PWS_update.docx

DOCX document 34 KB Posted

Attached to
Engineering Services
Solicitation number
FA825119R0017
Issued by

About this file

Updated PWS

View the file

Other files

File Type Posted
Clarifications_to_the_RFP__2.docx DOCX document
FA825119R0017_______0002.pdf PDF
Clarifications_to_the_Request_for_Proposal.docx DOCX document
FA825119R0017_______0001.pdf PDF
CDRL.pdf PDF
PWS.docx DOCX document
FA825119R0017.pdf PDF
Pre_Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PERFORMANCE WORK STATEMENT

FOR

Item Unique Identification Sustainment

PREPARED BY

748 Supply Chain Management Group Hill Air Force Base, Utah

DATE

July 29, 2019

Background The purpose of this effort is to procure professional engineering services in support of the Item Unique Identification (IUID) program at the 638 SCMG at Robins AFB, GA, the 748 SCMG at Hill AFB, UT, and the 848 SCMG at TAFB, OK. The Supply Chain Management Groups provide program management and engineering support for the Item Unique Identification (IUID) program at the group level. The purpose of this effort is to support those activities within the 448 SCMW.

Scope The scope of the work for this task order includes engineering, technical, analytical, and strategic services for the 638 SCMG, the 748 SCMG, and the 848 SCMG in support of IUID part marking activities. Support will encompass engineering expertise, non-recurring engineering, and process development support. It will include review, adjudication, and technical data modification and publication for approximately 10,000 NIIN’s. All supported NIIN’s, including Phase I, beyond Phase I, and Nuclear Weapons Related Material, shall be Class IX, Budget Code 8, depot repairable assets.

Objectives Solicitation Objectives This Performance Work Statement (PWS) provides the objectives in support of the IUID effort. It provides the Contractor flexibility to develop cost-effective solutions and the opportunity to propose innovative alternatives for meeting the Government’s identified objectives.

The purpose of this PWS is to solicit a proposal for program management and engineering support for the IUID effort in the supply chain management groups.

This effort will include a base year and three option years.

Program Objectives The objective of this effort is:

Receive, under a performance-based, Firm Fixed Priced (FFP) arrangement, highly reliable and secure technology based services defined herein, ensuring support that meets or exceeds customer requirements and expectations. Vendor should have at least two years of recent and relevant experience.

Logistics/Integration – Provide logistics and integration activities and support for IUID marking activities.

Personnel - Provide a proper skill mix, experience, and number of qualified personnel.

Materials - Procure all necessary supplies, spares, consumables, software, automatic data processing equipment, documentation, and other applicable properties, in the most cost effective/efficient manner ensuring that the requirements for purchasing of materials and other ODCs (to include travel, and subcontracted labor) are in full compliance with the Core Task Order terms and conditions.

Organizational processes - Provide internal controls, management oversight, and supply support.

Obtain sufficient rights to any technical data generated by this effort, both software and hardware, such that the Government can maintain and modify any software, hardware or data systems utilized by or generated in this effort using Government personnel and third party Contractors as required now and in the future.

Use electronic technologies to reduce paper copies of program information generated throughout the life of this contract.

Use electronic technologies to communicate and pass data between Government and Contractor organizations to the maximum extent feasible.

Tasks Tasks for this module can be summarized as follows:

Task 1: non-recurring engineering support for the IUID effort at the 638 SCMG, the 748 SCMG, and the 848 SCMG.

Requirements Non-Recurring Engineering Support Track remaining Phase I NIIN’s through Engineering Order (EO) and Technical Order (TO) processes to completion of drawing and TO updates (several hundred NIIN’s). This population includes approximately 1000 NIIN’s, approximately 2/3 are in the drawing revision/JEDMICS publication process, the remaining 1/3 are in the tech order revision/publication process.

Provide non-recurring engineering for NIIN’s beyond Phase I to include: a) Review and adjudication of NIIN’s with IUID marking requirements (currently defined as approximately 10,000 NIIN’s); b) creation of EO’s to update drawings; c) creation of Air Force Form 252 to update TO’s.

Target completion rate for NIIN’s beyond Phase I to be at least 200 NIIN’s per month.

The contractor shall research and develop solutions to problems that the government personnel identify including the technical, analytical and strategic services in support of the Class IX marking activities.

Nuclear Weapons Related Material Support Provide non-recurring engineering for approximately 80 Nuclear Weapons Related Material (NWRM) NIIN’s to include: a) Tracking of EO’s thru publication in JEDMICS; b) Creation of Air Force Form 252 to update TO’s; c) Support for label creation; d) Tracking of the marking of approximately 10,000 assets.

DoD IUID Registration The contractor shall provide support, IUID expertise, requirements definition and integration services to accomplish DoD registration and facilitate depot utilization of IUID marking.

The contractor shall support process development in registration of marking data in the DoD IUID registry. This will include support of efforts for UII registration of marks made on marking carts using Triad software and non-Triad based machines. It will also include supporting the sunsetting of EDCL and the development of a replacement or temporary work-around for EDCL until the MROi system is in place and providing that function.

Depot Use-Case Development Provide non-recurring engineering for the development of IUID use cases for depot utilization with the goal of enabling process flow through automated IUID data capture.

Database Utilization The contractor shall track all NIIN’s for Class IX status, IUID marking requirement, and thru the JEDMICS and TO publication processes.

The contractor shall manage, maintain, and update the IUID Program Management Database used for tracking all NIIN’s for Class IX status, IUID marking requirement, and thru the JEDMICS and TO publication processes.

The contractor shall manage, maintain and update the Marking Data Association Tool (MDAT) database. Train government personnel in the use and support of MDAT for maintaining marking data, syncing all marking machines to prevent the creation duplicate UII’s. Manage and support the transition away from EDCL as appropriate.

Software The contractor shall provide support, IUID expertise, requirements definition and integration services for the Maintenance, Overhaul and Repair Initiative (MROi). This is an enterprise tool being developed that utilizes the UII to track assets thru the MRO processes. The long term plan is for MROi to subsume Impresa, LDMS, 4L, Maximo and similar maintenance data tracking systems. The MROi effort has recently been awarded.

Any software or database products produced under this contract shall be considered Government work and shall have no license encumbrances and shall be delivered to the Government with unlimited data rights.

Materials - Consumables The contractor shall provide consumable items as needed for process development and demonstration.

Travel The contractor shall travel in support of IUID Program Management Reviews as needed, typically 3 per year. Other travel may be needed to support the Robins or Tinker locations.

Deliverables The Contractor shall provide a monthly status report of all work accomplished (CDRL A001).

The Contractor shall provide the Contract Data Requirements List (CDRLs) as identified in Table 2, “Document Deliverables.” A full description of each deliverable is contained in Appendix B.

Table 2: Document Deliverables

CDRL
Deliverable
DID
Paragraph
A001
Monthly Status Report
DI-MGMT-80227

Constraints Work Locations and Hours of Performance Work will be performed at both the Contractor facility and Government facilities. When working at Government facilities, work will typically be accomplished during normal duty hours. However the work schedule can be flexible to accommodate the contractor.

For work at a Government facility, the Government shall provide office space as required including office furniture, computers, telephones, etc.

Security While at Government locations, the Contractor shall comply with local security procedures, policies, and provide appropriate visitor data.

A Common Access Card (CAC) is required in support of this effort. This will be issued in accordance with appropriate installation instruction, Issue of Common Access Cards to Contractors (Contractor Verification System). The contractor must have favorable or higher adjudication based on a National Agency Check with Inquiries (NACI) or higher investigation.

Also, AFSSI 8522, Communications and Information, Chapter 3, Access to Information Systems and Networks, states:

Favorable Background Investigation. CSAs, in coordination with the security manager, will verify proper security clearance and background investigation checks (National Agency Check with written Inquiries (NACI), Single Scope Background Investigation) are submitted prior to granting a network user access to the AF-GIG.

Upon successful completion of initial Information Assurance (IA) awareness training and verification of favorable background check, the user is authorized use of the network and is granted access to authorized network resources.

The Government Program Manager will assist contractor personnel in processing the necessary DOD forms to obtain base or area badges for access to government facilities and property. Access to government facilities is limited. Therefore, the Contractor shall coordinate required access/usage times and dates through the Government Program Manager at least fifteen working days prior to the need date. Control of the facilities shall remain with the Government.

The Contractor shall not divulge any information regarding files, data, processing activities/functions, user ID's, passwords, or other knowledge that may be gained, to anyone who is not authorized to have access to such information. Contractor personnel shall abide by all government rules, procedures, and standard of conduct. Contractors requiring access to government Automated Information Systems (AIS) shall have background investigations and security awareness training completed, after task order award but prior to AIS access. When the period of performance is complete or and contractor personnel leave work on this project they will have 5 working days to terminate all their network user account and to return all access cards and base identification badges.

Registration of Vehicles All Contractor employees’ vehicles used for the performance of this contract shall comply with all local, state, and federal regulations. Additionally, any pass shall be surrendered to Security Forces upon demand to positively identify a person’s need to be on a federal installation.

Government Furnished Property/Government Furnished Equipment (GFP/GFE) No Government Furnished Property (GFP) is anticipated for this effort. If GFP is required, the Contractor shall forward a request to the Government at least 30 days before the need date.

All GFE or GFP shall be returned upon completion of the effort.

Program Management The Contractor shall plan and manage daily operations and activities associated with providing this requirement to ensure the necessary processes and activities are performed to provide an effective and acceptable system. The Contractor shall employ effective management tools and methods to assure control of cost, schedule and performance. The Contractor shall provide technical support to the program office throughout the duration of this effort, which includes, but is not limited to: development of engineering and technical data, responding to requests for technical assistance, and development of technical alternatives to remedy Government-identified issues. As needed, the Contractor shall conduct, support, or participate in program management and technical reviews, meeting, and conferences to ensure effective and efficient project execution.

Period of Performance (POP) The POP for this activity is 12 months from date of award for the basic task.

APPENDIX A

Points of Contact

1. Points of Contact.

Government Contracting Officer NAME: Travis Stephens

ORGANIZATION: AFSC OL:H/PZABB

Email: travis.stephens.1@us.af.mil Phone: 801-586-5091 Government Project Manager NAME: Ryan Josephson

ORGANIZATION: 748 SCMG/EN

Email: ryan.josephson@us.af.mil Phone: 801-777-6943

APPENDIX B

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item) Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO.
B. EXHIBIT
C. CATEGORY:

OTHER

D. SYSTEM/ITEM
E. CONTRACT/PR NO.
F. CONTRACTOR
1. DATA ITEM NO.
2. TITLE OF DATA ITEM
3. SUBTITLE
4. AUTHORITY (Data Acquisition Document No.)
5. CONTRACT REFERENCE
6. REQUIRING OFFICE
7. DD 250 REQ
9.DIST STATEMENT REQUIRED
10. FREQUENCY
12. DATE OF FIRST SUBMISSION
14.DISTRIBUTION

b. COPIES

8. APP CODE

11. AS OF DATE
13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

Reg

Repro

16. REMARKS:

* - each submission

15. TOTAL

G. PREPARED BY
H. DATE
I. APPROVED BY
J. DATE

image1.wmf