DD1423_GBSD_DemVal_Tech_Studies_1_Jul_14.pdf

PDF 1 MB Posted

Attached to
GBSD/DemVal Technology Studies Federal contract opportunity
Solicitation number
FA8219-14-R-7001
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

CDRL package

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STANDARD FORM 1447 (2/2012)

Prescribed by GSA FAR (48 CFR) 53.215-1(d)

Contract Data Requirements List (CDRL) Program: GBSD/DemVal Technology Studies

Date: 1 July 2014

Version:

1. Introduction

This document was developed in accordance with DOD MIL-STD 310000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.

2. General Guidelines

The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization

Information System (ASSIST) and provide additional direction for data preparation.

3. Communications

Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.

4. Codes used in the DD Form 1423

The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.

4.1 Block 7, DD Form 250 Requirements

Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements.

Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.

Code Inspection Acceptance

SS Source (DD Form 250 or equivalent document)

Source (DD Form 250 or equivalent document)

DD Destination (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

SD Source (DD Form 250 or equivalent document)

Destination (DD Form 250 or equivalent document)

DS Destination (DD Form 250 or equivalent document)

Source (DD Form 250 or equivalent document)

Code Inspection

LT Letter of Transmittal only

NO No inspection or acceptance required

XX Inspection and acceptance requirements specified elsewhere in contract

S Indicates the contractor’s facility

D Indicates the primary destination point

4.2 Block 8, Approval Code

When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA).

When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.

Code Description

A Approval Required

N/A Approval Not Required

4.3 Block 10, Frequency of Submittals

DAILY Daily

WEKLY Weekly

BI-WE Each 2 weeks

MTHLY Monthly

BI-MO Each 2 months

QRTLY Quarterly

ANNLY Annually

SEMIA Each 6 months

OTIME One time

ONE/R One time and revisions

R/ASR Revisions as required

ASGEN As generated

ASREQ As required*

DFDEL Deferred delivery

DFORD Deferred ordering

DFREQ Deferred requisitioning

ONE/P One time preliminary draft

XTIME Multiple separate submittals (i.e., 2Time, 3Time)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in

Block 16.

4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions

ATP Authority To Proceed

ASGEN As generated

ASREQ As required*

CDR Critical Design Review

CA Contract Award

CO Change Order

CD Calendar Day(s)

CP/REQ Change page/as required

CP/O Change page/(only)

DCARC Defense Cost and Research Center

DFDEL Deferred delivery

FQT Formal Qualification Test

FCA Functional Configuration Audit

PCA Physical Configuration Audit

TRR Test Readiness Review

SA Supplemental Agreement

WD Working Day(s)

* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in

Block 16.

5. Supplemental Data Preparation Instructions

5.1 Data Item Description (DID) Tailoring

The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement

(PWS) or Statement of Objectives (SOO).

5.2 Distribution Statement Marking

The designation in Block 9 of the CDRL form indicates that one of the following seven (7) authorized distribution statements from Department of Defense (DoD) Directive 5230.24 and Air Force Instruction

(AFI) 61.204 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1-R. Should Block 9 of the

CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:

Distribution Statement A:

Approved for public release; distribution is unlimited.

Distribution Statement B:

Distribution authorized to U.S. Government

Agencies only (fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).

Distribution Statement C:

Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).

Distribution Statement D:

Distribution authorized to the DoD and U.S. DoD contractors only for Administrative or Operational

Use determined as of (date of determination). Other requests shall be referred to AFNWC/NI, 6054

Dogwood Ave Bldg 1255, Hill AFB UT

84056-5816.

Distribution Statement E:

Distribution authorized to Department of Defense

(DoD) Components only (fill in reason) (date determination). Other requests shall be referred to

(insert controlling Department of Defense (DoD) office).

Distribution Statement F:

Further dissemination only as directed by (insert controlling Department of Defense (DoD) office)

(date of determination) or higher Department of

Defense (DoD) authority.

Distribution Statement X:

Agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with (IAW) regulations implementing

10 U.S.C. 140 (date of determination). Controlling office is (insert).

5.3 Other Notices

All technical documents marked with Distribution Statements B, C, D, E, F, or X will also be marked with the following notices:

WARNING:

This document/software contains technical data/software whose export is restricted by the Arms Export

Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, (Title 50, U.S.C., App 2401 et seq). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.

Destruction Notice:

For classified documents, follow the procedures in DOD 5220.22M, National Industrial Security Program

Operating Manual, Chapter 5, Section 7, or DOD 5200.1R, Information Security Program Regulation, Chapter 6, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.

5.4 Pricing CDRL Items Separately

If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.

6. Supplemental Data Delivery Instructions

6.1 Due Dates

Due dates for delivery of data are to be construed as receipt at destination.

6.2 Late Delivery

Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain

Time on the date specified in Blocks 12, 13 or 16 of the CDRL.

6.3 Submittal Procedures

6.3.1 CDRL Submittal Procedure

For the purposes of data submittal, unclassified CDRLs are submitted to the government via encrypted email to the recipient outlined in Block 14.

Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:

1. Contract number

2. CDRL sequence number (i.e., A001)

3. Exact title and subtitle (if applicable) of the document being transmitted

4. Line item or CLIN number

5. Modification Number or Order Number

4. Document date, number, and revision information (if applicable)

5. Data delivery method and date of delivery

6. Whether the document is a draft, or final submittal

7. For approval data: State “For Approval”

8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal

9. For periodic reports: The report period that the document covers

10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or

Block 16 of the CDRL Form

6.3.2 Classified CDRL Submittal Procedure

Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW

Appendix B of the DD254. For Classified Disks send two (2) copies.

Outer Envelope:

Address

ATTN: Security Office/Document Control

Inner Envelope:

Address

ATTN: Name of person for whom the document should be delivered

7. Supplemental Data Review and Approval Process

7.1 Approval CDRLs

The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item.

In addition, Block 16 of the form may contain additional directions.

Written

Approval

Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.

Approved with

Comment or

Disapproved

The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or

PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.

Draft Versions of the CDRL

If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval

CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.

7.2 Contractual Document Action (CDA)

After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:

COMMENT CODE CODE DESCRIPTION

C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.

S Substantive Comments of a less serious nature that have noticeable impact on the document's quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.

A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.

7.3 Information Only CDRLs

When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD

Form 1423.

8. Data Accession List (DAL)

During performance of the contract, requests from the PCO for data ordered from the Data Accession List

(DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.

9. Organizational Cross Reference List

The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.

ORG#/ Name Address Attention/To Contact Info

ORG1/AFNWC/NICB 6077 Indigo Ln (Bldg.1530) Hill AFB UT 84056

Program Manager

ORG2/AFNWC/NICB 6077 Indigo Ln (Bldg.1530) Hill AFB UT 84056

SRM Engineer

ORG3/AFNWC/PZBA 6014 Dogwood Ave (Bldg 1258) Hill AFB UT 84056-5816

Contracting Officer

ORG4/AFNWC/NIES 6054 Dogwood Ave (Bldg 1255) Hill AFB UT 84056-5816

Data Manager

10. CDRL Master Listing Index

Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.

CDRL # TITLE DID #

A001 Integrated Program Management Report (IPMR) DI-MGMT-81861

A002 Conference Agenda (Meeting Agenda) DI-ADMN-81249A

A003 Briefing Material DI-MGMT-81605

A004 Report, Record of Meeting/Minutes DI-ADMN-81505

A005 Program Management Plan DI-MGMT-81797

A006 Quality Assurance Program Plan DI-QCIC-81794

A007 Management Plan (Small Business Subcontracting Plan) DI-MGMT-80004A

A008 Test Plan DI-NDTI-80566A

A008 Conceptual Design Drawings/Models DI-SESS-81001E

A010 Developmental Design Drawings/Models and Associated Lists DI-SESS-81002E

A011 Interface Control Document (ICD) DI-CMAN-81248A

A012 Technical Report – Study/Services (Final Report) DI-MISC-80508B/T

A013 Technical Report – Study/Services (Trade Studies) DI-MISC-80508B/T

A014 Risk Management Status Report DI-MGMT-81809

A015 Management Plan (Open Systems Management Plan) DI-MGMT-80004A

11. DD Form 1423s (full 1423’s)

*1423’s, block A Reference Number: CLIN number to be added at time of award

**1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award

CONTRACT DATA REQUIREMENTS LIST

(1 Data Item)

Form Approved OMB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

GBSD/DEM VAL TECHNOLOGY

STUDIES

1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP

A001

INTEGRATED PROGRAM MANAGEMENT

REPORT (IPMR)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

TOTAL PRICE

DI-MGMT-81861/T

BAA Sections A, B, C, D, E, F, G, H, I, J, K

AFNWC/NICB

7. DD 250 REQ 9.DIST STATEMENT

REQUIRED

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

14. DISTRIBUTION

LT

MTHLY SEE BLK 16

b. COPIES

8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION

a. ADDRESSEE

Draft Final

A

EOM SEE BLK 16

Reg

Repro

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

BLOCK 4:

Format 1 only.

BLOCK 9:

Distribution Statement D: (see pages 3 & 4 for distribution statement, warning, and destruction notices)

BLOCKS 10, 11, 12 & 13:

Initial Submittal:

Contractor shall submit initial Integrated Program Management Report

(IPMR) NLT the 15th day of the month following the first complete month of the contract.

Subsequent Submittals:

Contractor shall submit subsequent IPMR NLT the 15th day of each month thereafter for the duration of the contract. Government will be allowed 10 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised

IPMR incorporating Government comments, if applicable, on the following month’s IPMR.

BLOCK 14: Contractor shall submit IPMR to ORG1 (see page 7 for address).

ORG1

ORG2 (Lt of delivery only)

ORG3 (Lt of delivery only)

ORG4 (Lt of delivery only)

15. TOTAL 1

G. PREPARED BY H. DATE I. APPROVED BY J. DATE

Nancy Baker

AFNWC/NIES

1 Jul 14

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

LM 14-26

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A002 CONFERENCE AGENDA Meeting Agenda

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81249A

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ASREQ N/A

a. ADDRESSEE

Draft

N/A N/A

Contractor shall submit Conference Agenda (Meeting Agenda) NLT 5 days prior to scheduled meetings or meetings deemed necessary by the

Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Agenda to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A003 BRIEFING MATERIALS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81605

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ASREQ SEE BLK 16

a. ADDRESSEE

Draft

N/A

N/A N/A

Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the

Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.

Contractor shall present corrected Briefing Materials incorporating

Government comments, if applicable, NLT 2 days after receipt from

Government.

BLOCK 14:

Contractor shall submit Briefing Materials to ORG1 (see page 7 for

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A004

REPORT, RECORD OF MEETING/MINUTES

Meeting Minutes

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-ADMN-81505

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

N/A SEE BLK 16

Contractor shall submit Report, Record of Meeting Minutes (Meeting

Minutes) NLT 15 days after meeting or event has been held.

Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.

BLOCK 14: Contractor shall submit Meeting Minutes to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A005 PROGRAM MANAGEMENT PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-81797

G, H, I, J

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

ONE/R SEE BLK 16

a. ADDRESSEE

Draft

SEE BLK 16 SEE BLK 16

Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments.

Contractor shall submit revised Program Management Plan incorporating Government comments, if applicable, NLT 30 days after receipt from Government.

Contractor shall submit revised Program Management Plan no more than once a year if applicable. Government will be allowed 15 days after receipt from contractor, to review for approval/disapproval/ comments. Contractor shall submit updated change pages incorporating Government comments, if applicable, NLT 15 days after receipt of comments from Government.

BLOCK 14: Contractor shall submit Program Management Plan to

ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A006 QUALITY ASSURANCE PROGRAM PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-QCIC-81794 BAA Section B AFNWC/NICB

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit initial Quality Assurance Program Plan NLT

30 days after award of contract. Government will be allowed to review for approval/disapproval/comments. Contractor shall submit revised Quality Assurance Program Plan incorporating Government comments, if applicable, NLT 30 days after award of contract.

BLOCK 14: Contractor shall submit Quality Assurance Program

Plan to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

LM 14-23

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A007 MANAGEMENT PLAN Small Business Subcontracting Plan

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MGMT-80000

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit Management Plan (Small Business

Subcontracting Plan) NLT 30 days after award of contract.

Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Management Plan (Small Business Subcontracting Plan) incorporating Government comments, if applicable, NLT 30 days after

BLOCK 14: Contractor shall submit Management Plan (Small Business

Subcontracting Plan) to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FD2020-14-52185

A008 TEST PLAN

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-NDTI-80566A BAA Sections A, B, D, G, H, I AFNWC/NICB

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

8. APP CODE E 11. AS OF DATE 13. DATE OF SUBSEQUENT

a. ADDRESSEE

Draft

6. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL

Distribution Statement E: (see pages 3 & 4 for distribution statement, Contractor shall submit Test Plan NLT 75 days prior to start of test.

Government will be allowed 60 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Test Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.

BLOCK 14: Contractor shall submit Test Plan to ORG1 (see page 7 for address).

NOTE: Test Plan shall be submitted IAW AFNWCI 99-101 and

ICBMSD 99-103.

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

0002 A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A009 CONCEPTUAL DESIGN DRAWINGS/MODELS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81001C

BAA Sections A, C, D, E, F, H, J

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

2TIMES SEE BLK 16

a. ADDRESSEE

Draft

16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY,

SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.

Initial:

Contractor shall submit initial Conceptual Design Drawings/Models mid-term of the contract.

Subsequent:

Contractor shall submit subsequent Conceptual Design

Drawings/Modes NLT 30 days prior to conclusion of contract.

Government will be allowed 20 days, after receipt from contractor, to review for comments. Contractor shall submit revised Conceptual

Design Drawings/Models incorporating Government comments, if applicable, NLT 10 days after receipt from Government.

BLOCK 14: Contractor shall submit Conceptual Design

Drawings/Models to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. Exhibit C. CATEGORY:

C TDP__X_______TM__________OTHER ________

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A010

DEVELOPMENTAL DESIGN

DRAWINGS/MODELS AND ASSOCIATED LISTS

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-SESS-81002F/T BAA Sections B, G AFNWC/NICB

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

BLK 16 BLK 16

a. ADDRESSEE

Draft

BLK 16 BLK 16

Initial:

Contractor shall submit initial Developmental Design

Drawings/Models and Associated Lists mid-term of the contract.

Subsequent:

Contractor shall submit subsequent Developmental Design

Drawings/Models and Associated Lists NLT 30 days prior to conclusion of contract.

Government will be allowed 20 days, after receipt from contractor, to review for comments. Contractor shall submit revised Developmental

Design Drawings/Models and Associated Lists incorporating

Government comments, if applicable, NLT 10 days after receipt from

BLOCK 14: Contractor shall submit Developmental Design

Drawings/Models and Associated Lists to ORG1 (see page 7 for

AFNWC/NWIES

DD Form 1423-1, FEB 2001 Page___1__of___1__Pages

MIL-STD-31000A

TDP OPTION SELECTION WORKSHEET

SYSTEM DATE PREPARED:

A. CONTRACT NO.

B. EXHIBIT / ATTACHMENT NO.

C. CLIN

D. CDRL DATA ITEM NO(s)

1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) Note. The level selected must coincide with the requirements of the elements selected in Block 5.

A. CONCEPTUAL LEVEL

DEVELOPMENTAL LEVEL

PRODUCTION LEVEL

B. REMARKS:

2. DELIVERABLE DATA PRODUCTS (XALL THAT APPLY AND COMPLETE AS APPLICABLE)

TYPE FORMAT

A. 2D DRAWINGS

NATIVE CAD ISO 32000 PDF HARD COPY

OTHER FORMAT (SPECIFY) ____________________________________________________

B. 3D MODELS

3D Digital MODELS ONLY 3D Digital MODELS W/ASSOCIATED

2D DRAWINGS

NATIVE CAD (Specify level of annotation __________________________________________ MODEL ORGANIZATION SCHEMA (Specify Appendix B or other ) _________________ NEUTRAL FORMAT (Specify, e.g. ISO 10303 APxxx)________________________________ OTHER FORMAT (Specify, e.g., 3D PDF, JT) _______________________________________

C. METADATA

(Specify in Section 9)

ASCII TEXT – PIPE DELIMITED ISO 10303 (Specify, e.g., APxxx & DEX________

JEDMICS (DLF) OTHER FORMAT (Specify)_________________

D. ASSOCIATED LISTS

(See Section 7)

NATIVE FORMAT ISO 32000 PDF HARDCOPY

OTHER FORMAT (Specify)_____________________________________________________

E. SUPPLEMENTAL

TECHNICAL DATA

(Specify in Section 9)

NATIVE __________________________________________________

NEUTRAL (Specify e.g., STEP AP238, 240, DEX, Other) ________________________________ OTHER (Specify e.g., PDF) ________________________________________________________

3. CAGE CODE & DOCUMENT

NUMBERS

A. CONTRACTOR CAGE & DOCUMENT NUMBERS

GOVERNMENT CAGE (COMPLETE 3B, 3C and 3D)

B. USE CAGE CODE:

C. USE DOCUMENT NUMBERS:

D. TO BE ASSIGNED BY:

4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICATLE)

CONTRACTOR FORMAT GOVERNMENT FORMAT

REMARKS: Must meet ASME Y14.100 and be JEDMICS compatible _

5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)

CONCEPTUAL DESIGN DRAWINGS / MODELS

DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS

PRODUCTION DRAWINGS / MODELS AND ASSOCIATED LISTS

SPECIAL INSPECTION EQUIPMENT (SIE) DRAWIANGS, MODELS AND ASSOCIATED LISTS

SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS

SPECIAL PACKAGING INSTUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS

SPECIFICATIONS AND/OR STANDARDS (Specify) ________________________________________________________________________ SOFTWARE DOCUMENTATION (Specify)________________________________________________________________________________ QUALITY ASSURANCE PROVISIONS (QAP) (Specify)______________________________________________________________________ META DATA (Specify) _________________________________________________________________________________________________ SUPPLMENTARY TECHNCIAL DATA (Specify) ___________________________________________________________________________

6. TDP DATA MANAGEMENT PRODUCTS

SOURCE CONTROL DRAWING (SOCD) APPROVAL REQUEST

DRAWING NUMBER ASSIGNMENT REPORT

PROPOSED CRITICAL MANUFACTURING PROCES DESCRIPTION

7. ASSOCIATED LISTS (X AND COMPLETE AS APPLICABLE)

A. PARTS LIST (X ONE)

(1) INTEGRAL

(2) SEPARATE

(3) CONTRACTOR SELECT

B. DATA LISTS

REQUIRED (Specify Levels of Assy) ____________________________________________________________

C. INDEX LISTS

D. WIRING LISTS

E. APPLICATION LISTS

(1) INTEGRAL

(2) SEPARATE

(3) CONTRACTOR SELECT

F. OTHER

8. APPLICABILITY OF STANDARDS. THE FOLLOWING STARNDARDS APPLY: (X AS APPLICABLE)

ASME Y14.100

ENGINEERING DRAWING

PRACTICES

WITH APPENDICES:

B C D E

ASME Y14.24 TYPES AND APPLICATIONS OF

ENGINEERING DRAWINGS

ASME Y14.34 ASSOCIATED LIST

ASME Y14.35M REVISION OF ENGINEERING

DRAWINGS AND ASSOCIATED LIST

ASME Y14.41 DIGITAL PRODUCT DEFINITION

DATA PRACTICES

ASME Y14.5 DIMENSIONING AND TOLERANCING

OTHER STANDARDS APPLY

AS DESCRIBED

COMPANY STANDARDS

PERMITTED

YES NO

9. OTHER TAILORING (ATTACH ADDITION SHEETS AS NECESSARY)

See attached METADATA instructions.

TDP OPTION SELECTION WORKSHEET

Atch 2

Metadata Spreadsheet

METADATA FILE

2010.xls

Atch 3 METADATA spreadsheet column-by-column description

NOTE: DO NOT ADD OR REMOVE COLUMNS

Column Header name Required

Field

Max # char’

Description

A Row Format Yes 10 Value is “IMAGE”.

B Document # Yes 20 This is the primary document number as it appears in the title block. If the document number in the title block includes the dash number, include it in this column as well. Do not include the Doc Type designator in this column, i.e. PL or WL. For ECOs this is the number of the primary drawing the accompanying document is applicable to.

C CAGE Yes 5 5 character CAGE code listed in the title block of document being submitted.

D Doc Type Yes 2 Type of document being submitted. For drawings and accompanying documents (ECOs, etc) leave blank.

Parts List = PL

Wire List = WL

Wire Diagram = WD

Data Lists = DL

Specifications = SP

Test Procedure = TP

Application Lists = AL

E Doc Size Yes 2 The size of the document being submitted. A, B, C, D, E or J.

F Doc Rev Yes 2 Revision (normally the revision level of sheet 1) of the document. Max

2 characters. Leave blank if a new release

G Doc Rev Date No 50 Leave Blank. Not used

H Doc Title Yes 40 Title of document being submitted. Spaces and dashes are allowed. Do not use slashes, dots or commas. Limited to 250 characters

I Sheet # Yes 4 Drawing sheet number shown in this image.

J # of sheets Yes 4 Total number of sheets in the drawing.

K Sheet Rev Yes 2 Sheet revision letter. Leave blank if a new release

L Frame # Default 4 List the frame number of the file. Always 0001 with one exception: J size sheets, which are split into multiple frames, with each frame in it’s own file.

M # of Frames Default 4 List the total frames for the sheet. Always 0001 with one exception: J size sheets, which are split into multiple frames, with each frame in it’s own file.

N File Type No 3 752 for PDF files.

746 for Word documents.

748 for Excel spreadsheets.

1 for all other approved formats.

O File Type Format No 20 DOC for Word and PDF documents.

SPRD for Excel spreadsheets.

C4 for all other approved formats.

P File Type Src Fla No 30 PDF for PDF files.

WORD for Word documents.

EXCEL for Excel spreadsheets.

RSTR for all other approved formats.

Q File Type Dest No 30 V1.7 for PDF files

V2007 for Word and Excel files

C4 for all other approved formats.

R File Type Content No 30 Leave blank, Not Used

S File Type Version No 30 Leave blank, Not Used

T Site Code No 6 Value is 5M640

U File Name No 14 Name of file described by this row of the spreadsheet without the extension. Case sensitive. Spaces, pipes and the following characters are NOT allowed: . , / \ %| Limited to 14 characters

Column Header name Required

Field

Max # char’

Description

V File extension No 10 Extension of file described by this row of the spreadsheet, without dot

(.). For PDF, Word, Excel and C4 files this is the actual extension of the file (case sensitive). For all other approved formats (dwg, dxf, tif) enter C4

W File Path No 242 Default Value is 00 (zero, zero)

X Field 24 No Leave Blank

Y Field 25 No Leave Blank

A Field 26 No Leave Blank

AA Security Level Default 10 Default value is N

AB Rights Default 5 Default value is U (Proprietary data default value is L)

AC Foreign Security Default 10 Default value is N

AD Nuclear Default 5 Default value is N

AE Subsafe Default 6 Default value is N

AF AirType No Leave Blank

AG APL No Leave Blank

AH CADInfo No Leave Blank

AI Control Mode No 5 Value is ME

AJ HSC No Leave Blank

AK NSN No Leave Blank

AL UIC No Leave Blank

AM System No Leave Blank

AN Nomenclature No Leave Blank

AO ShipClass No Leave Blank

AP ShipTypeHullNum No Leave Blank

AQ MasterLoc No Leave Blank

AR PhysicalLoc No Leave Blank

AS Field 45 No Leave Blank

AT Field 46 No Leave Blank

AU Part Number No Leave Blank

AV SubSheet No Add sheet revision of drawing if file is an EO.

AW Succeeding No Leave Blank

AX Dist statement Yes 5 List the applicable distribution statement. Normally D

AY Acc Doc Kind Yes 20 Leave blank unless this data is an accompanying document. Enter

Change Notice (ECO) = NT.

Addendum = AD

Amendment = AM

Appendix = AP

AZ Acc Doc # Yes 10 Number assigned to accompanying document. Notice 10 character limit.

BA Field 53 No Leave Blank

BB Acc Doc Rev Yes 2 Leave blank

BC Field 55 No 50 Leave Blank, Not used

BD Field 56 No 50 Leave Blank, Not used

BE WSC No 15 N/A

BF Source Site Yes 5 Always HAFB

BG RevOrder No 6 Leave Blank

BH AccRevOrder No 6 Leave Blank

BI qaStatus No 1 Leave Blank

BJ TDAC No 1 Leave Blank

BK Comment No 40 Leave Blank

BL Export Control Yes 1 Enter “Y” or “N”

BM Record End No 5 Leave Blank

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

FD2020-14-52185

A011 INTERFACE CONTROL DOCUMENT (ICD)

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-CMAN-81248A BAA Sections B, C, E, F, G AFNWC/NICB

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

Contractor shall submit ICD NLT 30 days prior to conclusion of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised ICD incorporating Government comments, if applicable, NLT 10 after receipt from Government.

BLOCK 14: Contractor shall submit ICD to ORG1 (see page 7 for

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A012 TECHNICAL REPORT – STUDY/SERVICES Final Report

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B/T

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.

2. Delete paragraphs 2. (a) & (b) in their entirety

Contractor shall submit Technical Report – Study/Services NLT 30 days prior to conclusion of the contract. Government will be allowed

20 days, after receipt from contractor, to review for comments.

Contractor shall submit revised Technical Report – Study/Services incorporating Government comments, if applicable, NLT 10 days after

BLOCK 14: Contractor shall submit Technical Report –

Study/Services to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_ Page

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:

A TDP TM OTHER ___X_____

D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR

A013 TECHNICAL REPORT – STUDY/SERVICES Trade Studies

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED

DI-MISC-80508B/T BAA Sections C, G AFNWC/NICB

10. FREQUENCY 12. DATE OF FIRST

SUBMISSION

a. ADDRESSEE

Draft

1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.

2. Delete paragraphs 2. (a) & (b) in their entirety

Contractor shall submit Technical Report – Study/Services (Trade

Studies) NLT 30 days after requested by the Government.

Government will be allowed 20 days, after receipt from contractor, to review for comments. Contractor shall submit revised Technical

Report – Study/Services (Trade Studies) incorporating Government comments, if applicable, NLT 10 days after receipt from Government.

BLOCK 14: Contractor shall submit Technical Report –

Study/Services (Trade Studies) to ORG1 (see page 7 for address).

DD Form 1423-1, FEB 2001 Page___1__of__1_…