05_QALI_F_15_Sequence_Selector.pdf

PDF 909 KB Posted

Attached to
Eject Sequence Mode Selector Federal contract opportunity
Solicitation number
FA821321Q3000
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to Eject Sequence Mode Selector, newest first.
File Type Posted
08_Special_Packaging_Instruction_F00_349_3943.pdf PDF
03_Attach2_SOW_Ammo_Data_Cards.pdf PDF
13_JFQR_1377_00_349_3943_F_15_Mode_Selector.pdf PDF
12_JFQR_1377_01_479_9295_F_15_Sequence_Mode_Selector.pdf PDF
11_JFQR1377_01_437_4075ES_F_15_ModeSelector.pdf PDF
10_CADPAD_Item_Marking_Instruction_Version1_5_dated_01May2019.pdf PDF
07_Repair_And_Rework.pdf PDF
04_SOW_Packaging.pdf PDF
06_Item_Description.pdf PDF
02_Repship.pdf PDF
01_Airmunitions_Specification_FD2020_21_50134.pdf PDF
FA821321Q3000.RTF RTF text file
CDRLs_FD2020_21_50034.pdf PDF
FA821321Q3000.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name

CAGE code

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor, at a minimum, shall allow DCMA to inspect the following points:

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend per comment section.

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification) Monitor - R: Will monitor testing, may reduce to verification per comment section.

Notify - N: By phone or email prior to action.

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer Signature

Rev Date: 5 May 2019

Sheet1

Text46: 05 Jun 2020
2020-06-05T12:51:47-0600
TIDWELL.QUINN.RAY.1241451913
undefined_9: N
Text32: 9. Additional Requirements
undefined_8: M
Text31: 8. Shippers (DD250, Reports)
undefined_7: M
Text30: 7. AMMO Data Card Review
undefined_6: V
Text29: 6. Preparation for Shipment
undefined_5: W
Text28: 5. LAT
undefined_4: V
Text27: 4. LAT Sample Selection
undefined_3: V
Text26: 3. X-Ray/N-Ray
undefined_2: V
Text25: 2. Leak Test
undefined: V
Text36: 1. Explosive Weight

2. Verify gross leak and fine leak check are performed.

3. Ensure film labeling correct. Ensure radiographic film is readable and well-defined. DCMA is not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Testing should occur in accordance with latest government approved ATP. Prior to LAT ensure proper calibration and validation of all test equipment. Witness proper test setup and at least the first 3 functional tests. Further witnessing may be required if there are known concerns with the item or requested by Government Engineer.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer,original lot number, and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Government Project Engineer

Text24: 1.Inspection
Part Number: 6139100, 50905-3, 826213-01
DODIC: UY68
Text20:
Text19:
Part Number Line 2:
Contract No: 21-50134
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-15

File details come from the government source that posted it. Updated .