ES7034.pdf

PDF 61 KB Posted

Attached to
Canopy Actuated Release Bolt Federal contract opportunity
Solicitation number
FA821319R3026
Issued by
Department of the Air Force Materiel Command Lifecycle Management Center Hill Air Force Base

About this file

Rework and Repair of Nonconforming Materials

View the file

Other files for this federal contract opportunity

Other files attached to Canopy Actuated Release Bolt, newest first.
File Type Posted
FA821319R3026.pdf PDF
EDL.pdf PDF
AirSpec.pdf PDF
F010855974.pdf PDF
CDRLs.pdf PDF
PackReq.pdf PDF
CADPADIMI19Apr2016.pdf PDF
REPSHIP.pdf PDF
QALI.pdf PDF
JQRS.pdf PDF
ID.pdf PDF
ADCSOW.doc DOC document
SOW.pdf PDF
BidSets.doc DOC document
Show all 14

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

(ES7034)

REWORK AND REPAIR OF NONCONFORMING MATERIAL

Jan 2012 (version)

(a) Rework and Repair are defined as follows:

(1) Rework - The reprocessing of nonconforming material to make it conform completely to the drawings, specifications or contract requirements.

(2) Repair - The reprocessing of nonconforming material in accordance with approved written procedures and operations to reduce, but not completely eliminate, the nonconformance. The purpose of repair is to bring nonconforming material into a usable condition. Repair is distinguished from rewor� in that the item after repair still does not completely conform to all of the applicable drawings, specifications or contract requirements.

(b) Rework procedures along with the associated inspection procedures shall be documented by the Contractor and submitted to the Government Quality Assurance Representative (QAR) for review prior to implementation. Rework procedures are subject to the QAR's disapproval.

( c) Repair procedures shall be documented by the Contractor and submitted on a Request for Deviation/Waiver, DD Form 1694, to the Contracting Officer for review and written approval prior to implementation.

(d) Whenever the Contractor submits a repair or rework procedure for Government review, the submission shall also include a description of the cause for the nonconformances and a description of the action taken or to be taken to prevent recurrence.

( e) The rework or repair ;,rocedure shall also contain a provision for reinspection which will take precedence over the Technical Data Package requirements and shall, in addition, provide the Goverrunent assurance that the reworked or repaired items have met reprocessing requirements.

(f) Rework and repair is a supply chain flow-down requirement that applies to contractors and their suppliers, vendors or subcontractors.

(ES7034)

File details come from the government source that posted it.