AN/FPS-117 Software CLS Enter Contract Number Here
Performance Work Statement
Atmospheric Early Warning System
AN/FPS-117(V) 1/4 Long Range Radar
Software Contractor Logistics Support
Prepared by
AFLCMC/HBZIA
DATE: 2 August 2016
Contents
1. GENERAL
1.1 Scope
1.2 Purpose
2. APPLICABLE DOCUMENTS
2.1 Specification Documents
2.2 Guidance Documents
2.3 Workload Agreements (Refer to Appendix B)
3. REQUIREMENTS
3.1 Task Order Categories
3.2 Program Management (CDRL A001, CDRL A002)
3.2.1 Contractor’s Progress, Status, and Management Report (CDRL A001)
3.2.2 Meetings, Reviews, and Conferences (CDRL A002)
3.2.3 Configuration Management
3.2.4 Deficiency Reporting (DR)
3.2.5 Data Accession List (DAL) (CDRL A008)
3.2.6 Task Order CDRLs
3.3 Software Maintenance Activities
3.3.1 Software Performance
3.3.2 Software Review Board (SRB) (CDRL A002)
3.3.3 Schedule
3.3.4 Software Maintenance Summary
3.3.5 Software, Firmware, and Programmable Devices
3.3.6 Information Assurance Controls
3.3.7 License
3.3.8 Required CDRLs
3.3.9 Government Acceptance (DD-250)
3.4 Engineering Support Services
3.4.1 Task Planning/Scheduling Meeting (CDRL A002)
3.4.2 Technical Call-in Service
3.4.3 Test Support
3.4.4 Routine Tasks
3.4.5 High Effort Tasks
3.4.6 Special Task Options
3.4.7 Training
3.4.8 Task Order CDRLs
3.5 Technical Data Package
3.5.1 Technical Orders, Drawings, and Instructions (CDRL 006, CDRL 007, CDRL 008)
3.5.2 Engineering Change Proposal (ECP) (CDRL A009)
3.5.3 Software Version Description (SVD) (CDRL A010)
3.5.4 Task Order CDRLs
3.5.5 Subject Matter Experts
3.5.6 Training Materials
3.5.7 Task Order CDRLs
3.5.8 Government Acceptance (DD-250)
3.6 Travel
3.7 Security
4. PERFORMANCE SERVICE SUMMARY
5. ADMINISTRATIVE
5.1 Equipment, Software, and Tools
5.1.1 Government Furnished Equipment (GFE) Requirements
5.1.2 Test Equipment Calibration
5.2 Overtime
5.3 HBZIA Engineering Facility (EFAC)
5.4 Packaging, Handling, Storage, and Transportation
5.4.1 Packaging and Transport
5.4.2 Special Electrostatic Sensitive Device Requirements
5.4.3 Reusable Containers
5.4.4 Receiving Inspection
5.4.5 Marking
5.5 AEWS Points of Contact (POC)
5.5.1 AEWS Program Manager/Contracting Officer Representative (COR)
5.5.2 SPO Lead Engineer
5.6 AN/FPS-117 Site Locations
5.7 Shipping/Mailing Addresses
5.8 Travel Requirements
6. APPENDICES
APPENDIX A - ACRONYMS
APPENDIX B - WORKLOAD AGREEMENTS (WLA)
ATTACHMENT 1 - WLA for AN/FPS-117 – Alaska Sites
ATTACHMENT 2 - WLA for AN/FPS-117 – Canada Sites
ATTACHMENT 3 - WLA for AN/FPS-117 – Mt Kokee, Hawaii
ATTACHMENT 4 - WLA for AN/FPS-117 – Punta Salinas, Puerto Rico
APPENDIX C - SOFTWARE LISTING
APPENDIX D - MAILING ADDRESSES
APAPPENDIX E - MASTER CDRL LIST
1. GENERAL
This Performance-Based Work Statement (PWS) outlines the tasks and duties required of the contractor to support the AFLCMC/HBZIA, Atmospheric Early Warning System (AEWS), AN/FPS-117V(1)/V(4)
(AN/FPS-117), System Program Office (SPO). The initial contract award is for one base year with two additional one year options.
1.1 SCOPE
This PWS outlines the tasks and duties required of the Contractor to provide Support for sustainment of the
AEWS consisting of 28 AN/FPS-117 and the AN/UPX-48 Identification Friend Foe (IFF) Secondary
Surveillance Radar (SSR), and five Maintenance Control Systems (MCS). The AN/FPS-117 operational radar system consists of a total of 27 version 1 and 4 radars integrated with four MCS systems located in Alaska, Canada, Puerto Rico, and Hawaii. An additional AN/FPS-117 radar system and MCS are at the Engineering
Facility (EFAC) located at Hill Air Force Base (HAFB) Utah, and is operated as an engineering test bed for system maintenance support, integration, modifications, upgrades, product software obsolescence/non-availability resolution and software upgrades.
1.2 PURPOSE
The purpose of this effort is to provide depot level Contractor logistics Support (CLS), for the AN/FPS-117 radar system software engineering and software maintenance by the Original Equipment Manufacturer (OEM) for all AN/FPS-117 radars, radar subsystems (Mono-Pulse Secondary Surveillance Radar (MSSR) and RECS), and the MCS equipment.
2. APPLICABLE DOCUMENTS
The following specifications establish the AEWS system software baseline. The contractor shall obtain
Government approval for any specification change to the AEWS baseline as listed in Table 1.
2.1 SPECIFICATION DOCUMENTS
Table 1 – AEWS Baseline Software Specifications
Document Number Title
ESD SS-
2433-3B, System Specification for Seek Igloo Minimally Attended Radar (MAR)
Radar System AN/FPS-117(V 1/4)
77A595311 System/Subsystem Specification for the AN/FPS-117 Atmospheric Early
Warning System (AEWS), Essential Parts Replacement Program (EPRP)
77A595644 European Aeronautics Defence and Space company (EADS) Monopulse
Secondary Surveillance Radar requirements Analysis for the AN/FPS-117
Atmospheric Early warning System (AEWS), Essential Parts Replacement
Program (EPRP)
77A595327 Software Requirements Specification (SRS) Radar 117 Product Line
Software Requirement Specifications (SRS) For The AN/FPS-117
Atmospheric Early Warning System (AEWS), Essential Parts Replacement
Program (EPRP)
77A574881 Radar Performance Mission Software (RPMS) Software Requirements
Specification for the Radar 117 Product Line Block 3
77A574874 Detection Procession Mission Software (DTMS) Software Requirements
Specification for the Radar 117 Product Line Block 3
77A574879 Target Processing Mission Software (TPMS) Software Requirements
Specification for the Radar 117 Product Line Block 3
77A574885 Communications Mission Software (COMS) Software Requirements
Specification for the Radar 117 Product Line Block 3
77A574889 Command and Control Display Software (CCDS) Software Requirement
Specification for the Radar 117 Product Line Block 3
77A590031 System Support Software (SSS) Software Requirements Specification for the Radar 117 Product Link Block 3
77A564034 Offline Detection Analysis Software (ODAS) Software Requirement
Specification for the Radar 117 Product Line
77A574887 Track Processing Mission Software (TKMS) Software Requirement
Specification for the Radar 117 Product Line Block 3
77A574886 Data Processor Operating Systems (DPOS) Software Requirement
Specification for the Radar 117 Product Line Block 3
77A574880 Radar Control Mission Software (RCMS) Software Requirements
Specification for the Radar 117 Product Line Block 3
77A574878 Computer Program Performance Specification Radar Environment
Simulator Software (RESS) Software Requirements Specification for the
Radar 117 Product Line Block 3
77A590024 Performance Database Support Software (PDSS) Software Requirement
Specification For the Radar 117 Product Line Block 3
77A590029 Software Requirements Specification TDS System Resource manager
(SRM) for the Radar 117 Product Line Block 3
77A590026 Site Adaptation Software (SAS) Software Requirements Specification for the Radar 117 Product Line Block 3
77A574884 Signal Processing Mission Software (SPMS) Software Requirements
Specification for the Radar 117 Product Line Block 3
77A590028 Computer Program Performance Specification Scenario Generator
Software (SGS) CSCI Software Requirements Specification for the Radar
117 Product Line Block 3
77A595292 Command and Control Display Software (CCDS) Software Requirements
Specification (SRS) Appendix for the AN/FPS-117 Atmospheric Early
Warning System (AEWS) Essential Parts Replacement Program (EPRP)
77A595289 Communications Mission Software (COMS) Software Requirement
Specification (SRS) Appendix for the AN/FPS-117 Atmospheric Early
Warning System (AEWS) Essential Parts Replacement Program (EPRP)
2.2 GUIDANCE DOCUMENTS
The documents listed in Table 2 are provided for guidance and are available from the AFLCMC/HBZIA
(AEWS) Program Office, 6029 Wardleigh Rd, B1207, Hill AFB, UT 84056.
Table 2 – Guidance Documents
Document Number Date Title
DoDI 8500.2
February
Information Assurance
DoD AIMS 03-1000A
January
Performance/Design and Qualification Requirements Technical Standard for the ATCRBS/IFF Mark XIIA Electronic Identification System
(AIMS) and Military Implementation of Mode S with Changes 1, 2, and
Interface Control Standard for the Mode 4/5
DoD AIMS 03-1000B
1 July
Performance/Design and Qualification Requirements Technical Standard for the ATCRBS/IFF Mark XIIA Electronic Identification System
(AIMS) and Military Implementation of Mode S Amendment 1.
DoD AIMS 04-900A
January
Cryptographic Computer
STANAG 4193
Parts I, II, III
12 Nov
Technical Characteristics of IFF MK XA and MK XII Interrogators and
Transponders Parts I-III
Part IV
12 Apr
Technical Characteristics of IFF MK XA and MK XII Interrogators and
Transponders Part IV: Technical Characteristics of Mode S in Military
Interrogators and Transponders
STANAG 4193 31 Mar
Technical Characteristics of IFF MK XA and MK XII Interrogators and
Transponders Part V Technical Description of the MK XIIA System, Part V
Mode 5 Levels 1 through 4
Part VI
13 May
Technical Characteristics of IFF MK XA and MK XII Interrogators and
Transponders Part VI: Classified Performance Aspects of Mode 5
77A595624 16 Dec
Integrated Logistics Support Plan for the AN/FPS-117 Atmospheric
Early Warning System (AEWS), Essential Parts Replacement Program
(EPRP)
2.3 WORKLOAD AGREEMENTS (REFER TO APPENDIX B)
Site support and visit requirements are detailed within the workload agreements, Appendix B, Attachments 1 through 4.
3. REQUIREMENTS
This PWS covers depot level AN/FPS-117 radar system CLS for software engineering and software maintenance for all AN/FPS-117 radars and the MCS equipment. This PWS also includes specific task orders for Program Management, Software Maintenance, Engineering Support services, Technical Data Package, and
Training.
3.1 TASK ORDER CATEGORIES
The Government will issue task orders along with specific deliverables for support In Accordance With (IAW) this PWS. Each tasking may contain all or part of the predefined task orders listed in paragraph 3 and associated
Table 3.
Table 3 – Task Order Categories
Task ID Reference
Paragraph #
Requirement Deliverable
1 3.2 Program Management A001
A002
2 3.3 Software Maintenance A002
3 3.4 Engineering Support Services A002,A003,A004,A005
4 3.5 Technical Data Package A006,A007,A008,A009,A010
5 3.6 Travel
3.2 PROGRAM MANAGEMENT (CDRL A001, CDRL A002)
The contractor shall provide a single Point Of Contact (POC) for this effort. The contractor shall immediately inform the AEWS System Program Office (SPO) of any technical or schedule related problems.
The contractor shall provide overall program planning and control, contract/subcontract management, configuration management, security, and administrative support in the performance of the AEWS CLS contract.
The contractor shall furnish all facilities, software, materials, equipment and services, required to repair, replace, or change any software, firmware, or related documentation changes, that are necessary to operate the
AN/FPS-117 system/subsystem baseline.
Call-ins for routine Program Management questions that do not require tasking will be considered part of
Program Management overhead.
3.2.1 CONTRACTOR’S PROGRESS, STATUS, AND MANAGEMENT REPORT (CDRL A001)
The contractor shall provide a Contractor’s Progress, Status, and Management Report
20 Work Days prior to the Base and Option year period closeout.
The Contractor’s Program Manager shall be prepared, given reasonable notice, to present and discuss with the
Government, the status of contract activities throughout the contract period of performance.
3.2.2 MEETINGS, REVIEWS, AND CONFERENCES (CDRL A002)
3.2.2.1 Monthly Status Discussions
The contractor shall conduct monthly informal conference calls with the AEWS SPO and AN/FPS-117 user group to discuss Deficiency Reports (DR), Program Trouble Reports (PTR), Software Change Requests (SCR), and project status.
3.2.2.2 Quarterly Status Review (CDRL A002)
The contractor shall conduct a formal quarterly status review meeting with the AEWS SPO and AN/FPS-117 user group. Unless otherwise specified by the AEWS SPO, these meetings shall be conducted via teleconference; subjects may be combined under one meeting. As a minimum, the following topics shall be discussed during the quarterly status review.
1. Project Status (Task Orders)
2. Problem Reports, Deficiency Reports, Software Change Requests
3. Prioritization of projects
4. Planning and Schedules
5. Budget/Spend Rate
6. Software obsolescence/Non-availability (Reason for change, forecasted obsolescence, forecasted change for product improvement, i.e. any anticipated change to the government’s current baseline)
7. Engineering Change Proposals (ECP)
8. Technical Interchange (Special Interest Items)
9. Test Work Group (If required as part of a task order)
10. Status of Technical Order Documentation, drawings, and data (If required as part of a task order)
3.2.2.3 Post Award Conference (CDRL A002)
The Contractor shall plan for, host, and participate in a Post Award Conference to be held at the Contractor’s site within 45 calendar days of contract award. The Government will determine the actual date after contract award. At this conference, the Contractor shall address the plans, schedules, work efforts, risk management, and risk mitigation strategy, for this contract. To successfully complete the Post Award Conference, the
Contractor shall address the overall project approach, discuss all CDRLs, and obtain Government approval of the conference meeting minutes (CDRL A002).
3.2.3 CONFIGURATION MANAGEMENT
The Government will use the Computer Program Identification Number (CPIN) process to identify and control the AN/FPS-117 system software baseline. Any change to the AEWS baseline will be decided by the
Government. The Government will provide the current system baseline to the contractor for the purpose of evaluating changes. Once a new software release or software configuration change is fully verified by both
Contractor and Government, the new AEWS system baseline will be established and controlled by the
Government. Any software changes or made under this contract shall not degrade the performance of the
AN/FPS-117 Radar, AN/UPX-48 IFF subsystem, or MCS, (Section 2.1, and Appendix C, Software Listing).
3.2.3.1 Management of Software Baseline
The Contractor shall maintain the AEWS designated software baseline consistent with the hardware baseline configuration and AEWS Information Assurance (IA) controls, through all phases of software logistics support or hardware/software development. The Contractor shall notify the Government of any software baseline changes along with impact before development begins and prior to software and/or hardware related firmware is replaced or modified. The Government may issue a task order for an ECP or other required actions or deliverables before any change to the AEWS system software baseline (ECP, Paragraph 3.5.2).
During any software replacement or revision, the Contractor shall verify compatibility with the AEWS baseline configuration. Any changes to the AEWS system baseline shall be submitted to the Government for approval.
The contractor shall manage software maintenance and other software changes to ensure system Reliability, Availability, and Maintainability (RAM) meet quality factors IAW the System/Subsystem Specification (SSS) for the AEWS AN/FPS-117 EPRP, and LMC document 77A595311, refer to specification paragraph 3.4
(Quality Factors). RAM is further discussed within the LMC document 77A595624, Integrated Logistics
Support Plan (ILSP), Section 2.4.
The Contractor shall notify the AEWS SPO of any changed, outdated, or new Technical Orders, drawings, or data, and include a system documentation change discussion during the quarterly status review meeting (Section
3.2.2.2).
3.2.4 DEFICIENCY REPORTING (DR)
The Contractor shall maintain a DR database that includes all AEWS baseline software related PTR submitted by the Government along with any software deficiencies identified by the Contractor that apply to the AN/FPS-
117 System/Subsystem Block 3 baseline software. The DR database shall clearly identify the deficiency, the resolution, the area of software that is affected, any related hardware or operating configuration impacts, current status, and a listing of impacted Computer Software Configured Items. The Contractor shall discuss DR/SCR status to include all Government submitted PTRs and Software Change Requests (SCR), and shall include the
DR/SCR Summary within the Quarterly Status Review (Section3.2.2.2)
3.2.5 DATA ACCESSION LIST (DAL) (CDRL A008)
The Contractor shall create and maintain a Data Accession List (DAL). The Contractor shall list internal data generated in compliance with contractual tasks and subcontractor generated data on the DAL. The DAL listing shall be delivered IAW CDRL A008.
3.2.6 TASK ORDER CDRLS
The Government will identify any CDRL’s required as part of the task order within the task order.
3.3 SOFTWARE MAINTENANCE ACTIVITIES
The Government’s intention is to accomplish software baseline resets or Microsoft Windows upgrades, or updates of related support software, at pre-determined intervals based upon the current production baseline status and resolution of critical DRs, or to meet operational requirements. The periodic baseline reset will occur at eighteen month intervals unless the Government determines that a critical deficiency can only be resolved by out of cycle software baseline reset.
This task order covers all software and firmware related to the Primary Surveillance Radar (PSR)
System/Subsystem, the MSSR, the MCS, all mission software, firmware, Operating Systems & utilities, special support software, and all Commercial Off The Shelf (COTS) software.
This task order may be issued in total or in part. The AEWS SPO authorized POC may request additional task orders to meet the overall task objectives.
3.3.1 SOFTWARE PERFORMANCE
If the updated or changed software fails upon installation the deficient software will be returned with a Quality
Deficiency Report (QDR). In the event of rework for the same problem the contractor shall evaluate the returned software to determine if the software was at fault. The contractor shall not charge the government for re-work for the same reported deficiency.
Any software/firmware/programmable device changes made under this PWS shall meet required functionality and not degrade the performance of the AEWS AN/FPS-117, (Radar, IFF Subsystem, Maintenance Control
Center), as described in the documents listed in section 2.1. Delivered software shall meet RAM quality factors
IAW the System Subsystem Specification (SSS) for the AN/FPS-117 Essential Parts Replacement Program
(EPRP), 77A595311, and LMC document, Integrated Logistics Support Plan 77A595624, (Section 2.4) Quality
Factors.
3.3.2 SOFTWARE REVIEW BOARD (SRB) (CDRL A002)
The contractor shall conduct an annual Software Review Board (CDRL A002). The SRB shall address the current software baseline status; DRs, SCRs, software changes resulting from hardware/software obsolescence, software enhancement/upgrade that are available, and release time table.
The Government will determine which software changes or enhancement will be included in the next released build.
3.3.3 SCHEDULE
The contractor shall complete software builds within the agreed upon completion date established during the
Task Planning/Scheduling Meeting (3.2.3.3) IAW CDRL A002.
3.3.4 SOFTWARE MAINTENANCE SUMMARY
For each software change, repair or update, the software maintenance summary shall be included IAW paragraph 3.2.2.2, quarterly status review.
3.3.5 SOFTWARE, FIRMWARE, AND PROGRAMMABLE DEVICES
Where requirements cannot be met by using unaltered commercially offered software, or use of software of proprietary nature is necessary, the contractor shall notify the Government immediately.
All contractor-developed and modified software that interface with firmware or programmable devices shall be fully documented and the programming files and instructions provided to the Government.
3.3.6 INFORMATION ASSURANCE CONTROLS
If the contractor selects or changes software or associated firmware due to software obsolescence, DMSMS, or for other reasons, the replacement software shall, as a minimum, have IA controls that are compatible with the original AEWS baseline.
If identified as part of a task order, the contractor shall provide IA support to the Government sustainment IA team for continued Certification and Accreditation (C&A) of all AN/FPS-117 radars, IFF subsystems and the
MCS.
3.3.7 LICENSE
The Contractor shall deliver to the Government any licenses or other permissions to operate the Software with the AEWS baseline.
3.3.8 REQUIRED CDRLS
The Government will identify any CDRL’s required as part of the task order within the task order.
3.3.9 GOVERNMENT ACCEPTANCE (DD-250)
Delivery shall be according to the delivery schedule IAW (Sections 3.2.2.3 and 3.3.3). A listing of mailing addresses are in Appendix D. Government receipt and acceptance will be verified by a Government signed DD
250.
3.4 ENGINEERING SUPPORT SERVICES
Software Engineering support covers all software and firmware related to the AN/FPS-117, Radar
Environmental Control System (RECS), the AN/UPX-48, and the MCS. The Government may issue task orders to obtain engineering support to resolve software and firmware related issues or problems, support temporary fixes, assist with configuration settings, accomplish upgrades to hardware or software, resolve IA related software/hardware settings, certification support, test, and special studies (i.e. enhanced radar operation, optimization of software, software installation procedures, and operating instructions). The AEWS SPO authorized POC may issue additional task orders to meet the overall task objectives.
This task order also covers engineering support to the AEWS SPO to implement AIMS MK XIIA Mode 5 or
Mode S capability, implement enhanced performance and status monitoring, and support required system certifications to include special test. This may also include special studies or resolution of problems without a full baseline software release.
This task order may be issued in total or in part. The AEWS SPO authorized POC may request additional task
3.4.1 TASK PLANNING/SCHEDULING MEETING (CDRL A002)
The Contractor shall participate in meetings In Accordance With (IAW) specific task orders and with AEWS
SPO concurrence, items of discussion may be combined with the quarterly status review (Section 3.2.2.2). If required by the AEWS SPO, the Contractor shall conduct an informal initial planning/scheduling meeting to discuss requirements, determine level of effort, schedule of activities, and CDRL deliveries. The Contractor shall respond to the Government’s request for a Task Planning/Scheduling Meeting within five working days of initial notification. Unless otherwise specified by the task order, these meetings shall be conducted via teleconference; subjects may be combined under one meeting. Upon request the Contractor shall be submitted minutes IAW CDRL A002.
3.4.2 TECHNICAL CALL-IN SERVICE
The Contractor shall be available for AEWS SPO support IAW the Contractors established work schedule. All requests for Contractor support will be initiated by the AEWS SPO, which will authorize the Contractor to proceed with technical tasks.
3.4.3 TEST SUPPORT
If identified as part of a task order, the Contractor shall perform system integration and test at the AEWS EFAC at Hill AFB, or at a site location determined by the AEWS SPO to ensure that hardware and software work together as intended. The activity of system integration and test may require the use of all verification methods
(i.e., Inspection (I), Analysis (A), Demonstration (D), and Test (T)). The Contractor shall analyze the test data collected during testing to determine if the specifications and requirements were met in accordance with the
SSS and to verify that software operation and software/hardware functions are IAW requirements as determined by Contractor written and Government approved test procedures.
If identified as part of a task order, the Contractor shall develop and submit for Government approval, a separate test plan and test procedure for software changes. The Contractor shall document test results in a standalone test report. All testing documentation shall be IAW Test Plan (CDRL A003), Test Procedure (CDRL
A004).
If identified as part of a task order, (i.e. special study), the Contractor shall deliver a report IAW, Technical
Report (CDRL A005)
3.4.4 ROUTINE TASKS
The Contractor will not be required to provide the Government a ROM for individual tasks under10 man hours, unless requested, based upon the engineering support requested within a time period agreed to Government and
Contractor.
3.4.5 HIGH EFFORT TASKS
For any effort expected to exceed10 man hours, the Contractor shall provide to the Government a Rough Order of Magnitude Estimate (ROM) at the Government’s request, based upon the engineering support requested within a time period agreed to during the Task Planning/Scheduling Meeting (3.2.2.2) IAW CDRL A002.
3.4.6 SPECIAL TASK OPTIONS
If required by the AEWS SPO, the Contractor shall provide to the AEWS SPO a Firm Fixed Price (FFP) within a time period as agreed upon by the Government SPO and contractor, for engineering support and software changes necessary for special task options.
Upon issue of a special (Option) task order by the Government SPO and within 30 days, or as agreed upon by the AEWS SPO and Contractor; the Contractor shall conduct a Technical Interchange Meeting (TIM) for the purpose of discussing support requirements.
If tasked by the AEWS SPO, the Contractor shall prepare an ECP IAW CDRL A009, for each optional tasks.
If required by the AEWS SPO, The contractor shall verify functionality and provide engineering support for the purpose of Government test and Government required certifications.
3.4.6.1 Enhanced Performance and Status Monitoring (Option #1)
If issued as specific task by the AEWS SPO, the capability shall be provided to automatically report real time, (on-line), PSR and SSR System Performance Status Reports at the LCT and RCT displays. The enhanced performance monitoring shall show the PSR and SSR operating state as fully operational (Green), Limited
Capability (Amber), or Severely Degraded (Red). Along with the PSR and SSR performance indicator, the cause for degraded Amber or Red status shall be provided. Rated performance parameters are primary radar and secondary radar transmit power and sensitivity, primary and secondary radar detection, PSR/SSR Correlation, positional accuracy, false target reports, loss of function(s), missing or degraded interface signals or data, and degraded performance due to a combination of measured parameters. Additional measures of performance may be implemented pending contractor recommendations and with approval by the Government SPO.
3.4.6.2 Mode 5 Platform Integration (Option #2)
If issued as specific task by the AEWS SPO, the contractor shall provide engineering support and/or software needed to implement AIMS MK XIIA Mode 5 capability. Tasking is intended to resolve software related issues or problems, support temporary fixes, assist with software, hardware settings, firmware configuration changes or settings, ASTERIX message updates (inclusion of radar and crypto status), filtering of message data to active and passive users, and support required for system certifications. Items covered are the PSR, the AN/UPX-48, and MCS.
3.4.6.3 Mode S Platform Integration (Option #3)
If issued as specific task by the AEWS SPO, the contractor shall provide engineering support and/or software needed to implement Mode S or ADS-B capability. Tasking is intended to resolve software related issues or problems, support temporary fixes, assist with software, hardware settings, firmware configuration changes or settings, ASTERIX message updates or additions, filtering of message data to active and passive users, and support required system certifications. Items covered are the PSR, the AN/UPX-48 MSSR, and the MCS.
3.4.7 TRAINING
This task order may be issued in total or in part. The AEWS SPO authorized POC may request additional task
If required by the Government SPO, the contractor shall provide informal training to the system end users
(Engineers/Technicians) on new software releases that significantly affect the form or utility of the Mission
Software or support software. Required training may include operation, Man-Machine Interface (MMI) and other topics that are necessary to operate with the new or modified software. The training may be formal
(classroom), On-the-Job-Training (OJT), or a combination.
3.4.8 TASK ORDER CDRLS
The Government will identify any CDRL’s required as part of the task order within the task order.
3.5 TECHNICAL DATA PACKAGE
3.5.1 TECHNICAL ORDERS, DRAWINGS, AND INSTRUCTIONS (CDRL 006, CDRL 007, CDRL 008)
If required by the AEWS SPO, the Contractor shall provide updates to existing Technical Orders, drawings or data, or provide new Technical Orders, drawings or data, delivered in the same style and format as the current documents. The Contractor shall provide the AEWS SPO with software installation and operating instructions for each new software release. All Contractor-developed and modified COTS software that use firmware or programmable devices shall be fully documented and the programming files and instructions provided to the
Government. The technical data shall be provided in CDRL A006 and CDRL A007. Other support documentation will be included IAW (Section 3.2.5) and the Data Accession List, DAL (CDRL A008).
3.5.2 ENGINEERING CHANGE PROPOSAL (ECP) (CDRL A009)
If tasked by the AEWS SPO, the Contractor shall prepare an ECP IAW CDRL A011, either Class I or Class II, for any of the following:
Major (Class I) ECPs have any combination of the following:
1. A change that affects specified and approved requirements including safety, reliability, supportability, and quantitative requirements that result in product attributes that would be outside specified limits or specified tolerances.
2. A change that affects any approved acquisition baseline (i.e., Functional, Allocated, or Product
Baselines).
3. A change that affects compatibility with interfacing products including such products as test equipment, support equipment, software, firmware, and products furnished by an Acquirer or that affects one or more of the following:
a) Delivered operation or servicing instructions
b) Required calibration to the extent that product identification should be changed.
c) Interchangeability or substitutability of replaceable products, assemblies, or components
d) User skills or user physical attributes
e) Operator or maintenance training
f) Requires retrofit of delivered products (e.g., by product recall, modification kit installation, attrition, replacement during maintenance using modified spares)
g) Performance
h) Maintainability, durability, or survivability
i) Weight, balance, moment of inertia
j) Electromagnetic characteristics
k) Impact to logistical support requirements such as training, technical or operational manuals, spares, maintenance procedures or equipment, etc.
l) Re-qualification of the item
m) Domain certification (e.g., airworthiness, seaworthiness)
n) Source (supplier of an item) listed on a Source Control Drawing
o) Biomedical factors or human factors engineering
p) Personnel manning
q) Corrects deficiencies
r) Adds or modifies interface or interoperability requirements
s) Changes the operational capabilities or logistics supportability of the system or item and the change is significant and measurably changes the effectiveness
t) Life cycle costs/savings
u) Prevents slippage in an approved production schedule
4. A change that does not meet the above criteria but does impact cost/price/delivery to customer(s), including incentives and fees, guarantees, warranties, and contracted deliveries or milestones.
Minor (Class II) ECPs do not impact the criteria above for Major (Class I) changes.
The Contractor shall complete page 1 of the ECP form (DD1692) and any other pages specified in the task order. The DD1692 can be found at:
http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm
3.5.3 SOFTWARE VERSION DESCRIPTION (SVD) (CDRL A010)
If required by the Government SPO, the contractor shall provide a Baseline SVD (CDRL A010), which will include the entire system software baseline to include the AN/FPS-117 radar and subsystems, AN/UPX-48, mission software, support software, firmware, operating systems & utilities, patches and all COTS software.
3.5.3.1 Baseline SVD
The baseline SVD shall include software configured items, meaning a listing all software and version identifiers that are required to be installed on the LCT/RCT terminals, the Radar data Processor (RDP), all servers, all routers, and other devices that require software or firmware installation.
3.5.3.2 Subsequent SVD Releases
The contractor shall provide subsequent SVD releases for software and firmware as directed by the SPO POC.
Subsequent to the delivery of the initial Baseline SVD as indicated in paragraph 3.5.3.1, each new SVD shall http://www.dtic.mil/whs/directives/forms/dd/ddforms1500-1999.htm clearly identify all changes from the previous baseline SVD, including functional changes, new or changed documentation, upgrades and new requirements to any/all software, firmware, operating systems & utilities and all COTS software.
3.5.3.2 SVD Configuration Items
The SVD shall include all Configuration Items and parts of software impacted by the changes along with recommended regression testing to be accomplished by the contractor and/or the Government.
The SVD shall list all changes to individual site configuration file settings.
The SVD shall contain all unique instructions, procedures, and changes to operation that are not listed within existing Technical Orders.
If software changes cause changes to drawings or other technical data, the SVD shall identify all items and/or data that have changed.
3.5.4 TASK ORDER CDRLS
The Government will identify any CDRL’s required as part of the task order within the task order.
3.5.5 SUBJECT MATTER EXPERTS
The contractor shall provide subject matter expert support during the training.
3.5.6 TRAINING MATERIALS
Training support documentation will be included IAW (Section 3.2.5) and the Data Accession List, DAL
(CDRL A008).
3.5.6.1 Government Purpose Rights to Training Materials
The Contractor shall grant Government Purpose rights to all training materials used during the contractor conducted training. The Contractor shall allow the Government to copy, reproduce, or include such materials in separately conducted Government or Government contracted training.
3.5.7 TASK ORDER CDRLS
The Government will identify any CDRL’s required as part of the task order within the task order.
3.5.8 GOVERNMENT ACCEPTANCE (DD-250)
Government receipt and acceptance will be verified by a Government signed DD-250.
3.6 TRAVEL
The Contractor shall follow travel requirements using guidance provided in this PWS and the attachments by coordinating with the AEWS SPO POC and POCs listed in Appendix B of this PWS. Traveler’s shall submit travel requests and obtain approval from the AEWS COR or Contracting Officer before any travel occurs for any support to any radar/MCS sites. Airfare for travel and Per Diem shall be billed in accordance with Federal
Acquisition Regulations (FAR) (available at http://farsite.hill.af.mil). Per Diem rates can be found at http://www.defensetravel.dod.mil/site/perdiemCalc.cfm. The Contractor is responsible for making all necessary travel arrangements.
http://farsite.hill.af.mil/ http://www.defensetravel.dod.mil/site/perdiemCalc.cfm
3.7 SECURITY
The Contractor shall follow security requirements as defined in the AEWS Security Classification Guide (SCG) and the DoD AIMS SCG. The Contractor shall report all security incidents immediately to the Government and obtain Government approval of the action to be taken before closure.
SCG.pdf DoD AIMS 2009 SCG.pdf
Contractor shall abide by all security requirements as detailed in the workload agreements or as briefed by site personnel. Site clearances may be required when conducting work at Contractor or Government facilities, or within Canada. Contractor personnel shall obtain the required clearances prior to engaging in activities requiring such.
4. PERFORMANCE SERVICE SUMMARY
The Contractor performance will be evaluated by AEWS Program Office IAW Table 4 Performance Service
Summary (PSS).
Table 4 is the list of performance objectives and standards that must be met by the contractor. This matrix details the method of surveillance the Government COR will use to validate and inspect these performance elements. Inspection of each element will be documented in the COR file.
Performance standards define the level of service required under the contract to successfully meet the performance objective. The inspection methodology defines what, how, and when objectives will be assessed in measuring performance. The PSS will be used to form the foundation of the COR’s inspection checklist.
Table 4 – Performance Service Summary
Inspection &
PWS
Paragraph
Performance
Objective/
Elements
Standard/AQL
Inspection
Performance Rating
What How/Method When/Freq
PSS# 1
Para: 3.2
Program
Management and all sub-paragraphs
CDRL A001,
A002
Contractor shall provide overall program planning, control, contract/ subcontract management.
Manage tasks
IAW the PWS
Contractor’s management of the program results in no uncorrected
Corrective Action
Report (CAR) within a 12 month performance period.
All products and services are delivered within agreed upon cost, schedule, and performance
IAW the PWS and task order.
Cost, schedule and performance.
Number of
CARs and
Performance
Assessment
Reports
(PAR)
associated with each task order.
CDRL
deliveries
Inspect deliverables for completeness and accuracy.
Method:
Verify compliance with schedules.
Contractor meets on time delivery of products and services.
Verify completed documentation such as quarterly status review, meeting minutes, on-time contractor response.
At completion of each task order and after each monthly status report.
Meet Standard
PSS# 1.1
Para:
3.2.2.1
3.2.2.2
3.2.4
Deficiency
Reporting
CDRL A002
Deficiency tracking and resolution process is in place and is used effectively to resolve system deficiencies.
No more than 1 reported deficiency not recorded or tracked during the
12 month reporting period
Content, accuracy, and currency of
DR database, at CDRL delivery IAW
PWS 3.2.2.2
The
Government’s
DR database will be compared to the
Contractor’s database.
Compare PTR submissions with DR database
Verify updates as discussed during bi-weekly status meetings and quarterly status review.
Quarterly review with bi-weekly updates
IAW CDRL
A002 and PWS
Deficiency Reporting meets standard, is updated, and accurate for bi-weekly meetings.
Uncorrected DR’s will generate a PAR.
3 PARS over a 12 month period will generate a
CAR
Paragraph
Performance
Objective/
Elements
Standard/AQL
Inspection
Performance Rating
What How/Method When/Freq
PSS#1.2
Para:
3.2.3
Configuration
Management
Maintain
Software
Baseline IAW
AEWS SPO
requirements
For any Software change the
Government shall be notified before the change is implemented
No unapproved changes to the
Software baseline
Proposed software baseline changes
Periodic with quarterly updates per
CDRL A002,
and PWS
Review
Contractor modifications and review
ECPs
Notification of any change proposal
ECP if tasked
Contractor notifies
AEWS SPO 60 days prior to proposed change
PSS#1.3
Para:
3.2.3.1
Reporting of obsolescence/Non
-availability issues
Notification and resolution of Software obsolescence/N on-availability issues
Software obsolescence/Non
-availability items are identified to the AEWS SPO in a timely fashion obsolescence/
Non-availability notifications and obsolescence reports
Quarterly as per CDRL
A002 and
3.2.2.2.
Annually as per A006 and
3.2.3.1 documentation
Random check upon CDRL delivery
Contractor notifies
AEWS SPO quarterly
IAW PWS 3.2.2.2
PSS#1.4
All CDRLs A001 through A010
CDRL
requirements met IAW PWS and as agreed to for each task
On-time delivery with required content IAW
Data Item
Description
(DID) and is
Government approved
All CDRLs
A001 through
A010
Timely CDRL delivery and content
CDRLs
Random check upon CDRL delivery
Meets Standard
On-time CDRL delivery, meets DID requirements, content and accuracy, with no more than 5 minor errors that do not change intent of the
CDRL.
Government acceptance of task completion.
PSS#2
Para: 3.3 and all sub-
Maintenance
CDRL A007
Software meets quality requirements
Any software/firm ware/program mable device changes made under this
PWS shall meet required functionality and not degrade the performance
Maximum of 2
QDRs during any 12 month period. No second re-work for the same reported deficiency.
Software operation
Software
Installation and Test
By testing
A) Verify operation upon install and Test
B)Long Term
Operation
Meets standard with no more than 2 PARs and no CARs in the reporting period
QDR shall be resolved within 90 days of
QDR receipt from the
Government
Paragraph
Performance
Objective/
Elements
Standard/AQL
Inspection
Performance Rating
What How/Method When/Freq
PSS#3
Para: 3.4 and all sub-
Engineering
Support Services
CDRLs A002, A003, A004, A005
Meet task requirements and on-time delivery of documentation, products, and services
Meets delivery of task required services and deliverable products and services
Government at task completion
IAW CDRL
A002, A003, A004, A005, Inspect CDRLs
Verify CDRLs are in compliance
Upon receipt of
CDRL delivery and at task completion
Meets Standard
On-time CDRL delivery, meets DID requirements, content and accuracy, with no more than 5 minor errors that do not change intent of the
CDRL
of task completion
PSS#4
Para: 3.5 and all sub- paragraphs
Technical Data
Package
CDRL A006,
A007, A008,A009,A010
Government has necessary
Technical data and documentation to maintain and sustain the
AN/FPS-117
radar
On-time delivery of products per the task order with agreed upon content and completeness. No more than 3 minor errors per delivery.
Maximum of one significant error that prevents use of technical data.
The SPO will submit a CAR for each significant error left uncorrected
CDRL
deliveries, A006, A007, A009,A010
Inspect CDRLs
Inspect procedures and instructions during acceptance test
Upon receipt of
CDRL delivery and at task completion
Meets Standard with No
CARs of delivered product
PSS#5
Para:3.4.7, 3.5.2, 3.5.5, 3.5.6.1
Training
A008
Government has necessary training to install and operate software required to maintain the
AN/FPS-117
radar
On-time delivery of training and documentation per the task order with agreed upon content and completeness.
CDRL
deliveries, A008
Training conducted as per schedule.
Student
Evaluation
Upon receipt of training
Meets Standard, On
Time delivery as per task order.
5. ADMINISTRATIVE
5.1 EQUIPMENT, SOFTWARE, AND TOOLS
5.1.1 GOVERNMENT FURNISHED EQUIPMENT (GFE) REQUIREMENTS
The contractor shall notify the Government if any Government Furnished Equipment (GFE) is required for depot software maintenance.
5.1.2 TEST EQUIPMENT CALIBRATION
All test equipment used for software certification and/or test shall have current calibration and certification.
5.2 OVERTIME
Normally, overtime will not be authorized in performance of this contract unless under an emergency condition where time is critical. Contractor personnel are authorized Government funded overtime only if approved by the Contracting Officer. All overtime shall be IAW the terms of this contract.
5.3 HBZIA ENGINEERING FACILITY (EFAC)
The AEWS AN/FPS-117 EFAC will be available for the contractor to utilize in support of software development or test as agreed to by the SPO. The contractor shall request access to the EFAC from
AFLCMC/HBZIA.
5.4 PACKAGING, HANDLING, STORAGE, AND TRANSPORTATION
5.4.1 PACKAGING AND TRANSPORT
Most packaging, except for reusable containers, will be disposed of at the destination. Packaging guidance can be found within the MIL-E-17555H document or in conformance to “best commercial practices.” Additional guidance is provided in LMC document 77A595624, Integrated Logistics Support Plan (ILSP) (Section 5). The
Contractor shall be responsible for the preservation, packaging, packing, and shipping of all items to be delivered under the terms of this contract. The Contractor shall be responsible for all transportation and costs to move items from the Contractor’s site to the Government designated staging area. If Contractor travel is required to the radar site or MCS site in support of this contract, the Contractor shall be responsible for all
Contractor personnel, equipment and tools to and from the radar/MCS location or between staging locations during any Contractor support activities(Section 3.6, 5.6 and Attachment B). The Contractor shall provide copies of manifests and commercial bills of lading to the Government, on request, for any shipments made under this contract. The Contractor shall replace any equipment or property damaged during shipment and will be responsible for delays in the contract due to such damage. Government receipt and property transfer will be verified by a Government signed certificate of conformance in contractor format following shipment of the asset under DD Form 1149 Requisition and Invoice/Shipment Document. The Government will be responsible for the transportation from the Government site to the Contractor’s designated facility and from the Government staging area to the radar site or MCS location.
The designs of packaging, preservation, and packing applicable to the shipment of material shall be governed by the ultimate destination, modes of transportation to be used, length and type of storage, requirements for reshipment, and induced or environmental conditions. The package designs developed and approved for system unique items shall maintain the established reliability levels of equipment being prepared for delivery and shall ensure safe, damage-free delivery. Handling instructions on final packing shall be conspicuously marked.
System equipment shall be designed and constructed to ensure it is in the transport configuration, no part will become loose or shift its setting, position, or orientation, no part will become permanently warped, deformed, or damaged, and the equipment will not suffer degradation in performance or useful life.
5.4.2 SPECIAL ELECTROSTATIC SENSITIVE DEVICE REQUIREMENTS
Equipment and devices (including software media and programmable devices, certain equipment and circuit cards) that are sensitive to environmental field forces will be packaged to ensure maximum protection and eliminate potential damage from the environment.
5.4.3 REUSABLE CONTAINERS
Reusable containers may be used for transit of select high cost, high failure rate items. Reusable containers are designed to facilitate equipment packing and unpacking and are provided with special cushioning, blocking and a means of handling. The containers will have provisions for dehydrating entrapped moisture. Reusable containers meet all protective requirements for equipment or software media. Special containers will be developed to ensure maximum protection, facilitate ease of handling, and eliminate potential damage to contents.
5.4.4 RECEIVING INSPECTION
The contractor shall notify the COR of all damages and/or shortages discovered, as soon as possible after receipt of item(s) at the contractor’s facility.
5.4.5 MARKING
The contractor shall permanently and legibly mark each shipping container bill of materials with the contractor’s name, Air Force contract number, part number/version, and date.
5.5 AEWS POINTS OF CONTACT (POC)
5.5.1 AEWS PROGRAM MANAGER/CONTRACTING OFFICER REPRESENTATIVE (COR)
The government Program POC for this PWS is the AEWS AN/FPS-117 Program Manager, Mary Barnett, AFLCMC/HBZIA, (801) 777-8990.
5.5.2 SPO LEAD ENGINEER
The System Engineer POC for this PWS is the AEWS AN/FPS-117 Lead Engineer, Tim Perkins, AFLCMC/HBZIA, (801) 775-5205.
5.6 AN/FPS-117 SITE LOCATIONS
All work completed at AN-FPS-117 facilities may require a completion of a site Workload Agreement. Sites and applicable workload agreements are located in Appendix B (Attachments 1 – 4) of this PWS.
5.7 SHIPPING/MAILING ADDRESSES
Shipping addresses are in Appendix D. Any changes or additions will be provided by the AEWS program manager.
All work completed at AEWS AN-FPS-117 facilities may require the completion of a site Workload
Agreement. Sites and applicable Workload agreements are located in Section 6, Appendices.
5.8 TRAVEL REQUIREMENTS
The Contractor shall follow travel requirements using guidance provided in this PWS and the Attachments by coordinating with United States Air Force (USAF) POC, AFLCMC/HBZIA Program Office and POCs listed in
Appendix B of this PWS. Travel requests shall submit travel requests and obtain approved from USAF contracting officers before any travel occurs for any support to any radar/MCS sites. Airfare for travel and per
Diem shall be billed in accordance with Federal Acquisition Regulation (FAR) (available at http://farsite.hill.af.mil). Per Diem rates can be found at http://www.defensetravel.dod.mil/site/perdiemCalc.cfm. The contractor is responsible for making all necessary travel arrangements.
6. APPENDICES
Appendix A contains program Acronyms; Appendix B contains 4 Workload Agreement attachments, one each, for Alaska, Canada, Hawaii, and Puerto Rico; Appendix C contains the Software List; Appendix D contains the
Shipping Address List; Appendix E contains the Master CDRL List.
http://farsite.hill.af.mil/ http://www.defensetravel.dod.mil/site/perdiemCalc.cfm
APPENDIX A - Acronyms
Ao Operational Availability
AEWS Atmospheric Early Warning System
AIMS Air Traffic Control Radar Beacon System (ATCRBS)/Identification
Friend-or-Foe (IFF)/MARK XII System
BER Beyond Economical Repair
C&A Certification and Accreditation
CDRL Contract Data Requirements List
CLS Contractor Logistics Support
CLIN Contract Line Item Number
COR Contracting Officer’s Representative
COTS Commercial Off-The-Shelf
CPIN Computer Program Identification Number
CSCI Computer Software Configuration Item
DAEPM Directorate Aerospace Equipment Program Management
DAL Data Accession List
DFAR Defense Federal Acquisition Regulation