of these specifications. For the purpose of this specification, environmental pollution is defined as the presence of chemical, physical, or biological elements or agents which adversely affect human health or welfare; unfavorably alter ecological balances; detrimentally impact on biological species and/or their habitat; or degrade the aesthetic and recreational value of the area. The control and prevention of environmental pollution requires consideration of impacts upon air, water, land, archeological sites, and/or biological species/habitat and involves noise control, solid waste management, and resources conservation to include management of hazardous and/or toxic materials and management of radiant energy and radioactive materials, as well as other pollutants.
1.2 Technical assistance for complex environmental problems shall be coordinated with Base Environmental Coordinator, 78 CEG/CEV.
2. APPLICABLE CRITERIA:
2.1 In order to prevent, and to provide for abatement and control of any pollution or environmental problems arising from the activities of the contractor and his subcontractors in the performance of this contract, they shall comply with all applicable Federal, State, and local laws, and regulations concerning environmental pollution control and abatement, and all applicable provisions of the Corps of Engineers Manual, EM 385-1-1, 3 Nov 2003, entitled Safety and Health Requirements, as well as the specific requirements stated elsewhere in the contract specifications.
2.2 Work shall be accomplished within the guidance and limitations established by the following:
A. The National Environmental Policy Act of 1969, PL 91-190.
B. The Clean Air Act, November 1977 as amended, PL 95-95.
C. The Federal Water Pollution Control Act, December 1977 as amended, PL 95-271.
D. The Safe Drinking Water Act of 1977, PL 95-190.
E. The Noise Control Act of 1972, PL 95-574.
F. Federal Insecticide, Fungicide and Rodenticide Act Amendments, 1972, PL 92-516.
G. Toxic Substances Control Act, 1976, PL 94-469.
H. Resource Conservation and Recovery Act of 1976, PL 94-580.
I. Solid Waste Disposal Act Amendments of 1980, as amended, PL 96-4S2.
J. Title 40, Code of Federal Regulations, Part 260-265, Hazardous Waste Management System, 1980, and Part 761, Polychlorinated Biphenyls (PCBs), 1978 as amended. Part 61, subparts A&M asbestos NESHAP.
K. Georgia Asbestos Safety Act, Georgia Code Title 12, Chapter 12. Approved April 7, 1978, currently effective.
L. Georgia Air Quality Control Act, Act No. 794 Title 12, Chapter 9, Effective March, 1978
M. Rules of Asbestos Licensing Board, Chapter 51-1. Effective July, 1986.
N. Asbestos Removal and Encapsulation Regulations, Chapter 391-3-14. Effective December, 1986.
O. Solid Waste Management Regulation, Chapter 391-3-4. Effective October, 1974.
P. Deleted.
Q. Recommended Procedures for Bulk Handling of Non-Friable Asbestos-Containing Waste Material (NFACWM) by Licensed Asbestos Removal Contractors, Georgia EPD.
R. AFOSH STD. 161-21 (1990) Hazard Communication
S. Asbestos Management Plan, 78 CEG/CEV
3. NOTIFICATION: The CO will notify the Contractor in writing of any noncompliance with the provisions of paragraph 2 above and the action to be taken. The Contractor shall, upon receipt of such notice, immediately take corrective action. Such notice, when delivered to the contractor or his authorized representative at the site of the work, shall be deemed sufficient for the purpose.
4. SUBCONTRACTORS: Compliance with the provisions of this section by subcontractors shall be the responsibility of the Contractor.
5. PROTECTION OF WATER RESOURCES: The Contractor shall not pollute storm or sewer lines, or swales with fuels, oils, bitumen’s, calcium chloride, acid, construction wastes, or other harmful materials. It is the responsibility of the contractor to investigate and comply with all applicable Federal, State, County and Municipal laws concerning pollution of river and streams. All work under this contract shall be performed in such a manner that objectionable conditions will not be created in streams through or adjacent to the project areas.
6. HAZARDOUS AND/OR TOXIC MATERIALS:
6.1 Hazardous materials are defined as any materials with the characteristics of ignitability, corrosiveness, reactivity, or toxicity, or any combination of these characteristics. These materials, if not properly controlled, pose a potential hazard to human health or other living organisms because they are non-degradable, persistent in nature, lethal, or may otherwise cause or tend to cause detrimental cumulative effects.
6.2 Waste material is defined as any material for which no use or reuse is intended and which is to be discarded.
6.3 Any and all hazardous/toxic materials brought to the job site shall require the completion of the Material Safety Data Sheets (MSDS) (Re: FARS 52.223-03) as directed by the clause entitled Hazardous Material Identification and Material Safety Data. This is an anticipated listing and does not release the Contractor from identification, proper handling of hazardous/toxic materials, and submittal of the appropriate MSDS to assure adequate safety and protection of life and property.
6.4 Disposal of hazardous waste, containers or components thereof, shall be disposed of in a hazardous waste disposal site only: no other location shall be utilized for such disposal. Only hazardous waste sites that are permitted by the US Environmental Protection Agency, the State of Georgia, or the state in which the disposal will occur, shall be utilized for such disposal actions. Coordination with the Base Hazardous Waste Operations Branch, 78 CEG/CEVOH, 6-1176 for disposal/storage activities is mandatory prior to disposal.
6.5 Disposal actions shall be accomplished in compliance with the "Manifest System" for shipment and ultimate disposal. The Contractor shall ensure that such transporting and disposal are in strict compliance with the established criteria (40 CFR Parts 260 thru 265 and Part 761). A copy of the completed manifest shall be provided to the Base Environmental Coordinator and the CO. Copies of the appropriate criteria are available from the Base Environmental Coordinator and assistance/guidance to ensure compliance will be provided upon request.
6.6 Hazardous waste disposal, generated as a result of the contract action, is the Contractor's responsibility to be accomplished at his expense and no separate or direct payment will be made and this cost thereof shall be considered incidental to and included in the contract prices.
6.7 Contractor shall not use any class I Ozone Depleting Chemicals (ODC's) in performance of the contract nor require delivery of a separately identifiable Class I ODC as an Item of supply or as part of any service.
A. Air Permits - Other Emission Sources: For air emission sources that require permits construction and operation as defined in Georgia EPD Rules for Air Quality Control, Chapter 391-3-1, the Contractor shall submit data required on the permit application form. Since an approved permit to construct is mandatory prior to start of construction, the contractor shall not order and install the equipment until the permit has been approved and government approval of the contractor's submittal has been obtained. Contractor shall anticipate 90 days from the issuance of Notice to Proceed for this to occur.
B. Other Submittals, Notifications, and Approvals: The following submittals, notifications and approvals are required to maintain compliance:
1. Solid Waste Disposal: When applicable, the Contractor shall provide a solid waste disposal plan which will include a notarized letter from the contractor stating how all materials leaving Robins AFB will be disposed of.
(a) The letter shall certify that the Contractor shall dispose of all materials in compliance with all Federal, State of Georgia, and local laws. This letter will be signed by a senior official of the company. The plan shall address the disposal of each item addressed in Sections 3.01 and 3.02 as applicable. Non-hazardous solid waste shall be broken down into individual types, i.e., asphalt, concrete, wood, brick, etc.
(b) The plan shall address each landfill to be used. A copy of all landfill permits shall be provided unless the Houston County landfill is to be used. The plan shall designate the employee who will be responsible for verifying that all materials removed from Robins AFB are disposed of in accordance with the above referenced laws. The employee shall be an employee of the contractor and shall have authority to act for the contractor. Provide five copies of the Disposal Plan to the CO prior to the Pre-construction Conference or 14 calendar days prior to the start of disposal operations if no pre-construction conference is held.
(c) Provide a copy of a Solid Waste Handling Permit, issued by GA EPD, which allows the Contractor to handle solid wastes. This is not required if the contractor is operating under the inert waste landfill permit-by-rule provision.
(d) Establish and maintain a waste disposal log. The log shall be updated daily. Each load of materials that leaves Robins AFB shall be accounted for in the log. The log shall list the load number, bill of sale number/date, or other record for recycling and who from the contractor verified that the material was disposed of properly and how verification was accomplished.
(e) Keep on hand evidence of proper disposal of construction debris as well as providing this evidence to the CO. Examples of evidence include dump tickets from a licensed sanitary landfill and copies of a current landfill permits from the State of Georgia (unless Houston County landfill is used.), manifest, bill of sale, or other record for recycling. This evidence shall be provided the workday after the load is carried off.
(f) After contract work is completed and prior to final payment, the Contractor shall submit a notarized letter of certification signed by a senior official of the company certifying that all materials removed from Robins AFB have been disposed of in accordance with all applicable Federal, State, and local laws. Attach a copy or duplicate of the Waste Shipment Tracking Document for each load transported to the Houston County Landfill. See paragraph 3.01.B.2.a.(1)
2. Recycling: Provide a letter indicating what materials will be treated as recovered materials under GA EPD regulations and show how the criteria for recovered materials are met. See Section 3.0.1.B.2.d.
C. Disposal of Waste/Excess Material: Non-hazardous Solid Waste or Excess Material, except topsoil and suitable fill material, shall be removed from the base daily. Dispose in a manner approved by the US Environmental Protection Agency and the Georgia Department of Natural Resources, Environmental Protection Division (EPD). Also comply with applicable local codes and requirements. Equipment/material to be removed from the project but not turned in to the Government is the property of the contractor.
1. Solid Waste Handling: All persons engaged in solid waste handling or operations of solid waste handling facilities or disposal sites shall have a solid waste handling permit. The provision of Georgia EPD regulations concerning proper handling of solid wastes and applicable prohibitions (e.g., handling in such a manner as to create a nuisance and cause insect or rodent infestation) shall govern.
2. Disposal: Use one or more of the following methods to dispose of non-hazardous solid waste.
(a) Sanitary Landfill: All solid waste may be disposed of in a sanitary landfill properly licensed by the State of Georgia. If a landfill other than the Houston County sanitary landfill is used, provide a copy of the landfill license. Provide proof that any Georgia municipal solid waste disposal facility to which they propose to bring RAFB waste, except Houston County, is operated by someone who has obtained the certification required by the Georgia Solid Waste Management Act, O.C.G.A. 12-8-24.1.
(1) All non-hazardous wastes disposed of in the Houston County Landfill must have a Waste Shipment Tracking Document signed by the Contractor’s hauler certifying that no hazardous waste was introduced into the waste while in his custody. (A copy of the form is attached at the end of this section.) The government (Environmental Management) has filled out the top of the form. The contractor will complete the bottom of the form. The contractor must provide this form with each load disposed of. Also attached is a copy of the completed Special Waste Acceptance Application (SWAA) giving the results of the government’s testing during the design phase of the project of the materials expected to make up the waste stream.
(b) Inert Waste Landfill: Materials not likely to cause production of leachate of environmental concern may be disposed of in an inert waste landfill. Only earth and earth-like products, concrete, cured asphaltic concrete, rock, bricks, yard trimmings, and land clearing debris such as stumps, limbs, and leaves are acceptable for disposal in an inert waste landfill... These materials shall not be from construction demolition, but only from land or site clearing operations. Vegetation may come from a demolition site, if it is removed prior to other demolition and is kept segregated from other construction and demolition wastes. Provide a copy of the written notice of commencement of operation by the landfill as given to the Georgia EPD.
(c) Construction/Demolition Disposal Site: Only wood, metal, wallboard, paper, cardboard, and materials that can go in an inert waste landfill may be disposed of in this facility. Provide a copy of the landfill license.
(d) Recycling: Recycling of materials is strongly encouraged. Materials destined for recycling must meet the definition of non-hazardous wastes under federal/state hazardous waste regulations. Materials defined as “recovered materials” by GA EPD regulations are excluded from regulation as solid wastes. Direct all inquiries to 78 CEG/CEVQ, Pollution Prevention Division, (478) 327-3976.
(e) All materials to be disposed of in other than a sanitary landfill must be kept segregated at the project site from those materials, which are allowed only in a sanitary landfill.
3. Solid Waste Disposal Outside of Georgia: Dispose of no solid waste outside the state of Georgia without prior written approval of the CO. If the contractor desires this, he shall provide sufficient information as determined by the contracting officer to allow verification of compliance with the law.
END OF SECTION
Copy of the SWAA form follows.
HOUSTON COUNTY MSW LANDFILL
2018 Kings Chapel Road
Perry, Georgia 31069
Profile No. _______________
Telephone: (478) 987-0089
(Assigned by Houston County)
Fax: (478) 987-0102
SPECIAL WASTE ACCEPTANCE APPLICATION (SWAA)
Generator Name: ________________________________________ Contact:______________________
Address:_______________________________________________________________
Telephone:_______________________ Fax: ____________________________
Description of Waste: ______________________________________________________________________________
Source / Location of Waste: _________________________________________________________________
Waste Quantity: _________________________________ Cubic Yards ________ Tons ______
Frequency of Disposal: Daily_____ Weekly____ Monthly _____ One Time_____ Other_______
Laboratory Data (Please attach a hard copy of laboratory test data)
Physical Properties: Physical State: _________Solid______ Semisolid______ Liquid______
Color: _______
Halogenated Organics: _________ mg/kg Flash Point: _______deg F Odor: Yes_______ No_______
Water Content: ___________ % by Weight Paint Filter Test Passed__________ Failed________
Reactive: No _____ Yes _____ With H2S _____ mg/kg HCN _____ mg/kg Others ______mg/kg pH Value ________ (S.U.) Infectious: Yes ______ No _______
Chemical Properties: (Concentrations in mg/I)
(TCLP) Arsenic______ m-Cresol_____ Pyridine______
Hexachlorobenzene_____ Barium_____ p-Cresol_____
Hexacholorobutadiene_____ Selenium_____ Benzene _____
Total Cresol_____
Hexachloroethane_____
Silver______ Cadmium_____ 2,4-D_____ Lead_____ Tetrachloroethene______ Carbon Tetrachloride_____
1,4 Dichlorobenzene_____ Lindane_____ Toxaphene______
Chlordane_____
1,2 Dichloroethane_____
Mercury_____
Trichloroethene______ Chlorobenzene_____
1,1 Dichloroethane_____ Methoxychlor_____
2,4,5 Trichlorophenol______ Chloroform_____ 2,4 Dinitrotoluene______
Methyl Ethyl Ketone______
2,4,6 Trichlorophenol______ Chromium_____ 2,4,5 TP Silvex______
Endrin_____ Nitrobenzene______
0-Cresol_____ Heptachlor (a hydroxide)_____ Vinyl Chloride______
Oentachlorophenol______
None of the above constituents exceed TCLP disposal limits___________
Others (List) _____________________________________________________________________________________
Other Information: Delivery method: Bulk________
Other _________________________________________________________________________
Regulatory Agency Approval Received: Yes__ No__ Permit Number ____________________
Material Safety Data Sheet Provided: Yes__ No__
Generator's Certification Statement
"I certify under penalty of law that this document and all attachments were prepared under my direction and supervision in accordance with a system designed to assure that qualified personnel properly gathered and evaluated the information submitted. To the best of my knowledge, the material described above is not classified as hazardous waste under current regulations, and I agree to notify Houston County MSW Landfill if such classification changes. The attached information provided is true and accurate to the best of my knowledge."
Signature of Authorizing Agent _______________________________________ Date _________
Name of Agent (Typed or Printed) ____________________________________ Title _______________
Houston County MSW Landfill
Profile No._________
2018 Kings Chapel Road
(Assigned to SWAA)
Perry, Georgia 31069
Telephone: (478) 987-0089
WASTE SHIPMENT TRACKING DOCUMENT
Generator Name: _____________________________________ Contact: ________________
Address: ____________________________________________________________________
Telephone: ______________________ Fax: ________
Description of Waste: ____________________________________________________________________
Location of Waste: _______________________________________________________________________
Date Shipped: _____________ Quantity Shipped _____________________
Certification: I certify the waste described above is the waste represented by the Special Waste Acceptance Application
(SWAA) of the same Profile Number and no regulated hazardous waste has been introduced into the waste.
Generator's Signature: ________________________________________ Date: ___________
To Be Filled Out by the Contractor’s Project Manager or Waste Hauler and Signed by the Waste Hauler
Transporter: __________________________ Contact: ____________________________________
Address: _____________________________________________________________
Telephone: ___________________________
Certification: I certify no regulated hazardous waste was introduced into the waste while in my custody:
Hauler's Signature: _________________________________ Date: _____________
REPLACE AND REPAIR ROOFS
ROBINS AFB, GEORGIA
TECHNICAL SPECIFICATIONS
SECTION 01200
PROJECT SUBMITTALS
1. GENERAL: Provide items requiring drawings, diagrams, certifications, manufacturers’ literature, data brochures, technical data, sample requests, forms, and other data as noted under the submittals section of each specification section.
1.1 Contractor Responsibility: Review, Corrections, or Comments made on the Submittals do not relieve the Contractor from compliance with the requirements of the Drawings, Specifications, Addendums and Contract Documents.