CDRL1381.pdf

PDF 1 MB Posted

Attached to
F-16 Cable Assembly-FMS
Solicitation number
FA8212-18-Q-0031
Issued by

About this file

First Article

View the file

Other files

File Type Posted
SQSC0031.pdf PDF
SOW0031.pdf PDF
FA821218Q0031_______0002.pdf PDF
EDL0031.pdf PDF
Pack0031.pdf PDF
Trans0031.pdf PDF
EI0031.pdf PDF
FA821218Q0031_______0001.pdf PDF
FA821218Q0031.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT DATA REQUIREMENTS LIST Form Approved (1 Data Item) 0MB No. 0704-0188

Public reporting burden for this collection of information is estimated to average 110 hours per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection of information, including suggestions for reducing this burden, to: Department of Defence, Washington Headquarters Services, Directorate for information Operations and Reports, 1215 Jefferson Davis Highway, Suite 1204, Arlington VA 22202-4302, and to the Office of Management and Budget, Paperwork Reduction Project (0704-0188). Washington, DC 20503. Please DO NOT RETURN your form to either of these addresses, Send completed form to the Goverment-lssuing Contracting Officer for the ContracUPR No. listed in Block E.

A. CONTRACT LINE ITEM NO. B. EXHIBIT

I

C. CATEGORY

A TOP TM OTHER NDTI

D. SYSTEM/ ITEM E. CONTRACT / PR NO. F. CONTRACTOR

CABLE ASSEMBLY, SPEC

PAKISTAN (GUB -18- 048) FD2020 -18- 01381

AOOl Test/Inspection

1. DATA ITEM NO

r

· TITLE OF DATA IT�M

Report

13. SUBTITLE

4. AUTHORITY (Data Acquisition Document No.) 5. CONTRACT REFERENCE 6. REQUIRING OFFICE CLIN for Data

DI-NDTI-80809B/T 416 SCMS/GUEAA

7. DD 250 REQ 9. DIST STATEMENT 10. FREQUENCY 12. DATE OF FIRST SUBMISSION

REQUIRED 14. DISTRIBUTION

DD OTIME BLK 16

b. COPIES

8. APP CODE B 11. AS OF DATE 13. DATE OF SUBSEQUENT

SUBMISSION a. ADDRESSEE Final

Draft A BLK 16 BLK 16 Reg Repro

16. REMARKS 416 SCMS/

NOTE: Changes to office symbols and/or e-mail GUEAA addresses, when necessary shall be made by letter 6070 Gum LN through the CO/ACO without further revision to this Bldg. 1213

CDRL. HILL AFB UT

84 056-5825

1. BLK 4: Contractor's format is acceptable.

Paragraph 1 0.2 of DI -NDTI-80809B is clarified as SEE BLK 16 follows:

a. All dimensions and tolerances specified on the manufacturing data shall be listed in one column, with the actual corresponding reading obtained from the inspection of the part listed in another column.

b. Materials utilized in the manufacture of "First Article" item shall be identified and certified along with a copy of material purchase requests as conforming to applicable data requirements.

c. Material processing, including finish requirements (plating, heat treatment, welding, inspecting, anodize, painting, etc.} utilized in the manufacture of "First Article" item shall be identified and certified as conforming to applicable requirements. A copy of the purchase order certifying the process accomplished at other than contractor facility shall be included.

d. Other requirements as called out on Engineering Data Requirement ( 00-ALC FORM 462).

2. The Distribution Statement, Export Control Warning and Destruction Notice shall be placed on the first sheet of each document and located in a conspicous location.

BLK 9: DISTRIBUTION STATEMENT "Bu: Distribution authorized to u.s·. Government agencies only. (Test &

Evaluation) (14 May 2018). Other requests for this document shall be referred to (416 SCMS/GUEAA, 6070

. 15. TOT AL ------>

G. PREPARED BY H.DATE I. APPROVED BY

Jt')=-NILA DAGSEN� 14 May

DATA MANAGE

18 CURTIS BLANC

��1ENGINEER � �

0 1

J. DATE

14 May 18

DD Form 1423-1, JUN 90 Computer Generated Previous editions are,llbsolete

Page _1_ of ---1_ Pages

17. PRICE GROUP

18. ESTIMATED

TOTAL PRICE

NSP

File details come from the government source that posted it.