PR_Group_A_Harness_SOW_-_Amend_2.docx

DOCX document 41 KB Posted

Attached to
ASQ-236 Group A Solicitation Federal contract opportunity
Solicitation number
FA823217R3010
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Amended SOW

View the file

Other files for this federal contract opportunity

Other files attached to ASQ-236 Group A Solicitation, newest first.
File Type Posted
FA823217R3010_______0005.pdf PDF
ASQ-236_Group_A_Kits_Q&A_20171027.xlsx XLSX spreadsheet
ASQ-236_Group_A_Kits_Q&A_20171023.xlsx XLSX spreadsheet
ASQ-236_Group_A_Kits_Q&A_20171016.xlsx XLSX spreadsheet
FA823217R3010_Solicitation_Amendment.pdf PDF
FA823217R3010_______0003.pdf PDF
ASQ-236_Group_A_Kits_Q&A_20171010.xlsx XLSX spreadsheet
FA823217R3010_______0002.pdf PDF
PR_Group_A_Harness_SOW_-_Amend_1.pdf PDF
FA823217R3010_Solicitation.pdf PDF
FA823217R3010_Solicitation.pdf PDF
Show all 11

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIFF Blk 42 19 Feb, Rev 02 Group A - SOW 27 October 2017

ASQ-236 SOW Page 5 of 5

STATEMENT OF WORK (SOW)

GROUP A FOR ASQ-236 POD

REV 06

JULY 10, 2017

Table of Contents

Table of Contents2
1INTRODUCTION3
1.1Purpose3
1.2Objective/Scope3
2CONTRACTOR TASKING / REQUIREMENTS3
2.1Contractor Specific Requirements3
2.2Quality Assurance Plan (CDRL A001 DI-QCIC-81794)3
2.3Quality Assurance Report (CDRL A002 DI-MISC-80508)3
2.4First Article4
2.5Test / Inspection Report (CDRL A003 DI-NDTI-80809B)4
2.6Packaging and Shipping4
3DELIVERY SCHEDULE5
3.1Delivery Schedule and Report (CDRL A003 DI-MGMT-80368A)5

4 SPECIAL CONSIDERATIONS

4.1 Property…………………………………………………………………………………………5

INTRODUCTION

Purpose The purpose of this contract is to provide the U.S. Air Force build-to-specification ASQ-236 kits consisting of wiring harness, Loose Wire Assemblies (LWA) and incidental parts to support USAF F-16 ASQ-236 installation.

Objective/Scope The objective of this effort is to award a contract to provide a Kit Proof/First Article Group A Harness kit with production Group A kits upon completion of the Kit Proofs.

Kit Proof/First Article Kit NSN: 6110K0102735A will be provided and bought off by the Government based on the delivery schedule prior to the start of the production kits being produced.

Production kits will begin upon acceptance of the First Article/Kit Proof to build Kits. The production kits will be built in accordance with the updated Tech Packages which will be provided after installation of the kit proof kit defined in 1.2.2, changes will include updated harness identifiers and markings, Harness Break outs, and any minor length changes that are determined during the Kit Proof install.

Modification Support Kits and support equipment in support of kits install (Reference provided in Technical Data Packages) Molded Cable Assembly Drawing: WWMEL2017-A-002 in support of Trial Verification Installation (TVI) Kit (Reference provided in Technical Data Packages) Loose Wire Assembly (LWA) Kit Drawing: WWMEL2017-E-105 in support of production installs and spares augmentation. (Reference provided in Techincal Data Package)

CONTRACTOR TASKING / REQUIREMENTS

Contractor Specific Requirements The Contractor shall order/build all required parts to the specification provided in the attached Technical Data Packages provided by the Government.

The Contractor shall build and deliver all kits per 1.2.2, 1.2.3, 1.2.4, and 1.2.5 and instructions in the attached Technical Data Packages provided by the Government in accordance with the delivery schedule described in 4.1.1 and 4.1.2 The contractor shall start building the production kits after receipt of the updated Technical Data Package, provided by the Government, following Production Readiness Review (PRR) closeout.

Quality Assurance Plan (CDRL A001 DI-QCIC-81794) The Contractor shall comply with SAE AS9100, AS9102 and 16PR145 as a minimum. The contractor shall include inspection, validation, evaluation, corrective action and procedures necessary to ensure quality of all products provided under this contract.

Quality Assurance Plan shall demonstrate that the Government’s designs are adhered to and that materials used conform to the approved designs/drawings provided in the Technical Data Package by the Government. The plan shall cover both First Article and Production Items.

Quality Assurance Report (CDRL A002 DI-MISC-80508) The Contractor shall perform conformace tests on the First Article and document the results, findings and analyses in a Quality Assurance Report (QAP). The QAP shall describe the compliance to the Quality Assurance Plan.

First Article The Contractor shall deliver First Article kits. The TVI and Kit Proof kits will be in support of a Kit Proof; however the contractor shall not start the production kits until after closeout of PRR and Contractor has been notified of acceptance.

In the event of rejection due to article non compliance or Government changes, the Contractor will be notified in writing by the Government of the specific reasons why the part was rejected. Unless otherwise specified the Contractor shall have 5 workdays to correct the rejected part and resubmit to the Government for re-inspection.

Documentation of test(s) performed on each assembly per 16PR145 and/or AS9102 and shall be supplied upon request.

Test / Inspection Report (CDRL A003 DI-NDTI-80809B) The Contractor shall perform tests on the First Article and the Production Kits in accordance with the QAP.

Packaging and Shipping The Contractor shall ensure all parts/kits be packaged separately so as to prevent damage to part features and finishes during shipment The Contractor shall ensure all Kits and Parts are properly identified and shipped per the instructions provided in the Contract (i.e. CLIN, NSN, Ship To DoDAAC and delivery address notes).

The contract will have the following 3 distinct shipping instuctions and addresses:

Shipping instructions for the First Article:

FA8716 519th MXDEB

BLDG 1515 CP 801 775 2741

6137 WARDLEIGH RD

HILL AFB, UT 84056-5843

MARK FOR: “David Barker or Timothy Tingle – 801-777-1702”

FOB: DEST

Shipping instructions for the Relays, TVI, & Modification Kits:

FA8716 519th MXDEB

BLDG 1515 CP 801 775 2741

6137 WARDLEIGH RD

HILL AFB, UT 84056-5843

MARK FOR: “David Barker or Timothy Tingle – 801-777-1702”

FOB: DEST

Shipping instructions for the Production Kits:

FB2029

DDHU/Central Receiving 5851 F Ave Bldg 849 W.

HILL AFB, UT 84056-5713

Mark For/ Account 09

DELIVERY SCHEDULE

Delivery Schedule and Report (CDRL A003 DI-MGMT-80368A) The Contractor shall deliver the Kit proof Kits NLT 45 days after Milestone 1 in Para 4.1.5.

The Contractor shall begin delivery of production kits at a rate of 30 per month outlined in SOW Para 4.1.5.

The Contractor shall provide a monthly status report until final production delivery.

Contract Deliverable Requirements Lists. (CDRLs)

CDRL Number
Description
DID
SOW Paragraph
Approval
A001
Quality Assurance Plan
DI-QCIC-81794
2.2.1 – 2.2.2
Government Acceptance
A002
Quality Assurance Report
DI-MISC-80508
2.3.1
Government Acceptance
A003
Test/Inspection Report
DI-NDTI-80809B
2.5.1
Government Acceptance
A004
Monthly Status Report
DI-MGMT-80368A
3.1.1 – 3.1.4
Government Acceptance

Milestone Schedule

Milestone Description
Delivery Date
Entry Criteria
Exit Criteria
1
Contract Award
After Receipt of Order (ARO)
N/A
N/A
2
Kit proof
45 Days After Milestone 1
Milestone 1 complete
Government written acceptance and Invoice submitted and accepted in Wide Area Work Flow (WAWF)
3
Production Readiness Review (PRR)
3 Weeks after Kit Proof
Milestone 2 complete
Government written acceptance and Invoice submitted and accepted in Wide Area Work Flow (WAWF)
4
Start Production kits
30 per month starting 30 days after the acceptance of Milestone 2
Milestone 3 complete
Government written acceptance and Invoice submitted and accepted in Wide Area Work Flow (WAWF)

1 SPECIAL CONSIDERATIONS

1.1 Property

All wiring harnesses and kits ordered through this contract and built by the vendor shall become the property of the US Government upon the completion of that order. All products developed under this contract shall be considered Government work and shall have no license encumbrances.

File details come from the government source that posted it. Updated .