DESIGN AND ENGINEERING SUPPORT PROGRAM
PERFORMANCE-BASED WORK STATEMENT (PWS)
Production Acceptance Certification (PAC)/Work Control Document (WCD) Correlation Requirement
20 June 2018
Prepared by:
Jennifer Blackburn
Hill AFB, UT
84056-5731
801-777-2109 jennifer.blackburn@us.af.mil
Page 2 of 17 November 1, 2018
Table of Contents
1.0 INTRODUCTION
1.1 Purpose
1.2 Scope
1.3 Background
2.0 REFERENCE DOCUMENTS
3.0 CONTRACTOR TASKING / REQUIREMENTS
3.1 Contractor Requirements
4.0 DELIVERY SCHEDULE AND PERIOD OF PERFORMANCE
4.1 Period of Performance
4.2 Delivery Schedule
4.3 Expertise/Professional Services
4.4 Government Inspection and Acceptance of Deliverables
5.0 SPECIAL CONSIDERATIONS
5.1 Security
5.2 Access to Facilities and Property
5.3 Government Furnished Equipment, Materials, and Software
5.4 Government Provided Office Space
5.5 Government Program and Contract Management
5.5.1 Government Program Management
5.5.2 Government Contract Management
6.0 TRAVEL REQUIREMENTS:
7.0 SERVICES SUMMARY (SS):
8.0 CONTRACTING OFFICER REPRESENTATIVE
9.0 CONTINUATION OF ESSENTIAL SERVICES DURING CRISIS:
Appendix C: SAFETY…………………………………………………………………………………………14
Page 3 of 17 November 1, 2018
ACRONYM LIST
A & AS Advisory and Assistance Services
ACO Administrative Contracting Officer
AFARS Air Force Federal Acquisition Regulations
AFI Air Force Instruction
AFIN AF Information Networks
AFSC Air Force Sustainment Center
AIS Automated Information System
BLK Block
CDRLS Contract Data Requirements Lists
CFR Code Federal Regulation
COR Contracting Officer Representative
CSA Cognizant Security Agency
DAC Days after Contract
DID Data Item Description
DOD/DD Department of Defense
DODI Department of Defense Instruction
FAR Federal Acquisition Regulation
GFE Government Furnished Equipment
GFM Government Furnished Material
GFS Government Furnished Software
IAW In Accordance With
IA Information Assurance
LAN Local Area Network
LCAT Logistics Compliance Acceptance Team
MFT Multi-Functional Team
MIPR Military Interdepartmental Purchase Request
N/A Not Applicable
NSN National Stock Number
NO Number
OSHA Occupational Safety and Health Administration
QASP Quality Assurance Surveillance Plan
PAC Production Acceptance Certification
PARA Paragraph
P/N Part Number
PDMSS Program Depot Maintenance Scheduling System
PM Program Manager
PMP Program Management Plan
POP Period of Performance
PR Purchase Request
PWS Performance-Based Work Statement
QA Quality Assurance
QTY Quantity
QASP Quality Assurance Surveillance Plan
RCC Resource Control Center
RFP Request For Proposal
Page 4 of 17 November 1, 2018
SDO Services Designated Official
SEC Section
SME Subject Matter Expert
SS Services Summary
SSQ Special Skills Qualification
TSS Training Scheduling System
USC United States Code
WCD Work Control Document
1.0 INTRODUCTION
1.1 Purpose
To ensure that Production Acceptance Certification (PAC) tasks properly correlate to Work Control
Document (WCD) operations, ensuring that PAC tasks are Identifiable, Trainable, and Auditable.
1.2 Scope
WCD/PAC Tasks Standardization/Correlation. Contract support required to assist, 309th Aircraft
Maintenance Group in implementing guidance and procedures to create/revise Production Acceptance
Certification (PAC) Program Tasks to meet the requirements of AFSCMAN 21-102 with the Work
Control Document (WCD) and to formalize inspection criteria ensuring the PAC Training inspection process meets the required standards in AFSCMAN 21-102. Guidance will also establish procedures for
Pre-Production Planning Teams (PPPT) and Production Planning Teams (PPT) to conduct WCD reviews and notify the appropriate PAC Manager of changes to the WCD that might affect PAC tasks.
Additionally, assists the appropriate PAC Manager as a required member of the PPPT so when new work load is planned and WCD’s created, the appropriate PAC Manager will be responsible for creating tasks to support this new work load. The applicable supervisors have the responsibility to ensure tasks are identified in TSS/PAC. PAC task standardization shall be accomplished to the extent possible for similar work. A PAC task shall be identifiable, trainable and auditable. PAC tasks shall relate to the work described on the WCD. When the work performed does not lend itself to this kind of task definition, PAC tasks shall be structured to the nature of the service performed. This can be by skill, equipment, type of service, or other logical breakdown. SSQ tasks will be designated with the SSQ indicator and number.
1.3 Background
During the 2012 LCAT inspections, it was discovered that not all PAC certification tasks correlated to the WCDs at the three AFSC Complexes. The on-going requirement for the three Complexes is to review all tasks and WCDs that are in the production work centers to ensure there is correlation. A task is a necessary activity in the completion of an industrial process or procedure involving a product or product-related service. To date, over 9600 WCDs are currently in use and need to be correlated.
Page 5 of 17 November 1, 2018
2.0 REFERENCE DOCUMENTS
2.1 Government Documents
Publication/Instruction
Title
Specific Paragraph/Chapter/or
Entire Document Applies
AFSC Depot Maintenance
Process Guide
Entire Document
Aircraft Maintenance
Technical Order 1C-130(All applicable models)-06
“O6 Manual”
Entire Document
Aircraft Maintenance
Technical Order 1F-16(All applicable models)-06
“O6 Manual”
Entire Document
Aircraft Maintenance
Technical Order 1A-10(All applicable models)-06
“O6 Manual”
Entire Document
Aircraft Maintenance
Technical Order 1T-38(All applicable models)-06 “O6
Manual”
Entire Document
F-35 Support Data Entire Document
F-22 Support Data Entire Document
3.0 CONTRACTOR TASKING / REQUIREMENTS
The Contractor shall provide engineering/technical services for the efforts described within Section 3.1 below.
3.1 Contractor Requirements
3.1.1 The Contractor shall ensure 95% of reviewed/created documents pertaining to PAC or other WCD printouts identifying PAC Tasks reviewed by the contractor are error free.
3.1.1.1 For existing PAC task, verify narrative to ensure verbiage correlates to PAC Task associated in record and annotate on log accomplished review, CDRL A001 contractor’s Progress, Weekly Status and Management Report.
3.1.1.2 All AMXG’s WCDs reviewed, must be considered Identifiable – Can be quickly and easily associated with the PAC tasks it correlates with. Trainable – Can be logically and effectively trained to new/seasoned personnel and Auditable – Can be
Page 6 of 17 November 1, 2018 logically and easily checked to ensure the task has been properly accomplished.
IAW AFSCMAN 21-102, Table 21.1.
3.1.2 For existing PAC task, which do not comply with regulatory requirements the Contractor shall perform the following:
3.1.2.1 Contractor shall identify those WCD’s that do not correlate with PAC Task.
3.1.2.2 Once identified, validate with PAC Manager (identified on CDRL listing) for further action.
3.1.2.2.1 Develop PAC tasks & numbers to meet the requirements of AFSCMAN
21-102, Table 21.1.; route/coordinate using an AMXG Form 136 or equivalent to all applicable SMEs, PAC Manager or designee and QA if applicable. Follow up as required to ensure timely progress of review/update.
3.1.2.2.2 If required, correct as requested and re-route for coordination. Coordinate with AMXG PAC Manager as required.
3.1.2.2.3 Once coordination concurrence has been achieved, build PAC task in PAC and notify AMXG PAC Office of completion.
3.1.2.2.4 At the direction of the AMXG PAC Office, apply task to appropriate PAC matrices and notify the AMXG PAC Office of completion.
3.1.2.3 Annotate WCD that requires updates in Log (CDRL A001).
3.1.2.3.1 The Contractor shall utilize the appropriate “O6 Manuals” to ensure standard nomenclature is used on PAC Task and WCD’s, and shall provide suggested changes and corrective actions as necessary.
3.1.3 For non-existing PAC Tasks, the Contractor shall perform the following:
3.1.3.1 Verify narrative to ensure nomenclature correlates to PAC Task associated in each individual record and shall annotate, track and accomplish reviews, CDRL A001
Contractor’s Progress, Weekly Status and Management.
3.1.3.2 IAW “O6 Manuals” for proper verbiage to be used on PAC Task and WCD’s, and provide suggested correction.
3.1.3.3 Annotate PAC Tasks and WCD that require updates in Log (CDRL A001).
3.1.3.3.1 Develop PAC tasks & numbers to meet the requirements of AFSCMAN
21-102, Table 21.1.; route/coordinate using an AMXG Form 136 or equivalent to all applicable SMEs, PAC Manager or designee and QA if
Page 7 of 17 November 1, 2018 applicable. Follow up as required to ensure timely progress of review/update.
3.1.3.3.2 If required, correct as requested and re-route for coordination. Coordinate with AMXG PAC Manager as required.
3.1.3.3.3 Once coordination concurrence has been achieved, build PAC task in PAC and notify AMXG PAC Office of completion.
3.1.3.3.4 At the direction of the AMXG PAC Office, apply task to appropriate PAC matrices and notify the AMXG PAC Office of completion
3.1.4 Contractor shall complete and provide Contractor’s Progress, Weekly Status and
Management Report, CDRL A001, before close of business on first business day of the week after contract award, with no more than 1 late report per month.
3.2 Information Assurance Training and Workforce Management.
The Contractor shall comply with all computer and network access requirements and instructions including DoD Directive 8570.1. Information Assurance Training, Certification and Workforce
Management.
4.0 DELIVERY SCHEDULE AND PERIOD OF PERFORMANCE
4.1 Period of Performance
The basic Period of Performance (PoP) for this contract shall be for 12 months After Receipt of Contract
(ARO). Following the basic PoP there will be four (4), 12 month pre-priced option periods. The
Government will include the FAR Clause 52.217-8 Option to Extend Services in this contract. The total period of performance for this contract shall not exceed 66 months.
4.1.1 Contract Holidays
The prices/costs in Section B, The Schedule, shall include holiday observations; accordingly, the
Government will not be billed for such holidays, except when services are required by the
Government and are actually performed on a holiday. Holidays falling on a Saturday will be observed on the preceding Friday. Holidays falling on a Sunday will be observed on the following
Monday. The following days are contract holidays.
New Year’s Day 1 January
Martin Luther King’s Birthday Third Monday in January
President’s Day Third Monday in February
Memorial Day Last Monday in May
Independence Day 4 July
Labor Day First Monday in September
Page 8 of 17 November 1, 2018
Columbus Day Second Monday in October
Veteran’s Day 11 November
Thanksgiving Day Fourth Thursday in November
Christmas Day 25 December
4.1.2 Days and Hours of Operation
When work is to be performed at the Government’s location, workdays are Monday through Friday except Federal Holidays. Hours of operation are generally between the hours of 6:00 AM and 6:00
PM. With prior coordination with the Government’s Program Manager and approval by the
Contracting Officer, the days and hours of operation (i.e. alternate work schedule) may be changed on an individual basis dependent upon the type and estimated duration of work activities and workload.
4.1.3 Government Provided Service Plan
When work is to be performed at the Government’s location, the Government will prioritize service requirements based on operating requirements. The Government will provide the
Contractor’s Technical Lead a generalized projected service plan that may be reviewed or revised by the Government Program Manger as necessary. The purpose of the plan is to prioritize
Government service requirements and provide the contractor with the information required to effectively manage their personnel.
The Contractor shall provide total task management and supervise contractor personnel. The
Government’s relationship in this non-personal services contract is with the Contractor and not with individuals employed by the Contractor. At all times, it must be clear that the Contractor, not the Government, manages its employees. The Contractor’s Technical Lead shall serve as the primary point of contact for all technical aspects of the required work. The Contractor Lead shall also be a prime provider of the required technical services. No personal services shall be performed.
AFI63-138, Chapter 6, Section 6.4, Initial Contract Performance Review, states “The initial evaluation of contractor performance is a joint determination by the MFT that the contractor has successfully started performance, completed transition, is fully operational, and is within the estimated cost, schedule, and performance parameters of the contract. The initial performance review criteria shall be included in the QASP or similar documentation. The SDO may waive the initial evaluation for contractors that have continued performance under a successor contract award
(prior incumbent), or for contractors that have otherwise demonstrated full compliance with contract start-up. Separate initial contract performance reviews are not required when they would duplicate existing reviews.”
AFI63-138, Chapter 6, Section 6.4.1, Scheduling, states “The review shall take place within 30 days after the contractor assumes full performance responsibility (i.e. after completion of transition/mobilization).”
In order to help the contractor start performance, complete transition/mobilization and become fully operational when work is to be performed at the Government location, the following initial performance review criteria is provided below. These criteria shall be used for the “Initial
Page 9 of 17 November 1, 2018
Contract Performance Review” that shall take place 30 days after receipt of order (ARO) (i.e.
contract award) and shall also be considered as the initial generalized projected service plan.
This list shall not be considered to be all inclusive and may be reviewed or revised by the
Government Program Manger as necessary after award.
Initial Performance Review Criteria / Government Provided Service Plan
ARO
(Business Days) Performance / Objective Element
Contractor shall provide a notice of who their designated “Technical Lead” is for this contract to the Program Manager, Contracting Officer and
Contracting Officer Representative (COR). The Technical Lead shall serve as the primary point of contact for all technical aspects of the required work. This person shall also be a prime provider of the required technical services. (PWS Section 4.1.3)
1 - 5
Contractor personnel shall provide a completed copy of the Nondisclosure
Agreement (reference PWS Attachment III) to the Government Program
Manager, Contracting Officer Representative (COR) and Contracting
Officer prior to performing work that involves Confidential, Proprietary and/or Sensitive Information held by the USAF relating to the tasks to be performed under this contract. (Ref. PWS Section 5.1.2)
Contractor personnel shall have obtained all required security clearances
(Ref. PWS Section 5.1.3)
Contractor shall provide a listing of personnel who require a CAC to the
Contracting Officer, Program Manager and Contracting Officer
Representative (COR) (Ref. PWS Section 5.1.4)
Contractor shall provide a listing of personnel who require Base or Area
Badges and Access to Facilities to the Program Manager, Contracting
Officer and Contracting Officer Representative (COR). (Ref. PWS Section
5.2
1 - 5
Contractor personnel shall coordinate receipt/assignment of Base Support -
Government Provided Office Space with the Program Manager and
Contracting Officer Representative. (Ref. PWS Section 5.3)
Contractor’s Technical Lead shall notify the Program Manager and
Contracting Officer Representative (COR) when the Contractor has obtained the Government documents referenced in PWS Section 2.1.
Contractor personnel in place at Government location and ready to begin performance of PWS tasks.
Page 10 of 17 November 1, 2018
**Include other actions/requirements/expectations that are within scope of this contract
& PWS that the Govt reasonably can expect the contractor to complete within the initial
30 days of the contract’s performance period. ***
4.2 Delivery Schedule
Documentation deliverables shall be delivered in accordance with this PWS, unless otherwise specified by the Government Program Manager and Contracting Officer through a contract modification or PCO letter.
Paragraph Description CDRL Due Date
3.1.4 Contractor’s Progress, Weekly Status and Management Report A001 Weekly
4.3 Expertise/Professional Services
The Contractor shall furnish professional and technically qualified personnel to perform assigned tasking.
The Contractor shall provide total task management and supervise Contractor personnel. The Contractor’s
Technical Lead shall serve as the primary point of contact for all technical aspects of the required work. This person shall also be a prime provider of the required technical services. No personal services shall be performed.
Documentation deliverables shall be delivered in accordance with this PWS unless otherwise specified by the
Government.
4.4 Government Inspection and Acceptance of Deliverables
The Government Program Manager will have the right to reject or require correction of any deficiencies found in deliverables. In the event of rejection of any deliverable, the Contractor will be notified in writing by the Government Program Manager of the specific reasons why the deliverable was rejected. The
Contractor shall have 3 business days, to correct the rejected deliverable and resubmit to the Government
Program Manager for re-inspection. If no comments are provided within 5 calendar days of deliverable receipt, the deliverable will be deemed to have been accepted by the Government.
5.0 SPECIAL CONSIDERATIONS
5.1 Security
5.1.1 Contractor personnel shall not release or remove system documentation, data, or reports generated by or through use of Government systems. All requests for information shall be forwarded to 309AMXG/OBSP.
Page 11 of 17 November 1, 2018
5.1.2 Common Access Cards
In the event a Common Access Card (CAC) is required in support of this effort and the Security
Clearance level is expected to be UNCLASSIFIED, the following instructions shall apply. It should be noted that this process may take a minimum of four (4) weeks to complete; so it is critical that Contractors consider these instructions before award (i.e. when preparing a proposal in response to a RFP) and prior to changing contractor personnel after award.
In accordance with Hill AFB Instruction 36-812, Issue of Common Access Cards to Contractors
(Contractor Verification System), paragraph 6.1.5. The contractor "Must have favorable or higher adjudication based on a National Agency Check with Inquiries (NACI) or higher investigation."
Also, AFSSI 8522, Communications and Information, Chapter 3, Access to Information Systems and Networks, states:
Favorable Background Investigation. CSAs, in coordination with the security manager, will verify proper security clearance and background investigation checks (National Agency Check with written Inquiries (NACI), Single Scope Background Investigation) are submitted prior to granting a network user access to the AFIN.
Upon successful completion of initial Information Awareness training and verification of favorable background check, the user is authorized use of the network and is granted access to authorized network resources.
5.1.3 Base or Area Badges and Access to Facilities
309AMXG/OBSP or the Government Program Manager will assist contractor personnel in processing the necessary DoD forms to obtain base or area badges for access to government facilities and property. Access to government facilities is limited. Therefore, the Contractor shall coordinate required access/usage times and dates through 309AMXG/OBSP at least 15 working days prior to the need date. Control of the facilities shall remain with the Government.
5.1.4 Standards of Conduct
The Contractor shall not divulge any information regarding files, data, processing activities/functions, user ID's, passwords, or other knowledge that may be gained, to anyone who is not authorized to have access to such information. Contractor personnel shall abide by all government rules, procedures, and standard of conduct. Contractors requiring access to government Automated Information Systems (AIS) shall have background investigations and security awareness training completed, after award but prior to AIS access. When the period of performance is complete or and contractor personnel leave work on this project they will have 5 working days to terminate all their network user account and to return all access cards and base identification badges.
5.2 Access to Facilities and Property
Page 12 of 17 November 1, 2018
Access to Government facilities is limited. Therefore, the Contractor shall coordinate required access/usage times and dates through 309AMXG/OBSP at least 15 working days prior to the need date.
Control of the facilities shall remain with the Government.
5.3 Government Furnished Equipment, Materials, and Software
All products developed under this contract shall be considered Government work and shall have no license encumbrances. All Government Furnished Equipment (GFE), Government Furnished Software (GFS), and Government Furnished Material (GFM) shall be returned to the Government upon completion of this contract. The Government will provide 1 desktop PC and 2 monitors which shall be considered GFE. At the end of this project, the Contractor shall return the GFE to the Government and will not be required to return the GFE to its original state prior to delivery to the Government.
5.4 Government Provided Office Space
Office space will be provided in Bldg. 225 Room SC212, for 1 Lead and 8 contractors.
Services for this effort shall be performed during the working hours for 309AMXG/OBSP at bldg. 225 the Government will furnish office space, desk, chair, file cabinets, bookcases, telephone, e-mail, and
Internet access for up to 9 on-site technicians. The Government will furnish a computer with Windows and Microsoft Office, and Microsoft Project software, and a connection to a printer on the local area network (LAN). At 309AMXG/OBSP the Contractor shall locate up to 1 Lead and 8 contractors in the bldg. 225 offices in direct support of this PWS, as required by 309AMXG/OBSP.
5.5 Government Program and Contract Management
5.5.1 Government Program Management
5.5.1.1 309AMXG/OBSP will provide the Government Program Manager for this contract.
The Government Program Manager will provide the Contractor access to all technical data required to perform approved tasking. Only the Government
Program Manager has authority to review and approve contract deliverables (see paragraph 4.4).
5.5.2 Government Contract Management
5.5.2.1 Responsibility for contracting activities rests solely with the Government
Contracting Officer. No conversation, recommendations, or direction, whether given directly by, or implied by Government personnel, that will affect the scope, schedule, or price of the program covered by this PWS shall be acted upon by the
Contractor unless specifically approved by the Government Contracting Officer.
6.0 TRAVEL REQUIREMENTS:
No travel is anticipated with this contract.
Page 13 of 17 November 1, 2018
7.0 SERVICES SUMMARY (SS):
Services Summary
Performance Objective PWS Para. Performance Threshold Remedy
Contractor Progress
Weekly Status Reports/
Technical Reports are timely
3.1.1.1 , 3.1.4, CDRL
A001
No more than 1 late reports submitted per month
Contractor’s Progress, Weekly Status and
Management Report, provided no later than the first business day of each week after contract award.
Errors shall be corrected and resubmitted to the
Gov within 3 business days at no additional cost to the Gov.
Weekly Status Reports/
Technical Reports are accurate
3.1.1.1 , 3.1.4, 4.4
No more than 2 errors are identified per month.
Examples are as follows: Wrong WCD identified, Duplicate WCD’s identified, PAC and WCD correlated, no corrective suggests, etc.…
Errors shall be corrected and resubmitted to the
Gov within 3 business days at no additional cost to the Gov.
8.0 CONTRACTING OFFICER REPRESENTATIVE
The overall Program Management (PM) responsibilities for this contract reside with the following office:
309 AMXG/OBSP
5875 South Gate
Bldg. 225, Room 202
Hill AFB, Utah 84056
801-586-4263
The Contractor will be notified by letter at time of award of the Primary and Alternate CORs assigned to this contract.
9.0 CONTINUATION OF ESSENTIAL SERVICES DURING CRISIS:
IAW DFARS 252.237-7023, this requirement is not considered mission essential.
Page 14 of 17 November 1, 2018
APPENDIX C
SAFETY, FIRE PROTECTION AND HEALTH
SPECIFICATION
INDUSTRIAL SAFETY REQUIREMENTS
OGDEN AIR LOGISTICS COMPLEX
UNITED STATES AIR FORCE
HILL AIR FORCE BASE, UTAH 84056
PAC/WCD Correlation Requirement
21 Jun 2018
OO-ALC/SE
Control Number: TH180603
Page 15 of 17 November 1, 2018
SECTION I - GENERAL REQUIREMENTS
A. Safety Program Requirements.
The contractor will implement a safety program that ensures protection of Government personnel and property. The program will consist of, as a minimum:
1. Mishap reporting, as defined in paragraph B1 below.
2. All contractor personnel shall be trained and qualified to perform their duties safely.
3. The contractor shall include a clause in all subcontracts requiring the subcontractors to comply with the safety provisions of this contract, as applicable.
4. Per AFPAM 91-210, para 6.4, due to non-hazardous nature of work, a Safety Plan is not required.
B. Mishap Notification
1. The contractor shall notify OO-ALC/SE (801-586-6038) or the Hill AFB Command Post (801-777-
3007) after normal duty hours, and the designated Government Representative (GR), i.e., the ACO, PCO, or DCMA COR (Contracting Officer's Representative) within one (1) hour of all mishaps or incidents at or exceeding $2,000 (material + labor) in damage to DOD property entrusted by this contract, even if the government is wholly or partially reimbursed. This notification requirement shall also include physiological mishaps/incidents. A written or email copy of the mishap/incident notification shall be sent within three calendar days to the GR, who will forward it to OO-ALC/SE. For information not available at the time of initial notification, the contractor shall provide the remaining information no later than 20 calendar days after the mishap, unless extended by the ACO.
Mishap notifications shall contain, as a minimum, the following information:
(a) Contract, Contract Number, Name and Title of Person(s) Reporting
(b) Date, Time and exact location of accident/incident
(c) Brief Narrative of accident/incident (Events leading to accident/incident)
(d) Cause of accident/incident, if known
(e) Estimated cost of accident/incident (material and labor to repair/replace)
(f) Nomenclature of equipment and personnel involved in accident/incident
(g) Corrective actions (taken or proposed)
(h) Other pertinent information
2. The contractor shall cooperate with any and all government mishap investigations. Additionally if requested by government personnel or designated government representative (GR), i.e., the ACO, PCO, Page 16 of 17 November 1, 2018 or DCMA COR (Contract Officers Representative), the contractor shall immediately secure the mishap scene/damaged property and impound pertinent maintenance and training records, until released by safety investigators.
3. The contractor shall provide copies of contractor data related to mishaps, such as contractor analyses, test reports, summaries of investigations, etc. as necessary to support the government investigation.
4. The contractor shall support and comply with the safety investigation and reporting requirements of
AFI 91-204, Chapters 1 – 5.
C. General Safety Requirements:
The contractor is solely responsible for compliance with all federal, state and local laws, the
Occupational, Safety and Health Act (OSHA) (Public Law 91-596) and the resulting standards, OSHA
Standards 29 CFR 1910 and 1926, as applicable, and the protection of their employees. Additionally, the contractor is responsible for the safety and health of all subcontractor employees. All documents required as a result of OSHA 29 CFR 1910 and 1926 regulations, (i.e. certifications, training, respiratory protection program, workplace hazard assessments), shall be made available to the COR upon request.
The contractor shall ensure assigned personnel are adequately trained and qualified for the task being performed. Brief all personnel on the hazards involved with operations and applicable precautions to be taken. Should unidentified hazards arise, cease operations until actions are taken to eliminate or mitigate hazards to safe levels.
Contractor personnel must receive Explosive Safety Awareness Training if their duties require entry into the Explosive Clear Zone. This training will be provided by the OO-ALC Safety Office. Contact
Eric Covington at 586-0168.
A Risk Assessment will be required prior to any work being accomplished, if munitions will remain in the facility.
Compliance with OSHA and other applicable laws and regulations for the protection of contractor employees is exclusively the obligation of the contractor. Note: The government shall assume no liability or responsibility for the contractor's compliance or non-compliance with such requirements. The contractor shall furnish to each of his/her employees a place of employment, which is free from recognized hazards. The contractor shall brief his/her employees on the safety requirements of this contract and on hazards associated with prescribed tasks. The contractor is responsible for compliance with OSHA Public
Law and the resultant standards identified within. In addition, the contractor is required to flow down the safety requirements/specification to all subcontractors. This applies to Federal Acquisition Regulation
(FAR) 12 commercial acquisitions as well. This contract shall in no way require persons to work in surroundings or under working conditions which are unsafe or dangerous to their health. The contractor must coordinate and perform work so as not to impact the safety of government employees or cause damage to government property. This requires providing personnel with protective equipment and associated safety equipment as may be necessary. The contractor must also protect personnel from hazards generated by the work. If the contractor employs BILINGUAL speaking employees, they must post bilingual signs and have written procedures for specific tasks in applicable languages.
SECTION II – SPECIFIC REQUIREMENTS
http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0 http://www.osha.gov/pls/oshaweb/owasrch.search_form?p_doc_type=STANDARDS&p_toc_level=0
Page 17 of 17 November 1, 2018
PEDESTRIAN CROSSWALKS: All contractor personnel are required to use the closest crosswalk, or traffic controlled intersection when crossing the road. Pedestrians must look both ways to ensure the coast is clear before stepping out into the crosswalk. Pedestrians DO NOT have the right of way unless they are already in the crosswalk. Contractor vehicle operators have the same responsibilities as pedestrians, to share the road and mutually observe and yield to pedestrians.
MOTOR VEHICLES: Contractor shall comply with the standards in: DoD Directive 5525.4, Enforcement of State Traffic Laws on DoD Installations", Nov 2, 1981, Para 3-4; DODI 6055.4, DoD
Traffic Safety Program, 20 Jul 99; AFI 91-207, USAF Traffic Safety Program, 22 May 07; and AFI 91-
207 AFMC SUP1, The US Air Force Traffic Safety Program, 1 Oct 07. Each applies to all persons at any time on an Air Force Installation and includes all leased, owned, or privatized property including housing areas. In addition: AFI 13-213, Airfield Management, applies to all contractors, sub-contractors, vendors, commercial delivery companies, and all other private business vehicles who operate anywhere on Hill Air
Force Base, including the airfield (to include the industrial areas and any buildings or hangars located upon the airfield) in support of their mission.
HOUSEKEEPING: Housekeeping shall be conducted according to the requirements in OSHA Standard
29 CFR 1910.141. CLEAN AS YOU GO will be enforced.
Element/Requirement Referenced Benchmark
Contract Safety AFPAM 91-210 Para. 6
Mishap Notification/Reporting Appendix C, Section I
AFI 91-204 Para. 4.9
Facility Fire Protection NFPA 13, 70, & 72
NFPA 409/410
AFI 91-203 Chapters 6, 22
Handling, Storage and use of Flammable/ NFPA 30, 33
Hazardous Material Management AFI 32-7086 HAFBSUP 1
Storage and Materials Handling DoDI 4140.62