Atch1_APPENDIX C SAFETY.pdf
PDF 181 KB Posted
- Attached to
- F-16 USAFE Depot Services Support Federal contract opportunity
- Solicitation number
- FA8232-11-R-1000
About this file
Applicable Safety Information
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| attch4.pdf | ||
| amend1.pdf | ||
| attch5.pdf | ||
| Atch_ExhibitA_4CDRLs.pdf | ||
| Atch2_FIXED_RATE_table.xls | XLS spreadsheet | |
| Best Estimated Contract Qty Schedule.pdf | ||
| Atch4_Fuel_EvalCostAdder.xls | XLS spreadsheet | |
| Atch3_CLIN_price_summary_worksheet.xls | XLS spreadsheet | |
| Atch7_PERFORMANCE_PLAN.pdf | ||
| AtchL3_Questionnaire.doc | DOC document | |
| Atch1_APPENDIX A_PWS_Rev5_2Mar11.pdf | ||
| USAFE_AOR_map.pdf | ||
| Atch5_OrganicResource_EvalCostAdder.xls | XLS spreadsheet | |
| AtchL1_PPIS.doc | DOC document | |
| Atch6_RTM.xls | XLS spreadsheet | |
| 0_FA823211R1000_Draft_model.pdf | ||
| Atch1_APPENDIX B REVISED for USAFE F-16.pdf | ||
| AtchL4_Subctr_ConsentForm.doc | DOC document | |
| AtchL2_QcvrLtr_template.doc | DOC document |
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OGDEN AIR LOGISTICS CENTER
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
APPENDIX “C”
SAFETY, FIRE PROTECTION AND HEALTH SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
USAFE F-16 DEPOT LEVEL MAINTENANCE
DATE: March 3, 2011
PREPARED BY:
David D. Battle, 75 ABW/SEG, (DSN: 777-1435)
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
The contractor will implement a safety program plan that ensures protection of
Government personnel and property. The program will consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. A Safety Plan that addresses, as a minimum, the subjects listed in Section II –Specific
Requirements, and will be used during the performance of the work described in the contract.
The Safety Plan will be approved by 75 ABW/SEG (Safety Office) prior to commencement of any work described in this contract.
3. Routine and recurring surveillance to ensure the safety requirements of this contract are enforced.
4. Competent personnel to provide surveillance of the Safety Plan.
5. Identification of segregated work site locations for operations that cannot be co-mingled with general industrial operations and the process for ACO approval of operations and changes at these specific sites.
6. All contractor personnel shall be trained and qualified to perform their duties safely.
7. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
B. Mishap Notification
1. The contractor shall notify 75 ABW/SEG (801-777-3333), or the Hill AFB Command Post
(777-3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to 75 ABW/SEG. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations.
Additionally if requested by government personnel or designated government representative
(GR), i.e., the ACO, PCO, or DCMA QAR (Quality Assurance Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
4. The contractor shall support and comply with the safety investigation and reporting requirements of AFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
If the safety plan is modified, the contractor shall submit the proposed modification, in writing, to the Contract Administration Office safety representative.
The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.
SECTION II – SPECIFIC REQUIREMENTS
The contractor’s prepared Safety Plan shall:
Demonstrate a management commitment to employee safety and health
Identify applicable rules and regulations
Identify the roles and responsibilities of Management, Supervisors, Employees and
Safety Coordinator
Identify work to be performed and location of expected operations
Provide a description of safety program, safety monitoring responsibilities, organizational structure, and contact information for on-site personnel
Include a work hazard analysis of the worksite and operations to be performed to include baseline hazard identification and required control measures
Identify employee safety and health training requirements and the documentation process
Include emergency response plans and procedures that relate to protection of government personnel and property
Include a workplace inspection frequency, to include the identity of the individual responsible for conducting the inspection
Include hazard reporting procedures and identify individual(s) responsible for the correcting identified hazards
Identify procedures for accident reporting and investigation
Identify the process for tracking controlled hazards in contractors work area
The contractor shall ensure that each element identified below is adequately addressed in detail in the safety and health plan:
SYSTEM MODIFICATION-WHICH ALTERS FORM, FIT OR FUNCTION: Contractor shall comply with Mil Standard 882D, Standard Practice for System Safety, 10 Feb 00 and AFI
91-202, The US Air Force Mishap Prevention Program, 1 Aug 98, Chap 9 for system modifications, which alter form, fit, or function.
ELECTRICAL: Contractor shall comply with AFOSH STD 91-501, Air Force Consolidated
Occupational Safety Standard, 7 Jul 04, Chapter 8. Contractor’s Safety Plan shall also address:
-Selection and use of work practices
-Training (basic electrical safety knowledge)
-Use of equipment (handling, visual inspection, rating of equipment)
CONFINED SPACE PROGRAM ELEMENTS: Contractor shall comply with AFOSH STD
91-25, Confined Spaces, 1 Feb 98. A confined space must meet the following three criteria:
(1) Is large enough and so configured that an employee can bodily enter and perform assigned work; and
(2) has limited or restricted means for entry or exit (for example, tanks, vessels, silos, storage bins, hoppers, vaults, and pits are spaces that may have limited means of entry.); and
(3) is not designed for continuous employee occupancy. Examples: underground vaults, tanks, storage bins, manholes, pits, silos, process vessels, and pipelines.
Contractor’s Safety Plan shall address:
-Hazards of confined space
-Permit and Non-permit confined spaces
-Responsibilities of management, entry supervisor, authorized entrant, and authorized attendants
-Training requirements
-Permit handling and approval
-Emergency and rescue plans
-Testing and monitoring requirements
-Special hazards
GROUNDING, BONDING OF AIRCRAFT & AVIONICS EQUIPMENT: Contractor shall comply with the standards for grounding and bonding in accordance with TO 00-25-172, Ground
Servicing of Aircraft and Static Grounding/Bonding, 15 Jul 02/Change 12-12 Feb 08, for aircraft repair and TO 00-25-234, General Shop Practice Requirements for the Repair, Maintenance and
Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07, for avionics equipment.
CLEANING/CORROSION CONTROL OF AIRCRAFT: Corrosion removal and treatment shall be conducted according to T.O. 1-1-691, Cleaning and Corrosion Prevention and Control, Aerospace and Non-Aerospace Equipment, 1 Jul 03, Change 2, 19 Oct 07.
ELECTRONIC/ELECTROSTATIC DISCHARGE SENSITIVE COMPONENTS: An electrostatic discharge program, when applicable, shall be implemented according to MIL-
HDBK-263B, Electrostatic Discharge Control Handbook for Protection of Electrical and
Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated Explosive
Devices), 31 Jul 94, MIL-STD-1686C, Electrostatic Discharge Control Program for Protection of Electrical and Electronic Parts, Assemblies and Equipment (Excluding Electrically Initiated http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-501.pdf
Explosive Devices), 25 Oct 95 and T.O. 00-25-234, General Shop Practice Requirements for the
Repair, Maintenance and Test of Electrical Equipment, 1 Aug 88/Change 36, 13 Aug 07.
AIRCRAFT MAINTENANCE: Contractor shall comply with the standards in AFOSH STD
91-100, Flightline Vehicle Operations, 1 May 98, Chap 8 site specific applicable Dash 2 Series
Technical Orders, and AFI 21-101, Aircraft and Equipment Maintenance Management, 29 Jun
06.
AIRCRAFT TOWING/PARKING/MOORING: Towing, parking and mooring procedures must comply with AFI 11-218, Aircraft Operations and Movement on the Ground, Chap 1, Sect
1D, 1 May 95 AFOSH STD 91-100, Flightline Vehicle Operations, 1 May 98, Chap 2, and site specific applicable aircraft Technical Orders.
FUELING/DEFUELING OPERATIONS: All fueling/defueling operations will be in compliance with T.O. 00-25-172, Ground Servicing of Aircraft and Static Grounding/Bonding, 15 Jul 02/Change 12-12 Feb 08; T.O. 1-1-3, Inspection and Repair of Aircraft Integral Tanks and Fuel Cells, 31 Aug 06/Change 2, 1 May 07.
AIRCRAFT JACKING OPERATIONS: Contractor’s procedures shall comply with site specific applicable aircraft T.O.s and 35A2 series Technical Orders (various jacking equipment), and AFOSH STD 91-100 Flightline Vehicle Operations, 1 May 98, Chap 3.
WORK STANDS/PLATFORMS: Contractor’s procedures shall comply with AFOSH STD
91-501, Air Force Consolidated Occupational Safety Standard, 7 Jul 04, Chap 16 and 35A4 series T.O.s -Ground Support Equipment (various maintenance stands).
SEVERE WEATHER PLAN: Contractor shall comply with the standards in NAS 3306, AFI
10-220, Contractor’s Flight and Ground Operations, 1 Mar 07, Para’s 5.1.2.25 – 5.1.2.25.6.
Contractor’s Safety Plan shall also address instructions for personnel, equipment and debris.
FOREIGN OBJECT DAMAGE (FOD) Awareness, Prevention and Responsibilities:
Contractor shall comply with the standards in: AFI 21-101, Aircraft and Equipment
Maintenance Management, 14 Dec 07, paragraphs 14.19 - 14.19.10.1.13; AFOSH STD 91-100, Flightline Vehicle Operations, 1 May 98, Chap 6. The FOD program must be integrated into the day-to-day operations to reduce/eliminate FOD incidents.
SAFING/EGRESS/ESCAPE SYSTEMS: Contractor shall comply with the standards in T.O.
11A-1-33, Handling and Maintenance of Explosives-Loaded Aircraft, 11 Jan 05, and site specific applicable aircraft Technical Orders.
EXPLOSIVE SAFETY REQUIREMENTS: Contractor shall comply with the standards in
AFMAN(I) 24-204, Preparing Hazardous Materials for Military Air Shipments, 15 Apr 07
Change 1, 4 May 2007; and dash 11 series TOs; DoDI 4145.26M, DoD Contractors' Safety
Requirements for Ammunition and Explosives, 9 Apr 05; DoD 4145.19-R-1, Storage and
Materials Handling, 15 Sep 79, Chpts 5/6; AFJMAN 23-210, Joint Service Manual for Storage and Material Handling, Apr 94; TO 11A-1-33, Handling and Maintenance of Explosives-
Loaded Aircraft, 20 Nov 08), TO 11A-1-46, Fire Fighting Guidance, Transportation, and
Storage, 15 Nov 04 Change 6 (12 Nov 08) for all handling of all explosive devices to be http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-100.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-100.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-100.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-100.pdf http://www.e-publishing.af.mil/shared/media/epubs/AFOSHSTD91-100.pdf removed, installed, stored or transported, AFMAN 91-201, Explosive Safety Standards, 17 Nov
08.
File details come from the government source that posted it. Updated .