1750009QALI.pdf
PDF 75 KB Posted
- Attached to
- F15 Canopy Remover Federal contract opportunity
- Solicitation number
- FA8213-20-R-3030
About this file
This document contains a quality assurance letter of instruction and planning requirements sheet for a federal contract to provide canopy remover cartridges, aircraft canopy removers, and related data. The contractor must impose listed DCMA inspection points into work orders for critical flight items and identify such work orders. Inspection types include mandatory stamping/signatures, witnessing, verification, and monitoring of testing. The contractor must also prepare for shipment, review ammunition data cards, and ensure correct shippers' documentation. Additional requirements may be imposed.
The related federal contract opportunity is a pre-solicitation to provide F-15 canopy remover cartridges and removers to Hill Air Force Base. Line items include the listed items along with data deliverables. Delivery for most items is by December 31, 2021 with quantities specified. The solicitation will use an electronic procedure and all responsible sources may submit a capability statement, proposal, or quotation for consideration by the Department of the Air Force Materiel Command Lifecycle Management Center.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| FA821320R3030_______0001.pdf | ||
| QALIF15CRCdual.pdf | ||
| CDRLs.pdf | ||
| EDL.pdf | ||
| ADCSOWJan2018.doc | DOC document | |
| F001382871.pdf | ||
| JQR003493938.pdf | ||
| SOWSPI.pdf | ||
| REPSHIP11Mar14.doc | DOC document | |
| CADPADItemMarkingInstruction.pdf | ||
| JQR012029195.pdf | ||
| JQR003616048.pdf | ||
| ItemDescription.pdf | ||
| FA821320R3030.pdf | ||
| 1750009airspec.doc | DOC document |
Show all 15
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Contractor Name CAGE code
DCMA QAR Reviewer
Date Review Completed
Date Issued to Contractor
PR No. FD2020-
Date Contract Awarded
Final Delivery Date (FDD)
Program Name
DODIC
Part Number
The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.
All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.
Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)
Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable
Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)
Monitor - R: Will monitor testing, may reduce to verification
Notify - N: By phone or daily schedule 24( R ) - 48 ( NR ) hours in advance
Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)
Prepared by:
Date
Concurrence Signature by QAR/DCMA:
QAR/DCMA
THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.
QUALITY ASSURANCE LETTER OF INSTRUCTION
Planning Requirements
COMMENTS
NOTICE
Engineer
Date
Sheet1
| Contract No: FD2020-17-50009 |
| Date Contract Awarded: |
| Final Delivery Date FDD: |
| Program Name: IDIQ |
| DODIC: SEE PARTS TABLE |
SEE PARTS TABLE
S TABLE
| undefined: V |
| undefined_2: M |
| undefined_3: V |
| undefined_4: M |
| undefined_5: W |
| undefined_6: V |
| undefined_7: M |
| undefined_8: M |
| undefined_9: |
| undefined_10: |
| undefined_11: |
| undefined_12: |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: 1.Inspection |
| Text25: 2. Leak Test |
| Text26: 3. X-Ray/N-Ray |
| Text27: 4. LAT Sample Selection |
| Text28: 5. LAT |
| Text29: 6. Preparation for Shipment |
| Text30: 7. AMMO Data Card Review |
| Text31: 8. Shippers (DD250, DD1149, Reports) |
| Text32: 9. Additional Requirements |
| Text33: |
| Text34: |
| Text35: |
| Text36: 1. Explosive Weight |
2. Verify ATP contains both gross and fine leak checks, and gross leak and fine leak checks are performed.
3. Ensure film labeling correct. Ensure radiographic film readable/well-defined. DCMA not required to interpret film.
4. Randomly select LAT units per latest government approved ATP.
5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.
6. Ensure Paperwork is correct.
7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.
8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)
9. Any additional requirements imposed by DCMA shall be approved by Project Engineer
| 2016-08-31T06:15:51-0600 | |
| MONK.DAVID.B.1257530864 |
| Text46: 31 Aug 2016 |
| Text49: |
| Type name_1: |
| Type name_4: |
| Part Number: SEE PARTS TABLE |
| Noun: |
File details come from the government source that posted it. Updated .