QALI.pdf

PDF 110 KB Posted

Attached to
Canopy Actuated Release Bolt Federal contract opportunity
Solicitation number
FA821319R3026
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

QALI

View the file

Other files for this federal contract opportunity

Other files attached to Canopy Actuated Release Bolt, newest first.
File Type Posted
FA821319R3026.pdf PDF
EDL.pdf PDF
AirSpec.pdf PDF
F010855974.pdf PDF
ES7034.pdf PDF
REPSHIP.pdf PDF
JQRS.pdf PDF
ID.pdf PDF
ADCSOW.doc DOC document
SOW.pdf PDF
BidSets.doc DOC document
CDRLs.pdf PDF
PackReq.pdf PDF
CADPADIMI19Apr2016.pdf PDF
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Contractor Name CAGE code

DCMA QAR Reviewer

Date Review Completed

Date Issued to Contractor

PR No. FD2020-

Date Contract Awarded

Final Delivery Date (FDD)

Program Name

DODIC

Part Number

The contractor is required to impose the listed below DCMA Inspection Points into the appropriate Work Orders.

All Work Orders pertaining to CRITICAL FLIGHT ITEMS must be identified on folders.

Mandatory - M: Stamp and/ or Signature on original documentation (i.e., Mfg. Planning, ATP, FAT Report, etc.)

Witness - W: GSI required to attend, may reduce level of effort after 50% of production lots found acceptable

Verification - V: Stamp and/or Signature required unless noted otherwise (may be done by written verification)

Monitor - R: Will monitor testing, may reduce to verification

Notify - N: By phone or email

Additional requirements: (DCMA reserves the right to impose additional inspection points as deemed necessary.)

Prepared by:

Date

Concurrence Signature by QAR/DCMA:

QAR/DCMA

THIS PLANNING SHEET WILL BE UPDATED IF NECESSARY.

QUALITY ASSURANCE LETTER OF INSTRUCTION

Planning Requirements

COMMENTS

NOTICE

Engineer

Date

Sheet1

Contract No: 19-50015, 19-50026
Date Contract Awarded:
Final Delivery Date FDD:
Program Name: F-16
DODIC: SP87
undefined: V
undefined_2: V
undefined_3: V
undefined_4: M
undefined_5: W
undefined_6: V
undefined_7: V
undefined_8: V
undefined_9: N
undefined_10:
undefined_11:
undefined_12:
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: 1.Inspection
Text25: 2. Leak Test
Text26: 3. X-Ray/N-Ray
Text27: 4. LAT Sample Selection
Text28: 5. LAT
Text29: 6. Preparation for Shipment
Text30: 7. AMMO Data Card Review
Text31: 8. Shippers (DD250, DD1149, Reports)
Text32: 9. Additional Requirements
Text33:
Text34:
Text35:
Text36: 1. Verify that the Explosive Weight is identified and meets drawing and hazard classification requirements.

2. Verify gross/fine leak checks are performed per ATP requirements

3. Ensure film labeling correct. Ensure radiographic film readable / well-defined. DCMA not required to interpret film.

4. Randomly select LAT units per latest government approved ATP.

5. Prior to LAT ensure proper calibration and validation of all test equipment. Testing should occur in accordance with latest government approved ATP.

6. Ensure Paperwork is correct.

7. Verify all energetic materials: list original manufacturer, original lot no., and latest certification/recertification date < 24 months.

8. Ensure Paperwork is correct. Verify Packaging, Packing, Preservation & Marking (PPP&M)

9. Notify and obtain approval from the Project Engineer for any additional requirements imposed by DCMA.

2018-05-30T15:53:43-0600
TIDWELL.QUINN.RAY.1241451913
Text46: 30 May 2018
Text49:
Type name_1:
Type name_4:
Part Number:
Noun: 2652100-2, 2-502300-1

File details come from the government source that posted it.