DD1423_GBSD_DemVal_Tech_Studies_1_Jul_14.pdf
PDF 1 MB Posted
- Attached to
- GBSD/DemVal Technology Studies Federal contract opportunity
- Solicitation number
- FA8219-14-R-7001
About this file
CDRL package
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| RFI_question_FBO_spreadsheet_2014_09_11.pdf | ||
| RFI_question_FBO_spreadsheet_2014_09_03.pdf | ||
| RFI_question_FBO_spreadsheet_2014_08_19.pdf | ||
| GBSD_DemVal_Studies_Updated_CDRLs_-_12_Aug_14.pdf | ||
| RFI_question_FBO_spreadsheet_2014_08_06_(2).pdf | ||
| GBSD_DemVal_Studies_Updated_CDRLs_-_31_Jul_14.pdf | ||
| RFI_question_spreadsheet_2014_07_31.pdf | ||
| GBSD_DemVal_BAA_SOO_2014_07_30.pdf | ||
| Copy_of_RFI_question_spreadsheet_2014_07_30.pdf | ||
| FA821914R7001_______0001.pdf | ||
| GBSD_DemVal_BAA_SOO_2014_06_30.pdf | ||
| Attch_2_CDRL_A010_Metadata_Spreadsheet.pdf | ||
| FA821914R7001.pdf | ||
| DD254_Options_FD20201450535.pdf | ||
| BAAGuide.pdf |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STANDARD FORM 1447 (2/2012)
Prescribed by GSA FAR (48 CFR) 53.215-1(d)
Contract Data Requirements List (CDRL) Program: GBSD/DemVal Technology Studies
Date: 1 July 2014
Version:
1. Introduction
This document was developed in accordance with DOD MIL-STD 310000A and represents the general requirements for the Technical Data Package (TDP) for this program. The purpose of this Attachment, Technical Data Package, is to define the data deliverables due for this program, including the instructions for their development, and delivery. All specific delivery instructions are specified on the CDRL forms or its digital (word, excel, pdf) equivalent.
2. General Guidelines
The CDRL form, Department of Defense (DD) Form 1423, specifies the data required to be delivered to the Government, as well as the frequency and approval requirements. The Data Item Descriptions (DID), listed on the CDRL form, were selected from the Acquisition Streamlining and Standardization
Information System (ASSIST) and provide additional direction for data preparation.
3. Communications
Any correspondence related to requests for data delivery deviations and/or amendments, additions or deletions to the CDRL form shall be addressed to the Procuring Contracting Officer (PCO) with a courtesy copy to the Data Management Officer (DMO) (Air Force Nuclear Weapons Center (AFNWC)/NIES) and the cognizant program manager (PM). Copies of all forms & templates noted in this file are available as requested from your program manager, the DMO or your PCO.
4. Codes used in the DD Form 1423
The directions for submittal and approval of data is indicated in Blocks 7, 8, 9, 10, 11, 12, 13, 14, 15 or 16 of the DD Form 1423. Usually, the direction is in the form of a code (explained below). The following abbreviations/codes are common usage within AFNWC.
4.1 Block 7, DD Form 250 Requirements
Block 7 of the CDRL form indicates whether Procurement Quality Assurance (PQA) inspections and acceptance of deliverable data by DD Form 250 is required. “Draft” copies submitted for advance approval and “Preliminary Draft” copies submitted are exempt from the DD Form 250 requirements.
Information copies of DD Form 250 to accompany each letter of transmittal for this category of data.
Code Inspection Acceptance
SS Source (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
DD Destination (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
SD Source (DD Form 250 or equivalent document)
Destination (DD Form 250 or equivalent document)
DS Destination (DD Form 250 or equivalent document)
Source (DD Form 250 or equivalent document)
Code Inspection
LT Letter of Transmittal only
NO No inspection or acceptance required
XX Inspection and acceptance requirements specified elsewhere in contract
S Indicates the contractor’s facility
D Indicates the primary destination point
4.2 Block 8, Approval Code
When document approval is required (code “A”), the approval authority (ORG) for that 1423 is designated with an (A). Approval coordination shall be done using the Contract Document Action Form (CDA).
When document approval is not required (code “N/A”), no approval of the CDRL is required (note that documents that do not require approval shall also be marked as “NO” or “LT” in block 7.
Code Description
A Approval Required
N/A Approval Not Required
4.3 Block 10, Frequency of Submittals
DAILY Daily
WEKLY Weekly
BI-WE Each 2 weeks
MTHLY Monthly
BI-MO Each 2 months
QRTLY Quarterly
ANNLY Annually
SEMIA Each 6 months
OTIME One time
ONE/R One time and revisions
R/ASR Revisions as required
ASGEN As generated
ASREQ As required*
DFDEL Deferred delivery
DFORD Deferred ordering
DFREQ Deferred requisitioning
ONE/P One time preliminary draft
XTIME Multiple separate submittals (i.e., 2Time, 3Time)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in
Block 16.
4.4 Block 12 and 13, Dates of Initial and Subsequent Submissions
ATP Authority To Proceed
ASGEN As generated
ASREQ As required*
CDR Critical Design Review
CA Contract Award
CO Change Order
CD Calendar Day(s)
CP/REQ Change page/as required
CP/O Change page/(only)
DCARC Defense Cost and Research Center
DFDEL Deferred delivery
FQT Formal Qualification Test
FCA Functional Configuration Audit
PCA Physical Configuration Audit
TRR Test Readiness Review
SA Supplemental Agreement
WD Working Day(s)
* When ASREQ is used in Blocks 10, 11, 12 or 13 an explanation of the requirements must be entered in
Block 16.
5. Supplemental Data Preparation Instructions
5.1 Data Item Description (DID) Tailoring
The DID is a specification for the preparation of data. DID tailoring is reflected in Block 16 of the CDRL form. “T” entered after the DID number in Block 4, means that the DID has been tailored. Block 4 tailoring is made to either relax preparation instructions or to tailor the DID to be in consonance with the source document tailoring contained in the Statement of Work (SOW), Performance Work Statement
(PWS) or Statement of Objectives (SOO).
5.2 Distribution Statement Marking
The designation in Block 9 of the CDRL form indicates that one of the following seven (7) authorized distribution statements from Department of Defense (DoD) Directive 5230.24 and Air Force Instruction
(AFI) 61.204 shall be annotated on that technical data. Distribution statements will be selected to denote the audience the data is intended for: A distribution statement marking is distinct from and in addition to a security classification marking assigned in accordance with (IAW) DoD 5200.1-R. Should Block 9 of the
CDRL form and the DID be in conflict, Block 9 of the CDRL form shall take precedence. The following distribution statements are authorized for use in marking technical documents:
Distribution Statement A:
Approved for public release; distribution is unlimited.
Distribution Statement B:
Distribution authorized to U.S. Government
Agencies only (fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).
Distribution Statement C:
Agencies and their contractors (fill in reason) (date of determination). Other requests for this document shall be referred to (insert controlling DoD office).
Distribution Statement D:
Distribution authorized to the DoD and U.S. DoD contractors only for Administrative or Operational
Use determined as of (date of determination). Other requests shall be referred to AFNWC/NI, 6054
Dogwood Ave Bldg 1255, Hill AFB UT
84056-5816.
Distribution Statement E:
Distribution authorized to Department of Defense
(DoD) Components only (fill in reason) (date determination). Other requests shall be referred to
(insert controlling Department of Defense (DoD) office).
Distribution Statement F:
Further dissemination only as directed by (insert controlling Department of Defense (DoD) office)
(date of determination) or higher Department of
Defense (DoD) authority.
Distribution Statement X:
Agencies and private individuals or enterprises eligible to obtain export-controlled technical data in accordance with (IAW) regulations implementing
10 U.S.C. 140 (date of determination). Controlling office is (insert).
5.3 Other Notices
All technical documents marked with Distribution Statements B, C, D, E, F, or X will also be marked with the following notices:
WARNING:
This document/software contains technical data/software whose export is restricted by the Arms Export
Control Act (Title 22, U.S.C., Sec 2751 et seq.) or the Export Administration Act of 1979, as amended, (Title 50, U.S.C., App 2401 et seq). Violations of these export laws are subject to severe criminal penalties. Disseminate in accordance with provisions of DOD Directive 5230.25.
Destruction Notice:
For classified documents, follow the procedures in DOD 5220.22M, National Industrial Security Program
Operating Manual, Chapter 5, Section 7, or DOD 5200.1R, Information Security Program Regulation, Chapter 6, Section 7. For unclassified, limited documents, destroy by any method that will prevent disclosure of contents or reconstruction of the document.
5.4 Pricing CDRL Items Separately
If blocks 17 and 18 of the DD form 1423 documents are marked as "N/A" and "NSP" respectively, then the Government does not want to separately group or price CDRL items. If blocks 17 and 18 are left blank, the Government intends to seek separate pricing for the development costs of each CDRL. This pricing is for development costs of the data items and is considered separate from data rights costs.
6. Supplemental Data Delivery Instructions
6.1 Due Dates
Due dates for delivery of data are to be construed as receipt at destination.
6.2 Late Delivery
Delivery of data is considered late if it does not arrive at its destination by 1530 hours (3:30 PM) Mountain
Time on the date specified in Blocks 12, 13 or 16 of the CDRL.
6.3 Submittal Procedures
6.3.1 CDRL Submittal Procedure
For the purposes of data submittal, unclassified CDRLs are submitted to the government via encrypted email to the recipient outlined in Block 14.
Each data submittal shall be accompanied by a Contract Document Action (CDA) form (please request current version from ORG1). If for any reason a CDA form is not available, a cover letter shall contain the following information:
1. Contract number
2. CDRL sequence number (i.e., A001)
3. Exact title and subtitle (if applicable) of the document being transmitted
4. Line item or CLIN number
5. Modification Number or Order Number
4. Document date, number, and revision information (if applicable)
5. Data delivery method and date of delivery
6. Whether the document is a draft, or final submittal
7. For approval data: State “For Approval”
8. If the document is a re-submittal, reference the Government letter Contractual Document Action (CDA) requesting re-submittal or disapproval of previous submittal
9. For periodic reports: The report period that the document covers
10. Distribution: Information disclosing the total contractual distribution being made per Block 14, or
Block 16 of the CDRL Form
6.3.2 Classified CDRL Submittal Procedure
Classified CDRLs and classified documentation are submitted in accordance with this instruction and are never to be emailed. Classified CDRLs or portions of a CDRL, as applicable, shall be forwarded IAW
Appendix B of the DD254. For Classified Disks send two (2) copies.
Outer Envelope:
Address
ATTN: Security Office/Document Control
Inner Envelope:
Address
ATTN: Name of person for whom the document should be delivered
7. Supplemental Data Review and Approval Process
7.1 Approval CDRLs
The letter “A” in Block 8 of the DD Form 1423 indicates that the Government must approve the data item.
In addition, Block 16 of the form may contain additional directions.
Written
Approval
Written approval indicates agreement or concurrence with the contractor furnished data only and shall not be construed as changing any of the terms or conditions of the subject contract. The approval authority shall be ORG 1 as outlined in section 9 of this document. Approval shall take the form of either a letter signed by the PCO/DMO or concurrence using the Contractual Document Action (CDA) form, signed and dated by the representative stated in ORG 1. Data items submitted for approvals are NOT automatically approved without government approval.
Approved with
Comment or
Disapproved
The Contractor shall revise data items Approved with Comments or Disapproved in accordance with the specific written comments transmitted with the CDA or
PCO/DMO letter and resubmit not later than 30 calendar days (unless otherwise directed) from receipt of the Approval with Comments or Disapproval, unless otherwise directed. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD Form 1423.
Draft Versions of the CDRL
If a DD Form 1423 directs the Contractor to submit a “draft” version of an approval
CDRL in advance of the final version, the draft will be considered an information only submission. However, the PCO/DMO still retains the right to disapprove a draft data item that does not comply with the contract requirements. Unless otherwise directed by the PCO, the Contractor shall incorporate the Government’s comments in the final submission and shall not resubmit the draft version of the data item.
7.2 Contractual Document Action (CDA)
After the Government receives a data item submission, a Temporary Data Identification Number (TDID), a unique identifier to that submission, will be assigned by the DMO. The Government’s review of that data item will result in a coordinated CDA form, or PCO letter, indicating the data items approval or disapproval. Should the Government have comments on the data item; the CDA will include either comments on the CDA form itself or a Comment Resolution Matrix (CRM). Comments will be provided to the submitter in accordance with the format and timeline noted in block 16. Comments will be assigned one of the following codes:
COMMENT CODE CODE DESCRIPTION
C Critical Comments of a very serious nature that will preclude final approval and publication of the document. You are willing to elevate the comment or issue to senior organization leadership (e.g., general officer) and recommend they non-concur. These are the "show-stoppers". Convincing rationale for critical comments must be provided. The individual making the comment and the document writer will reconcile the comment.
S Substantive Comments of a less serious nature that have noticeable impact on the document's quality or content. The document appears to be incorrect, misleading, confusing, or inconsistent with other sections.
A Administrative Comments that address minor items such as typographical, format and/or grammatical errors.
7.3 Information Only CDRLs
When an “A” is not indicated in Block 8 of the DD Form 1423, the PCO/DMO still retains the right to disapprove any data that does not comply with contract requirements. The Contractor shall revise the disapproved data item in accordance with the specific written comments transmitted with the CDA form or PCO letter and resubmit not later than 30 calendar days, unless otherwise directed, from receipt of the disapproval. The resubmitted data will require a new approval cycle as indicated in Block 8 of the DD
Form 1423.
8. Data Accession List (DAL)
During performance of the contract, requests from the PCO for data ordered from the Data Accession List
(DAL) (with the application of DID DI-MGMT-81453A) shall be provided at no increase in contract price. Requests for quantities greater than two each per document shall be honored upon receipt of PCO direction and with Contractor concurrence that such request can be filled at no increase in contract price.
9. Organizational Cross Reference List
The following Organizational Cross Reference List shall be used in conjunction with the CDRLs to determine actual addressees for distribution of data. The ORG number will be entered in lieu of a address on the CDRL and will be a part of the CDRL package. Changes to the list will be identified by an asterisk next to the ORG number and a revision date to the list.
ORG#/ Name Address Attention/To Contact Info
ORG1/AFNWC/NICB 6077 Indigo Ln (Bldg.1530) Hill AFB UT 84056
Program Manager
ORG2/AFNWC/NICB 6077 Indigo Ln (Bldg.1530) Hill AFB UT 84056
SRM Engineer
ORG3/AFNWC/PZBA 6014 Dogwood Ave (Bldg 1258) Hill AFB UT 84056-5816
Contracting Officer
ORG4/AFNWC/NIES 6054 Dogwood Ave (Bldg 1255) Hill AFB UT 84056-5816
Data Manager
10. CDRL Master Listing Index
Full 1423’s for CDRL’s applicable to this program are included in section 11 of this document.
CDRL # TITLE DID #
A001 Integrated Program Management Report (IPMR) DI-MGMT-81861
A002 Conference Agenda (Meeting Agenda) DI-ADMN-81249A
A003 Briefing Material DI-MGMT-81605
A004 Report, Record of Meeting/Minutes DI-ADMN-81505
A005 Program Management Plan DI-MGMT-81797
A006 Quality Assurance Program Plan DI-QCIC-81794
A007 Management Plan (Small Business Subcontracting Plan) DI-MGMT-80004A
A008 Test Plan DI-NDTI-80566A
A008 Conceptual Design Drawings/Models DI-SESS-81001E
A010 Developmental Design Drawings/Models and Associated Lists DI-SESS-81002E
A011 Interface Control Document (ICD) DI-CMAN-81248A
A012 Technical Report – Study/Services (Final Report) DI-MISC-80508B/T
A013 Technical Report – Study/Services (Trade Studies) DI-MISC-80508B/T
A014 Risk Management Status Report DI-MGMT-81809
A015 Management Plan (Open Systems Management Plan) DI-MGMT-80004A
11. DD Form 1423s (full 1423’s)
*1423’s, block A Reference Number: CLIN number to be added at time of award
**1423’s block E Reference Number: Contract and Mod/TO number to be added at time of award
CONTRACT DATA REQUIREMENTS LIST
(1 Data Item)
Form Approved OMB No. 0704-0188
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
GBSD/DEM VAL TECHNOLOGY
STUDIES
1. DATA ITEM NO. 2. TITLE OF DATA ITEM 3. SUBTITLE 17. PRICE GROUP
A001
INTEGRATED PROGRAM MANAGEMENT
REPORT (IPMR)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
TOTAL PRICE
DI-MGMT-81861/T
BAA Sections A, B, C, D, E, F, G, H, I, J, K
AFNWC/NICB
7. DD 250 REQ 9.DIST STATEMENT
REQUIRED
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
14. DISTRIBUTION
LT
MTHLY SEE BLK 16
b. COPIES
8. APP CODE D 11. AS OF DATE 13. DATE OF SUBSEQUENT
SUBMISSION
a. ADDRESSEE
Draft Final
A
EOM SEE BLK 16
Reg
Repro
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL
BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
BLOCK 4:
Format 1 only.
BLOCK 9:
Distribution Statement D: (see pages 3 & 4 for distribution statement, warning, and destruction notices)
BLOCKS 10, 11, 12 & 13:
Initial Submittal:
Contractor shall submit initial Integrated Program Management Report
(IPMR) NLT the 15th day of the month following the first complete month of the contract.
Subsequent Submittals:
Contractor shall submit subsequent IPMR NLT the 15th day of each month thereafter for the duration of the contract. Government will be allowed 10 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised
IPMR incorporating Government comments, if applicable, on the following month’s IPMR.
BLOCK 14: Contractor shall submit IPMR to ORG1 (see page 7 for address).
ORG1
ORG2 (Lt of delivery only)
ORG3 (Lt of delivery only)
ORG4 (Lt of delivery only)
15. TOTAL 1
G. PREPARED BY H. DATE I. APPROVED BY J. DATE
Nancy Baker
AFNWC/NIES
1 Jul 14
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
LM 14-26
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A002 CONFERENCE AGENDA Meeting Agenda
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81249A
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ASREQ N/A
a. ADDRESSEE
Draft
N/A N/A
Contractor shall submit Conference Agenda (Meeting Agenda) NLT 5 days prior to scheduled meetings or meetings deemed necessary by the
Government. Government will be allowed 2 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Agenda incorporating Government comments, if applicable, NLT 2 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Agenda to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A003 BRIEFING MATERIALS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81605
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ASREQ SEE BLK 16
a. ADDRESSEE
Draft
N/A
N/A N/A
Contractor shall submit Briefing Materials NLT 5 days prior to each scheduled meeting and/or any other meeting deemed necessary by the
Government and as requested by the Government. Government will be allowed 2 days, after receipt from contractor, to review for comments.
Contractor shall present corrected Briefing Materials incorporating
Government comments, if applicable, NLT 2 days after receipt from
Government.
BLOCK 14:
Contractor shall submit Briefing Materials to ORG1 (see page 7 for
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A004
REPORT, RECORD OF MEETING/MINUTES
Meeting Minutes
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-ADMN-81505
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
N/A SEE BLK 16
Contractor shall submit Report, Record of Meeting Minutes (Meeting
Minutes) NLT 15 days after meeting or event has been held.
Government will be allowed 5 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Meeting Minutes incorporating Government comments, if applicable, NLT 5 days after receipt from Government.
BLOCK 14: Contractor shall submit Meeting Minutes to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A005 PROGRAM MANAGEMENT PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-81797
G, H, I, J
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
ONE/R SEE BLK 16
a. ADDRESSEE
Draft
SEE BLK 16 SEE BLK 16
Contractor shall submit Program Management Plan NLT 30 days after award of contract. Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments.
Contractor shall submit revised Program Management Plan incorporating Government comments, if applicable, NLT 30 days after receipt from Government.
Contractor shall submit revised Program Management Plan no more than once a year if applicable. Government will be allowed 15 days after receipt from contractor, to review for approval/disapproval/ comments. Contractor shall submit updated change pages incorporating Government comments, if applicable, NLT 15 days after receipt of comments from Government.
BLOCK 14: Contractor shall submit Program Management Plan to
ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A006 QUALITY ASSURANCE PROGRAM PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-QCIC-81794 BAA Section B AFNWC/NICB
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit initial Quality Assurance Program Plan NLT
30 days after award of contract. Government will be allowed to review for approval/disapproval/comments. Contractor shall submit revised Quality Assurance Program Plan incorporating Government comments, if applicable, NLT 30 days after award of contract.
BLOCK 14: Contractor shall submit Quality Assurance Program
Plan to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
LM 14-23
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A007 MANAGEMENT PLAN Small Business Subcontracting Plan
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MGMT-80000
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit Management Plan (Small Business
Subcontracting Plan) NLT 30 days after award of contract.
Government will be allowed 30 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Management Plan (Small Business Subcontracting Plan) incorporating Government comments, if applicable, NLT 30 days after
BLOCK 14: Contractor shall submit Management Plan (Small Business
Subcontracting Plan) to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FD2020-14-52185
A008 TEST PLAN
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-NDTI-80566A BAA Sections A, B, D, G, H, I AFNWC/NICB
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
8. APP CODE E 11. AS OF DATE 13. DATE OF SUBSEQUENT
a. ADDRESSEE
Draft
6. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY, SHALL
Distribution Statement E: (see pages 3 & 4 for distribution statement, Contractor shall submit Test Plan NLT 75 days prior to start of test.
Government will be allowed 60 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised Test Plan incorporating Government comments, if applicable, NLT 15 days after receipt from Government.
BLOCK 14: Contractor shall submit Test Plan to ORG1 (see page 7 for address).
NOTE: Test Plan shall be submitted IAW AFNWCI 99-101 and
ICBMSD 99-103.
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
0002 A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A009 CONCEPTUAL DESIGN DRAWINGS/MODELS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81001C
BAA Sections A, C, D, E, F, H, J
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
2TIMES SEE BLK 16
a. ADDRESSEE
Draft
16. REMARKS: CHANGES TO OFFICE SYMBOLS, WHEN NECESSARY,
SHALL BE MADE BY THE CO/ACO WITHOUT REVISIONS TO THE CDRL.
Initial:
Contractor shall submit initial Conceptual Design Drawings/Models mid-term of the contract.
Subsequent:
Contractor shall submit subsequent Conceptual Design
Drawings/Modes NLT 30 days prior to conclusion of contract.
Government will be allowed 20 days, after receipt from contractor, to review for comments. Contractor shall submit revised Conceptual
Design Drawings/Models incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14: Contractor shall submit Conceptual Design
Drawings/Models to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. Exhibit C. CATEGORY:
C TDP__X_______TM__________OTHER ________
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A010
DEVELOPMENTAL DESIGN
DRAWINGS/MODELS AND ASSOCIATED LISTS
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-SESS-81002F/T BAA Sections B, G AFNWC/NICB
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
BLK 16 BLK 16
a. ADDRESSEE
Draft
BLK 16 BLK 16
Initial:
Contractor shall submit initial Developmental Design
Drawings/Models and Associated Lists mid-term of the contract.
Subsequent:
Contractor shall submit subsequent Developmental Design
Drawings/Models and Associated Lists NLT 30 days prior to conclusion of contract.
Government will be allowed 20 days, after receipt from contractor, to review for comments. Contractor shall submit revised Developmental
Design Drawings/Models and Associated Lists incorporating
Government comments, if applicable, NLT 10 days after receipt from
BLOCK 14: Contractor shall submit Developmental Design
Drawings/Models and Associated Lists to ORG1 (see page 7 for
AFNWC/NWIES
DD Form 1423-1, FEB 2001 Page___1__of___1__Pages
MIL-STD-31000A
TDP OPTION SELECTION WORKSHEET
SYSTEM DATE PREPARED:
A. CONTRACT NO.
B. EXHIBIT / ATTACHMENT NO.
C. CLIN
D. CDRL DATA ITEM NO(s)
1. TDP LIFECYCLE LEVEL (CHOOSE ONLY ONE PER WORKSHEET) Note. The level selected must coincide with the requirements of the elements selected in Block 5.
A. CONCEPTUAL LEVEL
DEVELOPMENTAL LEVEL
PRODUCTION LEVEL
B. REMARKS:
2. DELIVERABLE DATA PRODUCTS (XALL THAT APPLY AND COMPLETE AS APPLICABLE)
TYPE FORMAT
A. 2D DRAWINGS
NATIVE CAD ISO 32000 PDF HARD COPY
OTHER FORMAT (SPECIFY) ____________________________________________________
B. 3D MODELS
3D Digital MODELS ONLY 3D Digital MODELS W/ASSOCIATED
2D DRAWINGS
NATIVE CAD (Specify level of annotation __________________________________________ MODEL ORGANIZATION SCHEMA (Specify Appendix B or other ) _________________ NEUTRAL FORMAT (Specify, e.g. ISO 10303 APxxx)________________________________ OTHER FORMAT (Specify, e.g., 3D PDF, JT) _______________________________________
C. METADATA
(Specify in Section 9)
ASCII TEXT – PIPE DELIMITED ISO 10303 (Specify, e.g., APxxx & DEX________
JEDMICS (DLF) OTHER FORMAT (Specify)_________________
D. ASSOCIATED LISTS
(See Section 7)
NATIVE FORMAT ISO 32000 PDF HARDCOPY
OTHER FORMAT (Specify)_____________________________________________________
E. SUPPLEMENTAL
TECHNICAL DATA
(Specify in Section 9)
NATIVE __________________________________________________
NEUTRAL (Specify e.g., STEP AP238, 240, DEX, Other) ________________________________ OTHER (Specify e.g., PDF) ________________________________________________________
3. CAGE CODE & DOCUMENT
NUMBERS
A. CONTRACTOR CAGE & DOCUMENT NUMBERS
GOVERNMENT CAGE (COMPLETE 3B, 3C and 3D)
B. USE CAGE CODE:
C. USE DOCUMENT NUMBERS:
D. TO BE ASSIGNED BY:
4. DRAWING FORMATS (X ONE AND COMPLETE AS APPLICATLE)
CONTRACTOR FORMAT GOVERNMENT FORMAT
REMARKS: Must meet ASME Y14.100 and be JEDMICS compatible _
5. TDP ELEMENTS AND ASSOCIATED DATA REQUIRED (X ALL THAT APPLY)
CONCEPTUAL DESIGN DRAWINGS / MODELS
DEVELOPMENTAL DESIGN DRAWINGS / MODELS AND ASSOCIATED LISTS
PRODUCTION DRAWINGS / MODELS AND ASSOCIATED LISTS
SPECIAL INSPECTION EQUIPMENT (SIE) DRAWIANGS, MODELS AND ASSOCIATED LISTS
SPECIAL TOOLING (ST) DRAWINGS, MODELS AND ASSOCIATED LISTS
SPECIAL PACKAGING INSTUCTIONS (SPI) DRAWINGS, MODELS AND ASSOCIATED LISTS
SPECIFICATIONS AND/OR STANDARDS (Specify) ________________________________________________________________________ SOFTWARE DOCUMENTATION (Specify)________________________________________________________________________________ QUALITY ASSURANCE PROVISIONS (QAP) (Specify)______________________________________________________________________ META DATA (Specify) _________________________________________________________________________________________________ SUPPLMENTARY TECHNCIAL DATA (Specify) ___________________________________________________________________________
6. TDP DATA MANAGEMENT PRODUCTS
SOURCE CONTROL DRAWING (SOCD) APPROVAL REQUEST
DRAWING NUMBER ASSIGNMENT REPORT
PROPOSED CRITICAL MANUFACTURING PROCES DESCRIPTION
7. ASSOCIATED LISTS (X AND COMPLETE AS APPLICABLE)
A. PARTS LIST (X ONE)
(1) INTEGRAL
(2) SEPARATE
(3) CONTRACTOR SELECT
B. DATA LISTS
REQUIRED (Specify Levels of Assy) ____________________________________________________________
C. INDEX LISTS
D. WIRING LISTS
E. APPLICATION LISTS
(1) INTEGRAL
(2) SEPARATE
(3) CONTRACTOR SELECT
F. OTHER
8. APPLICABILITY OF STANDARDS. THE FOLLOWING STARNDARDS APPLY: (X AS APPLICABLE)
ASME Y14.100
ENGINEERING DRAWING
PRACTICES
WITH APPENDICES:
B C D E
ASME Y14.24 TYPES AND APPLICATIONS OF
ENGINEERING DRAWINGS
ASME Y14.34 ASSOCIATED LIST
ASME Y14.35M REVISION OF ENGINEERING
DRAWINGS AND ASSOCIATED LIST
ASME Y14.41 DIGITAL PRODUCT DEFINITION
DATA PRACTICES
ASME Y14.5 DIMENSIONING AND TOLERANCING
OTHER STANDARDS APPLY
AS DESCRIBED
COMPANY STANDARDS
PERMITTED
YES NO
9. OTHER TAILORING (ATTACH ADDITION SHEETS AS NECESSARY)
See attached METADATA instructions.
TDP OPTION SELECTION WORKSHEET
Atch 2
Metadata Spreadsheet
METADATA FILE
2010.xls
Atch 3 METADATA spreadsheet column-by-column description
NOTE: DO NOT ADD OR REMOVE COLUMNS
Column Header name Required
Field
Max # char’
Description
A Row Format Yes 10 Value is “IMAGE”.
B Document # Yes 20 This is the primary document number as it appears in the title block. If the document number in the title block includes the dash number, include it in this column as well. Do not include the Doc Type designator in this column, i.e. PL or WL. For ECOs this is the number of the primary drawing the accompanying document is applicable to.
C CAGE Yes 5 5 character CAGE code listed in the title block of document being submitted.
D Doc Type Yes 2 Type of document being submitted. For drawings and accompanying documents (ECOs, etc) leave blank.
Parts List = PL
Wire List = WL
Wire Diagram = WD
Data Lists = DL
Specifications = SP
Test Procedure = TP
Application Lists = AL
E Doc Size Yes 2 The size of the document being submitted. A, B, C, D, E or J.
F Doc Rev Yes 2 Revision (normally the revision level of sheet 1) of the document. Max
2 characters. Leave blank if a new release
G Doc Rev Date No 50 Leave Blank. Not used
H Doc Title Yes 40 Title of document being submitted. Spaces and dashes are allowed. Do not use slashes, dots or commas. Limited to 250 characters
I Sheet # Yes 4 Drawing sheet number shown in this image.
J # of sheets Yes 4 Total number of sheets in the drawing.
K Sheet Rev Yes 2 Sheet revision letter. Leave blank if a new release
L Frame # Default 4 List the frame number of the file. Always 0001 with one exception: J size sheets, which are split into multiple frames, with each frame in it’s own file.
M # of Frames Default 4 List the total frames for the sheet. Always 0001 with one exception: J size sheets, which are split into multiple frames, with each frame in it’s own file.
N File Type No 3 752 for PDF files.
746 for Word documents.
748 for Excel spreadsheets.
1 for all other approved formats.
O File Type Format No 20 DOC for Word and PDF documents.
SPRD for Excel spreadsheets.
C4 for all other approved formats.
P File Type Src Fla No 30 PDF for PDF files.
WORD for Word documents.
EXCEL for Excel spreadsheets.
RSTR for all other approved formats.
Q File Type Dest No 30 V1.7 for PDF files
V2007 for Word and Excel files
C4 for all other approved formats.
R File Type Content No 30 Leave blank, Not Used
S File Type Version No 30 Leave blank, Not Used
T Site Code No 6 Value is 5M640
U File Name No 14 Name of file described by this row of the spreadsheet without the extension. Case sensitive. Spaces, pipes and the following characters are NOT allowed: . , / \ %| Limited to 14 characters
Column Header name Required
Field
Max # char’
Description
V File extension No 10 Extension of file described by this row of the spreadsheet, without dot
(.). For PDF, Word, Excel and C4 files this is the actual extension of the file (case sensitive). For all other approved formats (dwg, dxf, tif) enter C4
W File Path No 242 Default Value is 00 (zero, zero)
X Field 24 No Leave Blank
Y Field 25 No Leave Blank
A Field 26 No Leave Blank
AA Security Level Default 10 Default value is N
AB Rights Default 5 Default value is U (Proprietary data default value is L)
AC Foreign Security Default 10 Default value is N
AD Nuclear Default 5 Default value is N
AE Subsafe Default 6 Default value is N
AF AirType No Leave Blank
AG APL No Leave Blank
AH CADInfo No Leave Blank
AI Control Mode No 5 Value is ME
AJ HSC No Leave Blank
AK NSN No Leave Blank
AL UIC No Leave Blank
AM System No Leave Blank
AN Nomenclature No Leave Blank
AO ShipClass No Leave Blank
AP ShipTypeHullNum No Leave Blank
AQ MasterLoc No Leave Blank
AR PhysicalLoc No Leave Blank
AS Field 45 No Leave Blank
AT Field 46 No Leave Blank
AU Part Number No Leave Blank
AV SubSheet No Add sheet revision of drawing if file is an EO.
AW Succeeding No Leave Blank
AX Dist statement Yes 5 List the applicable distribution statement. Normally D
AY Acc Doc Kind Yes 20 Leave blank unless this data is an accompanying document. Enter
Change Notice (ECO) = NT.
Addendum = AD
Amendment = AM
Appendix = AP
AZ Acc Doc # Yes 10 Number assigned to accompanying document. Notice 10 character limit.
BA Field 53 No Leave Blank
BB Acc Doc Rev Yes 2 Leave blank
BC Field 55 No 50 Leave Blank, Not used
BD Field 56 No 50 Leave Blank, Not used
BE WSC No 15 N/A
BF Source Site Yes 5 Always HAFB
BG RevOrder No 6 Leave Blank
BH AccRevOrder No 6 Leave Blank
BI qaStatus No 1 Leave Blank
BJ TDAC No 1 Leave Blank
BK Comment No 40 Leave Blank
BL Export Control Yes 1 Enter “Y” or “N”
BM Record End No 5 Leave Blank
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
FD2020-14-52185
A011 INTERFACE CONTROL DOCUMENT (ICD)
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-CMAN-81248A BAA Sections B, C, E, F, G AFNWC/NICB
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
Contractor shall submit ICD NLT 30 days prior to conclusion of contract. Government will be allowed 20 days, after receipt from contractor, to review for approval/disapproval/comments. Contractor shall submit revised ICD incorporating Government comments, if applicable, NLT 10 after receipt from Government.
BLOCK 14: Contractor shall submit ICD to ORG1 (see page 7 for
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A012 TECHNICAL REPORT – STUDY/SERVICES Final Report
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B/T
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
Contractor shall submit Technical Report – Study/Services NLT 30 days prior to conclusion of the contract. Government will be allowed
20 days, after receipt from contractor, to review for comments.
Contractor shall submit revised Technical Report – Study/Services incorporating Government comments, if applicable, NLT 10 days after
BLOCK 14: Contractor shall submit Technical Report –
Study/Services to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_ Page
Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA. 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188), Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses. Send completed form to the Government Issuing Contracting Officer for Contract/PR No. listed in Block E.
A. CONTRACT LINE ITEM NO. B. EXHIBIT C. CATEGORY:
A TDP TM OTHER ___X_____
D. SYSTEM/ITEM E. CONTRACT/PR NO. F. CONTRACTOR
A013 TECHNICAL REPORT – STUDY/SERVICES Trade Studies
4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE 18. ESTIMATED
DI-MISC-80508B/T BAA Sections C, G AFNWC/NICB
10. FREQUENCY 12. DATE OF FIRST
SUBMISSION
a. ADDRESSEE
Draft
1. Paragraph 2., add the words “ Contractor Format Acceptable” after Format.
2. Delete paragraphs 2. (a) & (b) in their entirety
Contractor shall submit Technical Report – Study/Services (Trade
Studies) NLT 30 days after requested by the Government.
Government will be allowed 20 days, after receipt from contractor, to review for comments. Contractor shall submit revised Technical
Report – Study/Services (Trade Studies) incorporating Government comments, if applicable, NLT 10 days after receipt from Government.
BLOCK 14: Contractor shall submit Technical Report –
Study/Services (Trade Studies) to ORG1 (see page 7 for address).
DD Form 1423-1, FEB 2001 Page___1__of__1_…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .