Attch5_Sample_Task_RFP.pdf
PDF 236 KB Posted
- Attached to
- F-16 Bracket Parts and Kit Assemblies Federal contract opportunity
- Solicitation number
- FA8232-18-R-3014
About this file
Revised Attachment 5, Sample Task RFP, dated 1 Jun 2018
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA823218R3014_______0004.pdf | ||
| Attch2_SectionM.pdf | ||
| Attch5_Sample_Task_RFP.pdf | ||
| Attch3_Solicitation_Traceability_Matrix.pdf | ||
| FA823218R3014.pdf | ||
| Attch1_SectionL.pdf | ||
| FA823218R3014_______0002.pdf | ||
| ExhibitA_CDRLs.pdf | ||
| Attch4_SOW_20Mar2018.pdf | ||
| Attch8_Packaging_Instructions.pdf | ||
| FA823218R3014_______0003.pdf | ||
| FA8232-18-R-3014-0002.pdf | ||
| Attch7_TDP_HSDN_Rev1.PDF | ||
| FA8232-18-R-3014-0001.pdf | ||
| Attch8_Packaging_Instructions.pdf | ||
| FA8232-18-R-3014.pdf | ||
| ExhibitA_CDRLs.pdf | ||
| Attch6_TDP_CDU.PDF | ||
| Attch7_TDP_HSDN.PDF | ||
| Attch4_SOW_20Mar2018.pdf | ||
| Attch5_Sample_Task_RFP.pdf | ||
| Attch1_SectionL.pdf | ||
| Attch3_Solicitation_Traceability_Matrix.pdf | ||
| Attch2_SectionM.pdf |
Show all 24
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE AIR FORCE
AIR FORCE LIFE CYCLE MANAGEMENT CENTER
HILL AIR FORCE BASE UTAH
RFP-FY18-0001
Amendment 0001 Dated: 1 Jun 2018
FROM: F-16 Contracting Branch
AFLCMC/WWMK
6072 Fir Ave, Bldg. 1233 Hill Air Force Base, UT 84056-5820
SUBJECT: Sample Task/Initial Delivery Order (IDO) Letter Request for Proposal (RFP-FY18-0001) for Center Display Unit (CDU) and High Speed Data Network (HSDN) Bracket Kits (Solicitation FA8232-18-R-3014)
1. The Government hereby requests proposal submissions for production of F-16 Bracket Kits, as defined in the following schedule:
CLIN 0001 – First Article Bracket Kit (NSN: 1560K0102948GWF)
Firm-Fixed-Price (FFP)
Quantity U/I Unit Price Amount
KT
Description: The contractor shall provide a First Article Bracket Kit for the Center Display Unit (CDU) in accordance with (IAW) the basic Statement of Work (SOW), dated 20 Mar 2018, and the associated Technical Data Package (TDP), included as Attachment 6 in Section J – List of Attachments of solicitation FA8232-18-R-3014. Packaging shall be IAW with the basic SOW and the Packaging Instructions included as Attachment 8 in Section J – List of Attachments. The following items are included:
Qty Per Kit P/N Description 1 16E6042-847 Video Switch Mounting Bracket Assembly 1 201612358-10 IMSC Cover Plate Assembly 1 16D7405-413 Harness Clamp Assembly
FOB: Destination Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements
Required Delivery Schedule: 45 Days ARO
Ship To:
FA8716
6137 Wardleigh Rd.
Bldg. 1515, Rm 220 Hill AFB, UT 84056 Attn: Troy Van Buren
Mark For: “First Article Do Not Post” POC: Troy Van Buren (801) 777-0330
CLIN 0002 – First Article Bracket Kit (NSN: 1560K0102947BWF)
Description: The contractor shall provide a First Article Bracket Kit for the High Speed Data Network (HSDN) in accordance with (IAW) the basic Statement of Work (SOW), dated 20 Mar 2018, and the associated Technical Data Package (TDP), included as Attachment 7 in Section J – List of Attachments of solicitation FA8232-18-R-3014. Packaging shall be IAW with the basic SOW and the Packaging Instructions included as Attachment 8 in Section J – List of Attachments. The following items are included:
1 20155000-50 Forward GES Mounting Bracket Assembly 1 201416452-30 or 201612362-01 Remote Fill Bracket (Machined/Casting) 3 20157775-10 Forward GES Mounting Bracket Feet 4 16E6042-851 Rear GES Mounting Bracket Assembly 1 16D3700-803 Harness Clamp Assembly
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements
Required Delivery Schedule: 45 Days ARO
Ship To:
FA8716
6137 Wardleigh Rd.
Bldg. 1515, Rm 220 Hill AFB, UT 84056
Mark For: “First Article Do Not Post” POC: Troy Van Buren (801) 777-0330
CLIN 0031 – Production Bracket Kits (NSN: 1560K0102948GWF)
Description: The contractor shall provide Production Bracket Kits for the Center Display Unit (CDU) in accordance with (IAW) the basic Statement of Work (SOW), dated 20 Mar 2018, and the associated Technical Data Package (TDP), included as Attachment 6 in Section J – List of Attachments of solicitation FA8232-18-R-3014. Packaging shall be IAW with the basic SOW and the Packaging Instructions included as
1 16E6042-847 Video Switch Mounting Bracket Assembly 1 201612358-10 IMSC Cover Plate Assembly 1 16D7405-413 Harness Clamp Assembly
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements
Required Delivery Schedule: Quantity of 10 KT delivered 45 days after acceptance of First Article, followed by a minimum of 10 KT delivered every 30 days thereafter.
Ship To:
FB2029
DDHU/Central Receiving 5851 F Ave.
Bldg. 849W Hill AFB, UT 84056-5713
Mark For: Account 09, POC: Roxanne May (801) 775-2818
CLIN 0032 – Production Bracket Kits (NSN: 1560K0102947BWF)
Description: The contractor shall provide Production Bracket Kits for the High Speed Data Network (HSDN) in accordance with (IAW) the basic Statement of Work (SOW), dated 20 Mar 2018, and the associated Technical Data Package (TDP), included as Attachment 7 in Section J – List of Attachments of solicitation FA8232-18-R-3014. Packaging shall be IAW with the basic SOW and the Packaging Instructions included as
1 20155000-50 Forward GES Mounting Bracket Assembly 1 201416452-30 or 201612362-01 Remote Fill Bracket (Machined/Casting) 3 20157775-10 Forward GES Mounting Bracket Feet 4 16E6042-851 Rear GES Mounting Bracket Assembly 1 16D3700-803 Harness Clamp Assembly
Inspection: Origin Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Higher Level Contract Quality Requirements
Required Delivery Schedule: Quantity of 10 KT delivered 45 days after acceptance of First Article, followed by a minimum of 10 KT delivered every 30 days thereafter.
Ship To:
FB2029
DDHU/Central Receiving 5851 F Ave.
Bldg. 849W Hill AFB, UT 84056-5713
Mark For: Account 09, POC: Roxanne May (801) 775-2818
CLIN 0061 – Data
Not Separately Priced (NSP)
LO
NSP
NSP
Description: The contractor shall deliver data IAW the Contract Data Requirements Lists (CDRLs), located at Exhibit A, and the SOW, dated 30 Mar 2018.
Date Items: A001 – A003
FOB: Destination Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Exhibit: A Quality Assurance: Standard Inspection
Required Delivery Schedule: IAW CDRLs A001 – A003
Ship To:
FA8716
6137 Wardleigh Rd.
Bldg. 1515, Rm 220 Hill AFB, UT 84056
CLIN 0062 – Kick-off Meeting
EA
$200.00
$200.00
Description: The contractor shall participate in a kick-off meeting IAW the SOW, dated 30 Mar 2018.
Inspection: Destination Acceptance: Destination Inspection/Acceptance Report: Receiving Report Required Quality Assurance: Standard Inspection
Required Delivery Schedule: 2 Weeks ARO
2. The offeror shall propose pricing for the CLINs listed above. Prepare the proposal in accordance with the
Statement of Work (SOW), dated 20 Mar 2018, and the Contract Data Requirements Lists (CDRLs) A001 – A003, as attached to solicitation FA8232-18-R-3014 in Section J – List of Attachments.
3. Please note, offerors must submit all documentation required by Section L – Instructions, Conditions, and Notices to Offerors in order to be considered for award.
4. The Government does not guarantee award of a delivery order as a result of this request.
5. Request you submit the proposal in accordance with Section L – Instructions, Conditions, and Notices to
Offerors and no later than the due date and time identified in Block 9 of the front page of solicitation FA8232- 18-R-3014.
ALAN P. DAVIS
Contracting Officer
File details come from the government source that posted it.