ES7034.doc

DOC document 26 KB Posted

Attached to
FIRE EXT CART. Federal contract opportunity
Solicitation number
FA8213-20-R-3005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to FIRE EXT CART., newest first.
File Type Posted
SPI_F01-271-7161.pdf PDF
QALI_1377012258235_1377012340912.pdf PDF
QALI_1377012340912.pdf PDF
AirSpec1377012258235_1377012340912.docx DOCX document
ADC_SOW.doc DOC document
260s27jun2019.pdf PDF
SPI_AD_P_1377_5.pdf PDF
AirSpec1377007561384.docx DOCX document
PackagingSOW.pdf PDF
CADPADIMI_20190501.pdf PDF
QALI_1377007561384.pdf PDF
REPSHIP.doc DOC document
BidSets1377013915415.doc DOC document
JFQR_1377007561384_03132020.pdf PDF
AirSpec1377013915415.docx DOCX document
SPI_F01-255-2382.pdf PDF
SPI_F00-280-0272.pdf PDF
Packaging_Requirements_1377013915415_26Jun.pdf PDF
Packaging_Requirements1377012258235_1377012340912_18_sep.pdf PDF
ItemDescriptions11april2019.pdf PDF
Packaging_Requirements1377007561384_1_nov.pdf PDF
CDRLSMAY03.pdf PDF
FA821320R3005.RTF RTF text file
JFQR_1377016695313.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 5

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rework in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

(c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

(e) The rework or repair procedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Government assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

File details come from the government source that posted it. Updated .