PriceMatrix23Jan19.xlsx
XLSX spreadsheet 35 KB Posted
- Attached to
- A-10 3D Audio
- Solicitation number
- FA8202-19-R-1001
About this file
This document contains a pricing table for a federal contract solicitation seeking a 3D audio system for A-10 aircraft. The contractor will be responsible for qualification, delivery, integration and installation of 3D audio assets into A-10 aircraft. This includes updating installation drawings, technical orders, and other documents. The contractor will also provide interim contractor support and repair services. The pricing table outlines best estimated quantities and pricing for line items such as non-recurring engineering, kits, spares, repairs, data deliverables, and travel. It provides instructions for contractors to propose composite hourly rates for activities like depot stand-up and engineering support. Range pricing is also to be proposed for kits and spares. The related opportunity posting provides additional details such as the solicitation number, a description of the work scope, and instructions for interested parties to obtain additional documents required to propose.
Price Matrix
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 3D_Audio_J&A_Redacted.pdf | ||
| TOPP10Mar2015Rev52.pdf | ||
| 3DAudio158.pdf | ||
| 3DASSOW23Jan19.docx | DOCX document | |
| FA820219R1001.pdf | ||
| CybersecurityImpactschecksheet.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Pricing Table
| CLIN | Description | Requirements Doc Reference | Type | Unit of Issue | Overall Quantities | BEQ 1 - CA-February 28, 2020 | Price | BEQ 2 - March 1, 2020 - February 28, 2021 | Price2 | BEQ 3 - March 1, 2021 - February 28, 2022 | Price3 | BEQ 4 - March 1, 2022 - February 28, 2023 | Price4 | BEQ 5 - March 1, 2023 - February 28, 2024 | Price5 | Total BEQ | Total Price |
| X001 | Non-Recurring Engineering | 3.3 | CPFF | Lot | 2 | 1 | 0 | 0 | 0 | 0 | 1 | ||||||
| X002 | A-Kits (wiring) | 1.3.1 | FFP | Each | 283 | 101 | 87 | 99 | 0 | 0 | 287 | ||||||
| X003 | ACP - B-Kit | 1.3.1 | FFP | Each | 101 | 87 | 99 | 0 | 0 | 287 | |||||||
| X004 | EIA - B-Kit | 1.3.1 | FFP | Each | 101 | 87 | 99 | 0 | 0 | 287 | |||||||
| X005 | C-Kits (Helmet Assembly) | 1.3.1 | FFP | Each | 479 | 154 | 131 | 148 | 0 | 0 | 433 | ||||||
| X006 | Support Equipment | 3.5.4 | FFP | Each | 27 | 8 | 10 | 10 | 0 | 0 | 28 | ||||||
| X007 | Spares Equipment: A-Kit | 1.3.1; 3.5.2 | FFP | Each | 20% | 20 | 20 | 17 | 0 | 0 | 57 | ||||||
| X008 | Spares Equipment: B-Kit - ACP | 1.3.1; 3.5.2 | FFP | Each | 20 | 20 | 17 | 0 | 0 | 57 | |||||||
| X009 | Spares Equipment: B-Kit - EIA | 1.3.1; 3.5.2 | FFP | Each | 20% | 20 | 20 | 17 | 0 | 0 | 57 | ||||||
| X010 | Spares Equipment: C-Kit | 1.3.1; 3.5.2 | FFP | Each | 20% | 30 | 30 | 36 | 0 | 0 | 96 | ||||||
| X011 | Engineering Change Orders (ECOs) | 3.3 | FFP | Lot | 15 (yr 3,4,5) | TBN | TBN | TBN | TBN | TBN | 0 | ||||||
| X012 | Depot Stand-up Support | 3.3.21 | CPFF | Lot | 1 | 1 | 1 | 1 | 1 | 1 | 5 | ||||||
| X013 | Engineering Support | 3.3.25 | FFP | Lot | 1 | 1 | 1 | 1 | 1 | 1 | 5 | ||||||
| X014 | Technical Change Orders | 3.3.2 | NSP | Lot | 15 (yr 3,4,5) | 0 | 5 | 5 | 5 | 0 | 15 | ||||||
| X015 | Technical Order 35% Review | 3.3.2 | FFP | Lot | 0 | 5 | 5 | 5 | 0 | 15 | |||||||
| X016 | Technical Order 75% Review | 3.3.2 | FFP | Lot | 0 | 5 | 5 | 5 | 0 | 15 | |||||||
| X017 | Technical Order Validation/Certification | 3.3.2 | FFP | Lot | 0 | 5 | 5 | 5 | 0 | 15 | |||||||
| X018 | Pre-Publication Reivew | 3.3.2 | FFP | Lot | 0 | 5 | 5 | 5 | 0 | 15 | |||||||
| X019 | Deliver of Technial Data Updates | 3.3.2 | FFP | Lot | 0 | 5 | 5 | 5 | 0 | 15 | |||||||
| X020 | Software | 3.3.6, 3.3.7, 3.3.11, 3.3.12, 3.5.5.1 | FFP | Lot | 1 | 1 | 1 | 1 | 1 | 1 | 5 | ||||||
| X021 | Over and Above - Labor | 3.5.5 | FFP | Lot | TBN | TBN | TBN | TBN | TBN | TBN | 0 | ||||||
| X022 | Over and Above - Material | 3.5.5 | FFP | Lot | TBN | TBN | TBN | TBN | TBN | TBN | 0 | ||||||
| X023 | Travel | 5.4 | CRNF | Lot | 1 | Unpriced | Unpriced | Unpriced | Unpriced | Unpriced | 0 | ||||||
| X024 | ICS Repair (NFF) | 3.6 | FFP | Each | 150 (yr 3,4,5) | 0 | 50 | 50 | 50 | 0 | 150 | ||||||
| X025 | ICS Repair (ACP) | 3.6 | FFP | Each | 150 (yr 3,4,5) | 0 | 50 | 50 | 50 | 0 | 150 | ||||||
| X026 | ICS Repair (EIA) | 3.6 | FFP | Each | 0 | 1 | 1 | 1 | 1 | 4 | |||||||
| X027 | ICS Repair (Support Equipment) | 3.6 | FFP | Each | yr 3=5, 4=10, 5=15 | 0 | 5 | 10 | 15 | 0 | 30 | ||||||
| X028 | ICS Repair (Non-Standard) | 3.6 | FFP | Each | yr 3=5, 4=10, 5=15 | 0 | 5 | 10 | 15 | 0 | 30 | ||||||
| X029 | Data | IAW DD 1423 | NSP | Lot | 1 | 1 | 1 | 1 | 1 | 1 | 5 | ||||||
| X030 | Contractor Field Team (CFT) | 3.8.1 | CPFF | Each | 283 (Matches breakouts of CLINS 0002 and 0003) | 14 | 73 | 59 | 75 | 62 | 283 | ||||||
| Notes | |||||||||||||||||
| 1. Delivery Orders will be issued using current pricing from the period in which the order is placed. Additionally, the pricing will remain in effect for the entire Period of Performance of the order, regardless of whether or not the order crosses fiscal and/or calendar years. | |||||||||||||||||
| 2. The Best Estimated Quantities (BEQ) listed in the Pricing Table represent estimated quantities that could be ordered in a respective Ordering Period. This information will be used for planning purposes only and shall not be interpreted to create an obligation, on behalf of the Government, to place an order for any item or service in a particular Ordering Period. | |||||||||||||||||
| 3. CLINs 0002, 0003, 0004, 0005, 0007, 0008, 0009, and 0010: Contractor shall propose range pricing for A-Kits, B-Kits ( ACP and the EIA seperately), C-Kits, and all Spares line items on the tab titled "Range Pricing". | |||||||||||||||||
| 4. CLIN 0006: Contractor shall propose a list of all support equipment (Headset Assembly Support Parts, O-level testers, ect…) and provide pricing for each Ordering Period on the tab titled Support Equipment. | |||||||||||||||||
| 5. CLINs 0011, 0021 and 0022: TBN (To Be Negotiated). CLINs 0021 and 0022 will be negotiated and priced during, or after, the NRE period. CLIN 0011 will be utilized only when Engineering Change Orders are needed and will not be priced at the time of contract award. | |||||||||||||||||
| 6. CLIN 0012: Contractor shall propose a fully-burdened, composite hourly labor rate, comprised of applicable labor categories, to support depot stand-up planning activities. See "Hourly Rates" tab. | |||||||||||||||||
| 7. CLIN 0013: Contractor shall propose a fully-burdened, composite hourly labor rate, comprised of applicable labor categories, to provide engineering support activities. See "Hourly Rates" tab. | |||||||||||||||||
| 8. CLIN 0024-0028 : Contractor shall propose a fixed repair price for all repairs. | |||||||||||||||||
| 9. CLIN 0014 and 0029: NSP (Not Separately Priced). | |||||||||||||||||
| 10. CLIN 0014-0019: The Contractor shall provide an estimate for each step in the TO/Source data process to publication | |||||||||||||||||
| 11. For CLINs 0002-0010: the Contractor shall propose pricing for a single unit, per Ordering Period, that will not change with respect to quantities ordered. | |||||||||||||||||
| 12. Clin 0023: The contractor shall provide government an estimate of travel costs on the Travel TAB |
Range Pricing
| YR 1 | YR 2 | YR 3 | YR 4 | YR 5 | ||||||||||||||
| CLIN | Description | Type | Unit of Issue | Range (from) | Range (To) | Price | Range (from) | Range (To) | Price | Range (from) | Range (To) | Price | Range (from) | Range (To) | Price | Range (from) | Range (To) | Price |
| X002 | A-Kits - Wiring/Electrical | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X003 | B-Kits - ACP | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X004 | B-Kits - EIA | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X005 | C-Kits - Headset Assembly | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X007 | Spares Equipment: A-Kit | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X008 | Spares Equipment: B-Kit - ACP | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X009 | Spares Equipment: B-Kit - EIA | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| X010 | Spares Equipment: C-Kit | FFP | Each | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | 1 | |||||
| 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | 2 | 5 | |||||||||
| 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | 6 | 10 | |||||||||
| 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | 11 | 25 | |||||||||
| 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | 26 | 50 | |||||||||
| 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | 51 | 100 | |||||||||
| 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | 101 | 200 | |||||||||
| Notes | ||||||||||||||||||
| 1. Contractor shall propose range pricing for CLINs 0002, 0003, 0004, 0005, 0007, 0008, 0009, and 0010. | ||||||||||||||||||
| 2. Quantity range increments should run between 1 - 200 units. | ||||||||||||||||||
| Notes | ||||||||||||||||||
| 1. Contractor shall propose range pricing for CLINs 0002, 0003, and 0004. | ||||||||||||||||||
| 2. Quantity range increments should run between 1 - 200 units. |
Support Equipment
| YR 1 | YR 2 | YR 3 | YR 4 | YR 5 | ||
| Part Number | Description | Price Per Unit | Price Per Unit2 | Price Per Unit3 | Price Per Unit4 | Price Per Unit5 |
Hourly Rates
| YR 1 | YR 2 | YR 3 | YR 4 | YR 5 | |
| Labor Category | Hourly Rate 1 | Hourly Rate 2 | Hourly Rate 3 | Hourly Rate 4 | Hourly Rate 5 |
Travel
| Destination | No. Persons | No. Trips | No. Days | Purpose |
| Terma N/A or Terma A/S, Denmark | Contract Kick Off / T.O. Guidance Conference | |||
| Hill AFB | SIL Integration | |||
| AATC | A/C Integration | |||
| AATC | Flight Test Support | |||
| Terma A/S, Denmark | Technical Interchange Meeting (TIM) | |||
| Terma North America, GA | Kick-Off and System Requirement Review | |||
| Terma A/S, Denmark | PDR | |||
| Terma North America, GA | CDR | |||
| Terma North America, GA or subcontractor facility | FCA | |||
| Terma North America, GA or subcontractor facility | PCA | |||
| Ft Wayne, IN | CFT - Installation | |||
| Selfridge, MI | CFT - Installation | |||
| Baltimore, MD | CFT - Installation | |||
| Boise, ID | CFT - Installation | |||
| Whiteman, MO | CFT - Installation | |||
| Moody, GA | CFT - Installation | |||
| Nellis, NV | CFT - Installation | |||
| Eglin, FL | CFT - Installation | |||
| Davis Monthan, AZ | CFT - Installation | |||
| Sheppard, OK (training A/C) | CFT - Installation | |||
| Note: | ||||
| 1. The Contractor shall add any other recommended travel reasons to this list | ||||
| 2. The Contractor shall evaluate and recommend any changes to destinations listed above. | ||||
| (IE: if the Contractor feels it would be best to have the kickoff/TO guidance at Terma A/S, then please include that in the BID) |
File details come from the government source that posted it. Updated .