1750009QALI.pdf

PDF 75 KB Posted

Attached to
F15 Canopy Remover Federal contract opportunity
Solicitation number
FA8213-20-R-3030
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

This document contains a quality assurance letter of instruction and planning requirements sheet for a federal contract to provide canopy remover cartridges, aircraft canopy removers, and related data. The contractor must impose listed DCMA inspection points into work orders for critical flight items and identify such work orders. Inspection types include mandatory stamping/signatures, witnessing, verification, and monitoring of testing. The contractor must also prepare for shipment, review ammunition data cards, and ensure correct shippers' documentation. Additional requirements may be imposed.

The related federal contract opportunity is a pre-solicitation to provide F-15 canopy remover cartridges and removers to Hill Air Force Base. Line items include the listed items along with data deliverables. Delivery for most items is by December 31, 2021 with quantities specified. The solicitation will use an electronic procedure and all responsible sources may submit a capability statement, proposal, or quotation for consideration by the Department of the Air Force Materiel Command Lifecycle Management Center.

View the file

Other files for this federal contract opportunity

Other files attached to F15 Canopy Remover, newest first.
File Type Posted
FA821320R3030_______0001.pdf PDF
QALIF15CRCdual.pdf PDF
CDRLs.pdf PDF
EDL.pdf PDF
ADCSOWJan2018.doc DOC document
F001382871.pdf PDF
JQR003493938.pdf PDF
SOWSPI.pdf PDF
REPSHIP11Mar14.doc DOC document
CADPADItemMarkingInstruction.pdf PDF
JQR012029195.pdf PDF
JQR003616048.pdf PDF
ItemDescription.pdf PDF
FA821320R3030.pdf PDF
1750009airspec.doc DOC document
Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: FD2020-17-50009
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: IDIQ
DODIC: SEE PARTS TABLE

SEE PARTS TABLE

S TABLE

undefined: V
undefined_2: M
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: M
undefined_8: M
undefined_9:
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Explosive Weight

2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.

3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Any additional requirements imposed by DCMA shall be approved by Project Engineer

2016-08-31T06:15:51-0600
MONK.DAVID.B.1257530864
Text46: 31 Aug 2016
Text49:
Type name_1:
Type name_4:
Part Number: SEE PARTS TABLE
Noun:

File details come from the government source that posted it. Updated .