About this file

Appendix C

View the file

Other files for this federal contract opportunity

Other files attached to Communication, Detection, and Coherent Radiation Equipment, newest first.
File Type Posted
FA825013R80468______0004.pdf PDF
FA825013R80468______0003.pdf PDF
FA825013R80468______0002.pdf PDF
FA825012R80468______0003.pdf PDF
FA825013R80468______0001.pdf PDF
A004TechnicalReport.pdf PDF
FA825013R80468.pdf PDF
RepairDataListsFO.pdf PDF
Performance_Work_Statement.pdf PDF
A005TechnicalReport.pdf PDF
MILSTARSQS.pdf PDF
SectionLFO.pdf PDF
Transportation2.pdf PDF
A003CONTRACTORPROGRESSSTATUSANDMANAGEMENTREPORT.pdf PDF
A002REPAIRABLEITEMINSPECTIONREPORT.pdf PDF
SQSnew.pdf PDF
Table1FullOpenUpdated27Nov.pdf PDF
A001CAVAFREPORT.pdf PDF
SectionMFO.pdf PDF
TRANSPORTATION.pdf PDF
Packaging.pdf PDF
QualifiedNSNs.xlsx XLSX spreadsheet
Show all 22

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FD2020-12-80468

FD2020-13-00460 1

OGDEN AIR LOGISTICS CENTER

UNITED STATES AIR FORCE

HILL AIR FORCE BASE, UTAH 84056

APPENDIX “C”

SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION

INDUSTRIAL SAFETY REQUIREMENTS

PR NO: FD2020-12-80468

DATE: January 19, 2012

David D. Battle

Contract Safety Manager

75 ABW/SEG

SECTION I - GENERAL REQUIREMENTS

A. Safety Program Requirements.

The contractor will implement a safety program plan that ensures protection of

Government property. The program will consist of, as a minimum:

1. Mishap reporting, as defined in paragraph B1 below.

2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific

Requirements, and will be used during the performance of the work described in the contract.

The Safety Plan will be approved by 75 ABW/SEG (Safety Office) prior to commencement of any work described in this contract.

3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.

FD2020-13-00460 2

4. Competent personnel to provide surveillance of the Safety Plan.

5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.

6. All contractor personnel shall be trained and qualified to perform their duties safely.

7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.

B. Mishap Notification

1. The contractor shall notify 75 ABW/SEG (801-777-3333), or the Hill AFB Command Post

(777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to 75 ABW/SEG. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.

Mishap notifications shall contain, as a minimum, the following information:

(a) Contract, Contract Number, Name and Title of Person(s) Reporting

(b) Date, Time and exact location of accident/incident

(c) Brief Narrative of accident/incident (Events leading to accident/incident)

(d) Cause of accident/incident, if known

(e) Estimated cost of accident/incident (material and labor to repair/replace)

(f) Nomenclature of equipment and personnel involved in accident/incident

(g) Corrective actions (taken or proposed)

(h) Other pertinent information

2. The contractor shall cooperate with any and all government mishap investigations.

Additionally if requested by government personnel or designated government representative

(GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.

FD2020-13-00460 3

3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.

4. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.

C. General Safety Requirements:

If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.

The contractor is solely responsible for compliance with all federal, state and local laws, the Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees.

SECTION II – SPECIFIC REQUIREMENTS

The contractor’s prepared Safety Plan shall:

Demonstrate a management commitment to employee safety and health

Identify applicable rules and regulations

Identify the roles and responsibilities of Management, Supervisors, Employees and

Safety Coordinator

Identify work to be performed and location of expected operations

Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel

Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures

Identify employee safety and health training requirements and the documentation process

Include emergency response plans and procedures that relate to protection of government personnel and property

Include hazard reporting procedures and identify individual(s) responsible for the correcting identified hazards

Identify the process for tracking controlled hazards in contractors work area

The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:

SYSTEM MODIFICATION-WHICH ALTERS FORM, FIT OR FUNCTION: Contractor shall comply with Mil Standard 882D, Standard Practice for System Safety, 10 Feb 00 and AFI

91-202, The US Air Force Mishap Prevention Program, 1 Aug 98, Chap 9 for system modifications, which alter form, fit, or function.

http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0

FD2020-13-00460 4

ELECTRICAL: Contractor shall comply with the standards in 29 CFR 1910 Subpart S, 29

CFR 1926 Subpart K, AFOSH STD 91-501, Air Force Consolidated Occupational Safety

Standard, 7 Jul 04, Chap 8, and NFPA 70. All electrical wiring must be IAW National

Electrical Code (NEC) 70. Electrical wiring and equipment shall be a type listed by UL or another recognized listing agent. Contractor’s Safety Plan shall also address:

-Selection and use of work practices

-Training (basic electrical safety knowledge)

-Use of equipment (handling, visual inspection, rating of equipment)

-GFCI Protection for outside contractor drops and wet/damp areas

-Arc Flash

FIRE PROTECTION FOR FACILITIES: Contractor’s procedures shall comply with NFPA

10, Portable Fire Extinguishers, 2007 Edition; NFPA 13, Installation of Sprinkler Systems, 2007

Edition; NFPA 33, Spray Application Using Flammable or Combustible Materials, 2007

Edition; NFPA 70, National Electrical Code, 2008 Edition; NFPA 72, National Fire Alarm

Code, 2007 Edition; NFPA 91, Exhaust Systems for Air Conveying of Vapors, Gases, Mists, and

Noncombustible Particulate Solids, 2004 Edition.

MATERIALS HANDLING AND STORAGE: Contractor shall comply with the standards in

29 CFR 1926.250, 953, 957 and 29 CFR 1910.101, Subparts F, H & N; and 29 CFR 1910.178, Powered Industrial Truck. Contractor’s Safety Plan shall also address:

-Storage and handling of materials

-Disposal of trash from elevations

-Personnel lifting techniques--proper storage to prevent shifting, for stability, etc.

-Rigging (requirements, inspection, components, and qualifications)

-Equipment (use in handling materials)

-Industrial trucks (training, inspection, maintenance, and safe use) http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10135 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10915 http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10928 http://www.osha.gov/pls/oshaweb/owadisp.show_document?p_table=STANDARDS&p_id=10117