AIRSPEC_FD20201950092_AirSpecs_ARD863.docx

DOCX document 28 KB Posted

Attached to
Impulse Cartridges, ARD 863 and ARD 446
Solicitation number
FA8213-19-R-3033
Issued by

About this file

Airspec ARD 863

View the file

Other files

File Type Posted
FA821319R3033_______0001.pdf PDF
SPI_F005169924_ARD446.pdf PDF
Exhibit_A_ARD446_CDRL.pdf PDF
SOW_Preservation_and_Packing.pdf PDF
Contract_Attachment_PricingTable.xlsx XLSX spreadsheet
ADC_SOW_Attachment2.doc DOC document
Exhibit_A_ARD863_CDRL.pdf PDF
SPI_F005859291_ARD863.pdf PDF
AIRSPEC_FD20201950092_AirSpecs_ARD446.docx DOCX document
FA821319R3033.pdf PDF
REPSHIP_COPY.DOC DOC document
Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AIRMUNITION SPECIFICATION

(version 9 May 2018)

FD2020-19-50092

NSN: 1377-01-369-2492

1. The contractor shall provide an advanced Report of Shipment (REPSHIP) to the consignee no later than 24 hours prior to the shipment arrival, and for ammunition shipments no later than two hours after shipment departure. A (REPSHIP) shall include all the following data in accordance with ATTACHMENT 1.

2. Contractor shall contact their nearest Defense Contract Management Agency (DCMA) Office for transportation guidance and assistance for all Foreign Military Sales (FMS) deliveries prior to shipment; and ensure that the DCMA provides one information copy of completed Notice of Availability (NOA) including FMS case and requisition numbers by mail to: AFLCMC/EBHMB Attn: FMS Transportation 6043 Elm Lane, Hill AFB, UT 84056-5819, or Fax to: (801) 777-1089 or Email to ooalc.gacp.transportation@us.af.mil.

3. Department of Defense Identification Code (DODIC): M189

4. Ammunition lot numbering shall be accomplished. Reference MIL-STD-1168C for guidance. Each energetic ingredient and component used in production lot(s) shall be from a single material lot.

5. Ammunition Data Cards (ADC) shall be filled out; input in accordance with Attachment 2, Statement of Work – Ammunition Data Cards; and state quantity/serial number of lot acceptance test units in the remarks block. One hard copy of the ADC shall accompany shipments to each shipping location. CDRL (DI-MISC-80043B)

6. Items shall be marked using accepted practices for marking (reference MIL-STD-130N for guidance). Minimum item marking shall include Government/Manufacturer Part Number, Lot Number (reference MIL-STD-1168C), and Serial Number if applicable. Government

7. Shelf Life Code marking NOT required per MIL-STD-129R.

8. Physical Security of Arms, Ammunition & Explosive (AA&E) items shall be safeguarded as sensitive in accordance with DoDM 5100.76, April 17, 2012 28 February 2014, DFARS 252.223-7007 and the following sensitivity/category code:

Ammunition and Explosives SRC IV

9. Hazard Classification Information:

Hazard Class/Division: 1.4 Compatibility Group: S DOT Marking/EX Number: EX1993070049 DOT Shipping Lables: EXPLOSIVE 1.4C UN Number.: 0276 Proper Shipping Name: UN0276, CARTRIDGES, POWER DEVICE, 1.4C Net Explosive Weight per item (NEW): 0.009000 NEW Unit of Measurement: pounds NEW for all packaging/shipping documents shall reflect the NEW identified above per JHCS or IHC. . If NEW is altered to adjust item performance and is greater than the weight listed, an ECP shall be submitted to the government prior to manufacturing or at least 60 days prior to shipping and shall include the SDS (formerly MSDS) and applicable supporting documentation.

10. Contractor shall perform testing and shall acquire data necessary to support compliance with the Performance Oriented Packaging (POP) requirements of hazardous materials as defined in Title 49, Code of Federal Regulations (CFR), the International Maritime Organization’s International Maritime Dangerous Goods (IMDG) Code, and the International civil Aviation Organization (ICAO) Technical instructions for the Safe Transport of Hazardous Goods. The Contractor shall document the results of the testing and data acquisition. CDRL (DI-PACK-81059A)

11. All Engineering Change Proposals (ECPs), Notice of Revisions (NORs), and Request For Variances (RFVs formerly RFD/RFWs) affecting the approved product baseline configuration, acceptance test procedures, or manufacturing process of any item(s) on this contract shall be in accordance with EIA-649-B. Major ECPs with NORs and Critical/Major RFVs shall be submitted to the responsible Government Engineering Authority for review/disposition by CCB. Minor/Administrative ECPs with NORs and Minor RFVs shall be processed by the: COGNIZANT GOVERNMENT ENGINEER

ECPs -- CDRL (DI-SESS-80639D)
NORs – CDRL (DI-SESS-80642D)
RFVs – CDRL (DI-SESS-80640D)

Distribution Statement: D, Reason: Critical Technology (ref. DoD 5230.24)

12. The contractor shall provide the Lot Acceptance Test Plan (LATP/ATP) for this item(s) in accordance with the contractual data requirements. No changes to previously approved government Acceptance Test Plans shall be made without prior government approval. The Lot Acceptance Test Plan provided must be approved by HAFB engineering at least 90 days prior to commencement of Lot Acceptance Testing allowing for 30 days approval time after submission.

CDRL (DI-QCIC-80553A)

13. Lot Acceptance Test Requirements are: OMP-104

14. The contractor shall furnish a Lot Acceptance Test/Inspection Report in the following system(s): WAWF

CDRL: (DI-NDTI-80809B)

15. LOT ACCEPTANCE TEST: In the event of an end item failure, the contractor shall notify the PCO/ACO and Air Force Engineering Organization within 1 business day.

Air Force Engineering Organization: AFLCMC/EBHCC Organization E-mail: matthew.adams.48.ctr@us.af.mil

16. In the event of test failure(s), a Failure Summary and Analysis Report with proposed corrective actions/recommendations is required. CDRL: (DI-SESS-80255A)

17. The age of the energetic materials and components (i.e. ALL explosives, propellants, pyrotechnics, cartridges, and/or initiators) used in the manufacture of these items or sub-components shall not exceed 24 months based on the original manufacturing date. All energetic materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121 (http://www.pmddtc.state.gov/regulations_laws/itar.html).

18. Raw (non-blended) ingredients & materials used in blended/mixed energetic materials such as, but not limited to: fuels, oxidizers, binders, curatives, sensitizers, plasticizers, stabilizers etc., shall not exceed 24 months since date of manufacture and comply with original manufacture’s Specification or MIL-STD. The government may waive the energetic and constituent material requirements listed above or portions thereof, on a case-by-case basis (when acceptable to the government) provided the contractor furnishes all details of the reason for the variance and the age, lot numbers, traceability, and other pertinent information/ test data and Certificate of Analysis/ Conformance (COA/COC) of the subject materials or components. The variance shall be submitted as a RFV and may be subject to, but not limited to, conditions such as sensitivity testing, stabilizer and analysis and/or dehumidification at vendor’s cost; therefore, vendor must plan accordingly. RFV not required provided vendor has approved energetic material and constituent management and recertification plan approved by HAFB technical authority for this specific contract and contract is executed with materials in compliance with said plan. Recertification test data for materials shall be provided by vendor upon request at no additional charge to the government. All raw ingredients, materials and components must be traceable to the original DoD qualified manufacturer and compliant with the ITAR part 120 and 121.

19. The contractor shall comply with MIL-STD-1171/B for propellants, explosives and /or chemical materials used in the end item(s) or component(s) on this contract. Acceptance and description sheets shall be submitted in WARP (see Attachment Clause ES7035). CDRL (DI-MGMT-81978)

20. A detailed end item component listing for Ammo Data Card reporting is required (See Attachment Clause ES6200)

21. Approval from government engineer is required prior to rework and repair of nonconforming material (see Attachment Clause ES7034)

22. DoD Preferred Methods for Acceptance of Product, MIL-STD-1916, shall be used for this procurement action. (See Attachment Clause ES7650) If MIL-STD-1916 is utilized it is mandatory to have contractor provide a QAPP CDRL as the vehicle to submit alternate acceptance methods (e.g. process control and statistical control methods).

23. First Article Test/Inspection Report IAW AFMC form 260 FAT- Contractor Test (Engineer shall supply ATTACHMENT #8 Clause to Item Manager) CDRL (DI-NDTI-80603A)

24. First Article Test Plan and Procedures CDRL (DI-NDTI-81307A)

25. The contractor shall provide a Quality Assurance Program Plan (QAPP) which meets the requirements of ISO 9001:2015. The QAPP shall include a corrective action and disposition system for nonconforming material. The contractor QA requirements shall flow down to all tiers of subcontracts and assure subcontractor/vendor supplies conform to the requirements of this contract. The contractor’s quality program shall focus on the prevention and detection of discrepancies to assure delivered products satisfy the life cycle and performance requirements. This deliverable will be a living document and therefore revisions may be periodically required and resubmitted for approval. Upon request, the contractor shall supply quality manuals, operating procedures, or work instructions as referenced in the QAPP or as referenced in the contractor’s ISO 9001:2015 Quality Management System. CDRL (DI-QCIC-81794)

26. The Contractor shall prepare and submit an AIE package to the Government for review and approval.( See Attachment Clause ) CDRL (DI-QCIC-81960)

27. Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Plan. CDRL (DI-MGMT-81948)

28. Diminishing Manufacturing Sources and Material Shortages (DMSMS) Management Implementation Plan. CDRL (DI-MGMT-81949)

29. The contractor shall provide a Diminishing Manufacturing Sources and Material Shortages (DMSMS) Parts Management Plan IAW MIL-STD-3018, Parts Management, Requirement 5.1 (parts management elements). CDRL (DI-SDMP-81748)

30. Counterfeit Mitigation Clause-DFARS Title 48 252 246 7007 Applies. CDRL (DI-MISC-81832)

31. The contractor shall host a post award meeting at the contractor’s facility no later than ____days after contract award and provide minutes of the meeting. CDRL (DI-ADMN-81505) PM email preston.smith.6@us.af.mil

32. Contractor shall plan and provide a Conference Agenda for all Program Reviews (PRs)/Technical Reviews (TRs) at their facilities and/or subcontractors facilities.

CDRL (DI-ADMN-81249B) PM Email: preston.smith.6@us.af.mil

33. Contractor shall prepare and deliver conference minutes for all PRs and TRs.

CDRL (DI-ADMN-81505) PM Email: preston.smith.6@us.af.mil

34. Contractor shall prepare and submit monthly progress reports documenting program status of milestones, schedule, cost objectives, and technical performance requirements. CDRL (DI-MGMT-80227) PM email preston.smith.6@us.af.mil

35. Contractor shall provide a report of GFP inventory and end-item transactions as described in CDRL (DI-MGMT-80442) Applies to all inventories that are intended to be returned to the government after repair or use. Excluded are new production and items intended for disposal or expenditure.

36. Contracts involving ammunition and explosives (AE) will contain:

- DFARS Title 48 Part 252.223-7002, Safety Precautions for Ammunition and Explosives

- DFARS Title 48 Part 252.223-7003, Change in Place of Performance - Ammunition and Explosives Additionally, if the scope of work includes air shipment of explosives, the safety specification should require contractor compliance with:

- AFMAN 24-204(I), Preparing Hazardous Materials for Military Air Shipments

File details come from the government source that posted it.