MPSSF Estimate of Hours.xlsx

XLSX spreadsheet 69 KB Posted

Attached to
Professional, Administrative and Management Support Services Federal contract opportunity
Solicitation number
FA8217-10-R-5022
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Professional, Administrative and Management Support Services, newest first.
File Type Posted
Response to Questions —
Response to Questions —
Performance Work Statement —
Section L Attachments —
Pricing Table —
FA8217-10-R-5022 0002.pdf PDF
Contract Data Requirements List —
FA8217-10-R-5022 0001.pdf PDF
Response to Questions —
Response to Questions —
Contract Data Requirements List.pdf PDF
Section L Attachments.docx DOCX document
Contract Security Classification Specification.pdf PDF
FA8217-10-R-5022.pdf PDF
Government Furnished Property.pdf PDF
Performance Work Statement.pdf PDF
Appendix C.pdf PDF
Pricing Table.xlsx XLSX spreadsheet
Staffing Table.xlsx XLSX spreadsheet
Show all 19

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

OPS_SMEs and Rovers

TaskResponsible partyTime to accomp-lish# per yearTotal time per yearEstimation MethodologyComment
SME
CM ValidationsSME82016020 MPEs X 1 day per validation
FieldingSME800201600020 MPEs X 800 hours/MPE ***Very Rough Estimate***
Test SupportSME80201600Typically a two-week effort
Help Desk Support/ResponseSME1100010001000 calls/year * 1 hour average effort
In-House TestingSME2416384Based on 6 hardware test support plus 10 fielding MPE hardware tests
Site VisitsSME4020800Estimated at an average of 1 per MPE per year X 20 MPEs
Tech Pubs ValidationSME1625400Based on 25 new tech pubs/ year and 2 days per validation
TCNO TestingSME2240480Based on 20 MPEs tested monthly
Post Implementation ReviewSME242048020 MPEs fielded/year X 3 days per PIRIncludes survey development, approval, distribution and processing
Help Desk Analysis and ReportingSME451254040 hours per month post-call analysis plus 5 hours reporting
SME Total:21844
Rovers
Test SupportRover808640
SSR AugmentationRover80241920
Fielding SupportRover90302700
In-House TestingRover81080
Rover Total:5340

Tech Pubs Task Responsible party Time to accomp-lish # per year Total time per year Estimation Methodology Comment

Develop Technical Orders (TOs)Writers360155400Historical (hours), forecast number of TOs
Develop Time Compliance Technical Orders (TCTOs)Writers220102200Historical (hours), forecast number of TCTOs

Total: 7600

CM

Task Responsible party Time to accomp-lish # per year Total time per year Estimation Methodology Comment

Packaged Processed (DT/OT/Fielding/Miscellaneous)CM Techs6.56003900Packages sent - includes duplication, labeling, packaging, deliver for shipment - 6.5 hours per package (5 disks) 600 packages per year
Package Support - MPE Validation, Telecons, Meetings, SME SupportCM Techs6.56003900Package Support - MPE Letter Review - Telecons or other meetings - SME Support
Help Desk / Miscellaneous Mission Planning SupportCM Techs445180Package Support - MPE Letter Review - Telecons or other meetings - SME Support

Total: 7980

Hardware Task Responsible party Time to accomp-lish # per year Total time per year Estimation Methodology Comment

Hardware Acquisition support
Keep abreast of user requirements and identify new computer and peripheral technologies that can improve the Mission Planning computer systems to meet those requirements.Hardware2012240One topic per month, 40 hours per topic
Attend requirements meetings to discuss new hardware requirements and schedules.Hardware404160Quaterly meetings
Provide Request for Proposal (RFP) support.Hardware16696Once per new item
Plan hardware fly off.Hardware406240Once per new item
Conduct hardware fly off.Hardware1006600Once per new item
Conduct First Article Inspection.Hardware8648Once per new item
Create Operating System (OS) Restore Disk for each new Mission Planning Computer.Hardware404160Once per new computer
Conduct Final Acceptance Inspections.Hardware806480Once per new item
Provide technical expertise to the Technical Publications team for the creation of all Technical Orders and Time Compliant Technical Orders related to the new hardware.Hardware1206720Once per new item
Hardware Acquisition Total:2744
Hardware Sustainment support
Provide Tier 2 hardware and OS technical support to the users in the field.Hardware1750750Interview/Historical data
Initiate Warranty Request action on non-operational Mission Planning equipment.Hardware0.5500250Interview/Historical data
Periodically conduct inspection of Mission Planning equipment stored in government warehouses to ensure that the equipment is stored IAW the RFP.Hardware21224Once per month
Conduct failure trend analysis to detect trends in equipment failures.Hardware206120Interview/Historical data
Provide support to the fielding effort for new hardware.Hardware5201520Interview/Historical data
Define and install mission planning systems hardware / software modification kits.Hardware408320Interview/Historical data
Refurbish mission planning systems and provide depot support / repairHardware405200Interview/Historical data
Provide turn-in instructions to users when equipment has reached its end-of-life.Hardware21020Interview/Historical data
Provide support to the Mission Planning Users ConferenceHardware40140Interview/Historical data
Total:2244

Hardware Total: 4988

MPC

Task Responsible party Time to accomplish (hrs) # per week # per year Total time per year Performed Estimation Methodology Comment

Develop and release new SharePoint training manualsMPC Trainer60.03180.0YesAverage 60 pages per manual/ 1 hour per page includes research, writing and verification, based on previous manual development.Guides yet to be developed: SharePoint Designer, Advanced Design, Advanced Workflow
Maintain existing SharePoint Training manualsMPC Trainer4.040160.0Yes300 current manual pages @ 8 pages per week @ .5 hours per page, based on previous manual maintenance.Add to and improve existing manuals. Topics to be maintained: Document Management, Security, InfoPath, Excel Services, PowerPoint Libraries, Site Design
Maintain existing EDR and MPC custom application training manualsMPC Trainer4.02496.0Yes280 current manual pages
Develop and release new training manuals for MPC custom applicationsMPC Trainer24.05120.0Yes5 custom application upgrades or new products per year @ average of 24 pages per training guide @ 1 hour per page, based on average of previous application releases.
Develop CBT modules for SharePointMPC Trainer16.024384.0Yes24 high use SharePoint topics @ 16 hours per module for research, development and verification, based on time to develop prototypes.
Develop CBT modules for EDR and MPC custom applicationsMPC Trainer16.016256.0Yes16 high use EDR topics @ 16 hours per module, based on time to develop prototypes.
Deliver classroom training for SharePointMPC Trainer16.0464.0Yes4 two day events @ 16 hours ea
Deliver online training for SharePointMPC Trainer2.04896.0Yes48 online training events @ 2 hours ea
Deliver online training for MPC custom applicationsMPC Trainer2.04896.0Yes48 online training events @ 2 hours ea
Deliver classroom training for EDRMPC Trainer12.0224.0Yes2 1.5 day events @ 12 hours ea
Pre and post class online training preparation and wrap up.MPC Trainer2.02.0096192.0Yes96 total events @ 1 hour prep and 1 hour post ea
Manage training projectsMPC Trainer4.01.0048192.0Yes4 hours per week @ 48 weeks, based on three previous training projectsMonitoring schedule, plans, risks, and testing, developing reports, communicating with stakeholders
Travel associated with training eventsMPC Trainer16.0232.0YesOne day depart and one day return for two events.
Back up help desk supportMPC Trainer2.01.004896.0Yes2 hours per week @ 48 weeks, based on last years average weekly supportReceiving calls, resolving help desk requests
MPUC Preparation and AttendanceMPC Trainer160.01160.0YesBased on average of three previous MPUC eventscustomize training guides for MPUC breakout sessions, manage project, coordinate and develop booth material
Test MPC SystemsMPC Helpdesk1.05.00260260.0YesRun through various 'tasks' that test mulitple tools on MPC. Receive alerts and then write summary of test in description.
Provide MPC Helpdesk SupportMPC Helpdesk3.55.00260910.0YesSupport to MPC customers provided through phone, email, and helpticket submiting. Research for problem solution and correspondance with user. Including follow up and ticket closure.
Maintain existing MPC Helpdesk siteMPC Helpdesk0.53.0015678.0YesMake sure all submited tickets are either resolved and closed or assigned to appropriate team member. Monitor customer submited tickets. Make sure assigned tickets are closed in timely manner.
Develop and release new Knowledge Base wiki articlesMPC Helpdesk1.51.5078117.0YesWrite 'How To' articles and add to the MPC Knowledge Base.
Maintain existing Knowledge Base articlesMPC Helpdesk0.50.502613.0YesScan Knowledge base articles to ensure they are current and correct. Add new knowledge base articles when nessicary or when new tool has been pushed to live version of MPC.
Approve or deny request for Mission Planner AccessMPC Helpdesk1.55.00260390.0YesView Access Request, verify and approve all military and government users. Contact contractor sponsors for verification and approve. Deny request where authorization has not been given. Correspondance with users and sponsors.
Order and Purchase MPC office materialsMPC Helpdesk3.0412.0YesCreate and submit purchase requests for all supplies. Order supplies once PR is approved. Count all supplies to verify aquaracy of order and finish paperwork send to corporate.
Order and purchase all MPC Library booksMPC Helpdesk2.048.0YesCreate and submit purchase requests for all books. Order once PR is approved. Count all books after arrival to verify aquaracy of order and finish paperwork send to corporate.
Gather MPC weekly activity reports and assist creating MARMPC Helpdesk0.51.005226.0YesGather WAR and add to spreadsheet. Send to Tom Jones. End of Week assist in producing a Monthly activity report.
EDR Working Group meetingMPC Helpdesk2.01.0052104.0YesAttend and record meeting minutes for EDR WG. Write meeting minutes and submit.
Monthly and weekly reporting of Helpdesk/access request statsMPC Helpdesk1.01.005252.0YesGather number of Helpdesk tickets submitted in week or month and number of access requests/MPC accounts.
Manage MPC Helpdesk projectMPC Helpdesk1.03.00156156.0YesInsure all MPC Project tasks, deliverables, and milestones are met according to schedule and ensure that the project site reflects they are met.
MPUC Preparation and AttendanceMPC Helpdesk100.01100.0YesCreate materials, guides, flyers etc. for MPUC event.
Software Versioning AccuracyCM/Data Quality Manager4.03.00156624.0YesWork estimates derived from average MPE letters received.Based on historical data.
Build Date AccuracyCM/Data Quality Manager1.03.00156156.0YesWork estimates derived from average MPE letters received.Based on historical data.
MPE Software completenessCM/Data Quality Manager1.03.00156156.0YesWork estimates derived from average MPE letters received.Based on historical data.
Classification AccuracyCM/Data Quality Manager0.53.0015678.0YesWork estimates derived from average MPE letters received.Based on historical data.
Lifecycle managementCM/Data Quality Manager1.03.00156156.0YesWork estimates derived from average MPE letters received.Based on historical data.
Owning Organization ResearchCM/Data Quality Manager0.53.0015678.0YesWork estimates derived from average MPE letters received.Estimate-depends on complexity of task.
Sub-Assembly CreationCM/Data Quality Manager4.00.5026104.0YesWork estimates derived from average MPE letters received.Based on historical data.
Sub-Assembly ManagementCM/Data Quality Manager0.53.0015678.0YesWork estimates derived from average MPE letters received.Based on historical data.
Sub-Assembly MaintenanceCM/Data Quality Manager1.01.005252.0YesAverage of updating data on existing subessmblies.Based on historical data.
Variants Nomenclature AccuracyCM/Data Quality Manager4.00.251352.0YesWork estimates derived from average new component variant requests received.Based on historical data.
Variants Classification AccuracyCM/Data Quality Manager0.50.25136.5YesWork estimates derived from average new component variant requests received.Based on historical data.
Variants Branching MaintenanceCM/Data Quality Manager0.50.25136.5YesWork estimates derived from average new component variant requests received.Based on historical data.
Variant Version Software Versioning AccuracyCM/Data Quality Manager1.05.00260260.0YesWork estimates derived from average new component variant versions received.Based on historical data.
Variant Version Build Date AccuracyCM/Data Quality Manager1.05.00260260.0YesWork estimates derived from average new component variant versions received.Based on historical data.
Variant Version Lifecycle managementCM/Data Quality Manager1.05.00260260.0YesWork estimates derived from average new component variant versions received.Based on historical data.
Variant Version Supersedes ManagementCM/Data Quality Manager0.55.00260130.0YesWork estimates derived from average new component variant versions received.Based on historical data.
Variant Version Archive managementCM/Data Quality Manager1.05.00260260.0YesWork estimates derived from average new component variant versions received.Based on historical data.
Variant Version Owning Organization ResearchCM/Data Quality Manager0.55.00260130.0YesWork estimates derived from average new component variant versions received.Based on historical data.
Patch Software Versioning AccuracyCM/Data Quality Manager1.03.00156156.0YesWork estimates derived from average new patch requests received.Based on historical data.
Patch Build Date AccuracyCM/Data Quality Manager1.03.00156156.0YesWork estimates derived from average new patch requests received.Based on historical data.
Patch Association managementCM/Data Quality Manager1.53.00156234.0YesWork estimates derived from average new patch requests received.Based on historical data.
Patch Archive managementCM/Data Quality Manager0.53.0015678.0YesWork estimates derived from average new patch requests received.Based on historical data.
Product Line Issues Research stakeholderCM/Data Quality Manager4.00.5026104.0YesWork estimates derived from average times that MPEs and components have needed to be escalated to the PMs or government.Estimate-depends on complexity of task.
Product Line Issues Email communicationCM/Data Quality Manager2.00.502652.0YesWork estimates derived from average times that MPEs and components have needed to be escalated to the PMs or government.Estimate-depends on complexity of task.
Product Line Issues Telephone communicationCM/Data Quality Manager1.00.502626.0YesWork estimates derived from average times that MPEs and components have needed to be escalated to the PMs or government.Estimate-depends on complexity of task.
Product Line Issues Conduct MeetingsCM/Data Quality Manager2.00.502652.0YesWork estimates derived from average times that MPEs and components have needed to be escalated to the PMs or government.Estimate-depends on complexity of task.
Product Line Support Phone Call help desk suportCM/Data Quality Manager0.53.0015678.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
Product Line Support Email help desk supportCM/Data Quality Manager0.512.00624312.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
Product Line Support Conduct MeetingsCM/Data Quality Manager2.00.502652.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
Product Line Support Process Management MeetingsCM/Data Quality Manager2.00.502652.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
MPE Site loading for NavyCM/Data Quality Manager1.50.251319.5YesWork estimates derived from average MPE letters received.Based on historical data.
MPE Site loading for SOFCM/Data Quality Manager1.50.251319.5YesWork estimates derived from average MPE letters received.Based on historical data.
Product Line Tool Developer Group ParticipationCM/Data Quality Manager1.02.00104104.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
Product Line Tool Requirements documentationCM/Data Quality Manager1.01.005252.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
Product Line Tool Tool Design / TestingCM/Data Quality Manager1.01.005252.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
Product Line Tool Planning Area SupportCM/Data Quality Manager1.01.005252.0YesWork estimate calculated from previous year.Estimate-depends on complexity of task.
MPE Letter Generator Tool Developer Group ParticipationCM/Data Quality Manager1.01.005252.0YesWork estimate calculated from previous tool design.Estimate-depends on complexity of task.
MPE Letter Generator Tool Requirements documentationCM/Data Quality Manager0.51.005226.0YesWork estimate calculated from previous tool design.Estimate-depends on complexity of task.
MPE Letter Generator Tool Tool Design / TestingCM/Data Quality Manager0.51.005226.0YesWork estimate calculated from previous tool design.Estimate-depends on complexity of task.
MPE Letter Generator Tool End User Training / SupportCM/Data Quality Manager0.51.005226.0YesWork estimate calculated from previous tool design.Estimate-depends on complexity of task.
Develop and release new MPC DocumentationMPC Technical Writer3.05.00260780.0YesWork estimate calculated from previous tool design.
Administer MPC CRB weekly meetingMPC Technical Writer1.01.005252.0YesWork estimate calculated from previous tool design.
Administer MPC IPT meetingMPC Technical Writer2.00.502652.0YesWork estimate calculated from previous tool design.
CM Database ManagementMPC Technical Writer0.55.00260130.0YesWork estimate calculated from previous tool design.Create meeting sites, communicate with IPT members
Deliverables / Task ManagementMPC Technical Writer0.55.00260130.0YesWork estimate calculated from previous tool design.Develop breakout training material, teach breakout classes, man MPC booth
Develop and release new MPC-S DocumentationMPC Technical Writer4.00.251352.0YesWork estimate calculated from previous tool design.
Incident DocumentationMPC Technical Writer2.00.251326.0YesWork estimate calculated from previous tool design.Conduct quarterly internal QA audits
Internal QA AuditorMPC Technical Writer2.01.5078156.0YesWork estimate calculated from previous tool design.
Maintain existing MPC documentationMPC Technical Writer3.05.00260780.0YesWork estimate calculated from previous tool design.
Maintain existing MPC-S documentationMPC Technical Writer3.50.251345.5YesWork estimate calculated from previous tool design.
MPUC Preparation and AttendanceMPC Technical Writer100.01100.0YesWork estimate calculated from previous tool design.
Peer ReviewsMPC Technical Writer2.02.00104208.0YesWork estimate calculated from previous tool design.
Project Monitoring / ControlMPC Technical Writer0.53.0015678.0YesWork estimate calculated from previous tool design.
Requirements GatheringMPC Technical Writer1.51.5078117.0YesWork estimate calculated from previous tool design.
Secuity / Infrastructure Testing Results ReportsMPC Technical Writer8.0432.0YesWork estimate calculated from previous tool design.
Security / Access MaintenanceMPC Technical Writer1.50.251319.5YesWork estimate calculated from previous tool design.
Team MeetingsMPC Technical Writer1.01.005252.0YesWork estimate calculated from previous tool design.
TestingMPC Technical Writer0.53.0015678.0YesWork estimate calculated from previous tool design.
Automation ToolsSystems Analyst2.01.0052104.0YesWork estimate calculated from previous year.
Building Access ControlSystems Analyst1.00.251313.0YesWork estimate calculated from previous year.
Business Continuity CommitteeSystems Analyst1.03.00156156.0YesWork estimate calculated from previous year.
CER ManagementSystems Analyst0.515.00780390.0YesWork estimate calculated from previous year.
Country Manager / SSF Training MPC-ISystems Analyst2.50.251332.5YesWork estimate calculated from previous tool design.
Customer MeetingsSystems Analyst1.03.00156156.0YesWork estimate calculated from previous year.
Deliverable / TasksSystems Analyst0.515.00780390.0YesWork estimate calculated from previous year.
Develop TrainingSystems Analyst3.0618.0YesWork estimate calculated from previous year.
Develop Training MPC-ISystems Analyst4.00.251352.0YesWork estimate calculated from previous tool design.
Developing / Maintaining MPC-ISystems Analyst2.03.00156312.0YesWork estimate calculated from previous tool design.
Developing / Maintaining MPC-SSystems Analyst4.00.5026104.0YesWork estimate calculated from previous year.
Developing / Maintaining WEDGESystems Analyst0.55.00260130.0YesWork estimate calculated from previous year.
Developing / Maintaining WEDGE-SSystems Analyst0.55.00260130.0YesWork estimate calculated from previous year.
Documentation / Network DiagramsSystems Analyst1.010.00520520.0YesWork estimate calculated from previous year.
Email Maintenance / SupportSystems Analyst0.55.00260130.0YesWork estimate calculated from previous year.
Helpdesk Support Phone / EmailSystems Analyst2.06.00312624.0YesWork estimate calculated from previous year.
Local Systems AdministrationSystems Analyst1.01.507878.0YesWork estimate calculated from previous year.
Peer ReviewsSystems Analyst1.03.00156156.0YesWork estimate calculated from previous year.
Printer / Copier MaintenceSystems Analyst0.55.00260130.0YesWork estimate calculated from previous year.
Project Monitoring / ControlSystems Analyst1.53.00156234.0YesWork estimate calculated from previous year.
Purchasing RequestsSystems Analyst2.00.753978.0YesWork estimate calculated from previous year.
Requirements GatheringSystems Analyst1.01.507878.0YesWork estimate calculated from previous year.
Researching TechnologySystems Analyst1.015.00780780.0YesWork estimate calculated from previous year.
Security Access / TrainingSystems Analyst1.50.753958.5YesWork estimate calculated from previous year.
Security Contingency TestingSystems Analyst36.0272.0YesWork estimate calculated from previous year.
Security Monitoring MPC-ISystems Analyst1.02.00104104.0YesWork estimate calculated from previous tool design.
Software IntegrationSystems Analyst2.01.5078156.0YesWork estimate calculated from previous year.
System BackupsSystems Analyst1.05.00260260.0YesWork estimate calculated from previous year.
System Data / Security LoggingSystems Analyst1.05.00260260.0YesWork estimate calculated from previous year.
Systems Security / Virus ScanSystems Analyst0.55.00260130.0YesWork estimate calculated from previous year.
Systems Testing / GeneratorSystems Analyst12.0448.0YesWork estimate calculated from previous year.
Team MeetingsSystems Analyst1.54.50234351.0YesWork estimate calculated from previous year.
Update patchesSystems Analyst2.05.00260520.0YesWork estimate calculated from previous year.
Automation Tools MPC-ISystems Analyst2.01.0052104.0YesWork estimate calculated from previous tool design.
MPUC SupportSystems Analyst300.01300.0YesWork estimate calculated from previous year.
Hardware IntegrationSystems Analyst4.00.251352.0YesWork estimate calculated from previous year.
Change Request HandlingSoftware Engineer2.55.00260650.0YesWork estimate calculated from previous year.
Customer MeetingsSoftware Engineer5.05.002601,300.0YesWork estimate calculated from previous year.
Deliverables / Project Task DevelopmentSoftware Engineer8.01.0052416.0YesWork estimate calculated from previous year.
Develop SchedulesSoftware Engineer7.00.5026182.0YesWork estimate calculated from previous year.
Developer Meetings / TrainingSoftware Engineer8.02.501301,040.0YesWork estimate calculated from previous year.
Developing/ Maintaining Development / StagingSoftware Engineer30.00.2513390.0YesWork estimate calculated from previous year.
Developing/ Maintaining MPC-SSoftware Engineer8.02.00104832.0YesWork estimate calculated from previous tool design.
DocumentationSoftware Engineer8.51.0052442.0YesWork estimate calculated from previous year.
Help Desk Support Phone/EmailSoftware Engineer28.01.00521,456.0YesWork estimate calculated from previous year.
Maintaining Security / AccessSoftware Engineer20.00.2513260.0YesWork estimate calculated from previous year.
MPUC SupportSoftware Engineer500.01500.0YesWork estimate calculated from previous year.
Peer Reviews Documents and CodeSoftware Engineer6.03.501821,092.0YesWork estimate calculated from previous year.
Project Monitoring and ControlSoftware Engineer14.00.5026364.0YesWork estimate calculated from previous year.
Requirements GatheringSoftware Engineer20.00.5026520.0YesWork estimate calculated from previous year.
Researching new TechnologySoftware Engineer12.00.2513156.0YesWork estimate calculated from previous year.
Software Integration / Deployment MPCSoftware Engineer5.02.00104520.0YesWork estimate calculated from previous year.
Software TestingSoftware Engineer10.52.001041,092.0YesWork estimate calculated from previous year.
Software Integration / Deployment MPC-SSoftware Engineer5.00.5026130.0YesWork estimate calculated from previous tool design.
Software Engineering / Maintaining MPCSoftware Engineer20.05.002605,200.0YesWork estimate calculated from previous year.

Total 35,643.0

IT

Task Responsible party Time to accomp-lish # per year Total time per year Estimation Methodology Comment

Administer the NT network for the existing MPSSF network.IT112422662
Maintenance and backup of server file library.IT0.55226once per week
Maintain and track MPSSF support equipment inventory, to include software, hardware, and associated documentation.IT252104weekly
Maintain and track the warranties and maintenance agreements of the support resources.IT81296
Ensure support resources are taken care of in case of a disaster. (Disaster Preparedness).IT144
Troubleshoot and track all MPSSF network support resources. Compile, analyze, consolidate and / or develop reports of potential deficiencies and determine corrective action and coordinate prioritized recommendations.IT23507004 times per week
Monitor MPSSF support resources and MPS for viruses and take corrective action, when necessary.IT0.5356178daily
Maintain technology currency and make recommendations for network updates required.IT21224monthly
Implementation, maintenance, and configuration management of software and hardware installation / deinstallation scripts on MPSSF support resources.IT27001400
Create / maintain network security accreditation in accordance with DoD / Air Force / Hill AFB requirements.IT15050
Assist in tracking available databases for trends and make prioritized recommendations as required for their resolution.IT0.510050
Maintain government requested metrics and assist in performing trend analysis and include in MPSSF support documentation as required.IT0.55226
Total:5320

SST

Task Responsible party Time to accomp-lish # per year Total time per year Estimation Methodology Comment

Provide monthly TCNO set per MPE evaluation.SST94804320
Maintenance of internal MPE-TCNO evaluation utilities.SST6.54803120
Creation of MPE GPOs and related files.SST53261378
Security Hardware EvaluationsSST24896
DIACAP package reviewsSST820160
MPS OU SupportSST1096960
SSR SupportSST1840840
SDC/FDCCSST34662244

Total: 13118

FMS

TaskResponsible partyTime to accomp-lish# per yearTotal time per yearPerformedEstimation MethodologyComment
Training and SME support
Work closely with the country managers, SSRs and other System Matter Experts to keep the systems in the field in compliance with the approved hardware and software baseline(s).SME820160Yes (at fielding)One day (8 hours) per fielding/delivery event
Perform final system checkout of the MPE prior to fielding/delivery. Checkout will consist of building the MPE—use the applicable install instructions and load the entire software package on the specified hardware, connecting all peripherals and ensuring the MPE works as expected. Any problems/discrepancies will be brought to the attention of the country manager and MPSSF leadership to identify workarounds or required fixes.SME820160YesOne day (8 hours) per fielding/delivery event
Monitor changes to each FMS Mission Planning Environment (MPE) and as required, work with country managers (if requested) to implement changes.SME000YesRarely occurs, would be picked up during operations meeting attendance
Support the FMS Help Desk by taking and responding to problems/inquiries from FMS clients. Record all inquiries and responses in the Help Desk Tool to archive data for trend analysis and metric reporting.SME2100200YesBased on estimate of approx imately 2 calls/week and an average of 2 hours effort for each response
Through self-study and cross-talk with respective USAF SMEs, develop and maintain expertise/currency in each of the various mission planning systems (PFPS, JMPS) and aircraft specific software programs (PFPS A/W/Es and JMPS UPCs).SME820160Yes***New item in SOW*** This will require more effort/time for new hires.
Where practical and when approved by the respective country manager, travel to a USAF installation for familiarization with new mission planning software/hardware components, and aircraft interfaces (data transfer procedures).Time included in 1.2.1 e above
Develop training materials to support FMS work. To the maximum extent possible, training will be standardized and modular to support use among countries with similar MPEs. Training will be tailored to the requirements of each country, to include country specific exercises.SME240204800YesBased on 20 training events and 6 man-weeks per effort. Rough (and low) estimate based on expectation of extensive re-use of training materials. Initial efforts will be greater; subsequent ones less. (Note: Standards for training development are anywhere from 20-80 hours development time per hour of classroom instruction).***Dedicated Training Specialist would do bulk of this**** Will go down as core curriculum gets built
Provide in-country hardware setup, hardware training, and software training, to include system administration and operational use of the MPE.SME192203840YesBased on 2 travelers x 2 weeks (@40 hours) plus 16 hours each trip prep
Review and modify documentation (e.g., pocket guides, workbook material) to meet the specific FMS case requirementsSME820160YesBased on 20 trips/events and 8 hours per event
Work with the government Foreign Disclosure Office (FDO) to get all training materials released prior to distribution.SME22040YesBased on 20 trips/events and 2 hours per event***New item in SOW***
Validate and provide input changes to installation instructions for FMS MPEsSME42080YesBased on 20 trips/events and 4 hours effort each***Combined two steps (validate, provide input) from previous SOW****
Provide estimates for travel, labor, and material costs, as requestedSME22040YesBased on 20 trips and 2 hours total per trip
Participate and support all Integrated Product Team meetings/briefings as required/directed by the Government.SME600YesBased on 3 one-hour meetings/week * 50 weeks * 4 SMEsIncludes MPUC, face to face, and local meetings
Training and SME Total:10240
Logistics
Accomplish travel as necessary to both CONUS and OCONUS locations to provide integrated hardware and logistical support to international customersLogistics404160YesInterview/Historical data
Ensure timely mission planning support to international customersLogistics0.31250375YesInterview/Historical data
Formulate and prepare maintenance plans, programs and schedules for assigned mission planning systems during the introduction of new or modified systems into the inventory. Determine the logistic (technical) requirements to support new or modified systemsLogistics12020YesInterview/Historical data
Participate in engineering inspections, technical order / engineering data verifications, test / evaluation programs and maintainability demonstrations to assure that systems and equipment can effectively and economically maintainedLogistics155YesInterview/Historical data
Assure accuracy of technical data by participating in post publication reviews, recommend updates as necessaryLogistics0.5126YesInterview/Historical data
Coordinate with applicable government mission planning POC to set hardware configuration with the correct software MPE before each test and fieldingLogistics21020YesInterview/Historical data
Ensure that hardware requests from all international customers have been fully approved for release by the proper US Government authorityLogisticsInterview/Historical dataIncluded in #23
Inventory all purchased hardware ensuring the order is correct and completeLogistics11010YesInterview/Historical data
Arrange shipment and manage tracking of FMS hardware/software from the MPSSF to the designated freight forwarder, in-country POC or applicable test/development organizationLogistics21020YesInterview/Historical data
Track and maintain warranty information on FMS hardware and assist with any warranty issues regarding purchased equipment. Once developed, warranty data will be migrated and maintained in the FMS Product Line database.Logistics0.552.5YesInterview/Historical data
Provide Country Managers with assistance for MPE development, integration and customer specific requirementsLogisticsIncluded in #23
Document and distribute all FMS software patches to approved countries that purchased affected softwareLogisticscovered by CM actions
Attend and participate in bi-weekly FMS Mission Planning meetings to include providing current status on hardware purchase dates, and shipment dates for hardware / software deliveriesLogistics0.5157.5Yes
Logistics Total:626
Tech Pubs Support
Develop and modify T.O.s and supporting documentation for FMS mission planning systems per FMS requirements; ensure documentation meets FMS case specific requirementsTech Writer24051200YesBased on standard 240 hours for T.O. development
Review vendor provided documentation and take actions to correct discrepanciesTech Writer0YesIncluded in line 34
Develop and publish FMS T.O. Project Plan that encompasses all mission planning systemsTech Writer0YesIncluded in line 34; AFTO 00-5-19 covers this process
Participate and perform functions, if required, in the acquisition of T.O.s from the manufacturing contractor. These include Verification, Validation, Program Management Reviews (PMR), In-progress Reviews (IPR), and Critical Design Reviews (CDRTech Writer0NoWe do not aquire TO's or TCTO's, they are developed on site
Develop TCTOs for software updates and hardware modification to FMS mission planning systemsTech Writer1205600YesBased on standard 120 hours for TCTO development
Coordinate publications-related activities, including identification and correction of deficiencies, coordination with FMS country specific program office and contractor personnel, scheduling and performing kit proofingTech Writer0Yesincluded in lines 34/38
Maintain configuration control of supported T.O.s to include modifications, baselines, updates, releases, lessons learned, and process documentationTech Writer0Yesincluded in lines 34/38
Tech Data Support Total:1800
Configuration Management
Develop and maintain procedures, policies and practices to manage software configuration to include tracking, staffing, maintaining requirements and requirements databases.Configuration Management1034340Interview/Historical data
Software Duplication and Distribution: Load hardware with software prior to shipping , duplication of software media, distribution of software media FMS countries and test organizationsConfiguration Management32060Interview/Historical data
Provide software duplication and distribution for Developmental Test / Operational Test / Operational Releases per the country managers signed MPE letterConfiguration Management12424Interview/Historical dataIncluded in line 51
Work with Air Force Configuration Management to d. Work with Air Force Configuration Management to assign Computer Product Identification Numbers (CPINs) all FMS software releases, including beta releases.Configuration Management0.52010Interview/Historical data
Ensure compliance of Software distribution & CM processesConfiguration Management1150150Interview/Historical data
Coordinate all deliveries with country managers to verify receipt of test/CPINed softwareConfiguration ManagementIncluded in line 16
Conduct hardware and software configuration checkoutConfiguration Management0.52412Interview/Historical data
CM Total:596
FMS Web Services Support
Provide administrative oversight for FMS web sites; ensure web sites are accessible to each country and that country only, are reliably available (minimize downtime), and are backed up and restorable.Systems Analyst1250600Estimated @ about 12 hours/week in sustainment
Ensure compartmentalization and integrity of each country’s web site.Systems Analyst0500Included in #57
Develop and implement procedures for creating user accounts with country unique access.Systems Analyst450200Estimated @ about 4 hours per week
Develop an FMS specific database(s), to track FMS MPEs (hardware and software components) for each FMS case and facilitate cross-referencing and data queries to identify trends, problems, and fixes for the entire FMS community.Systems Analyst3001300Estimate for initial effort
Modify and/or develop web-based applications to support unique data handling and reporting requirements.Systems Analyst1205600Rough estimate--depends on complexity of tasking
Work with stakeholders to modify existing structure/reports and plan for future development.Systems Analyst300Total time over year
MPC-I Total:2000
FMS MPUC Support
Provide planning support, expertise and conference execution activities as directed by the MPUC Program Manager as needed to support all MPUC and FMS activitiesMPUC
FMS ADMIN Support
Prepare travel estimates, review travel vouchers and expense reportsFMS
Provide funding updates/ invoices / purchase order tracking for entire FMS effortFMS
Track funds for specific countries, input contract mods, and maintain country specific funding balancesFMS
Track and report to the Government the amount of hours, per case, used for in-country trainingFMS
Prepare and/or confirm security clearances and associated forms, as well as country entry paperworkFMS
Provide any necessary coordination between Tybrin Corporate and SSFFMS
Assist with logistical supportFMS
FMS Management Support
Coordinate with government POCs for tasking and direction related to FMS supportFMS
Provide direction and guidance for team members. Determine priorities in the event of conflicting tasksFMS
Provides reports as requested by the governmentFMS

Total: 15262

MPTT Development Task Responsible party Time to accomp-lish # per year Total time per year Estimation Methodology Comment

MPE Training Development-New DevelopmentTrainers112022240Historical ExperienceIncludes development of training materials and support of development/ test events
MPE Training Development-UpdateTrainers80064800Historical ExperienceIncludes revision of training materials for MPE spiral release and support of development/ test events
Fielding TrainingTrainers50592950Historical Experience1 week travel plus 10 hrs prep (avg) per event
Miscellaneous TrainingTrainers808640Historical ExperienceIncludes ESC/46TS/Other support--8 events for 1 week plus 1 week prep
Miscellaneous TripsTrainers408320Historical ExperienceIncludes PMRs and other meetings
Total:10950

MPTT Sustainment

TaskResponsible partyTime to accomp-lish# per yearTotal time per yearEstimation MethodologyComment
Sustainment Trainers
Monthly PFPS classes @HillTrainers401248032 hours of instruction + 8 hours prep per event
Provide PFPS training on the roadTrainers6012720Assumes one-week (40 hrs) per training trip plus 20 hours prep (tailoring)
PFPS Curriculum DevlopmentTrainers96021920Assumes one-week (40 hrs) per training trip plus 20 hours prep (tailoring)
Total Sustainment Trainers:3120
Unix and Training Support
Conduct Solaris/Unix ClassesSys Analyst403120
IT Support for Training Office/ClassroomSys Analyst1052520
Total System Analyst:640

Total: 7520