AirSpec1377013915415.docx

DOCX document 20 KB Posted

Attached to
FIRE EXT CART. Federal contract opportunity
Solicitation number
FA8213-20-R-3005
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

View the file

Other files for this federal contract opportunity

Other files attached to FIRE EXT CART., newest first.
File Type Posted
SPI_F01-271-7161.pdf PDF
QALI_1377012258235_1377012340912.pdf PDF
QALI_1377012340912.pdf PDF
AirSpec1377012258235_1377012340912.docx DOCX document
ADC_SOW.doc DOC document
260s27jun2019.pdf PDF
SPI_AD_P_1377_5.pdf PDF
AirSpec1377007561384.docx DOCX document
PackagingSOW.pdf PDF
ES7034.doc DOC document
CADPADIMI_20190501.pdf PDF
QALI_1377007561384.pdf PDF
REPSHIP.doc DOC document
BidSets1377013915415.doc DOC document
JFQR_1377007561384_03132020.pdf PDF
SPI_F01-255-2382.pdf PDF
SPI_F00-280-0272.pdf PDF
Packaging_Requirements_1377013915415_26Jun.pdf PDF
Packaging_Requirements1377012258235_1377012340912_18_sep.pdf PDF
ItemDescriptions11april2019.pdf PDF
Packaging_Requirements1377007561384_1_nov.pdf PDF
CDRLSMAY03.pdf PDF
FA821320R3005.RTF RTF text file
JFQR_1377016695313.pdf PDF
Show all 24

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

FD2020-20-50015 and FD2020-20-50016

NSN: 1377-01-391-5415ES

SUB NSN: 1377-01-672-9909ES

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): MD61

4. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043)

5. Items shall be marked in accordance with CAD/PAD Item Marking Instruction Version 1.5, 20190501, reference attachment.

6. Shelf Life Code marking NOT required per MIL-STD-129.

7. Hazard Classification Information: 1377013915415ES AND 1377016729909ES Hazard Class/Division: 1.4 Storage Compatibility Group: S DOT Marking/Proper Shipping Name: CARTRIDGES, POWER DEVICE DOT Class/Hazard Class: EXPLOSIVE 1.4S DOT Label/Shipping Label:

UN Serial No.: UN0323 UN Proper Shipping Name/UN No: CARTRIDGES, POWER DEVICE Net Explosive Weight per item (NEW): 0.001200 NEW Unit of Measurement: LBS NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

8. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D)
NORs – CDRL (DI-SESS-80642D)
RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: B_, Reason: _Admin and operational use only__(ref. DoD 5230.24)

9. Item(s) must pass both gross and fine leak checks. MIL-STD-883, Method 1014.13 may be used as guidance. The existing leak rate limit established for this item(s) will remain the same. Contractor shall generate a Lot Acceptance Test Plan (LATP/ATP) with an analysis or test results showing compliance for Hill AFB engineering approval at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission. CDRL (DI-QCIC-80553A)

10. Lot Acceptance Test Requirements are: IAW latest Gov. approved ATP

11. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

12. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHJ Organization Fax/E-mail: matthew.tanner.7@us.af.mil

13. In the event of test failure(s), a Failure Analysis and Corrective Action Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)

14. If Hexanitrostilbene (HNS) explosive material is used in the manufacture of this item, the HNS shall meet the requirements of Government Document WS5003F (or latest revision), Purchase Description of HNS Explosive; and maximum particle size shall not exceed 250 microns.

15. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

16. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the waiver and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The waiver shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

17. Percussion primers shall have been certified /recertified by performing sensitivity (all- fire/no fire) and dud testing per applicable specification within the past 24 months unless they are Navy certified and have a 2 year certification. Primers shall be stored in a temperature and humidity controlled environment and in a sealed container with desiccant from time of primer manufacturing, shipping, storage and through final installation in end item. All primers shall be X-rayed in top and side views for critical defects prior to use.

18. This item is designated as a Critical Safety Item (CSI). Documentation for critical characteristics may be found in the contract, TDP, assembly/inspection procedures or QALI. MRB approval authority shall be retained by government engineer. Other characteristics requiring inspection or special oversight from DCMA: See attached QALI

19. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment clause ES7034)

20. First Article Test/Inspection Report IAW AFMC form 260 CDRL (DI-NDTI-80603A) FAT-Government Test/Inspection, Non-explosive items only) or FAT-Contractor Test)

21. First Article Test Plan and Procedures CDRL (DI-NDTI-81307A)

22. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it. Updated .